Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20210630 Ver 1_Pre-Filing Meeting Request_20210325
DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210630 Version * 1 Fayetteville Regional Office - (910) 433-3300 Chad Turlington Pre -Filing Meeting Request submitted 3/25/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Deborah Shirley dshirley@sandec.com Townsend Estates Raeford Development Company (Attn: Dan Farrell) Hoke Street Address 645 Laurinburg Hwy Address Line 2 City State / Rovince / Region Raeford NC Fbstal / Zip Code Country 28376 USA Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Chad Turlington Please give a brief project description below and include location information. * This project proposes the construction of a single-family residential development including but not limited to, roadway infrastructure, residential lots, utilities, and SCMs. This project is located at 431 Townsend Road in Raeford, NC and is approximately 27 acres. Existing conditions onsite consists of wooded and agricultural land along with three agricultural related structures on the property. Specifically, there are three (3) perennial stream features and one (1) wetland feature on the property. Townsend Road bounds the property to the east. Please give a couple of dates you are available for a meeting. 3/26/2021 3/29/2021 3/30/2021 3/31/2021 4/1/2021 Please attach the documentation you would like to have the meeting about. 1651-DESIGN-C3.0 G&EC.pdf 2.53MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature =5Wc C-.', c`Ttyf P r t y Submittal Date 3/25/2021 I:\J&K Builders\1651 Townsend Estates\CIVIL 3D\DWG\1651-DESIGN.dwg • C3.0 G&EC • 3.25.2021 7:42:57 AM LEGEND: ECM® ECM -EXISTING CONCRETE EiP Oa EIP-EXISTING IRON PIPE EiR Oa EIR-EXISTING IRON ROD EPK0 EPK-EXISTING PK NAIL ERBO ERB-EXISTING REBAR SRBO SRB-SET REBAR a COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE - OPL - - - OLD PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY SILT FENCE - - - - SETBACK LINE OUTLET ss SANITARY SEWER LINE .' so STORM DRAINAGE WATER LINE OVERHEAD UTILITY - - - - EDGE OF WATER WETLANDS PERMANENT EASEMENT ' X FENCE LINE ❑ ❑ WOODEN FENCE TREE LINE V r PP • UTILITY POLE C GUY WIRE rI N WATER VALVE\III AFIRE HYDRANT tiYo SANITARY SEWER MANHOLE - SF SILT FENCE - DIV DIVERSION BERM ® EXCAVATED INLET PROTECTION O INLET PROTECTION EROSION CONTROL MATTING CONNECT ROOF DRAINS FOR LOTS 19 & 20 TO YI 46 Know what's below. Call before you dig. NAG S75 STP.PAT.D ,RIP RAP DISSIPATER' L=18' W=9/21'- D50=8" DMAX=12 "'/ /j//� CLASS 18" THICK , • ///199 - 26.00 LF © 1.00% 15" _RCP 26.00 LF © 0.69% 30" RCP \ CI 3 55.49 LF © 0.99% 15" RCP .106.61 LF ® 2.18% 8" HDPE 89,35 0- - \.. 41 6,p0, 709 PERMANENT WET POND#1 WATER SURFACE: 205.50' HIGH WATER (1 YR): 207.47' HIGH WATER (10 YR): 210.25' TOP OF POND: 212.20' EMERGENCY SPILLWAY: 211.00' INVERT OF POND: 200.00' PERMANENT POND IS TO BE t \ %USED AS A TEMPORARY SEDIMENT - -BASIN THROUGH CONSTRUCTION v-� v- THEN CONVERTED TO A WET POND UPON STABILIZATION OF THE SITE.RIP RAP DISSIPATER ". L=18' W=11/32' / D50=10" DMAX=15" CLASS B 23" THICK) -2-212 15' WIER D 50=8' DMAX=12" CLASS B 18" THICK -i -_i -- • . _ ---------__________ i -72.40 LF C� 1.67% 24' RCP / t 72.41 LF ©2.79% 36' Rl.r 1 CI 17 C� II 4� 1�64% 24" RC �II % --771M -i-,-. ---\ \ 71.53�F�r? 1.65% 24" RC$ . , ) //� ' INV 211.32 15 CI 4 17.00 LF 7.65%' 15" RCP• 36.77 LF 2.88% 15" RCP 52.00 LF © 0.69% 24" FRCP 73.18 LF © 3.39% 18" RCP 26.00 LF © 1.00% 15" RCP CI 39 43.40 LF C� _ 0.99% 18" RCP 51.92LFC� 1.00% 15" RCP \ • CI 3 140.00 LF 0.93% 18" RCP 1. TEMPORARY SKIMMER BASIN #1 L=264', W=98', D=12' SIDE SLOPES= 3:1 TOP OF BASIN: 212.20' BOTTOM OF BASIN: 200.00' 15' EMERGENCY SPILLWAY: 211.00' INVERT OF SKIMMER: 205.50' SIDE SLOPES OF BASIN ARE TO BE SEEDED WITHIN SEVEN DAYS. _ ""ATTACH A 3.0" FAIRCLOTH SKIMMER (OR EQUAL) r WITH 2.7" ORIFICE FOR DEWATERING THE SEDIMENT BASIN DURING CONSTRUCTION. v- - . . . ,...