Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0032145_Regional Office Historical File Pre 2018
ae F. Governor William G :Ross Jr. Secretary North Carolina Department of E»vironment and Natural Resources Golan H. Sullins, Director Division of Water Quality August 30, 2007 Mr, Carl Palmer, Town Administrator Town of Harrisburg 4100 Main Street PO Box 100 Harrisburg, NC 28075 Subject: Permit No. WQ0032145 Hawthorne Subdivision Town of Harrisburg Wastewater Collection System Extension Cabarrus County, North Carolina Dear Mr, Palmer, In accordance with your application received on August 9, 2007, we are forwarding herewith Permit No. WQ0032145, dated August 30, 2007, to the Town of Harrisburg for the construction and operation of the subject wastewater collection system extension, This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein, This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules, Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board, Nlooresville ReEional Office 610 East Cemer Ave Suite 301 Murcss Ile NC 281.15 lnternet: www.ncrnwalerquafity.org Customer Service: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Pecy-,led110%. Post Consumer Paper Phone. (7.04) 663-1699 Fax. (704) 663-600 01.k .N Nth C irohna Naturally Mr, Palmer Page 2 August 30, 2007 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Town of Harrisburg for the construction and operation of approximately 9,499 linear feet of 8-inch gravity sewer, 18,843 linear feet of 8-inch force main, a 470 gallon per minute pump station (with duplex pumps, on site audible and visual high water alarms, and an on -site generator with automatic transfer switch), and the discharge of 38,500 gallons per day of collected domestic wastewater into the Town of Harrisburg Collection System and the Water and Sewer Authority of Cabarrus County existing sewerage system, pursuant to the application received March 2, 2007, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable: the Division's Minimum Design Criteria for the Fast -Track Perrnitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County's Rocky River WVVTP (NPDES No, NC0036269) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699, Sincerely, 1.7 6 for Coleen H. Sullins cc: Mooresville Regional Office, Collection System Permit File Robert Davis, RD Davis Consulting Engineers, PLLC Thomas Bach, WSACC Tom Asenzo, PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein, 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data, 3 The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day ,e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time, f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B ,0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 4, This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6, Per 15A NCAC 2T .0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form, A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215,6A through §143-215.6C, 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 11, Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the Mittel verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) - 3 or (919) 33-330 . Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form - (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part 11 of Form - (or the most. current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 30th day of August, 2007. NORTH C R LINA ENVIRONMENTAL MANAGEMENT CO COMMISSION far Coleen H, Sullins, Director Division of Water Quality By Authority of the Environmental anagement om is on Per rrrit Nu be W03: Fast Track EngineeringCe Permit No, WQ0032145 August 30, 2007 Owner Carl Parmer, Town Administrator Town of Harrisburg 4100 Main Street Harrisburg, NC 28075 on WWTP/WQC S Thomas Bach, Util Systems Eng. WSACC PO Box 428 Concord, NC 28026 PE R D Davis RD Davis Consulting Eng, PLLC 323 Indian Trail Rd N Indian Trail,NC 28079 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form, Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION Li Partial Final as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (D periodically, J weekly, D full time) the construction of Hawthorne Subdivision, a Cabarrus County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit, 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable: and other supporting materials, North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineers Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, Central