Loading...
HomeMy WebLinkAboutWQ0020169_Regional Office Historical File Pre 2018Michael F. Easley, Governor William G. Ross Jr_ Secretor,' North Carolina Department of Environment and Natural Resources Alan W, KUnieL, P.E. Director Division of Water Quality April 14, 2005 Mr. Paul Campbell, Director of Engineering City of Concord Post Office Box 308 Concord, North Carolina 28026 Subject: Permit No. WQ0020169 Modification City of Concord Center at Kings Grant Crossing Phase 1A Wastewater Collection System Extension Cabarrus County, North Carolina Dear Mr. Campbell: In accordance with your application received on April 6, 2005, we are forwarding herewith Permit No, WQ0020169, dated April 14, 2005, to the City of Concord for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, shall void Permit No. WQ0020169 issued August 13, 2001, and shall be subject to the conditions and limitations as specified therein. This coveriefter shall be considered a part of this permit and is therefore incorporated therein by reference. The modification includes the addition of approximately 11 linear feet of 18-inch gravity sewer, and the decrease of approximately 268 linear feet of 8-inch gravity sewer. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H .0227 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2H .0200; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215,6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone (704) 663-1699 Fax (704) 663-6040 Internet h2o.enr.state.nc.us Customer Service: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post ConsunierPaper Mr, Paul Campbell Page 2 April 14, 2005 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Concord for the construction and operation of approximately 11 linear feet of 18- inch gravity sewer as part of the Center at Kings Grant Crossing Phase 1A project, with no additional discharge of collected domestic wastewater into the Water and Sewer Authority of Cabarrus County's existing sewerage system, pursuant to the application received April 6, 2005; and the continued construction and operation of approximately 255 linear feet of 18-inch gravity sewer, and approximately 753 linear feet of 8-inch gravity sewer (a decrease of 268 linear feet of originally permitted 1,021 linear feet) to serve a commercial development as part of the Center at Kings Grant Crossing Phase 1A project, and the discharge of 50,000 gallons per day of collected domestic wastewater into the Water and Sewer Authority of Cabarrus County's existing sewerage system, pursuant to the application received June 14, 2001, both in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County (WSACC) Rocky River WWTP (NPDES No. NC0036269) prior to being discharged into the receiving stream. This permit shall become voidable unless the agreement between the City of Concord and WSACC for the collection and final treatment of wastewater is in full force and effect. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 1508 of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Sonja Basinger at (704) 663-1699. Sincerely, /1:27C7--Ce for Alan W. Klimek, RE. cc: Cabarrus County Health Department Mooresville Regional Office, Surface Water Protection Jill Brim, Concord Engineering & Surveying, Inc. Surface Water Protection Central Files Marie Doklovic, PERCS F Permit No, NC0036269) NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227, If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d, Pump stations that are not connected to a telemetry system shall be inspected every day (Le, 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year, g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215,1C. 4, This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Perrnittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Per 15A NCAC 2H .0220, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Perrnittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities, 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 11. Noncompliance Notificatio The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc,; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence, This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved forrn) can also be completed to show that the SSO was beyond control. Permtt issued this the 14th day of April, 2005. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W. Klimek .E, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0020169 Fast Track Engineering Certification Permit No. WQ0020169 Modification April 14, 2005 Complete and submit this form to the permit issuing regional office with the following + One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension. Supporting design calculations (selected pumps„ system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division, Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION © Partial Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (0 periodically, ❑ weekly, El full time) the construction of the Center at Kings Grant Crossing Phase 1A, Cabarrus County project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track. Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 ATTN: DEE BROWDER The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, Central Files. APS SWP Permit Number WQ0020169 F. 04114/05 Permit Tracking Slip Program Category Non -discharge Permit Type Fast Track Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer Permit Contact Affiliation sonja.basinger Paul Campbell, PE Permitted Flow P© Box 308 0 Concord NC 28026 Status In review Project Type Major modifica Version Permit Classification Individual Facility Name Center at Kings Grant Crossing Phase IA Location Address Owner Owner Name City of Concord Date !Event Scheduled Oriq Issue ARP Received Draft Init!ated Issuance 08/13/01 04/06/05 Regulated Activitie Major/Minor Region Minor Mooresville County Cabarrus Facility Contact. Affiliation Owner Type Government - Municipal Owner Affiliation Paul PO Box 308 Concord Public Notice Commercial or industrial, other Restaurant Wastewater collection Outfall I LILL u� I Campbell, PE NC Effective Requested/Received Events Additional information requested Additional information received 28026 n Waterbody Name Stream Index Number Current Class Subbasin OC ME AS A VOICi PA' 0 RAP IU!` ROPR NTI 0 • N o AN AR IF CIA 6Na TEF1 AR CITY OF CON+ ORD PO.13O . 308 C'OR.f, N.C': 8O2 t308 3I;NERAL OP RA$`ING ACCOUNT Y POUR 1.1UD DOTaLAR CEO TO THE °R t7 ER or NCDE A l t�vi6.060K. IWARtCh A SS 3CIA'rloN r srtt a, 4C 2 W2 'op 6t3DAYS 028653 2ne I:o53 1©1561i:20799O©1 21,8660 s a;s. 286532 CHECK t7ATE ?3/11/©5 CHECK No 2B6532 *400 00 nt as been approved as required veca rnent Budget and Fiscal �C. Authorized Signature • FAST -TRACK APPIIC`ATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 Z 0 Lt. If. NC State 0 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Owner la. City of Concord Full Legal Name (company, municipality, HOA, utility, lb. Paul D. Campbell, Director of Engineering Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!; lc. The legal entity who will own this system is: ❑ Individual ❑ Federal ► Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): Application Number: (to be completed by DWQ) ld. 850 Warren C. Coleman, P.O. Box 308 Street Address 1 h. (704) 920-5425 Telephone 2. Project (Facility) information- 1 i. 786-452 Facsimile 2a. Center at Kings Grant Crossing, Phase 1A Brief Project Name (permit will refer to this name) 3. Contact Persona 3a. Mrs, Jill M, Brim PE Concord Engineering & Surveying, Inc. e Concord City l g. 28026 Zip Code beCncordnc.0 E-r 2b, Cabarrus County Where Pro Name and Affiliation of Someone Who Can Answer Questions About this Appication 3b. ,(704) 786- Phone Numbe 1. Project is ❑ tion (of an existing permit) ocated 3c. jillbrim@concordengine ring.com E-mail cation, Pe No.: W00020196 For modifications, attach a separate sheet clearly explaining the reason for the modification (Le. adding another phase, changing line sizellength, etc.). Only include the modified information in this permit application - do not duplicate project information in B(7) and B(10-11) that has already been included in the original permit. 2. Owner is !' Public (skip to item B(3)) ❑ Private (go to Item 2(a)) 2a. If private, applicant will be° 2b. If sold, facilities owned by a (must choose an Retaining Ownership (i.e. store, church, single office, etc) or © Leasing units (lots, townhomes, etc. - skip to Item 8(3)) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) Water & Sewer Authority of Cabarrus County, WSACC Owner of Wastewater Treatment Facility (WWTF) Treatin 4a. Rocker River WWTF 3.1 tL Name of WWTF Z 5a. WSACC Owner of Downstream Sewer The origin of this wastewater is (check all that apply): El Public Utility (Instruction III) ❑ Homeowner Assoc /Developer (Instruction IV) ewater From This Project 4b. NC0036269 `5b. 18-inch El Residential Subdivision ❑ Apartments/Condominiums obile Home Park School rr. Restaurant ❑ Office Receiving Sewer Size Car Wash ❑ Institution • Hospital ❑ Church © Nursing Home ❑ Other (specify): WWTF Permit No. 7, Volume of wastewater to be permitted in this project 0 gallons per day it Number of Oownstrearn Sewer (if known) If the permitted flow is zero, indicate wiry: ❑ Interceptor Line - Flow will be permitted is subsequent permits that connet Flow has already been allocated in Permit No, WQ062016S El Rehabilitation or replacement of existing sewer with no new flow expected this line Ca/ Domestic/Commercial % Industrial % Other (specify): FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AN III FORCE MAINS PAGE 4 Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below, Values other than that in 15A NCAC 2H ,0219(I)(1-2) must be