„ , , , k /v- 20' EMERGENCY SPILL Y \ ;\ WITH CENTIPEDE SOD \ \ ‘` \\ 4\ �` � POTENTIALLY JURISDICTIONAL STREAM, ��'�\ � DO NOT DISTURB EXCEPT AS CALLED , FOR WITHIN THIS PLAN. 26.00 LF 0.81 % 18" RCP BURNSIDE DRIVE 50' PUBLIC R/W iu CI 2-133.24 LF Co 0.94% 15" RCP CI 1 LIMITS OF CONSTRUCTION 22.8 AC 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 910-433-3300 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING OCCURS. 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL STABILIZATION AND PERMANENT VEGETATION HAS BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE ACTION PRIOR TO REMOVAL. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION ACTIVITY. 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS PROJECT. 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF CONSTRUCTION. 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON SITE IS STEVE PHILLIPS. CONTACT 910-638-6102. SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7-DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE (EXCEPT FOR PERIMETERS AND HQW ZONES) OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE CONSTRUCTION CONFERENCE. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE, CHECK DAM, SEDIMENT BASIN, WHERE SPECIFIED. CLEAR AND GRUB THE SITE AS NEEDED. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN GRASSED. INSTALL UTILITIES. INSTALL ALL RIP RAP DISSIPATERS AND INLET PROTECTION ON ALL NEW STORM WATER INLETS. PERFORM FINE GRADING. INSTALL AND PREPARE BASE COURSE. PAVE ROADWAYS AND PARKING LOTS. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. AFTER THE SITE HAS BEEN STABILIZED, REMOVE TEMPORARY CHECK DAMS. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL STORM WATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF TERMINATION (NOT). THE NOT IS AVAILABLE AT: HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE OF TERMINATION PROCESS. 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED GRADE OF THE CURB, UNLESS OTHERWISE NOTED. 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND LONGITUDINAL SLOPE NO STEEPER THAN 5%. 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. 13. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF THE BOX FOR ALL STRUCTURES UNLESS OTHERWISE NOTED. 14. ROOF GUTTER DOWNSPOUTS SHALL BE TIED TO THE YARD INLETS ON LOTS 19 &20. 15. STORM PIPE IS CLASS III RCP UNLESS SPECIFIED OTHERWISE. NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORM WATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (919) 433-3300. EXCAVATED INLET tPROTECTI ON TEMPORARY CONSTRUCTION. ENTRANCE 52.84 LF © 6.04% 18" RCP INV IN: 225.42 INV OUT:222.23 SF. n 26.00 LF © 0.70% 15" RCP %i5'y INLET /PROTECTION CI 33./(TYP) THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED k..G,N,.......e, ...•,,.. ....... • C.)- 03-2'/•21 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com 0.\\..),.sCsAsR/doz"../ ,.fSS •SEAICI< 027462/_l1 REVISIONS FINAL DRAWING FOR REVIEW PURPOSES ONLY PROJECT NAME TOWNSEND ESTATES SUBDIVISION GRADING AND EROSION CONTROL PLAN CLIENT J&K GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1651 DRAWING SCALE HORIZONTAL: 1 "=60' DATE RELEASED MARCH 24, 2021 SHEET NUMBER 0-3.0