Files: t P SVVP 0 9/fly Per it Number WQ0032 Perm Tracking Siip Program category Nan -discharge Permit Type Gravity Sewe Extensions Primary Reviewer dee,browder Permitted Flow 38500 . act sty Facility Name Hawthorne Subdivision Loc ion Address Owner Name Town of burg Orig Issu 08/30/07 Refit fated tabrfivis`son ' va:tewnter cc rest Track Extension, Pump Stations., Pressure Sewer Status In review Version A .pp Received Dra 0d l09/0 / 'vibes ec Outfall NULL Permit Cont ajorl' linor Sehedu d Issuance ctrf Project Type New Project errnit Class' fication Individual on Region Mooresville County barru Facility contact Affiliation Owner Type Government - Municipal Owner Affiliation Carl Plrr-rer, Administrator Town Public Notice Issue Effective 08/30/07 08/30/07 teddReceived Eve dr DD-rat inforrnatmcn requested Addle° infer atR err ¢ecekve l: body Name Stream ndex Number Current Cass Expir tiort aubbasin P.AY ToTH= GIANT PEACH LLC 166 FERN HAVEN LANE MOORESVILLE, NC 26117 BANK of NORTH CAR 66-1203/531 1084W 2015 TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS USE THE TAB KEY TO Owner: ............ Town of Harrisburg Full Legal Name (company, municipality, HOA, utility, etc.) OVE FROM FIELDTO FIELD! b Carl Parmer, Town Administrator Application Number: (to be completed by DWQ) PAGE 3 Signing Official Name and Title (Please review '15A NCAC 2H .0206(b) for authorized signing officials!) The legal entity who will own this system is: ❑ Individual ❑ Federal 0 Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): 4100 Main Street te. Harrisburg Street Address City North Carolina 1g. 28075 State Zip Code 1h, 704-455-5614 Telephone 2. Project (Facility) In a, Hawthorne Subdivision Facsimile Brief Project Name (permit will refer to this name; C rntacf Person: a, Robert D. Davis, P.E. Name and Affiliation of Someone Who Can Answer Questions About this Appli E-mail 2b, Cabarrus County Where Project is Located 3b. 704-821-7760 Phone Number 3c. robertdavistca E-mail .._..._�. _.._. Project is New D Modification (of art existing permit) If Modification, Permit No.: For modifications, attach a separate sheet clearly explaining the reason for the modification (Le. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information in B(7) and B(10-11) that has already been included in the original permit. 2. Owner is ® Public (skip to Item 8(3)) 2a. If private, applicant will be: Private (go to Item 2(a)) 2b If sold, facilities owned by a (must choose one Retaining Ownership (Le, store, church, single office, etc.) or 0 Leasing units (lots, townhomes, etc. - skip to Item 8(3)) 0 Selling units (lots, townhomes, etc. - go to Item B(2b)) Water and Sewer Ruth; Owner of Wastewater Treatment Facility (WWTF 4a Rocky River WastewaterTreatment Plant Name of WWTF WSACC w_........m fib. 12" Owner of Downstream Sewer Receiving Sewer Size The origin of this wastewater is (check all that apply): ▪ Residential Subdivision ❑ Apartments/Condominiums © Mobile Home Park. • School 0 Restaurant ❑ Office Volume of wastewater to be permitted in 0 Car Wash ❑ Institution Hospital D Church ❑ Nursing Home 0 Other (specify): Public Utility (Instruction III) 0 Homeowner Assoc./Developer (Instruction IV) ewater From This Project 4b NC 0036269 WWTF Permit No, Permit Number of Downstream Sewer (if known project: 38,500 gallons per day % Domestic/Commercia _.� % Industrial % Other (specify): If the permitted flow is zero, indicate why: O Interceptor Line - Flow will be permitted is subsequent permits that connect to this line O Flow has already been allocated in. Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected FTA 02/03 - Rcv, 2 04,/04 P, P , AST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4 Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H ,0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(1)(1-2) must be approved prior to submittal of this application. Submit a separate request to the Division of Water Quality, Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 in accordance with 15A NCAC 2H .0219(I)(3). 