HomeMy WebLinkAbout20210589 Ver 1_Pre-Filing Meeting Information_20210423DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Ple ase list all e xisting proje ct ID's associate d with this proje cts.*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
20210589 1
Winston-Salem Regional Office - (336) 776-9800
Dave Wanucha
Pre-Filing Me eting Reque st submitte d 3/19/2021
Jerry Parker
japarker3@ncdot.gov
Scientific Street Bridge Replacement
NCDOT
Guilford
City
Greensboro
State / Province / Region
NC
Postal / Zip Code
27415-4996
Country
USA
Street Address
1584 Yanceyville Street
Address Line 2
P.O. Box 14996
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
17BP.7.R.114
Dave Wanucha
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
Project will involve replacing a structurally deficient bridge with a new
bridge in the same alignment. An offsite detour will be utilized during
construction. The project has been designed to have as little
environmental impacts as practically possible. Best Management
Practices will be used throughout all phases of construction.
3/25/2021
3/30/2021
3/31/2021
Scientific Street Permit Drawings.pdf 5.39MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
3/19/2021