Loading...
HomeMy WebLinkAbout20210589 Ver 1_ePCN Application_20210423 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form April 4,2021 Ver 4 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20210589 1 Is a payment required for this project?* ✓ No payment required Reviewing Office* 6 Fee received Winston-Salem Regional Office-(336)776- ✓ Fee needed-send electronic notification 9800 Select Project Reviewer* Dave Wanucha:eads\djwanucha Information for Initial Review 1a.Name of project: Scientific Street Bridge Replacement 1a.Who is the Primary Contact?* Jerry Parker lb.Primary Contact Email:* 1c.Primary Contact Phone:* japarker3@ncdot.gov (336)451-6629 Date Submitted 4/23/2021 Nearest Body of Water UT to Deep River Basin Cape Fear Water Classification WS-IV Site Coordinates Latitude: Longitude: 35.977400 79.953197 A. Processing Information County(or Counties)where the project is located: Guilford Is this a NCDMS Project ✓ Yes G No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* 6 Yes r No (NCDOT only)T.I.P.or state project number: WBS#(?) 17BP.7.R.114 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes G No ID# Version 20210589 1 Pre-fling Meeting or Request Date 3/25/2021 Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop files here to attach document Scientific St Pre-file Acknowiedgement.pdf 56.74KB Re type must be FCF 1a.Type(s)of approval sought from the Corps: (7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No lb.What type(s)of permit(s)do you wish to seek authorization? f7 Nationwide Permit(NWP) ✓Regional General Permit(RGP) ✓Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? ✓ Yes 6 No Nationwide Permit(NWP)Number: 14-Linear transportation NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express ✓Non-404 Jurisdictional General Permit 17 Riparian Buffer Authorization ✓ Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes (' No For the record only for Corps Permit: r Yes 6 No If.Is this an after-the-fact permit application?* ✓ Yes f No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? 6 Yes rNo 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo Acceptance Letter Attachment Scientific Street Mitigation Letter.pdf 573.54KB 1h.Is the project located in any of NC's twenty coastal counties? ✓ Yes ( No 1j.Is the project located in a designated trout watershed? ✓ Yes (- No B. Applicant Information Id.Who is applying for the permit? (7 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* C Yes a No 2. Owner Information 2a.Name(s)on recorded deed: NCDOT 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 1584 Yanceyville Street Address Line 2 P.O.Box 14996 aty State/Province/Region Greensboro NC Postal/Zip code aunty 27415-4996 USA 2e.Telephone Number: 2f.Fax Number: (336)487-0000 2g.Email Address:* warcher@ncdot.gov C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Figh Point 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 l7ty State/Province/Region Postal/Zip ode Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* UT to Deep River 3b.Water Resources Classification of nearest receiving water:* WS-IV 3c. What river basin(s)is your project located in?* Cape Fear 3d.Please provide the 12-digit HUC in which the project is located. 030300030104 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Project site is a suburban mix of businesses,multi-family apartments,wooded/grassed tracts and single family residences. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* C Yes 6 No C Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) Scientific Street Topo Map.pdf 277.73KB 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) Scientific Street Soil Survey Map.pdf 543.13KB 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: 205 LF 4h.Explain the purpose of the proposed project:* The purpose of the project is to replace a structurally deficient single span bridge over an UT to Deep River with two 12'X 10'Reinforced Concrete Box Culverts(RCBCs)with wing walls. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The project will involve replacing a single span bridge with two box culverts.There will be impacts from the placement of the box culverts in the stream,as well as,impacts from bank stabilization that will be necessary at the inlet and outlet ends of the culverts to prevent slope failure.Floodplain benches with coir fiber matting will also be installed to help direct and reduce widening of the stream.The lowflow culvert will be placed at least one foot below the stream bed and sills will be used to direct stream flow and decrease stream widening. Traffic will be detoured offsite during construction.Standard road building equipment will be used such as dozers,cranes,dump trucks and tamps. 4j.Please upload project drawings for the proposed project. Scientific Street Permit Drawings.pdf 5.39MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* ( Yes r No Cl Unknown Comments: Streams were classified but no wetlands were observed on project. 5b.If the Corps made a jurisdictional determination,what type of determination was made?