Loading...
HomeMy WebLinkAboutNCS000437_Greenville Draft SWMP Transmittal Letter_20210415April 15, 2021 Jeanette Powell, CPSWQ, CPESC MS4 Program Coordinator 919-707-3620 Jeanette.Powell@ncdenr.gov Re: City of Greenville Draft SWMP Revisions Dear Ms. Powell: Thank you for your review and comments on our draft SWMP. Please find attached revised draft SWMP addressing most of your comments. As we discussed in the phone meeting on April 13, 2021, the items concerning the post-construction review and enforcement of state properties, reliance upon the NCG01 program for the construction waste management, and listing those measures that the City relies upon NCDEQ activities in our SWMP, will require additional legal and internal research by NCDEMLR. Thank you for the cooperation and discussion of how the City of Greenville can develop a complete SWMP and meet our MS4 permit requirements. Sincerely, Daryl Norris, P.E., CFM, CPSWQ Civil Engineer III, Stormwater City of Greenville-Engineering cc: Lisa Kirby, P.E., CFM, Director of Engineering