approved prior to submittal of this application. Submit a separate request to the Division of Water Quality, Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699 -1617 in accordance with 15A NCAC 2H .0219(I)(3). Flow previously all under permit 2916 PJ 10 Summary of Sewer Liters to be Permitted (attach additional sheets if necessary) Size (inches) 8 Length (feet) 753 266 Gravity or Force Main (use the pull down menu) Gravity Gravity Z ENTER TOTAL LINE LENGTH IN MILES CI Q' Q 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID Power Reliability Option (self chosen - as shown on Design Flow Operational Point (1- dual line feed; 2- permanent generator wIATS; 3 plans for cross-reference) (MGD) GPM @ TDH portable generator wltelemetry; 4-wet well storage) 12, Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force: Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .02as applicable? Yes 0 No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested: SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO TIME VARIANCE '#I 'tTi°t YOUR APPLICATION 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? 0 Yes 0 No N/A Sedimentation and Erosion Control Plan? 0 Yes 0 No N/A Stormwater? 0 Yes © No N/A FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 5 1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality Z regional office (see instructions for addresses) OR indicate the following: 0 A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody; AND, A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. 1) z 0 d Location ID on Map (self chosen - as shown on map for cross-reference) Harrisburg 1969 Quad Name of Waterbody Stream Waterbody Waterbody County River Basin Index Classification Rocky River Cabarrus Yadkin 13-17 C Submit the 8.5" x 11" COLOR topographic map as required in Instruction VI regardless of whether a classification is provided! 1. Applicant's Certification: I, Paul D. Campbell, PE attest that this application for Center at Kings Grant Crossing, Phase 'IA has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete, Note; In accordance with North Carolina General Statutes 143-215.6A and / 43-215.6B, any person who knowingly makes any false statement, representation, or certification in any application Shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well es Civil penalties up to $25,000 per violation, Signing 0fficiaflSgtature 2. Professional Engineer's Certificabon: attest that this application for Contor at Kings Grant Crossing, Phase -1A has been reviewed by me and accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies thi. have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215 6A and 143-215,6B, any person who knowingly makes any se statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, 2a. Jill M. Brim Professional Engineer Name 2b. Concord Engineering & Surveyjng, Inc. Engineering Fimi 2c, P,O. Box 268 Address 2d, Concord 2e. NC 2f 28026 City State Zip 2g. (704) 786-5404 2h, 2i. jillbrim concordengineering,com Telephone Facsimile E-mail TopoZone - The Web's Topographic Map Page 1 of 1 0.3 0.6 0.9 1.2 1.5 kg, 0 0.2 0.4 0.6 0.6 Map center is UTM 17 525633E 3914900N (WGS84/NAD83) Kannapolis quadrangle Projection is UTM Zone 17 NAD83 Datum G=0.163 http://www.topozone.com/printasp?z-17&n.---3914899.87077806&e-525632,55273254&s-50&sizo-1_ 8/23/2004 WSACC WATER & SEWER AUTHORITY OF CABARRUS COUNTY June 8, 2001 W, Brian Hiatt City of Concord Manager P. O. Box 308 Concord, NC 28026-0308 RE: FLOW ACCEPTANCE - CENTER AT KICNGS GRANT CROSSING Dear Mr. Hiatt: C 28027 to RO, Box 428 NC 28026-0428 6.1783 The Water and Sewer Authority of Cabarrus County (W SACC) has or currently expects to be able to make available capacity at the Rocky River Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the domestic wastewater from the proposed Center at Kings Grant Crossing. WSACC agrees to accept wastewater from five 200-seat restaurants. Based on North Carolina Department of Environment and Natural Resources (NCDENR) wastewater flow guidelines, the projected flow is 50,000 gpd; however WSACC expects the actual wastewater flow to more closely approximate 40,000 gpd based upon Master Plan engineering data. By requesting flow acceptance, the City of Concord acknowledges that WSACC may need to upgrade, expand, or construct new facilities to accommodate the increased' flow volume granted by this and previous flow acceptance. Appropriate design and construction will be initiated when actual flows dictate but may be subject to situations that WSACC does not expect or control. Based upon flow of 50,000 gpd and cost of S6,7595/gpd to provide treatment and transportation capacity, this flow acceptance represents an estimated capital expenditure in excess of 5337,900. For your information and based upon NCDENR wastewater flow guidelines, WSACC has approved 10,160,768 gallons of flow