104 lots x 360 gpd/lot + '1,060 gpd (clubhouse) = 38,500 gpd 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Sire (inches) ENTER TOTAL LINE LENGTH IN MILES Length (feet) 9,499 18,843 Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID (self chosen - as shown on plans for cross-reference 1-iawthorne _ Design Flo (MGD) 0,0385 Operational Point GPM @ TDH 470@203 Gravity or Force Main se the pull down menu) Gravity Forcemain Power Reliability Option (1- dual line feed; 2- permanent generator w1ATS;; 3- portable generator w/telemetry; 4-wet well storage) Does the sewer system comply with the Minimum Design Criteria fear the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H ,0200 as applicable? 0 Yes 0 No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested:. UBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATI©N . Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? 0 Yes [] No Ej N/A Sedimentation and Erosion Control Plan? ® Yes © No © N/A Stormwater? ® Yes [ No 0 N/A FTA 02/03 - Rev. 2 04f' 4 ,LA,ST-TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 1, Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as! necessary), This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: 0 A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody; AND, 0 A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map (self chosen - as shown on i Name of , : Waterbody Stream i Waterbody meRfor cross-reference) i Waterbody County River Basin Index i Classification Hawthorne ' McKee Creek ' Cabarrus Yadkin 13-17-7-1 c Submit the 8.5" x 11" COLOR topographic map as required in Instruction VI regardless of whether a classification is provided! 1, Applicant's Certification: 1, SIGNING OFFICIAL NAME, attest that this application for PROJECT NAME Hawthorne Subdivision has been reviewed by me and is accurate and complete to the best of my kriowledge 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 1 a. Signing Official Signature 2. Professional Engineer's Certification: 07 • Z 0 o 0 2a. Robert D. Davis Professional Engineer Name low Date I attest that this application for Hawthorne Subdivision has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans„ calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996,,and the Minimum Design Criteria for the Fast -Track Permitting of Pump ,Stations and Force Mains adopted June 1, 2000 and the watershed classification ih accordance with Division guidance Although certain portions of this submittal package may have been developed by other professionals,. inclusion of these materials under my signature and seal signifies that I have reviewed thismaterial and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A. and 143-215.68, any person who knowingly makes any false statement,1 representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as ,civil penalties up to $25,000 per violation. 2b. R p Davis ConsuftinjEnjgneersPLLC Engineering Firm 2o, 323 Indian Trail Road N Address 2d. Indian Trail 2e. NC 2f. City State Zip 2g, 704-821-7760 2h: 704-821-8014 2i: robertdavis@carolinasr.com Telephone Facsimile E-mail FTA 02/03 - Rev. 2 04104 . 0.1ce: 232 Da vids,on Fiwy.. (orvJ)rd; NC 28027 WATER & SEWER AUTHORITY OF CABARRUS COUNTY Mr, Carl Punier Town Administrator Town of Harrisburg PO Box 100 Harrisburg, NC 28075 July 26, 2007 Subject: Flow Acceptance Request Hawthorne Subdivision Dear 'Mr. .Pat er: P(), tiox 42d Concigd, NC 28026-04211 Phone: 70-1.786.1783 11538:: 7(14.795..158,4 This is in response to the Town's request for flow acceptance received July 2. 2007. 'The Water and Sewer Authority of Cabarrus County (WSACC) has or currently expects to be able to make available capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the domestic wastewater from the proposed Hawthorne Subdivision, consisting of 104 single 'family residential lots and a clubhouse facility. The wastewater generated by this project will be conveyed through the Town of Harrisburg's proposed 8-inch gravity system, then through a proposed on -site pump station and corresponding 8-inch force main system (along Peach Orchard Road, Robinson (hurch, Road, and Rocky River Road), and then enter WSACC's system at the existing I 2-inch Fuda Creek Interceptor just west of the crossing with Hickory Ridge Road. WSACC agrees to accept wastewater from the proposed sewer line based on information provided by R. D. Davis Consulting Engineers, PL.L.C. (Cvil Engineer for the project) using North Carolina Department of Environment and Natural Resources (NCDENR) wastewater flow guidelines. The projected flow is 38,500 gpd; however WSACC expects the actual wastewater flow to more closely approximate 26,850 gpd based upon Master Plan