Loading...
HomeMy WebLinkAbout20080931 Ver 1_Certification of Completion_20121024I f C R I S E R V TROUTMAN 4 TANNER October 11, 2012 Mr Ian McMillan NCDENR 401 Wetlands Unit 1650 Mall Service Center Raleigh, NC 27699 -1650 Re Castle Street/ Dram Tree Park and Dram Tree Parking Expansion 520 Surry Street Wilmington, NC Dear Mr McMillan See attached our Certificate of Completion To refresh your memory CAMA Mayor permit 151 -09 was Issued December 3, 2009 for Castle Street / Dram Tree Park, the first phase of the project As part of that permit, General Water Quality Certification No 3642 (DWQ Project No 091160) was Issued on 12/04/09 for the first phase of the project called Castle Street/ Dram Tree Park A minor modification to that CAMA permit was Issued October 4, 2011 for Dram Tree Parking Expansion, the second and final phase of the project There is no mention of Water Quality Certification in the CAMA modification permit The attached Certification of Completion is for both phases (the entire project) If you have any questions, please call me at (910) 397 -2929 Cordially, CRISER TROUTMAN TANNER CONSULTING ENGINEERS f Mark T Arcuri, P E Project Manager & Project Engineer MTA/mta /6375 2012 DENF`` , �an�i �► 1y CRISER TROUTMAN TANNER CONSULTING ENGINEERS WILMINOTON NC RALEIGH NC PO Box 3727 Wilmington NC 28406 1 3809 Peachtree Ave Suite 102 Wilmington NC 28403 p 910 397 2929 r 910 397 2971 cttenglneering cam VCDETdR DWQ Project No 0 vvM /F of 9IQ C T. ertificate of Completion o o?oOB -0 f3 / County Ark�- Ca A� S-Olc > Applicant P P-c r Project Name Date of Issuance of Wetland Permit n — -,,!A — w?, Upon completion of all work approved within the 401 Water Quality Certification and /or Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send certificates from all of these Applicant's Certification I, Q.e�, -C C- hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and /or Buffer Rules, the approved plans and specifications, and ooAer supporting materials Signature Um1Lfl—l—u�c Date b l7 l Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to b uilt within substantial compliance and intent of the 401 Water Quality Certification and /or Buffer Rules, ans and specifications, and other supporting materials N%i� r� Signature Date If this project was designed by a Certified Professional 20 I, , as a duly registered Professional (i e, Engineer, Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the protect, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting materials Signature Registration No Date