Loading...
HomeMy WebLinkAboutNCG500221_Compliance Evaluation Inspection_20210413 (2)United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code 1 IN I 2 LI 21 1 1 1 1 1 NPDES yr/mo/day Inspection 3 I NCG500221 111 121 21/04/12 117 Type 1810I I I 1 1 1 Inspector Fac Type 191 S I 2011 1 1 1 1 11 1 1 1 I I I 1 1 1 1 1 1 I I I I I 1 11 1 1 1 I 1 P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 67I1.0 I 70I I 71IN I 72 I N I 731 1 74 751 I I 1 I I I I I I 180 l Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES oermit Number) IMC-MetalsAmerica, LLC 135 Old Boiling Springs R Shelby NC 28152 Entry Time/Date 01:10PM 21/04/12 Permit Effective Date 20/12/15 Exit Time/Date 01:45PM 21/04/12 Permit Expiration Date 25/11/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Brian Freeman//704-471-6585 / Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Steve Ryan,135 Old Boiling Springs R Shelby NC 28152/Plant Manager/704-471-6505/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Operations & Maintenar Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) Michael J Meilinger Ori A Tuvia of Inspector(s) Agency/Office/Phone and Fax Numbers Date 4/13/2021 �—DocuSigned by: DWR/MRO WQ/704-235-2183/ i DWR/MRO WQ/704-663-1699/ \---1313Q57A2DEA17196... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger DWR/Division of Water Quality/704-235-2194/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. DocuSigned by: 4/13/2021 "- A14CC681AF27425... Page# 1 NPDES yr/mo/day 31 NCG500221 111 121 21/04/12 I17 Inspection Type 18 [j 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# 2 Permit: NCG500221 Inspection Date: 04/12/2021 Owner - Facility: IMC-MetalsAmerica, LLC Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ • ❑ application? Is the facility as described in the permit? • ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ • ❑ ❑ Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑ Comment: The following processes are present at the facility: Air Compressor — Oily water from the air compressor flows to the floor of the basement, liquids are pumped into two tanks capable of holding up to 13,000 gallons. Heritage Crystal pumps out said tanks Bi-monthly averaging approximately 4,500 Gallons. Cooling Towers- new cooling towers installed at the facility coolers are closed loop with no discharge; only discharge during maintenance. Maintenance related discharge goes into wastewater collection system treated by the city of Shelby. Boiler — has stopped working since the previous inspection and at the time the facility is not planning on repairing or replacing the boiler. the boiler blowdown was the only discharge the facility had and with it not being operational the facility has not been discharging. If the boiler is repaired or replaced the facility will need to notify MRO staff, and boiler blowdown discharge must be sampled semi-annually for PH, Flow and temperature. Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Yes No NA NE ❑ ❑ • ❑ ❑ ❑ • ❑ Comment: The following processes are present at the facility: Air Compressor — Oily water from the air compressor flows to the floor of the basement, liquids are pumped into two tanks capable of holding up to 13,000 gallons. Heritage Crystal pumps out said tanks Bi-monthly averaging approximately 4,500 Gallons. Cooling Towers - new cooling towers installed at the facility coolers are closed loop with no discharge; only discharge during maintenance. Maintenance related discharge goes into wastewater collection system treated by the city of Shelby. Boiler — boiler is used once a week. Blowdown from the boiler goes into the storm water system. Boiler must be sampled semi-annually for PH, Flow and temperature. pH calibration standards were out of date at the time of the inspection. At the time of the inspection facility staff was instructed as to how to properly calibrate, sample and record the required sampling. Page# 3