STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
BEVERLY PURDUE P O Box 25201, Raleigh, NC 27611 -5202
GOVERNOR PHONE 919 - 733 -2520
November 29, 2012
1 T'
F'o
t7�ROCq
EUGENE , Ok, I, JR
SECRETARY? °Icy
Mr Monte Matthews
U S Army Corps of Engineers
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105 0 1 2 1 0
Wake Forest, NC 27587
Subject Nationwide Permit #14
Replace Bridge #137 on SR 1136 with RCBC
Watauga County, North Carolina
Protect Number: 17BP 11 R 29 (DWQ Permit Fee: $240)
Dear Mr Matthews
The North Carolina Department of Transportation is scheduled to replace existing Bridge #137
with a reinforced concrete box culvert at the same location The existing bridge is 16 5 feet long
and is located at the intersection of SR 1136 and SR 1137 This is a school bus route and it is
difficult for the buses to make the turn here The culvert option should work well at this location
and will improve the situation for the larger vehicles using this route Stream slope is 4% so we
will have 1' tall buried sills at the inlet, outlet and one in the middle of the culvert to eliminate
head cutting and help retain natural stream alluvium Mitigation will be provided through EEP
No on -site detour is proposed Stream impacts are tabulated below
Stream Impacts:
hon y
hay 1Vumbei �
Eanshng 1
Structure Size_,
�A Proposed
, Structure - Size,
� :.�kw,vzPr"tu
em ,o ry
z, ewaterin
h t$Reprap
m cts` feet
�Cotal n7- at
this Station41 t:
16 5' long
12'x 6'x 38'
Bridge #137
bride
RCBC
1 40
70
148
UT #1 @
driveway
36 "x 36' CMP
60'x 36" CUT
20
0
44
Perm FilMprap Impacts =
132 feet
Total Protect Impacts =192
feet
P O Box 250 N Wu KESSORo NC 28659
PHONE (336) 667 9111 FAX (336) 667 -4549
Mr Monte Matthews
Bridge #137 on SR 1136
Page 2
November 29 2012
The replacement of the existing bridge with the proposed new culvert will require temporary
dewatermg An impervious sandbag dike will be constructed approximately 20 feet upstream of
the existing structure to create a small pool Clean water will temporarily be pumped around or
piped through the construction area and will be discharged downstream Any dirty water located
inside the construction area will be pumped into a silt bag if necessary Once the new structure is
in place the impervious dike will be removed and preconstruction streambed elevations will be
restored
Construction of this project will require impacts to waters of the United States in the Watauga
River Basin The existing bridge crosses Clark Creek (Class C) This project was reviewed for
the presence of threatened and endangered species in September 2012 The subject project will
have no effect on any federally listed endangered plant or animal species Historic compliance
work will be scheduled and concurrence with the State Historic Preservation Office will be
obtained if required
The project impacts are not significant in nature and should not alter the best usage for this
stream All appropriate BMPs will be used during construction Attached is a Preconstruction
Notification Form plan sheets a marked county map and a marked topography map
By copy of this electronic letter it is requested that Mrs Marla Chambers with the North
Carolina Wildlife Resources Commission comment directly to you concerning the 404
Nationwide Permit application with a copy sent to me
By copy of this electronic letter it is requested that the Division of Water Quality 401/Wetlands
Unit issue the appropriate permit for construction of this project It is requested that any
comments related to the 401 certification be forwarded directly to me with a copy sent to the US
Army Corps of Engineers
We would like to begin construction as soon as possible If further information is required
please let me know Your early review and consideration will be appreciated
Sincerely
Heath Slaughter
Division Environmental Officer
Enclosures
cc Monte Matthews US Army Corps of Engineers
Marla Chambers NCWRC
Amy Chapman Division of Water Quality
Mr Monte Matthews
Bridge #137 on SR 1136
Page 3
November 29 2012
Amy Euliss Division of Water Quality
Mike Pettyjohn PE Division Engineer
David Wayne PE Bridge Maintenance Engineer
Jami Guynn Division Bridge Program Manager
Heath Slaughter Division Environmental Officer
Neil Trivette Roadside Environmental Field Operations Engineer
O�00- VIA TE,q
o r
Office Use Only
Corps action ID no
DWQ project no
Form Version 1 3 Dec 10 2008
Page 1 of 10
PCN Form — Version 1 3 December 10 2008 Version
Pre - Construction Notification (PCN) Form
A Applicant Information
1
Processing
1 a
Type(s) of approval sought from the
Corps
®Section 404 Permit El Section 10 Permit
1b Specify Nationwide Permit (NWP) number 14 or General Permit (GP) number
1c
Has the NWP or GP number been verified by the Corps?
