Loading...
HomeMy WebLinkAboutNCG170364_Inspection Report_20210419ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director Valdese Weavers Inc. Attention: Eddie Atkinson 280 Crescent Street Valdese, North Carolina 28690 NORTH CAROLINA Environmental Quality April 19, 2021 Subject: Compliance Evaluation Inspection Valdese Weavers Inc- F&D Plant General Permit: NCG170000 Certificate of Coverage: NCG170364 Burke County, North Carolina Dear Mr. Atkinson: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on April 6, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed0ricdenr.gov. Enclosure: Inspection Report Sincerely, Isaiah Reed, El, CPSWQ, MS4 ECI Environmental Specialist Land Quality Section North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 828.296.4500 Compliance Inspection Report Permit: NCG170364 Effective: 08/01/19 Expiration: 05/31/24 Owner: Valdese Weavers Inc SOC: Effective: Expiration: Facility: Valdese Weavers Inc-F&D Plant County: Burke 280 Crescent St NE Region: Asheville Valdese NC 28690 Contact Person: Eddie Atkinson Title: Phone: 828-874-2181 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 04/06/2021 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 11:15AM Exit Time: 11:30AM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Slormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG170364 Owner- Facility: Valdese Weavers Inc Inspection Date: 04/06/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On April 6, 2021 this facility was visited for an inspection. As in the previous visit, entrance to the facility could not be gained and all phone numbers posted on exterior main entrance door were not answered when called. This facility will be visited for an inspection on or after May 25. If a complete inspection cannot be performed, a Notice of Violation will be issued to the permittee. The permittee shall assure that all necessary changes are made before the next inspection and modify the program as necessary to allow for unannounced inspections. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 Permit: NCG170364 Owner - Facility: Valdese Weavers Inc Inspection Date: 04/06/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ E ❑ ❑ Comment: No Stormwater Pollution Prevention Plan was made available at the time of the inspection. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: No qualitative monitoring records were made available at the time of the inspection. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? ❑ 0 ❑ ❑ # If the facility has representative oulfall status, is it properly documented by the Division? ❑ ❑ N ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3