Loading...
HomeMy WebLinkAbout20070587 Ver 1_More Info Received_20070531May 31 07 08:58a Land Management Group Inc 9104520060 LAND MANAGEMENT GROUP, INC BNVIRON'~iEI~TAL CONSULTANTS POST OFFICE BOX 2522 WIL1vIINGTON, I~'ORTH CAROLINA 28402 PHONE #: 910-4.i2-0001 FAX #: 910-452-0060 FACSIMILE TRANSMITTAL SHEET '1'O: 1~s • ~~d ~ 1~~ ~.---.J ~~,~ COAdPANY, P',4X NUMBLIL: N c ~wQ qr ~ - ~ ~ 3 ~~y3 PI-IONG NUMB]iR: 'f0'IAL NO. OP PAGE) 1NCLUllING COVER: hROb~L Ltu/tz S}~sa~r ~ RE: `-bw t~ t`~'~tiec.~- ~ U~ ~ D5g 7 ^UIZGEN"I' ^POK R1iVIEVV ^PLN:ISL COil4MENT ^PLliA5li REPLY ^PLL:ISE RI;CYCU NOTES/COMh11:N'CS: DOVVNE.Y BR:1~IC1I OI~~ICF. P:LRK 38(15 \X~RIGIITVI1,I,E AVL'NUP., SU1'1']d 15 ~x'I1.\{ING'1'ON, NOR"I'lI C_1RO1.1NA 38403 p. 1 MAY-31-2007 THU 09:00 TEL:9197336893 NAME:DWQ-WETLANDS F• 1 May 31 07 D8:58a Land Management Group Inc 9104520060 I°•2 <!/2<.l ~ ~~~fl/?C~CI'C~17~L'7? ~ ~(J"t~lljl, •~11C. ~~l~:~rif~ni~i~ii/~~~ ~~~1~jir//rr~~f~ / I• .%.i~ ~~firl+ .~. a.r ~~; ~~ ,lw~,i '1/yi~~/~i~i~~ .~/ri~i~ni~ ~ni/i /,i .%vcr::I/! ~,il p/~I:/~ J/i~liili~/iii .. - ~ ~~~ ~,~•%! :! Ii•mir. /ink iorr~ . i~lJ 29 May 2007 Ms. Cyndi Karoly 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 RE: Kingfish Bay DWQ Project # 07-0587 Dear Ms. Karoly, In response to your request for additional information regazding stormwater permitting for the above-reference project, please find enclosed the state-approved Stormwater Management permit. Please feel free to contact me if we can be of further assistance. Sincerely, La a Stasavich Environmental Scientist MAY-31-2007 THU 09:01 TEL:9197336893 NAME:DWQ-WETLANDS P• E May 31 07 08:58a Land Management Group Inc 9104520060 P•3 State stormwater Management Systems . Permit No. SWi3 061225 - STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT 1n accordance with the provisions of Article'21 of Chapter 143, General Statutes of North Carol':na as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Nathan D. Benson and Sandler at Calabash, LLC Kingfish Bay Brunswick County FOR THE construction, operation and maintenance of 13 underground infiltration trenches in compliance with the provisions of 1 fiA NCAC 2H .1 QDD (hereafter referred to as the "sformwater'rules'~ and the approved stormwater management laps and specifications and other supporting data as attached and on file with and approvedpby the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 19, 2017, and shalt be subject to the following specifred conditions and limitations: I. dESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 840,429 square feet of impervious area. The bypass outlet for each trench must be operated with a dissipater for non-erosive flow, in accordance with the approved plans. 3. The tract will be limited to the amount of built-upon area indicated on page 3 of this permit, and per approved plans. 4. Ail stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon area within the permitted drainage area of this project rn~st be directed into the permitted stormwater control system. Page 2 of 7 MRY-31-20D7 THU 89: D1 TEL:9197336893 NRME:DWQ-WETLANDS P. 3 May 31 07 08:58a Land Management Group Inc 9104520060 P•4 • State Stormwater Management Systems Permit No. SWi3 Oti1225 6. The following design criteria have been provided in the 13 infiltration trenches and must be malntalned at design conditions: Infiltratiorii.Trench Trench 1~ Trench 2 Trench 3 Trench 4 Trench 5 Trench 6 Trench 7 a. DrainageArea, acres Onsite ft2 4.33 188502 1.57 68528 1.57 66574 2.26 9$582 3.91 170434 1.43 62368 0.76 33157 , z Offsite, tt ~ .- _ -:Nona , , b. Total Irn rvious Surfaces, ft~ 105283 44204 38871 72824 91552 40688 22545 c. De ' n Storm, inches ~ - _ ,. ,. ,;1,~ , .,. }. ~ V d. Trench Dimensions, L x W x H, ft 118 X 48.9 X3.5 120.3 X 28 X2.5 122 X 22 X 3.0 115.3 X 45.7X2.5 107x54 X3.0 71.7 X 43.2X3.0 80X22 X 3.0 e. Perforated Pi a DiameterlLe ~ 3.5' 1840'L 2.5' l660'L 3.0' l440'L 2s' 1050' 3.0' 1950'L 3.0' /480'L 3.0' ~172'L f. Bottom Elevation FMSL 17.0 19.5 17.5 42.0 38,5 46.0 425 . B ass Weir Elevation, FMtSL 14.5 22.0 20.5 44.5 41.5 49.0 45.5 h. Permitted Stor a Volume, ft3 13$15 5591 5312 8932 11639 5975 3419 i. T e of Soil ;:, ..Blanton . ~' ~; ~ .,;, '. Ex ected Infiltration Rate, inlhr - ' ' ~ _ _ $'~0 •. k. Seasonal Hi h Water Table, Ft~sL 9.0 17.5 14.0 39.5 36.0 43.0 39.0 I. Time to Draw Dowrt hours 3.d 2.4 2.7 2.5 3.0 2.4 2.3 m. Receivi StrearrdRiver Basin ~ ``~ ~ ;~ ~~ Calaliash t?iverRunber .' •` n, Stream Index Number _ ! -~ '' "` 'i.5-23-13 a. Classification of Water Bod ~~ SAI:}iQW `Infiltration Tench Trench 8'>. Trench 8A " Trench 9 -: Trench t0 ~Treni:h 11 . Trench 12 a. Drainage Area, acres