HomeMy WebLinkAboutNCC200918_Annual Fee NOD Letter_20210419ROY COOPER
G-
DIONNE DEUI-GATTI
Secrercry
BRIAN WRENN
nbxror
4/19/2021
Southeastern Construction of Rockfish LLC
Attn: Jeffrey Wright
771 Bostic Rd
Raeford, NC 28376
Subject: Notice of Deficiency- Failure to Pay Annual Fee
Invoice No. NCC200918-2021
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 3/1/2021 and was due on 4/1/2021. The annual fee applies to the following construction site:
McPhail Meadows
Pittman Grove Church Road, McLauchlin, NC
Hoke County
Certificate of Coverage No. NCC200918
NC Reference No. NCG01-2020-0918
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov.
Sincerely,
Annette Lucas
Stormwater Program Supervisor
Division of Energy, Mineral, and Land Resources
Nun CarolFa Deparl ment of Environmental Q"Alry I OIvlslnn of Energy, Mlneral and Land Resources
Sl2NanhSallsburyStreet 1 3612 Mall SerAce center I Ralelgk Nanh Carclkn3 276W-1612
w +�+a 919.707.9246