Loading...
HomeMy WebLinkAbout19960052 Ver 2_PreFiling Acknowledgement Email_20210419Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, April 19, 2021 2:35 PM To: zan@jenningsenv.com Cc: Yankura, Kaylie Subject: Pre -Filing Meeting Request Acknowledgement - Asheville Water Treatment Plant River Bank Restoration - 19960052 Ver 2 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Asheville Water Treatment Plant River Bank Restoration that you submitted on 4/19/2021. The ID number for that project is 19960052, Version 2. Reviewer Contact Information: Reviewer: Kaylie Yankura Email: kaylie.yankura@ncdenr.gov Reviewing Office: Asheville Regional Office - (828) 296-4500 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. For internal use only: Non Transportation 1 DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 19960052 Version * 2 Asheville Regional Office - (828) 296-4500 Kaylie Yankura Pre -Filing Meeting Request submitted 4/19/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Zan Price zan@jenningsenv.com Asheville Water Treatment Plant River Bank Restoration City of Asheville Henderson Street Address 4037 Haywood Road Address Line 2 City State / Rovince / Region Mills River NC Fbstal / Zip Code Country 28759 USA Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Kaylie Yankura Please give a brief project description below and include location information. * Streambank stabilization project proposed on the Mills River at the Asheville Treatment Plant property at approximate location: 35.388627, -82.535025. See attached preliminary design plan set for project description and scope of work. Contact Greg Jennings (greg@jenningsenv.com) or Zan Price (zan@jenningsenv.com) if you need additional information or if you would like to meet at the site. Construction is tentatively planned for Winter 2021/2022 Please give a couple of dates you are available for a meeting. 4/29/2021 Please attach the documentation you would like to have the meeting about. Mills River Restoration Design Details 22MAR2021.pdf pdf only 3.54MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/19/2021