* ✓ Preliminary f Approved C Not Verified C Unknown t' N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): SEPI Agency/Consultant Company: Robert Lepsic Other: 5d1.Jurisdictional determination upload Scientific Street Jurisdictional Determination.pdf 1.65MB 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes (cNo Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): r Wetlands 17 Streams-tributaries 17 Buffers 1 Open Waters 1 Pond Construction 3.Stream Impacts 3a.Reason for impact(?) I 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 Placement of culvert Permanent Culvert UT to Deep River Perennial Both 6 84 Average(feet) (linear feet) 32 Bank stabilization& Permanent Bank Stabilization UT to Deep River Perennial Both 6 121 floodplain bench Average(feet) (linear feet) S3 Dewatering Temporary Dewatering UT to Deep River Perennial Both 6 53 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 205 53 3i.Total stream and ditch impacts: 258 3j.Comments: 6. Buffer Impacts(for DWR) 6a.Project is in which protect basin(s)? check all that apply. E Neuse E Tar-Pamlico E Catawba fJ Randleman E Goose Creek E Jordan Lake E Other 6b.Impact Type 6c.Per or Temp 6d.Stream name 6e.Buffer mitigation required? 6f.Zone 1 impact 6g.Zone 2 impact Culvert P UT to Deep River Yes 10,350 6,148 Road Crossing P UT to Deep River No 3,111 581 Road Crossing P UT to Deep River No 3,464 2,054 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 16,925.00 8,783.00 Zone 1 Zone 2 Total combined buffer impacts: 16,925.00 8,783.00 6i.Comments: Supporting Documentation Scientific Street Permit Drawings.pdf 5.39MB E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Roadway approach work was minimized as much as possible to reduce the overall footprint of the project.An offsite detour will be utilized during construction in order to avoid the need for a temporary crossing.Future stream impacts will be reduced by protecting the inlet and outlet ends of the culvert with riprap bank stabilization. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices for Construction and Maintenance Activities and Best Management Practices for the Protection of Surface Waters will be utilized.Erosion and sedimentation devices will be installed prior to commencing construction.Dewatering will occur during construction to prevent impacts to the stream and downstream aquatic resources.A pre-construction meeting with the Division Environmental Supervisor or his assignee will occur prior to beginning work. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? (* Yes r No 2c.If yes,mitigation is required by(check all that apply): 17 DWR E Corps 2d.If yes,which mitigation option(s)will be used for this project? E Mitigation bank 17 Payment to in-lieu fee E Permittee Responsible program Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. ( Yes C No 4b.Stream mitigation requested: (linear feet) 4c.If using stream mitigation,what is the stream temperature: 205 warm 4d.Buffer mitigation requested(DWR only): (square feet) 4e.Riparian wetland mitigation requested: 16,498 (acres) 4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested: (acres) (acres) 4h.Comments 6. Buffer mitigation(State Regulated Riparian Buffer Rules)-required by DWR 6a.Will the project result in an impact within a protected riparian buffer that requires buffer mitigation?If yes,you must fill out this entire form-please contact DWR for more information. ( Yes C No 6b.If yes,then identify the square feet of impact. 6c.Reason for impact 6d.Total impact Multiplier 6e.Required mitigation (square feet) (square feet) Zone 1 10,350 10,350 Zone 2 6,148 6,148 6f.Total buffer mitigation required 16498 6g.If buffer mitigation is required,is payment to a mitigation bank or NC Division of Mitigation Services proposed? ( Yes C No 6h.Attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services. Scientific Street Mitigation Letter.pdf 573.54KB 6j.Comments: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ( Yes C No What type of SCM are you providing? n Level Spreader n Vegetated Conveyance(lower SI-WT) n Wetland Swale(higher SI-tNT) n Other SCM that removes minimum 30%nitrogen I7 Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ( Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ✓ Yes r No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ✓ Yes C.' No Comments:* Project does not meet the threshold for requiring preparation of a NEPA/SEPA document 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes t: No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes ( No 3b.If you answered"no,"provide a short narrative description. Due to the minimal transportation impact resulting from the proposed project,stimulated growth and influence in nearby land use is not anticipated. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes (7Nor N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ✓ Yes f No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* 6 Yes rNo 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* ✓ Yes 6 No r Unknown 5e.Is this a DOT project located within Division's 1-8? • Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS website and documentation from environmental consultants Consultation Documentation Upload Scientific Street(Bridge 52)T&E Survey.pdf 41.83KB 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes RNo 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS County Index 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes 6 No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT Cultural Resource personnel 7c.Historic or Prehistoric Information Upload Scientific Rd No Archaelolgy Survey.pdf 1.57MB Scientific Rd No Archictectural Suevey.pdf 4.5MB 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* F Yes r No 8b.If yes,explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA 8c.What source(s)did you use to make the floodplain determination?* FEMA Flood Maps Miscellaneous Comments Miscellaneous attachments not previously requested. Scientific Street Bridge to Culvert Justification.pdf 50.67KB Signature * FJ By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: W.R.Archer Ill Signature Date 4/23/2021