Onsite,fl2 2.96 130004 4.54 19785T 1.23 53582 0.93 40349 2.59 112934 2.61 113734 Offsite, flz .None b. Total Im ervious Surfaces, ft2 83164 115746 36871 29568 72831 83282 c. Desi n Sforrn, Inches - ~ 1 5 ~ tl. Trench Dimensions, L x W x H, ft 102 X 54 X 3.0 1267X5.5X 3.0` 70 x 38 X 3.0 74.3 X 32.5X2.5 93 X 42.9 X3.5 i ~ 1.7 X 48.5X3.0 e. Perforated Pi a DiameterlLen th 3.0' /900'L 3'~l1261'L• 3.0' l406'L 2.5' 448'L 3.5'm1560'L 3.0' 1900'L f. Bottom Elevation, FMSL 41.5 41.5 19.5 16.0 13.0 12.5 . B ass WeirElevation, FMSL 44.5 44.5 22.5 18.5 16.5 15.5 h. Pernrotted Stara a Volume, fl3 11076 15268 5218 3956 9438 10979 i. T eofSo7 ~ ~~~~~Blanton ~~~'~ - ected Infiltration Rate, inlhr %':'~8 t) ', "° k. Seasona! Hi h Water Table, Fµsu 39,0 39.3 17.0 14.1 11.0 10.5 t. Time to Draw Down, hours 2.8 3.1 2.5 2.2 3.4 2.8 ~ m. Receivin StrearnlRiver Basin l ~ Calabash'RiverlLimber -; ~ `` n. Stream Index Number -15-23-13 o. ClassificaUOn of Water Bod ~' ' < . ': ~ ~ - SA;~ HflW'~`` *Pipe DiameterlLength and Trench Dimensions for Trench 8A based on 1 run of pipe. 11. SCHEDULE OF COMPLIANCE 1 _ The stormwater.management system shat! be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface_ 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 3 of 7 MAY-31-2007 THU 09:01 TEL:9197336893 NAME:DWQ-WETLANDS P• ~ May 31 07 08:58a Land Management Group Inc 9104520060 P•5 State stormwater Management Systems Permit No. SWS D61225 3. The permittee shall at al! times provide the operation and maintenance necessary to assure the permitted stormwater system functions at o timum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months}. b. Sediment removal. c. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris remova[ and unclogging of bypass structure, filter media, flow spreader, catch basins, piping and vegetated filter. g. ~ A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed m accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon complefion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an .appropriate designer for the system installed certifying that the permitted facility has been installed an accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plants and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shalt submit to the Director and shall have received approval for revised plans, specifiications, and calculations prior to construction, far any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area or to the drainage area, e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as al! property owned by the permittee, for which Sedir~nentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitte d future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained an file bye the Permittee for a minimum of ten years from the date of the completion of construction. Page4af7 MAY-31-2007 THU 09:02 TEL:9197336893 NRME:DWQ-WETLANDS P. 5 May 31 07 08:59a Land Management Group Inc 9104520060 P•6 State stormwater Management Systems Permit No. SW8 061225 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specrFed in the notice, the permittee shall submit a written time schedule to the Directorfor modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certifcation in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. [n the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permiftee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Fai{ure to abide by the conditions and limitations contained in this Permit may subject the Permittee. to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not predude the Perrnittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee~grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a requestfor apermit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion a rid Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceab{e parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the~l9th day of February 2007. N013.T CAROLINA EN~tRONt~E-1,VTAL MANAGEMENT COMMISSION for Alan VV. f<Rmerc, r.