acceptance for the City of Concord from 1992 to present and 759,922 gallons of flow acceptance year-to-date including this request. Based upon the approved flow acceptances WSACC has committed capacity valued in excess of $68,681,700 for the City of Concord since 1 i i lauding $ � , � �, 7�t�0 tar this calendar year. Downstream facilities trr, tt proposed project are scheduled in WSACC's current Capital Improvement Program (CIP) to increase available capacity, Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory approval, and funding availability. The following schedule of CIP projects is tentative and may he delayed by unforeseen circumstances: Lowe's Motor Speedw°ay Pump Station and the .Rocky River Pump Station at Highway 29 will be abandoned with the completion o the Harrisburg Rocky River Interceptor and Lower Rock` I'ver Inter cep torr`frrce Main and Pump Station, Scheduled completion date: July 20� 1 Sincerely', Infn C . Murdock, III Executive Dire.ctor Page Center at Kin s Grant Crossing une , 2001 Lower Coddle (>r I t-eptor °ibe par 1. ; ed l d cornp i p date: 2003. Kings Grant Rocky River Interceptor w.,ill be paralleled. Scheduled crarnletsnri date: 2004 Rocky River Waste ater Treatment Plant will be expanded to 34 Scheduled completion date: 2005, If construction of this project is not started within one year the date of this approval, the approval is rescinded and a second request and approval will be required. Please notify WSACC in writing when construction of this project is initiated. Also, notify Mark o ax 10 /786 I ) 4 hours prior to connection to the interceptor. If you have any questions, please call me at7 4 /86-1781 JCIEL/ cc Mark Lambert jay hive esey{ Furr k Lomax Mark nwler/Concord Adam apenhart/Cone r , Governor Cobey, Jr., Secretary orandum To: De1e arei Muracipali +es Frost: Steve W. Tedder, Chief Water' Quality Section Subject: Delegated Municipalities Chec State of No Carolina Department of Enrironment,Health, and Natural Resources Division of Environmental Management 512 North Salisbury Sr-ect ' Raleigh, North Carolina 27626-0535 George T. Everett, Ph.D. 1DL"tar May 1, 1991 evised Non -Discharge Pcrrriit Applications The Division of Environmental Management's Water Quality Section has revised the Gravity Sewer Non -Discharge Permit A.pplicatian Form. The form now incorporates the basic information that the Division feels is necessary in order for the delegated municipalities to perforn a review on a gravity sewer project for the Division; therefore, the Division will no longer require that the "Delegated Municipalities Gravity Sewer Design Checklist" be completed and submitted.. We do, however, require that the delegated municipality perform the same type of review as always required and complete the bottom portion of this page and attach it as the last page of all gravity sewer applications that "tee being submitted as a delegated municipalities project- If you have any questions on this matter, please contact Mr. Randy Jones at 91.9/733-50S3. DELEGATED MUNICIPALITY GRAVITY SEWER CERTIFICATION (THIS FORM MAY BE Ph'OI OGOPIED FOR USE AS AN ORIGINAL) CN E r T 1<r Applicant: Project Na Delegated Municipality Re specifications have been reviewed under my su consistent with the inforrnadon that has been s Division of Environmental Management's inininium Certification: Delegated Municipality Reviewer's NC Prof, Seal and Sigrarur (s - ify date):: FORM: DMGS 4/91 PAGE 1 OF 1 }on an if"icd on design requir lR :st that the subject patlanst©ns aarcnd plans and spe<..ific -Discharge Application and the nts far gravity sewer projects. ianal Engineer's Registration No.: City of Concord Engineering Department Scott Padgett, Mayor W. Brian Hiatt, City Manager Paul D. Campbell, P.E., Director of Engineering April 6, 2005 N.C. Department ofEnvironment and Natural Resources Division of Water Quality - Surface Water Protection Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 Attn: Mrs. Sonja Basinger 11,111, a city meeting the future. Subject: Permit Modification Request Wastewater Collection System Extension/Modification Project Title: Center at Kings Grant, Phase I A NCDENR Permit No: WQ0020169 Permit Issuance Date: August 13, 2001 City of Concord Project No, 2000-1416 City of Concord Cabarrus County Rocky River WWTP NPDES NC0036269 Dear Mrs. Basinger: The City of Concord is respectfully requesting a permitmodification for the Center at Kings Grant, Phase 1A, an existing commercial. subdivision located off of Concord Mills Boulevard. We are enclosing for your review and approval an original and a copy of the executed Fast -Track application form with enclosures, two copies of the WSACC flow acceptance letter, a copy of the original NCDENR Non -Discharge permit for the Center at Kings Grant Phase IA wastewater collection system.; as sealed and certified by Jill M. Brim, NCPE with