Loading...
HomeMy WebLinkAboutWQ0034430_Regional Office Historical File Pre 2018Ai NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary November 5, 2009 City of Kannapolis Mr, Wilmer Melton, Ill Director of Public Works 1401 Bethpage Road Kannapolis, NC 28081 Subject: Permit No. WQ0034430 The Farm at Riverpointe, Phase 3A Wastewater Collection System Cabarrus County, North Carolina Dear Mr, Melton, In accordance with your application received on October 29, 2009, we are forwarding herewith Permit No. VVQ0034430 dated November 5, 2009, for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein, This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T ,0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215,6A through §143-215,6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board Mooresville Regional Office Location: 610 East Cnter Ave, Suite 301 Ililooresville, NC 28115 Phone: (704) 663-1599; Fa (704) 663-6040 \ Customer Service: 1-877-523-6745 Internet:. www.novvaternuality.,..gi:g " (me N(741.1.1Carolitia 'Alrner Melton ace n Novernher5, 2039 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Water and Sewer Authority of Cabarrus County (WSACC) for the construction and operation of approximately 865 linear feet of 8-inch gravity sewer, and the discharge of 2,880 gallons per day of collected domestic wastewater into Rocky River Regional WWTP existing sewerage system pursuant to the application received October 29, 2009, and in conformity with 15A NCAC 2T, the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. , The sewage and wastewater collected by this system shall be treated in the Rocky River Regional Wastewater Treatment Facility VWITP (NPDES No.NC0036269) prior to being discharged into the receiving stream, Assessing subsequent impacts to the downstream collection system and treatment facility is the complete responsibility of the Water and Sewer Authority of Cabarrus County (WSACC). The (WSACC) must utilize whatever tracking tools necessary for planning additions of sewer flow in order to maintain compliance with the WWTP permitted limits and the WQCS00009 permit requirements. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Mr, Samar Bou- Ghazale at (704) 663-1699, Sincerely, H. Sullins, Director cc: Mooresville Regional Office, Collection System Permit Files Surface Water Protection Central Files PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, and other supporting materials unless specifically mentioned herein.. 2. This permit shall be effective only with respec application and other supporting data. 0 e nature and volume of wastes described in the The wastewater collection facilities shall be properly maintained and operated at all tunes. The Permittee shall maintain compliance with an individual systemwide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T :0403 if an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .©403: a The sewer system shall be effectively maintained and operated at all tirnes to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 26 ;0200 b. A map of the sewer system shall be developed and shall be actively maintained. c, An operation and maintenance plan shall be developed and implemented* d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time f. A general observation of the entire sewer system shall be conducted at least once per year, g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1 C. 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties invelved„ and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. Per 15A NCAC 2T .0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form, A complete certification is one where the form is fully executed and the supporting documents are provided as applicable 7. A copy of the construction record drawings shall be maintained on fie by the Permittee for the ife of the wastewater collection facilities. 8 Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T, the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable, the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as a.pplicable, and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Perrnittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 28 ,0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 28 0200 and 15A NCAC 2H ,0500. 