❑ Yes
® No
1d
Type(s) of approval sought from the DWQ (check all that apply)
® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1e
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification
❑ Yes ® No
For the record only for Corps Permit
❑ Yes ® No
1f
Is payment into a mitigation bank or in lieu fee program proposed for mitigation
of impacts? If so attach the acceptance letter from mitigation bank or in lieu
fee program
® Yes
® No
1g
Is the project located in any of NC s twenty coastal counties If yes answer 1 h
below
❑ Yes
® No
1h
Is the project located within a NC DCM Area of Environmental Concern (AECP
❑ Yes
® No
2
Project Information
2a
Name of project
Bridge #137 on SR 1136
2b
County
Watauga
2c
Nearest municipality / town
Foscoe
2d
Subdivision name
2e
NCDOT only T I P or state —]
project no
17BP 11 R 29
3
Owner Information
3a
Name(s) on Recorded Deed
NCDOT
3b
Deed Book and Page No
3c
Responsible Party (for LLC if
applicable)
3d
Street address
801 Statesville Road
3e
City state zip
North Wilkesboro NC 28659
3f
Telephone no
336 903 9202
3g
Fax no
336 667 4549
3h
Email address
hslaughter@ncdot gov
Page 1 of 10
PCN Form — Version 1 3 December 10 2008 Version
4 Applicant information (if different from owner)
4a Applicant is
❑ Agent ❑ Other specify
4b Name
4c Business name
(if applicable)
4d Street address
4e City state zip
4f Telephone no
4g Fax no
4h Email address
5 Agent/Consultant Information (if applicable)
5a Name
5b Business name
(if applicable)
5c Street address
5d City state zip
5e Telephone no
5f Fax no
5g Email address
Page 2 of 10
PCN Form —Version 1 3 December 10 2008 Version
B Project Information and Prior Project History
1 Property Identification
1a Property identification no (tax PIN or parcel ID)
lb Site coordinates (in decimal degrees)
Latitude 36 18218 Longitude 81 77811
(DD DDDDDD) ( DD DDDDDD)
1 c Property size
0 1 acres
2 Surface Waters
2a Name of nearest body of water (stream river etc ) to
proposed project
Clark Creek
2b Water Quality Classification of nearest receiving water
C
2c River basin
Watauga
3 Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
Substandard bridge to be replaced in a rural area
3b List the total estimated acreage of all existing wetlands on the property
0 acres
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
150 linear feet
3d Explain the purpose of the proposed project
Upgrade substandard stream crossing
3e Describe the overall project in detail including the type of equipment to be used
See attached cover letter
4 Jurisdictional Determinations
4a Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the pasty
Comments
Yes No El Unknown
4b If the Corps made the jurisdictional determination what type
of determination was made?
❑ Preliminary ❑ Final
4c If yes who delineated the jurisdictional areas?
Name (if known)
Agency /Consultant Company
Other
4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
5 Project History
5a Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes ® No ❑ Unknown
5b If yes explain in detail according to help file instructions
6 Future Project Plans
6a Is this a phased project?
