HomeMy WebLinkAbout20091346 Ver 4_USACE Correspondence_20121108DEPARTMENT OF THE ARMY O � - 16 4 4 V4
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403 -1343
RIMY TO
ATTINCION OF November 6, 2012
Regulatory Division/1145b
Action ID SAW- 2008 -00967
Mr Kyle Ward
Sprigs Investors, LLC
1000 Darrmngton Drive, Suite 105
Cary, North Carolina 27513
Dear Mr Ward
Reference the Department of the Army (DA) permit issued to you on January 10,
2011, for impacts associated with the New Hill Place mixed use development The
project is located northwest of GB Alford Highway (Hwy 55 Bypass), adjacent to the
intersection of GB Alford Highway and New Hill Road (SR 1152), in Holly Springs,
Wake County, North Carolina (35 664727N, -78 848884W) The site encompasses
168 83 acres, comprised of four parcels of predominately wooded land (ranging from
18 -98 acres) and nine small historically residential parcels, adjacent to the four -lane NC
Hwy 55 Bypass The site lies within the Little Branch watershed in the Cape Fear River
Basin
Associated with the development of the property, the proposed road would cross all
four of the tributaries flowing into Little Branch and would impact 1,040 linear feet (If)
of perennial stream channel and 0 044 acre of riparian wetlands In addition, the proposed
construction of the commercial and residential areas of the development would impact a
total of 3,0661f of intermittent stream channel and 0 827 acres of riparian wetlands due to
grading and lot fill In order to offset all unavoidable impacts the applicant has proposed
payment to the North Carolina Ecosystem Enhancement Program (NCEEP) for
restoration of 3,9861f of stream channel within the Cape Fear River Basin (Cataloging
Unit 03030004)
Also, reference is made to your permit modification request received by the Corps on
January 24, 2012, made by your consultant, Mr Ben Wilson, and subsequent approval
issued on February 7, 2012 Specifically, you requested to modify Special condition "5"
of your permit, which addresses compensatory mitigation for your project, to provide for
phasing of the mitigation to coincide with construction and the jurisdictional impacts
associated with the three phases of the project
@r
L�s Lg -
�
fi)lv'8�U12
.. DENR --WATER QUALITY
-2-
Reference is made to your letter of November 5, 2012, requesting another
modification to your existing DA permit Specifically, you have requested a change in the
mitigation payment schedule, due to the need to construct a sanitary sewer connection
identified as impact area' 2" which would impact 3121f of perennial stream channel
We have completed our evaluation of your request and concur with your request for
a change to the phased mitigation payment schedule Accordingly, Special Condition' 5"
of your permit is hereby modified to read
"In order to compensate for 0 871 acre of permanent impacts to wetlands and 4,106
linear feet of stream channel, the permittee shall make payment to the North Carolina
Ecosystem Program (NCEEP) in the amount determined by the NCEEP, sufficient to
perform the restoration of 3, 9861inear feet of warm water stream channels and 1 75
acres of riparian wetlands in the Cape Fear River Basin (Cataloging Unit 03030004)
Construction withmjurisdictional areas on the property shall begin only after the
permittee has made payments per the below mitigation table to the NCEEP and provided
a written confirmation to the Corps that it agrees to accept responsibility for the
mitigation work required, in compliance with the In -Lieu Fee Instrument that was
approved by the United States Army Corps of Engineers on July 28, 2010
The applicant will make phased mitigation payments to the NCEEP as listed below The
cost of credits will be the current price at the time of payment, not the current price at the
time the permit of this modification was issued No work on any phase of the project
shall begin until the payment for that phase has been issued to the NCEEP "
Phase
Impact Areas
Mitigation Required
Mitigation Payment
Number
Deadline
1,278 LF of stream &
1
4, 6, 7, 8, and 8A
1 25 acres of wetland
2/29/2012
2
2
624 LF of stream
11/30/2012
1, 3, 5, 10, 11,
1,920 LF of stream &
3
11A, 11 B, and 12
0 50 acres of wetland
12/31/2013
4
15, 16 and 17
164 LF of stream
12/31/2013
-3-
Once again, we have completed our evaluation of your request and concur with your
request for a change to the mitigation phasing schedule associated with your referenced
DA permit It is understood that all other conditions of the permit, including the permit
expiration date, remain applicable Should you have questions, contact Mr James
Lastmger, Raleigh Regulatory Field Office at telephone (919) 554 -4884, Extension 32
Sincerely,
� )1:a�
Steven A Baker
Colonel, U S Army
District Commander
Copy Furnished
Mr Ian McMillan
NCDWQ
1650 Mail Service Center
Raleigh, NC 27604
Ms Kelly Williams
NCEEP
1652 Mail Service Center
Raleigh, NC 27699
Mr Ben Wilson
ATC Associates
2725 East Millbrook Road, Suite 121
Raleigh, NC 27604
Copy Furnished (by email)
Mr David George
Kite Realty Group
30 South Meridian Street, Suite 1100
Indianapolis, IN 46204