HomeMy WebLinkAboutSW3200903_Wet Pond-ETARC_20210416Wet Pond NCDENR 2007 SHOPTON RIDGE BUSINESS PARK 4/16/2021 CHARLOTTE,NC WATER QUALITYBASIN DESIGN _ Pond Volume Linked to Worksheet: Wet Pond Volume 85% Total Suspended Soilds 25% Total Nitrogen 40% total Phosphate SURFACE AREA REQ'D Drainage Area =ac % Impervious =-% Try Perm. Pool Depth =- SA/DA= - Surface Area Req'd = ac Area Provided = 2.43 ac at Elev = 830.50 VOL prov'd perm pool= 9.56 ac-ft Avg Depth =�ft Actual Ratio = 3.11 Actual Area Req'd = 1.408 ac Design TSS% Removal Rate 85 % - sf sf (includes Fore -bay) Mountain & Piedmont Regions T.hlu in-1 SAIDA RATIO CHART (for 85% TSS removal) % imp cover avg. permanent pool depth (ft) 3 4 5 6 7 8 9 10 0.51 0.49 0.43 0.35 0.31 0.29 0.26 20 0.84 0.79 0.70 0.59 0.51 0.46 0.44 30 1.17 1.08 0.97 0.83 0.70 0.64 0.62 40 1.51 1.43 1.25 1.05 0.90 0.82 0.77 50 1.79 1.73 1.50 1.30 1.09 1.00 0.92 60 12.0912.03 1.71 1.51 1.29 1.18 1.10 70 2.51 2.40 2.07 1.79 1.54 1.35 1.26 80 2.92 2.78 2.38 2.10 1.86 1.60 1.42 90 3.25 3.10 2.66 2.34 2.11 1.83 1.67 Perm. pool elevation should be Mountain & Piedmont Regions within 6" +/- of the SHWT Table 10-3 (Seasonal High Water Table) TEMP. DRAWDOWN DETERMINE 1" STORM VOLUME USE SIMPLE METHOD Rv=0.05+0.009(I) Rv= = IN/IN P= IN VOLUME=DESIGN RAINFALL(Rv)DA VOLUME= -AC -FT 141,293 CIF VOLprov= AC -FT at elevation F 831.80 FORE -BAY SIZE PRE -BAY VOL=20% OF PERM POOL VOLUME Includes Forebay & PRE -BAY VOLregd= F1.911 Jacac-ft Main Pond PRE -BAY VOLprov.= 1.845-ft Actual % Used = 19.3 % Average depth should be a minimum of 3 feet. Average depth, day may be computed by: Option 1: d,, = Vol Perm. pool Area perm. pool Option 2: ( see NCDENR Manual ) $A/DA RATIO CHART (for 90% TSS removal) % imp cover avg. permanent pool depth (ft) 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 10 0.9 0.8 0.8 0.7 0.6 0.6 0.5 0.5 0.5 0.5 0.4 0.4 0.4 20 1.5 1.3 1.1 1.0 1.0 0.9 0.9 0.9 0.8 0.8 0.8 0.7 0.7 30 1.9 1.8 1.7 1.5 1.4 1.4 1.3 1.1 1.0 1.0 1.0 0.9 0.9 40 2.5 2.3 2.0 1.9 1.8 1.7 1.6 1.6 1.5 1.4 1.3 1.2 1.1 50 3.0 2.8 2.5 2.3 2.0 1.9 1.9 1.8 1.7 1.6 1.6 1.5 1.5 60 1 3.5 1 3.2 2.8 1 2.7 2.5 1 2.4 2.2 2.1 1.9 1.9 1.81 1.8 1.7 70 4.0 3.7 3.3 3.1 2.8 2.7 2.5 2.4 2.2 2.1 2.0 2.0 1.9 80 4.5 1 4.1 3.8 3.5 3.3 1 3.0 2.8 2.7 2.6 2.4 2.3 2.1 2.0 90 5.0 1 4.5 4.0 3.81 3.51 3.31 3.0 1 2.9 2.81 2.7 2.6 2.5 2.4 ORIFICE SIZING ORIFICE CALCULATIONS orifice formula Q=cA(2gh)A.5 w/ c=.6 2 DAY DRAWDOWN Q2= -cfs DIA (in) 5 DAY DRAWDOWN= Q5= -cfs Inv= (cfs) FROM ORIFICE CALC'S: USE w IN DIA ORIFICE (2) Elev Q ' Top 1" Stor = 831.80 Driving Head = H/3 Approx Draw Down Time = 2.3 days Perm. Pool = 830.5 See Figure 3-3 NCDENR BMP 56 hours Head = LO.43 Manual Avg Q = Enh, cfs Note: Formula modifed for (2) 6" orifices P:\DWG\l Preliminary\P-017 TKC Newton 800K (OLD Rawhide)\6. Calcs\SWM\Wet Pond-ETARC.xls Page 1 Of 2 BOUYANCY CALCULATIONS Weight of Structure Type Box Inside Width 4.0 FT Inside Length 4.0 Wall Thickness 0.5 Concrete CY/FT of Height 0.33 Structure Height 11.85 FT Total Structure 3.95 Pipe Deduction 0.127 Total Vol. of Concrete 3.82 Concrete LB/CY 145 Weight of Structure (Wstructure) 8,340 ANCHOR DIM'S L= 5.0 W=1 5.0 W etr-t— + W anchor WmQ Treqd= 2.84 ft 34.03 in Tprov'd= 36 in Wt. Anchor Prov'd = 6195.00 Ibs Total Wt. of Outlet = 14535.26 Ibs SFpratded = 1.23 Pipe Deductions per NCDOT 840.02 Dia. CY 12 0.032 15 0.036 18 0.049 24 0.085 30 0.127 36 0.178 42 0.243 48 0.317 54 0.401 BouVanCV Calculations BF=VOIRi—xDensityH2o 11,831.04 LBS Wt. Conc.=145-62.4(LB/C LB/CF SFreq=- Total Wt. Required(Wreq)= LBS VOL OF ANCH REQ'D= CF (W req - W structure) / 82.6 N:\Excel Templates\WaterQuality\NCDENRWgcalcs.xls Page 2 of 2