❑ Yes ® No
6b If yes explain
Page 3 of 10
PCN Form — Version 1 3 December 10 2008 Version
C Proposed Impacts Inventory
1 Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands ® Streams tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2 Wetland Impacts
If there are wetland impacts proposed on the site then complete this question for each wetland area impacted
2a
2b
2c
2d
2e
2f
Wetland impact
Type of Jurisdiction
number -
Type of impact
Type of wetland
Forested
(Corps 404 10
Area of impact
Permanent (P) or
(if known)
DWQ- non 404 other)
(acres)
Temporary T
W1 ❑ P ❑ T
❑ Yes
❑ No I
❑ Corps
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ No
❑ Corps
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ No
❑ Corps
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ No
❑ Corps
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ No
❑ Corps
❑ DWQ
2g Total wetland impacts
2h Comments
3 Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this
question for all stream sites impacted
3a
3b
3c
3d
3e
3f
3g
Stream impact
Type of impact
Stream name
Perennial
Type of Jurisdiction
Average
Impact
number
(PER) or
(Corps 404 10
stream
length
Permanent (P) or
intermittent
DWQ - non 404
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ®P ®T
RCBC Riprap &
Dewatenng
Clark Creek
® PER
❑ INT
® Corps
® DWQ
17 "
148
S2 ®P ®T
Piping Riprap &
UT #1 to Clark
® PER
® Corps
2
44
Dewatenng
Creek
❑ INT
® DWQ
❑ PER
❑ Corps
S3 ❑ P ❑ T
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ INT
❑ Corps
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ INT
❑ Corps
❑ DWQ
❑ PER
❑ Corps
S6 ❑ P ❑ T
[:11 NT
❑ DWQ
3h Total stream and tributary impacts
192
31 Comments 60 linear feet of the impacts are temporary
Page 4 of 10
PCN Form -Version 1 3 December 10 2008 Version
4 Open Water Impacts
If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of
the U S then individually list all open water impacts below
4a 4b 4c 4d 4e
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ❑P ❑T
02 ❑P ❑T
03 ❑P ❑T
04 ❑P ❑T
4f Total open water impacts
4g Comments
5 Pond or Lake Construction
If pond or lake construction proposed the complete the chart below
5a 5b 5c 5d 5e
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded I Filled I Excavated Flooded I Filled I Excavated Flooded
P1
P2
5f Total
5g Comments N/A
5h Is a dam high hazard permit required
❑ Yes ®No If yes permit ID no
51 Expected pond surface area (acres)
5I Size of pond watershed (acres)
5k Method of construction
6 Buffer Impacts (for DWO)
If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts
below If any impacts require mitigation then you MUST fill out Section D of this form
6a
Project is in which protected basin?
6b 6c 6d
Buffer impact
number — Reason
Permanent (P) or for
Temporary T impact
B1 ❑ PEI T
B2 ❑P ❑T
B3 ❑P ❑T
61 Comments
❑ Neuse ❑ Tar Pamlico ❑ Other
❑ Catawba ❑ Randleman
6e I 6f I 6g
Buffer
Stream name mitigation
re uired�
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
6h Total buffer impacts
Zone 1 impact I Zone 2 impact
(square feet) (square feet)
Page 5 of 10
PCN Form — Version 1 3 December 10 2008 Version
D Impact Justification and Mitigation
1 Avoidance and Minimization
la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
The culvert length is the minimum needed to improve safety at this location
lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
All appropriate BMPs will be used during construction
2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State
2a Does the project require Compensatory Mitigation for
impacts to Waters of the U S or Waters of the State?
® Yes ® No
2b If yes mitigation is required by (check all that apply)
❑ DWQ ® Corps
2c If yes which mitigation option will be used for this
project?
❑ Mitigation bank
® Payment to in lieu fee program
❑ Permittee Responsible Mitigation
3 Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type
Quantity
3c Comments
4 Complete if Making a Payment to In lieu Fee Program
4a Approval letter from in lieu fee program is attached
® Yes
4b Stream mitigation requested
62 linear feet
4c If using stream mitigation stream temperature
❑ warm ❑ cool ®cold
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non riparian wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5 Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 1 3 December 10 2008 Version
6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
❑ Yes ® No
6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5
6f Total buffer mitigation required
6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank
permittee responsible riparian buffer restoration payment into an approved in lieu fee fund)
6h Comments
Page 7 of 10
PCN Form — Version 1 3 December 10 2008 Version
E Stormwater Management and Diff use Flow Plan (required by DWQ)
1 Diffuse Flow Plan
1a Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
❑ Yes ® No
lb If yes then is a diffuse flow plan included? If no explain why
❑ Yes ❑ No
Comments
2 Stormwater Management Plan
2a What is the overall percent imperviousness of this project?
