Loading...
HomeMy WebLinkAbout20110335 Ver 2_Approval Letter_20121108NC ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Chuck Wakild, P.E. Dee Freeman Governor Director Secretary November 8, 2012 DWQ Project # 11 -0335 v2 Wake County Pappas Properties, LLC Attn: Alan Dean 111 Metropolitan Ave; Suite 235 Charlotte, NC 28204 Subject Property: Crabtree Village House Creek [03020201, 27- 33 -13, C, NSW] Authorization Certificate per the Neuse River Basin Riparian Buffer Protection Rules (15A NCAC 02B .0233) with Additional Conditions Dear Mr. Dean: You have our approval, in accordance with 15A NCAC 02B .0233 and any conditions listed below, to permanently impact 1,270 square feet of Zone 1 Neuse River Basin protected riparian buffer and 689 square feet of Zone 2 Neuse River Basin protected riparian buffer, as described within your application, received by the N.C. Division of Water Quality (DWQ) on October 12, 2012. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non - discharge, and other regulations. This authorization certification is for the purpose and design that you described in your application. if you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. Additional Conditions of Certification: Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Type of Impact Amount Approved (Units) Plan Location or Reference Zone 1 Buffers — permanent 1,270 (square ft.) PCN, page 7 (Section C.6) Zone 2 Buffers - permanent 689 (square ft.) PCN, page 7 (Section C.6) Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 Phone 919 -807 -63001 FAX 919-807 -6494 Internet http Hportal ncdenrorglweblwglws An Equal Opportunity 1 Affirmative Action Employer Crabtree Village Page 2 of 4 November 8, 2012 2. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 02B .0233. 3. Diffuse Flow Plan Submittal Required Because the stormwater management plan approved by the city of Raleigh is being used to meet diffuse flow requirements on this project, you are required to provide one copy of the approved SMP, including plan details on full -sized plan sheets, with proof of the city of Raleigh's approval. The approved SMP must be submitted to the DWQ Webscape Unit (1650 Mail Service Center, Raleigh, NC 27699 -1650) before any impacts authorized in this certification occur. The following requirements also apply: • The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site. • The approved SMP as well as drainage patterns must be maintained in perpetuity. • The SMP may not be modified without prior written authorization from the city of Raleigh. A copy of the approval letter and the modified SMP must be submitted to the DWQ Webscape Unit prior to the commencement of the modifications 4. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 5. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion • Crabtree Village Page 3 of 4 November 8, 2012 control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 6. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 7. The applicant and /or authorized agent shall provide a completed Certificate of Completion Form to the DWQ Webscape Unit within ten days of project completion (available at: http:HportaI.ncdenr.org/ web /wq /swp /ws/ 401 /certsandpermits /apply /forms). 8. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the Wetlands, Buffers, Stormwater, Compliance and Permitting Unit web site at: http: / /Porta1.ncdenr.ore/ web /wq /swp /ws/ 401 /certsandpermits /apply /forms. The text of the sample deed notification may be modified as appropriate to suit to this project. You can contest this Authorization Certificate as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings. You may obtain a petition form from the Office of Administrative Hearings at http: / /www.ncoah.com/ or call (919) 431 -3000 for information. Within thirty (30) calendar days of receipt of this notice, you must file the petition with the Office of Administrative Hearings. A petition is considered filed when the original and one (1) copy is received in' the Office of Administrative Hearings during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the Office of Administrative Hearings at (919) 431 -3100, provided the original and one copy of the petition is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. Mailing address for the Office of Administrative Hearings: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 Crabtree Village Page 4 of 4 November 8, 2012 One (1) copy of the petition must also be served to DENR: William Cary, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 Unless such a petition is filed, this Authorization Certificate shall be final and binding. Sincerely, lJ�l` -i�, Karen Higgins, Supervis r Wetlands, Buffers, Stormwater- Compliance & Permitting Unit cc: DWQ Raleigh Regional Office Troy Beasley, Withers and Ravenel, 1410 Commonwealth Drive, Suite 101, Wilmington, NC 28403 File Copy Filename: 110335v2 Pa ppasPropertiesLLCCra btreeVillage(W a ke)_N BR_Approve.docx