Concord Engineering and Surveying. The Center at Kings Grant,. Phase IA original NCDENR DWQ Non -Discharge permit, WQ0020169, was issued on August 13, 2001 and specified a wastewater collection system extension consisting of 1,021 linear feet of 8-inch gravity sewer and 255 linear feet of 18-inch gravity sewer to serve a commercial development with an average wastewater discharge of 50,000 GPD. Please modify the existing Center at Kings Grant, Phase IA permit to account for the reduction of 8-inch gravity sewer and the increase of the 18-inch gravity sewer and to account for an error in permitting that stemmed from unforeseen fieldconditions and the subsequent redesign of the sewer system. The NCDENR DWQ Non -Discharge permit, WQ0020169,. should have been permitted for the constructionand operation of approximately 753 linear feet of 8-inch gravity sewer and 266 linear feet of 18-inch gravity sewer with manholes and associated appurtenances off of Concord Mills Boulevard to serve an commercial development with an average wastewater discharge of 50,000 GPI), in accordance with Title 15A of the North Carolina .Administrative Code, Subchapter 2 H .0200; The Division of Water Quality's Gravity Sewer Minimum Design Criteria Alfred M. Brown Operations Center 850WanalCColenun.13lvd. • Pk). Box 308 • Noah Carolina. a1026 ?704) 9M-5425, (70,4' 7 g 6-4521 X) 1 -3 X )-73,54Qa2 Amp -mirk nej adopted February y 17 1996, as applicable; the Water and Sewer Authori standard technical specifications; the City of Concord's ordinances, specifications; the approved plans; and other supporting data. f there are any questions concerning this application package r the attac (7 -m Sincerely, Cir off D. Campbell, P.E., Di r c:t r of Engineering 'Insure cc:'r� j i No_ 2t. 00-146 Cah rw klca th r [[i ttcc_ t 307 South Cannon Concord EngineerinS rrvcy�ing. P,0 £Boa'6 A. E at I cput}° C iiv E n' NC 80 3 026, Attn: c h eats please t of Cabarrus County's 's pol is ics, and technical r wnOperations P.O. I-3 3 i a. )(Alai N Car State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D,, Acting Director August 13, 2001 PAUL D. CAMPBELL, INTER1M DIRECTOR OF ENGINEERING CITY OF CONCORD POST OFFICE BOX 308 CONCORD, NC 28026 Dear Mr. Campbell: DENRJT NORTH CAROLINA DEPARTMENT Or ES ENViRONMENT AND NATURAL RESQURCEt AUG 1 5 20 Subject: Permit No. WQ002, City of Concord Center At King's Grant Crossing Phase la Wastewater Collection System Extension Cabarrus County In accordance with your application received June 14, 2001, we are forwarding herewith Permit No. WQ0020169, dated August 13, 2001, to the City of Concord for the construction and operation of the subject wastewater collection system extension. This pennit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A. NCAC 2H .0227 or any individual system- wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Purnp Stations and Force, Mains adopted June I, 2000 as applicable, unless specifically mentioned herein, Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Pemlittees responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §1.43-215.6A through §1.43-215.6C, construction of additional or replacement wastewater collection facilities, andJor referral of the North Carolina -licensed Professional Engineer to the licensing board. In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to City of Concord for the construction and operation of approximately 1,02.1 li.near feet of 8-inch gravity sewer and 255 linear feet of 18-inch gravity sewer to serve commercial development. (five restaurants) as part of the Center At King's Grant Crossing Phase la project: and the discharge of 50,.000 gallons per day of collected domestic wastewater into the Water (k. Sewer Authority of Cabarru.s County's existing :sewerage system, pursuant to the application received June 14, 2001, and in conformity with I5A NCAC 2H :0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June I, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. 1617 MailService Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 FAX (919) 715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper The sewage and wastewater collected by this system shall be treated in the Water & Sewer Authority of Cabarrus Count) Wastewater Treatment Facility (NPDES Permit Ni. NC0036269) prior to being discharged into the receiving stream. This permit shall become voidable unless the agreement between the City of Concord and Water & Sewer Authority of Cabarrus County for the collection and final treatment of wastewater is in full force and effect. if any parts, requirements, or !irrigations contained in this permit are unacceptable, you have the right to request an adjudicator) hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 15013 of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Kristin E, Miguez at '733-5083 extension 524. Sincerely, cc: ('abarrus County Health Department Mooresville Regional Office, Water Quality Section (WWTF Permit No, NC0036269) ESP Associates, PA WSACC (PO Box 428, Concord, NC 28026) (919) NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minirnum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June L. 2000 as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all tines. The Perrnittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A, NCAC 2H. .0227. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 21'1.0227: a, The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters,. and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15.A. NCAC 2B .0200.. b. A map of the sewer system shall be developed prior to January I: 2004 and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented, d. Pump stations that are not connected to a telemetry system shall be inspected at least three times per week until July I. 2000; thereafter, pump stations shall. be inspected at least daily, as defined in 15A NCAC 2B .0503(5), until July 1., 2001; and thereafter, pump stations shall be inspected every day. Pump stations that are connected to a telemetry system shall be inspected at least once per week. e.High-priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be .maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute ,§143-215.1C. 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting .materials as may be appropriate. The approval of this request shall be considered 07 its merits and may or may not be approved. 5. Constructionof the gravity sewers shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Upon completion of construction and prior to operation of these permitted. facilities, a certification, a copy of the construction record drawings, as wellas supporting design calculations for any pump stations permitted as part of this project shall be received from a North Caroli.na-licensed Professional. Engineer certifying that the facilities have been installed in accordance with this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the. Fast -Track Permitting of Pump Station and Force Main adopted June 1, 2000 as applicable; and other supporting materials.. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire project has been completed. A copy of the construction record drawings, indicating the facilities constructed in the phase being certified, shall be submitted with each partial certification. Mail the Engineer's Certification, one copy of the "Construction Record Drawings", and one copy of the supporting design calculations to the .Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. S. Failure to abide by the conditions and limitations contained in this permit; 1.5A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's 'Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C. 9, In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions., the Permittee shall take immediate corrective action. including those as may be required by this Division. such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in I5A NCA.0 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit .NCG0100000, and any requirements pertaining to wetlands under I.5A NCAC 2B .0200 and 15A NCAC 2H .0500. 11. Noncompliance Notification: The Permittee shall report by telephone to the Mooresville Regional Office, telephone number (704) 663- .1699, as soon as possible, but in no case in.ore than 24 hours or on the next working day, followingthe occurrence or firstknowledge of the occurrence of either of the following: a. Any process unit: failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport. such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility, Persons repotting such occurren by telep ione shall also file w ritten report in letter form within fay days folloMng first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problems does not recur. Rerun issued this the thirteenth day of august. 2001 NORTH CAROLINA ENVIRONMENTAL ANA ENT COM1SSION Gregory 1. Thorpe, Ph.a, Act Division of Water Quality By Authority of the Environm n lanagez erttComm sion Permit Number WQ0020169 Permit No. WQ0020169 August 13, 2001. ENGINEER'S CERTIFICATION Partial Final 1, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Project Name Location and County Peimittee hereby .state that,. to the best of my abilities,. due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1,, 2000 as applicable; and other supporting materials, North Carolina Professional Engineer's seal, signature, and date: The above Engineer's Certification shall be completed and submitted to the address below with one copy of the "Construction Record Drawings" of the wastewater collection system extension as well as supporting design calculations for any pump stations permitted as part of this project. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 4