%
2b Does this project require a Stormwater Management Plan?
❑ Yes ® No
2c If this project DOES NOT require a Stormwater Management Plan explain why
2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan
❑ Certified Local Government
2e Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3 Certified Local Government Stormwater Review
3a In which local governments jurisdiction is this project?
❑ Phase II
3b Which of the following locally implemented stormwater management programs
❑NSW
El USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other
3c Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4 DWQ Stormwater Program Review
❑ Coastal counties
❑ HQW
4a Which of the following state implemented stormwater management programs apply
(check all that apply)
❑ ORW
❑ Session Law 2006 246
❑ Other
4b Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes No
❑
5 DWQ 401 Unit Stormwater Review
5a Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1 3 December 10 2008 Version
F
Supplementary Information
1
Environmental Documentation (DWQ Requirement)
1 a
Does the project involve an expenditure of public (federal /state /local) funds or the
® Yes
❑ No
use of public (federal /state) land?
1 b
If you answered yes to the above does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c
If you answered yes to the above has the document review been finalized by the
State Clearing House? (If so attach a copy of the NEPA or SEPA final approval
❑ Yes
❑ No
letter)
Comments
2
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated
Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards
❑ Yes
® No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after the fact permit application?
❑ Yes
® No
2c
If you answered 'yes to one or both of the above questions provide an explanation of the violation(s)
3
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes
® No
additional development which could impact nearby downstream water quality?
3b
If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered no provide a short narrative description
4
Sewage Disposal (DWO Requirement)
4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from
the proposed project or available capacity of the subject facility
N/A
Page 9 of 10
PCN Form —Version 1 3 December 10 2008 Version
5 Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
❑ Yes ® No
habitat?
5b Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ® No
impacts?
❑ Raleigh
5c If yes indicate the USFWS Field Office you have contacted
❑ Asheville
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
GIS and visual observation
6 Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑Yes ® No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
WRC will comment
7 Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e g National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
Project was submitted to OHE
8 Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA designated 100 year floodplain?
❑ Yes ® No
8b If yes explain how project meets FEMA requirements
8c What source(s) did you use to make the floodplain determination? ncfloodmaps
J Heath Slaughter
11/29/12
Applicant/Agent s Printed Name
Date
Applicant/Agent s S129ture
(Agents s ature is valid only if an authorization letter from the applicant
is provided
Page 10 of 10
PCN Form — Version 1 3 December 10 2008 Version
,§
| `
)
long .. .
I II .. .
��■
.
MII
! — �
, ! !
,
n
/
,! «
!
,
, !
•!! . .
,
|
, r
\ <
! .
• ) � �
5/
�
/ `
(�/
a ,
.)ems �
2§e� !.
)a!
_
}
.�
i`
\<
§ .
(
! )(
(§ �
Z- . \
■
,
MMUHIM-M |
. § ■ `|
W/
§ ..
� / !
,|
m
!
` !
!
.
!
��■
.
MII
! — �
, ! !
,
n
/
,! «
!
,
, !
•!! . .
,
|
, r
\ <
! .
• ) � �
5/
�
/ `
(�/
a ,
.)ems �
2§e� !.
)a!
_
}
.�
i`
\<
§ .
(
! )(
(§ �
Z- . \
■
,
MMUHIM-M |
. § ■ `|
W/
§ ..
� / !
,|
m
1 ' l
CD = �,
U
y
r�� � \` `t •�`.��� \� • �� � � 'ter �' `
Bridge #137 upstream view.
Downstream view.
Under bridge.
Wet driveway pipe (UT #1).
�LOi
J' CO 1
Cb
sg cr
2 r
qpm -Owl
C4 Do a
co
PP r-