engineering data. The Town of Harrisburg understands that separate Flow Acceptance Requests Will be required for the future flows that will connect into this sewer line. By requesting flow acceptance, the Town of Harrisburg acknowledges that WSACC may need to upgrade, expand, or construct new facilities to accommodate the increased flow volume granted by this and previous flow acceptance. Appropriate design and construction will be initiated when actual flows dictate but may be subject to situations that WSACC does not expect or control. Based upon flow of 38,500 gpd and cost of S8.1261gpd to provide treatment and transportation capacity, this flow acceptance represents an estimated capital expenditure in excess of $31.2,85.1. For your information and based. upon NCDENR wastewater flow guidelines, WSACC has approved 1,586,922 gallons of flow acceptance for the Town of Harrisburg from 1992 to present and. 38,875 gallons of flow acceptance year-to-date including this request. Based upon the approved flow acceptances, WSACC has committed capacity valued in excess of $12,895,328 for the Town of Harrisburg since 1992.including S315,898 for this calendar year. Projects on the Capital Improvement Program (CIP) are subject to approval by 'WSACC's Board of Directors, support from local governing bodies, regulatoryapproval, and funding Town of Harrisburg ornc Subdivision ly 26, 2007 Page ®- �a 3 til .bility. At this tiaa c there are no scheduled upgrade to ,, fa ilities in the current six �r CIF that are located donnstreana of this proposed project. It should be noted that the list and schedule of CIP projects are tentative and are revised periodically to reflect changing conditions and needs. Please note that if cons notion of this project is not started within two years of the date of this approval, the approval is rescinded and a second request and approval krill be required. Please. notify WSACC, in writing, s£l en construction of this project is initiated. If you have any questions, please call me at (704) 6-1 cc: Sincerely, Thomas A, Bach, P, , Utility Systems Engineer WSACC Engineering Staff Todd Taylor, r, P.E./Harrisburp Robert Davis, P.E.IR. D. I a °isCons icltiaa Ln ineers, PEI C 4 0 IN Ift Primary highway, hard surface Secondary highway, hard surface Intersta C° 38' 80 ROAD CLASSIFICATf2N Light-dhity road, hard or unproved surface Unimproved road - _ Route U S Route State Route Name: HARRISBURG Date: 6/22/107 Scale: 1 inch equals 2000 feet 0°'3i3'�CV.C3©�' 1I"3© Location: 035° 16' 01.6" N 080° 38' 53,4" W Caption: Hawthorne Pump Station Site Copyright (C) 1997, tpte, fnc August 7, 2007 Mrs. Sonja Basinger Division of Water Quality 919 North Main Street Mooresville, North Carolina 28115 Subject: Hawthorne Subdivision Sanitary Sewer System Extension Harrisburg, North Carolina Dear Mrs. Basinger: We are enclosing per your requirements, the original and one (1) copy of the Fast -Track Application for Gravity Sewers, Pump Stations and Force Mains. Also included are two (2) copies of the flow acceptance letter from the Water and Sewer Authority of Cabarrus County (WSACC) agreeing to transport and treat the wastewater. A check for $400 has been provided for the application fee. If you have any questions concerning this project, please feel free to contact us. Sincerely, Todd Taylor, P,E.. Town Engineer Enc Cc Robert Davis, R D Davis Consulting Engineers "World n CE 4l455_5 lal • Fa d 701) 4 .5--I2O Hawthorne Residential Development. Harrisburg, North Carolina Sanitary Sewer Calculations R D Davis Consulting Engineers, Pi LC 32.3 Indian Trail Road.N Indian is Trail, NC 28079 yo4-821 The 1-ht% th : me Cont a subd isles: The project lies along,McKee tti ra ek. A pumping s abou'2 miles tea the Magnolia Ridge development to t Ou°tfall.,. ed to convey sewerage rc k The m trl aaara a lesio n fle a fear th e prcttert s based can,rt t bats rat if s gpd per 7 44O galicans per day, t totbever tla pranafas raaarst mated to parr a.t tirrres th a spread nVer 15 hours or I04 gpm as rrrininaarrra tea meet peak floe s4 f r cry the length if the force main, and the total dynamic head coradltl air an 8' force main i needed. The mire visor velocity of 3 feet per second result in ra nainirnuIll pump rate, 47o gprig. 