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal •usiness hours may also be reported to the Division of Emergency Management at telephone number (3 3) - 3 8 or (919) 733-330 , Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form S-SS (or the most current Division approved form), within five days following: first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part Il of Form SS-S (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 5t day of November 2009, NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COM ISSI I gfor® Coleen H Sullins, Director Division of Water Quality By Authority of the Environmentai anagerraent Corn Perm u b r ' Q003 t Fast Track En ineerinq Certification Permit No, WQ0034430 November 5, 2009 The Farm at Riverpointe, Phase 3A VVASAC P.O. Box 428 Concord, NC 2802 R. Daniel Latta„P,E,. Stantec Consulting Services, Inc, 2127 Ayrsley Town Blvd., Suite 300 Charlotte, NC 28273 Complete and submit thisform to the permit issuing regional office with the foHowing • One copy of the project record drawings (plan & profile views of sewer lines of the wastewater collection system extension • Supporting design. calculations (selected pumps, system curve, operating point, available storage if porta.ble generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified, on the record drawings or in written summary form. Permit modifications are required for sresutinncoohance withthis permit., regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division, ENGINEER'S CERTIFICATION oi Partial L.-3 Final , as a duly registered Professional Engineer in the State of North Cardin , having been authorized to observe (o periodically, o weekly, o full time) the construction of The Farm at Riverpointe-Ph.ase 31\ collection Sewer System, a Cabarrus County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2TT, the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12., 19.96 as applicable:, the Division's Minimum Design. Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, and other supporting materials.. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a f nal oerbficaton s receiv'ed. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Owner/Permittee: la. City of Kannapolis Full Legal Name (company, municipality, HOA, utility„ etc.) 1b. Wilmer Melton, III, Director of Public Works Application Number: (to be corpieted by DWQ) Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing o lc. The legal entity who will own this system is: El CI Federal Municipality ❑ St a /County ❑ Private Partnership ❑ Corporation ❑ Other (specify): 1401 Bethpage Rd ie. Kannapolis ailing Address 3b, 704-329-0900 Phone Number to City NC 1g. 28081 State Zip Code 1h. 704-920-4200 ti. tj. wmeltonci,kannapolis,nc.uc Telephone Fa 'le 2, Project (Pecs! itt) Information: 2a. The Farm at Riv me — Phase 3A Brief Project Name (permit will refer to this name) Contact Person: R. Daniel Latta, PE, Stantec Consulting Services 2b. Cabarr County Where Project is Located Name and Affiliation of Someone Who Can Answer Questions About this Application 3c. dan.latta@stantec.cam E-mail Project is l New [ Modification (of an existing permit) If Modification, Perrnit No.: Owner is ® Public (skip to Item B(3)) 2a. If private, applicant will be: ❑ Private (go to Item 2(a)) 2b.If sold, facilities owned by a (must ch • Retaining Ownership (i.e. store, church, single office, etc.) o ❑ Leasing units (lots, townhomes„ etc. - skip to item B(3)) ❑ Selling units (lots, townhomes, etc. - go to item B(2b)) Owner of Rock us Coun astewater Treatment Facility (i` WTF) Treating Wastewater From This Pro River Regional Wastewater Treatment Plant 4b, NCO° 6269 se one El Public Utility (Instruction C) El Homeowner Assoc./Developer (Instruction ©) Name of WWTF 5a. KAN 1,4 APo L 3 5b. ,m Gravity Owner of Downstream Sewer Receiving Sewer Size ❑ Force Main The origin of this wastewater is (check all that apply): Residential Subdivision ❑ Apartments/Condominiums ❑ Mobile Horne Park ❑ School ❑ Restaurant ❑ Office WWTF Permit No. Pe Retail (Stores, shopping cen 0 Institution 0 Hospital O Church O Nursing Home ❑ Other (specify): s) Downstream Sewer (instruction E too % Domestic/Commercial % Industrial (attach description.) (RO: contact your Regional Office Pretreatment staff) % Other (specify): Volume of wastewater to be allocated or permitted for this particular project: 2,880 gallons per day *Do not Include future flows or previously permitted allocations If the permitted flow is zero, indicate why: ❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) z 0 Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater usei data in accordance with 15A NCAC 2T .0114 (f). 