>~.., urrector Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 MAY-31-2807 THU 89:02 TEL:9197336893 NAME:DWQ-WETLANDS p• 6 May 31 07 08:59a Land Management Group Inc 9104520060 p.7 i ~y ~~ ~ J~~ ~ ~ ?G~ North Carolina Department of Environment and Natural Resources ~~'~{~~ Division of Land Resources James D. Simons, PG, PE Land Quality Sec~on Michael F. Easley, Governor Director and State Geologist William G. Ross Jr., Secretary 1 /24/2007 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Sandler at Calabash, LLC Mr. Nathan D. Benson, Mgr 7246 Beach Drive SW, Suite #2 Ocean Isle Beach, NC 28469 RED Project Name: King Fish Bay Phase I E~cpress Review Project ID: Brans-20x7-251 County/Town/Street: $runswick, Calabash, Hwy 17 River Basin: Lumber Submitted By: Withers & Ravenel Date Received by LQ$: January 18, 2007 Plan Type: NEW Dear Mr. $enson: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications aad Performance Reservations. A list of the modifications and reservations is attached. This plan approval, shall eXp~ three {3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title ] SA NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required {G. S. 113A-54. I xb). Please be advised that Title 15A NCAC 4B.0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter to give the Notice required by G.S. 113A-61.1(x) of our right of periodic inspection to insure compliance with the approved plan. North CaroIina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 {North Carolina General Statute l I3A-51 thru 6b), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Wilmington Regional C4tlce 727 Cardinal Drive Fit., Wilmington, Nortlr Carolina 28405-3845 • phone; 9i0-796-72151FAX: 9i.0-350-2004 MAY-31-2007 THU 09:03 TEL:9197336893 NAME:DWQ-WETLANDS F• T May 31 07 09:OOa Land Management Group Inc 9104520060 Letter of Approval with Modifications and Performance Reservations Mr. Nathan D. Benson January 24, 2007 Page 2 of 4 p.8 Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please be aware that your project will be eavered by the enclosed NPQES General Stormwater Permit NCGQ1000 (Construction Activities). You should first become familiar with all ofthe requirements for compliance with the enclosed general pernut. Please note that this approval is based in part on the accuracy of the information pro~zded in the l; financial Responsibility Form, which you have provided. You are requested to file as amended forn- if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely; (_' cv,~ z1 1vr.~.:~.f t.~ Carol N. Miller Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modificatians and Performance Reservations NPDES Permit cc: Mr. Brad Hart, P.E., Withers & Ravenel LQS-WiRO P. 8 MAY-31-2007 THU 09:03 TEL:9197336893 NAME:DWQ-WETLANDS May 31 07 09:OOa Land Management Group Inc 9104520060 p•9 Letter of Approval with A~iodifications and Performance Reservations Mr. Nathan D. Benson January 24, 2007 Page 3 of 4 MODIFICATIONS AND PERFORiVIANCE RESERVATIONS Project Name: King Fish Bav Phsse I Project ID: Brava-2407-151 County: Brunswick 1. This plan approval shall expire three (3) years following the dale of approval, if no land disturbing activity has been undertaken, as is required by Title 1~A NCAC 4B.0029_ The developer is responsible fvr the control of sediment on-site. if the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out is necessary anytime the device is at 50% capacity. 3. Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed development unless otherwise noted. The removal of vegetation within any existing ditch or channel is prohibited unless the ditch or channel is to be regarded with side slopes of 2 horizontal to 1 vertical or less steep. Bank slopes may be mowed, but stripping of vegetation is considered new earth work and is subject to the same erosion control requirements as new ditches. 4. The developer is responsible for obtaining any and all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include agencies such as the Division of Water Quality's stormwater regulations, their enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. "this approval canmoi supersede any other permit or approval; however, in the case of a Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All highland would still have Eo be in compliance with the N.C. Sedimentation Pollution Control Act. 5. if any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act, the developer is responsible for compliance with the requirements of the Division of Water Quality, the Corps of Engineers and the Environmental Protection Agency (EPA) respectively. Any erosion control measures that fall within jurisdictional wetland areas must be approved by the aforementioned agencies prior to installation. The Land Quality Section must be notified of a relocation of the measures in question to the transition point between the wetlands and the uplands to assure that the migration of sediment will not occur, If that relocation presents a problem or contradicts any requirements of either DWQ, the Corps, or the EPA, it is the responsibility of the developez to inform the Land Quality Section regional office so that an MAY-31-2007 THU 09:03 TEL:9197336893 NAME:DWQ-WETLANDS P• 9 May 31 07 09:OOa Land Management Group Inc 9104520060 p. 10 Letter of Approval with Modifications and Performance Reservations Mr. Nathan D. Benson January 24, 2()d7 Page 4 of 4 adequate contingency plan can be made to assure sufficient erosion control remains on site. Failure to do so will be considered a violation of this approval. 