3) Design The system has been analyzed to de velop he s ,stem bead curve, Wlrii tl e faarca raara.in is over 18,000 feet long the highpoint at station 16+.70n is the con ig point, �bae actual slope of the line to discharge is steeper than the friction slope at design flow.. Therefore, the system head cume is calculated rising 16,7tao linear feet of friction n and a static head cif 137 feet. High point ele\ Low water wet w Total static bread L - 1.6,700 If PVC pipe use f lTrr= (0.083)l TDI 700 135 140 100)(100k fit !D4 sa ,5 r 8' dia Critical to. urnep is des pumps willalternate, (Q pump..ltao .d 'r 20 minutes from start to start of any one pi. minutes V rain. (47004 z 0)/4 Trap ut 1175 gal,F tOo ft3 376 galtvl depth 3,. feet 8 tic}. One hour holding capa ru4gpm X (yea ruin. = 64 f 8' Dia. We well has 5o the top of the wetwell at are to bat or abve; manholes and surcharged l 0 834e't Thereto' 16.6 vertical feet eaf stcatag is required. Set. ar t7' above the alarm elevation. All Mri.t theales ,md vents, ation unless sealed and lucked. PI'he an o .rnt of storage in es is considered as additional safety factor,. Based on the abovre, pump stationn elevations can be set as follows: Pump station top Invert in. Alarm elevation Lag pump on Lead pump an All pumps off Station invert 911: evarerare each eye Pump time at Volume pumped 3„3 X 47 8" pig has 0.35 f lf ( r 590 If c the force mafi 585 568.o 56.8.0. =567.,7 567. 2 564,E 561.5 /(pump out peak in 1203' . 70-104) =° 3.3 to rr, 45 gal.= 2o6 cf ne will move each cycle. 4 ant force 0i and 585 — , ,� 3 pth Base Top Walls Total w 13,500 #'s ),.zoo 's ( .5 @ 3,0' 84, oo#'s o #/rf 5oo#'s *red '' 85o x 1.5 . eight require l ,r1,2 5 — 84,2OO; �:t S 5o 4,,E et' coner°ete o ck of cane, Or 7.8 merle Qr Sizing 5 current and utt re design conditions a l l Mgt pump (product NN32o2 o9o') vi 37o mm. impellor at t 5 rpm was selected. See the attached eury ° s, data and spec frc tions. Design point = .47o gpm r 0;3' TDt. impellor =, 37o tam. 55 hp , Duty pofr t ,. spec) a 0 hp motors non overloading Efficiency 43% 1 If EsT E„ `f"_ POINT * t'"f,. f 6 FF. k EfiAFT POWER R,. p POWER EMT Development and Mana J & B Realty and Development Date: June 23, 2010 From: J&B Development and Management, Inc. 9450 Moss Plantation Ave, NW Suite 201 Concord, NC 28027 To: Ms. Dee Browder NCDENR Division of Water Quality 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Subject: Hawthorne Subdivision Partial Certification #1 WQ 0032145) M:s. Browder: Installation of utilities for the Hawthorne project. began before I became involved. with the project. 1 did not do the original design nor did. I witness a majority of the sanitary sewer that is installed. 1 did not design the sewer pump station but 1 did check the calculations after getting involved with the project and believe they are in order. I have included the design engineer's calculations with my certification package along with the pump drawdown test. 11 have witnessed the installation of the pump station, manholes 1- 3, and portions of the force main that required repair. I have witnessed the testing of the sewer, force main, and pump station and certify that these items meet the State testing standards. My certification does not include witnessing the type of pipe material, method of installation, or any other portion of the work completed before my involvement with the project. Please feel free to contact me (704) 652-2598 if you need additional information or want to discuss this issue further. I appreciate your help in this matter.. Sincerely R. Kevin Hall, PE J&B Development and Management, Inc. 9450 Moss Plantation Ave. NW Suite 201 6 Concord, NC 28027 phone 704-782-7800 • fax 704-782-7839 E tot LS tO't0, iS, 44r q SEND THIS FORK WITH REQ) EYED ATTACNMEN Doi (c'Li L o , PORTING 00 U ENTATK)N THE FOLLOWING ADDRESS MOORESVILLE REGIONAL; OFFICE SURFACE WATER PROTECTION EAST CENTER AVENUE, SUITE3O1 MOORE SVIL€_ E NC <TT'I 15 st:11ra,c,,T.Asqe 1LCer:titc, .t„ th,ft qttt-',,ttitt„tthEf,ttl, tttt httftt, tthti, thitt t‘: thtt thht '.'hhttttht. -tt.th Thettetore„ hhi4tAti,, ht-tthhhhhIttettchth!. Jhtith th„: thAtt h Attlthttht that is3A3033.3 pri33,34 retheApt trYy the Chhttsioh: ff,1 1Zo rte..yiet, x R 4 S oeffack C e c,"--i-sk A csec: f+i+3"\ TzK SEND THIS FORM & SUPPORTING DOCUMENTATION wITH REQUIRED ATTACHMENTS TO 'THE EOLLOWiNG ADDRESS OORESVILLE REGIOO NAL. FFICE 1'6%A cerac.41. SURF AC E WATER PROTECTION 1714 Hib3 810 EAST CENTER AVENUE SUIT REE 301 93t, 2, . '7 '7 • MOO SVR,LE NC 28115 -gxece. 0-42; es,