8 single family dwelling units at 360 gal/day per dwelling unit (3 bedrooms 1 per unit) = 2,880 gallons per day. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 8" Length (feet) 865 New Gravity or Additiona Force Main Gravity ummary of Pump Stations wl associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID r`-1 (self chosen -as shown on plans/map for refer Design Flow Operational Point Power Reliability Option (MGD) GPM @TDH 1 - permanent generator w/ATS; Force Main Size Force Main Length 2 - portable generator w/MTS Pump Station Location ID (self chosen - as shown on plan for reference Design Flow Power Reliability Option (MGD) Operational Painf 1 - permanent generator wIATS; Force Main Size Force Main Length GPM @TDH 2 - portable generator wIMTS 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? LI Yes II1 No If Yes, permit number of 2`d treatment facility (RO — if `yes" to B,12 please contact the Central Office PE,RCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? Yes fl No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 12r"f17 ver2 WPM LL 14, Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401Certification? D Yes El No N/A Sedimentation and Erosion Control Plan? 4 Yes 0 No 0 N/A Yes 0 No 1:1NM Stormwater? 15. Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)] involve aerial lines, siphons, or interference manholes)'? These lines will be considered high priority and must be checked once every six months Check if Yes: and provide details 1. Owner/Perrnittee's Certification: (Signature of Signing Official and Project Name) 1, Wilmer Melton, Ill, Director of Pubic Works, attest that this application for th.; has been reviewed by me and is accurate and complete to the best of my knowledge, I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note; In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. la. Signing Officiai Signature ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS Date APPLICATION, THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITYI TO OTHER UTILITIES, DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) 1, R. Daniel Latta, PE, attest that this application for The Farrn at Riverpointe — Phase 3A has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. R. Daniel Latta, PE Professional Engineer Name 2b. Stantec Consulting Services Inc. Engineering Firm 2c. 2iyyjownBd,Suite Mailing Address 2d. Charlotte 2e. NC 2f, 28273 City State Zip 2g. 704.329.0900 2h. 704.329.0905 2i. daniatta@stantec.com Telephone Facsimile E-mail NC PE Seal, Signature & Date FTA12/07,yer2 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE -I 0/07) OURISDICTR. N USE ONLY) Jurisdiction Requesting Flow Acceptance for Collection System: OCity of Concord City of Kannapolts ['Town of Harrisburg OTown of Mt. Pleasant ElCharlotte Mecklenburg Utilities Project Name, Description, and Number of Lots/Unit: Name: The Farm Riverpointe Phase.3A Description: _Approximately 865 feet of 8-inch_gravitv sewer to serve the proposed Phase 3A development of the Farm (iIt2 Riverpointe. What is the quantity of flow that will be discharged? 2,880 GPD Flow type: [2] Domestic 100 % El Commercial 0 %Lj industrial "/0 Section I - List the Jurisdiction's pump stations located between the project connection point and the WSACC Interceptor connection point. (For each existing pump station to he impacted by this proposed sewer extension project, list each pump station name, approximate pump station firm (design) capacity and approximate current average flow (previous 12 months) for each pump station. Include the proposed flow for this project and other flows that have been approved for .the pump station but are not yet tributary.) Pump Station Name: Approx. Current Avg, Daily Flow, MG1 Approx. Capacity, MGD (Firm/Design) Section IL Jurisdiction's Certification Statement: 1. Wilmer 'Melton III , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving WSACC interceptor and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving WSACC interceptor, This analysis has been preformed in accordance with local established policies and procedures using the best availabledata, This certification applies to those items listed above in Section for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity. Signatur4--this form indi -s acptance of this wastewater flow, Jurisdiction's Signing Signature Revision Date:. 