6. Any borrow material brought onto this site must be from a legally operated mine or other approved source, A single use borrow site. or an area to waste material is only permissible if it is operated under the total control of the Financially Responsible person or firm who is developing this site and has been separately permitted and incorporated as part of this plan meeting all the requirements of NC General Statue 74-49(7)f. 7. This pernlit allows for a land disturbance, as called for on the application plan, not to exceed 19.95 acres. Exceeding that acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impen~iaus surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and stornnwater retention measures. S. The construction detail for the proposed silt fence requires reinforcing wire and steel posts a maximum of 8.0_,,,_feet apart_ emission of the reinforcing. wire is a construction change that necessitates more posts for support, i.e., the spacing distance needs to be reduced to no greater than 6 feet apart. 9. Because the sediment .basins are shown on the plan as the primary sedimentation and erasion control devices on this project, it is necessary that the basins and their collection systems/ diversion ditches be installed before any other grading takes place on site. If that proves to be impractical, a revised plan must be submiried and approved that addresses erosion and sediment control needs during the interim period until the ponds aze fully functioning. 10. A graveled construction entrance must be located at each point of access and egress available to construe#ion vehicles during the grading and construction phases of this project. Access and egress from the project site at a point without a graveled entrance will be considered a violation of this approval. Routine maintenance of the entrances is critical. 11. 'The North Carolina Sedimentation Pollution Control Act mandates a shortened time frame in which to re-establish vegetative groundcover. Stapes (including cuts, fills, and ditch banks} left exposed will, within 21 calendar days after completion of any phase of grading, be planted or otherwise provided with groundcover sufficient to permanently restrain erosion. P. 18 MAY-31-2007 THU 09:84 TEL:9197336893 NAME:DWQ-WETLANDS 'May 31 07 09:O1a Land Management Group Inc 9104520060 p.ll o~oF War~9p~ r -i p `< Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Dcparimen[ of Environment and Natural Resources Alan W. K1i~E, P.E. pircctor Divisiao of Water Quality February 19, 2007 Mr. Nathan D. Benson, Manager Sandier at Calabash, LLC 448 Viking Drive, Suite-220 Virginia Beach, VA 23452 Subject: Stormwater Permit Na. SUY8 061225 Kingfish Bay High Density Project Brunswick County Dear Mr. Benson: ~~~~s~~~ FEB '~ 3 T047 ~~ther~ ~ ~~e~et The Wilm'sngton Regional Offace received a complete Stormwater Management Permit Application for Kingfish Bay on February 15, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in 'title 15A NCAC 2H.9000. We are forwarding Permit No. SW8 061225 dated February 19, 2007, for the construction of the subject project. This permit shall be effective From the date of issuance until February 19, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation, and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming fo Chapter 1508 of.the North Carolina General Statutes, and filed with the Oiflce of Administrative Hearings, P.O. Drawer 27447, Raleigh, NG 27611-7447. Unless such demands are made this permit shall be final and binding. if you have any questions, or.need additional information conceming this matter, please contact Paul Bartlett, or me ai (910} „ 7215. Si rely, •-~ ~ E and B k Regional Supervisor - Surface Water Protection Sectien ENB/ptb: S:1WQSISTORMWATERIPERMIT1061225.feb07 cc: ~ Ntlnt~r G ~ F`ee>:rlan, P E. :Withers ~ Raven e1, l nc~~' 3h'h Wiseman, Agent, Sandler at Calabash, LLC Delaney Aycock, Brunswick County Building inspections Jeff Phillipps, Brunswick County Engineering Pau(T. Bartlett, P.E Wilmington Regional Office Central Files I+>a#thCarolins JI atura!!j North Carotins Division ofVVater Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796.7215 Customer Servicx Wilmino on Regionat0!('ice Internet: wvvx~ ncwmtcr4ualitv,oce Fax (910)350-2004 1-$77-623.6748 An Equal OpporetnitytAffimtarive Acton Employer-30°6 Recydedl109G Post Consumer Paper P. 11 MAY-31-2807 THU 09:04 TEL:9197336893 NAME:DWQ-WETLANDS