Loading...
HomeMy WebLinkAbout20120296 Ver 2_Other Agency Comments_20121029 .DEPARTMENT �1 ANT •F OF THE ARMY r. a*417 *f'f'ti WILMINGTON DISTRICT CORPS OF ENGINEERS '` " i � -,-,0. fW m Washington Regulatory Field Office ��1 .) illl!:; 2407 W 5"Street yF �?�/�1/ cy�rf ���'' IN REPLY REFER TO Washington North Carolina 27889 T,y'�G )`� '9 J,.ff,✓ •`FTATES��F N' 4)sl'7�f�`A October 22, 2012 14 Regulatory Division Action ID No SAW 2006 10391 L 2 — b 7_ 'I Co Mr Jerry Jennings Division Engineer N C Department of Transportation 113 Airport Drive Edenton,North Carolina 27932 Dear Mr Jennings Reference the Department of the Army(DA)permit issued to NCDOT on August 17, 2012 to widen approximately 7 7 miles of US Highway 158 (TIP R 2507A) from an existing two lane ' facility to a multi lane facility from the intersection of US Highway 13/158 just west of Winton to the split of US Highway 13/158 in Tarheel in Hertford and Gates Counties North Carolina Also reference your subsequent written request dated October 15, 2012 for a permit modification to do the following A Permit Site 1 —Permanent fill will be decreased from 0 56 acres to 0 54 acres and mechanized clearing will increase from 0 18 acres to 0 19 acres B Permit Site 4—Hand clear 0 06 acres C Permit Site 5 —Permanent fill will increase from 2 01 acres to 2 03 acres and mechanized clearing will increase from 0 30 acres to 0 31 acres D Permit Site 23 —Hand clear 0 14 acres E Permit Site 32 —Permanent fill in wetlands will decrease from 1 08 acres to 1 07 acres F Utility Permit Site 1 —Reduce hand clearing from 0 06 acres to 0 acres and mechanize clear 0 09 acres The proposed modification will increase the total temporary hand clearing jurisdictional impacts for the above penult project sites to 0 20 acres increase the total mechanized clearing impacts for the above project sites to 0 76 acres and reduce the permanent fill impacts at the above project sites to 4 43 acres These changes are reflected in the chart which was included with the permit modification request This modification request was coordinated with the appropriate State and Federal agencies and the coordination revealed no objections to this modification request Therefore the permit is hereby modified m accordance with the specific work activities described above and in the enclosed plans It is understood that all conditions of the original permit remain applicable and that the expiration date is unchanged In addition the permittee will comply with the following Special permit conditions a All work authorized by this permit modification must be performed in strict compliance with the attached work plans which is part of this permit Any modification to the permit plans must be approved by USACE prior to implementation b The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit and any authorized modifications A copy of this permit and any authorized modifications including all conditions shall be available at the project site during construction and maintenance of this project c Special condition t of the above referenced permit is hereby modified as follows In order to compensate for impacts to 163 linear feet of stream / 20 32 acres of wetlands the permittee shall make payment to the North Carolina Ecosystem Enhancement Program (NCEEP) in the amount determined by the NCEEP sufficient to perform the restoration or restoration equivalent of 326 linear feet of warm water stream/29 08 acres of riparian rverme/11 56 acres non riparian wetlands in the Chowan River Basin Cataloging Unit 0301203 Construction within jurisdictional areas on the property may begin upon permit issuance,however within 30 days of permit issuance NCDOT shall provide written confirmation to the Corps that NCEEP agrees to accept responsibility for the mitigation work required in compliance with-die NCEEP In Lieu Fee Instrument, approved by the United States Army Corps of Engineers Wilmington District on July 28 2010 Until the Corps receives this confirmation letter from NCEEP NCDOT remains responsible for this mitigation requirement If the Corps has not received a confirmation from NCEEP within 150 days of the date of this verification NCDOT shall provide plans to accomplish the required mitigation to the Corps of Engineers within 210 days of the date of this verification 2 Any questions regarding this correspondence may be directed to Mr Bill Biddlecome NCDOT Coordmator/Regulatory Project Manager at the Washington Regulatory Field Office telephone (910) 251 4558 Sincerely 114.g/I I i d)-, .60—. Steven A Baker Colonel U S Army District Commander Enclosure Copies Furnished (without enclosure) Ms Cathy Brittingham Division of Coastal Management 1638 Mail Service Center Raleigh North Carolina 27699 1638 Mr David Wainwright Water Quality Section North Carolina Division of Environment and Natural Resources 1650 Mail Service Center , Raleigh North Carolina 27699 1650 Mr Paul Williams N C Department of Environment and Natural Resources Division of Coastal Management 1367 US 17 South Elizabeth City North Carolina 27909 3 Mr Garcy Ward NCDWQ Washington Regional Office 943 Washington Square Mall Washington North Carolina 27889 4