02/03104 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE - I 0/07) (WSA(:C USE ONLN) The Farm @, River Pointe SS Ext. Phase 3A Project Section 1. Name of wastewater treatment facility (WVVIF) receiving wastewater: Rock?,, River Wastewater Treatment Facility — Permit No: NO1036269 n Muddy Creek Wastewater Treatment Facility Permit No: NC.0081.621 WWTP thcilitys permitted flow, MGD 24,000 Estimated obligated flow not yet tributary to the WW1.11,.MGD 2.947 WWTP facility's actual avg. daily flow, MGD Total flow for this specific request, MGD Total actual and obligated flows to the facility, MGD Percent of permitted flow used 14.3 (59.6% of permit) 0.003 17.261 71.9% Section 111, Pump stations along the route from the Jurisdiction's connection pointto the WWTP. (For each existing pump station to be impacted by this proposed sewer extension project, list eachpump station name, approximate pump station firm (design) capacity and approximate current average flow. (previous 12 months) for each pump station. Include the proposed flow for this project and other flows that have been approved for the pump station but are not yet tributary.) Pump Station Name: ...ower Rocky River IPS Approx, Capacity., MGD (FirrivDesign) 37.000 Approx. Current Avg, Daily Flow, MGD 6.870 Section 111. WSACC Certification Statement: I, Thomas A. Bach_ , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant. This analysis has been preformed in accordance with local established policies and procedures using the best available data, This certification applies to those items listed above in Section I and Section 11 for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this waslLwater 1/15.4 CC 's Signing Otjiciai Signature .Rovisitm Date: t12:07.414 CORNELIUS, NC 35080-D7-TF-024 {,.`' SEWER ,i C BARRUS ( Mr. Michael 1cg Ma meet -Karma armalae lis x 1 199 NC 2$0$2 Subje TY, C)ctoher 22. 2009 f Icarv' c ecptanee The Farm at River Pointe — Phase 3A Sewer Extension aofse to the City's request O.µt203 232 Lim idio i+42. acceptance receiv=.edd October 20. 2009. "fh :y of Caharr us County (\VSACC) has or currently expects to be able to make pocky; River Regional Wastewater Treatment Plant and appropriate sewer iaaterc l tears to transport and treat the vv"astevw°atea licaan tlae proposed 1aro.jeet named The Farm at River Pointe _ Phase 3A Sewer Extension, The wastewater generated by this conv°eyed throta la the City of Kannapolis' existin and proposed rgravtiity° s devreloprraent lead then enter \VSACC's system tat the existing 36-inch Rocky River lntcree W S"C wastewater flower to more closet v,. .roposed project. which will consist of R is is laaasod on etas iaatiaan action tar°c v°ieled by Stantec (lll'ngiaaeer f r g Noa'tla C"tarolira Department of hnvirannieni lied Natural Resources (NCDENR) ovv guidelines. "flee projected flow is 2.880 gpd; however WSACC expects the actual ate 2.000 gpd based upon Master Plan engineering data. Kannapolis acknowledges that WSACC may aaceoniniodaate the increased hove volume ate design and construction will be initiated lea t WSACC does not expect or control. cavide treatment and transportation wnditure in excess of$2 403. construct nd previous ilevv° ; ccepttar vs dictate but nay be subject of 2,$$0 gpd and cost of S8.126° .eptanee represenfs tare estimtated caapi :l based upon NCI)I:NR. wastewater flow guidelines, \VSACC has approved 4(fCl=1 2 gallons of -low acceptance for the City of Kannapolis from 1992 to present and 285.854 gallons of glove acceptance year-to-date ia-elnding this request. Based upon the approved hove acceptances, " SAC(' has comas itte l caapacityr v"clued in excess or $ +3..025,299 for the Cite" of Kannapolis since 1992 inelucliaa , S2, }22,850 for this calendar year. Downstream facilities fr proposed project are scheduled in "SAC;C"s e Capital laaalat°cav°eaatcn t Program (t.1P) to increase available capacity. Projects on the C to aapproval lay° \VSACC"s Board of 1)irectors,. support front local approval, and l"tanding availability. The lollowiaag s "hedule or CIP pa delayed by unl'iaresecta circumstances: City of Kenna lis The Farm at River Pointe — Ph 3A Sewer Ext, October 22, 2009 Page 2 of 2 Kings Gr t Rocky River Parallel Interceptor. Scheduled completion date: 2010 Please note it if construction of this project is not started within two (2) years of the date of this approval, the approval is rescinded and a second request and approval will be required. Please notify WSACC, in writing, when const