Loading...
HomeMy WebLinkAbout20121118 Ver 1_Approval Letter_20121218ff� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P E Governor Director December 18, 2012 Wake County NCDWQ Project No 20121118 Bridge 209 on SR 2350 State Project No 17BP 5 R 5 APPROVAL of 401 WATER QUALITY CERTIFICATION and NEUSE BUFFER AUTHORIZATION, with ADDITIONAL CONDITIONS Mr J W Bowman, P E, Division Engineer NCDOT, Division 5 2612 North Duke Street Durham, NC 27704 Dear Mr Bowman Dee Freeman Secretary You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of replacing Bridge 209 in Wake County Stream Impacts in the Neuse River Basin Site Permanent Fill in Perennial Stream linear ft Total Stream Impact (linear ft) 1 43 43 Total 43 43 Total Stream Impact for Protect 43 linear feet Wetland Impacts in the Neuse River Basin list wetland type as riverine /non - riverme /coastal Site Temporary Fill ac Total Wetland Impact ac 1 <0 01 <0 01 Total <0 01 <0 01 Total Wetland Impact for Project <0 01 acres Neuse Riparian Buffer Impacts Site Zone 1 minus = Zone I Zone 1 Buffer Zone 2 minus = Zone 2 Zone 2 Buffer Impact Wetlands Buffers (not Mitigation Impact Wetlands Buffers Mitigation (sq ft) in Zone 1 wetlands) Required (sq ft) in Zone 2 (not Required (using (sq ft) (sq ft) (using 3 1 ratio) (sq ft) wetlands) 15 1 ratio) (sq ft 1 2412 0 2412 N/A 1418 0 1418 N/A Totals 2412 0 2412 0 1418 0 1418 0 * n/a = Total for Site is less than 1/3 acre and 150 lmear feet of impact, no mitigation required Total Buffer Impact for Project 3830 square feet Transportation and Permitting Unit 1650 Mail Service Center Raleigh North Carolina 27699 1617 Location 512 N Salisbury St Raleigh North Carolina 27604 Phone 919 - 807 -63001 FAX 919 -807 6492 Internet www ncwaterouality orq An Equal Opportunity 1 Affirmabve Acton Employer NorthCarolina Natura!!'ff The project shall be constructed in accordance with your application dated received December 14, 2012 After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3883 This certification corresponds to the Nationwide Permit 3 issued by the Corps of Engineers This approval is also valid for the Neuse Riparian Buffer Rules (15A NCAC 2B 0233) In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non - Discharge and Water Supply Watershed regulations This approval will expire with the accompanying 404 permit This approval is valid solely for the purpose and design described in your application (unless modified below) Should your project change, you must notify the NCDWQ and submit a new application If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H 0506 (h) (6) and (7) Additional buffer impacts may require compensatory mitigation as described in 15A NCAC 2B 0242(9) For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below Conditions of Certification 1 The post - construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations The impacted areas shall be revegetated with appropriate native species 2 Strict adherence to the most recent version of NCDOT's Best Management Practices For Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Quality Certification 3 Bridge deck drams shall not discharge directly into the stream Stormwater shall be directed across the bridge and pre - treated through site - appropriate means (grassed swales, pre - formed scour holes, vegetated buffers, etc ) before entering the stream Please refer to the most current version of Stormwater Best Management Practices 4 All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstruction contours and revegetated Maintained buffers shall be permanently revegetated with non -woody species by the end of the growing season following completion of construction For the purpose of this condition, maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT maintenance activities including mowing The area with non - maintained buffers shall be permanently revegetated with native woody species before the next growing season following completion of construction 5 Pursuant to 15A NCAC 2B 0233(6), sediment and erosion control devices shall not be placed in Zone 1 of any Neuse Buffer without prior approval by NCDWQ At this time, NCDWQ has approved no sediment and erosion control devices in Zone 1, outside of the approved project impacts, anywhere on this project Moreover, sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as diffuse flow 6 All stormwater runoff shall be directed as sheetflow through stream buffers at nonerosive velocities, unless otherwise approved by this certification 7 If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills 8 During the construction of the project, no staging of equipment of any kind is permitted in waters of the U S , or protected riparian buffers 9 The dimension, pattern and profile of the stream above and below the crossing shall not be modified Disturbed floodplams and streams shall be restored to natural geomorphic conditions 10 The use of rip -rap above the Normal High Water Mark shall be minimized Any rip -rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage 11 The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval 12 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water 13 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream 14 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials 15 No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification 16 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited 17 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law If NCDWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, NCDWQ may reevaluate and modify this certification 18 A copy of this Water Quality Certification shall be maintained on the construction site at all times In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on -site project manager 19 The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification 20 The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i a local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc 21 The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of discovery 22 Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer (or whomever is the authorized agent if a non - NCDOT project) shall complete and return the enclosed "Certification of Completion Form" to notify NCDWQ when all work included m the 401 Certification has been completed 23 Native riparian vegetation (i a trees and shrubs native to your geographic region) must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction 24 There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities 25 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification 26 Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards a The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual b The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project C For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual d The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing You may obtain the petition form from the office of Administrative hearings You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8 00am and 5 OOpm, except for official state holidays The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings The petition may be faxed - provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission The mailing address for the Office of Administrative Hearings is Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 Telephone (919) -431 -3000, Facsimile (919) -431 -3100 A copy of the petition must also be served on DENR as follows Mr William Cary, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act If you have any questions, please contact Rob Ridings at 919- 807 -6403 Sincerely, S Charles Wakild Director Cc Chris Murray, Division 5 Environmental Officer Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office File Copy