tion of this project is initiated. If you have any questions, pi- se call me at 704-786-1783. Sincerely, Thomas A. Bach, PE. Utility Systems Engineer cc: WSACC Engineering Staff Steve Bissinger, P.EiK apolis Assistant City Engineer Wilmer MeltoniKannapolis Daniel Latta, P.E./Stantec October 27, 2009 02501-65 NC Div of Environmental Management Department of Environment and Natural. Resources -- D 610 East Center Drive, Suite 301 Mooresville, North Carolina 2811.5 Re: The Farm ,'r17 Riverpointe Phase 3A Sewer Extension. City of Kannapolis - Cabarrus County Dear Sir or Madam: of Water Quality Please find attached for your review and approval the original and one copy of thepermit application and a check for S480.00 for the processing fee for the above reference project, Also enclosed is the flow acceptance letter from the Water & Sewer Authority of Ca.barrus County stating they will accept and treat the additional wastewater at the Rocky River Regional Wastewater Treatment Plant. The Water and Sewer Authority of Cabarrus County Standard Specifications for Wastewater Collections Systems were approved by your office and are being maintained by the Division of EnvironmentalManagement. This project will be installed in accordance with these Standard Specifications. Please call me at 704-938-1519 if you have any questions. Sincerely, Stephen J. Bissinger, PE Assistant City Engineer 02501-65 Riverpointe 3A sewer perrnit Ietter,doc T Y 0 F L. tug Department T 704..938.1v 19 F 704.938.6810 Kannapolis. NC 28082-1218 120 S. Main St. Karinapolis, NC 28081 Central Files: APS SWP 11/05/09 Permit Number WQ0034430 Permit Tracking Slip Program Category Non -discharge Status Project Type Active New Project Permit Type Fast Track Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer 1 00 individual Extensions Primary Reviewer samar bou-ghazale Coastal SW Rule Permitted Flow 2880 Facility Name The Farm at Riverpointe - Phase 3A Location Address Qwner Owner Name City of Kannapolis Dates/Events Orig Issue 11 /05/09 App Received Draft Initiated 10/29/09 Regulated Activities Subdivision Wastewater collection Outfall NULL Scheduled issuance Permit Contact Affiliation Major/Minor Minor Region Mooresville County Cabarrus Facility Contact Affiliation Owner Type Government - Municipal Owner Affiliation Wilmer Melton III DIR PUBLIC WORKS PO Box 1199 Kannapolis NC 280811199 Public Notice Issue Effective 11105/09 11 /05/09 ElquestecyReceive0 Events Additional information requested Additional information received Expiration Waterbody Name Stream Index Number Current Class Subbasin GREG'S CONSTRUCTION INC. 1012 KINGS GRANT WAY MATTHEWS, NC 28104•6,301 PAY TO THE ORDER OF t BankafAmera 0809 00 LD L, it 1:0 53000 1196': 23701,535616 GFr—IAi5::1•0 r LARS m , Ailey, Williams, Carmen & King, Inc. Post Office Box 1248 120 South Main Street Kannapolis, North Carolina 28082-1248 Phone 704/938-1515 Fax 704/938-6810 To: NCDENR Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 WE ARE SENDING YOU THE FOLLOWING: COPIES DATE Letter of Transmittal Elusps UPS DEED -EX DOVERNIGHT LHAND DELIVER Date: January 27, 2010 Attn: Dee B owde Job No. 02501-65 Re: The Farm @ Riverpointe Phase 3A (WQ0034430) Construction Record Drawings DESCRIPTION Engineer's Certification THESE ARE TRANSMITTED as checked below: El For approval For your use D As requested [1] See Remarks REMARKS El Approved as submitted El Approved as noted El Returned for corrections Resubmit Submit Return JAN 2 copies for approval ID For signature copies for distribution corrected prints 4 St n Bi , PE cc: Wendy Patterson — Public Works G:\worri1trsO25O1 Genera/10250/-65 RP ph 3A sewer as built transtdoc Fast Tack Engjneerinc{ Certi Permit No, WQ0034430 November 5, 2009 The Farm at Riverpointe, Phase 3A WASAC P.C. Box 428 Concord, NC 28026 ation R. Daniel Latta,P.E. Stantec Consulting Services, Inc. 2127 Ayrsley Town Blvd., Suite 3© Charlotte, NC 28273 Complete and submit this form to the permit issuing regional office with the foliowing: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION o Partial, Final .1 +'rribS��7� �r as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (0 periodically, o weekly, o full time) the construction of The Farm at Riverpointe-Phase 3A collection Sewer System, a Cabarrus County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials, North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 14 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions,