Loading...
HomeMy WebLinkAboutWQ0042435_Application (FTSE)_20210407Gavel & Dorn Engineering, PLLC 6730 I'rcedotn Drive,Charlotte, NC 2821,I, 701 83-205,1 March 19, 2020 NC Department of Environmental Quality Division of Water Resources Mooresville Regional Office Water Quality Section 610 E. Center Avenue Mooresville, NC 28115 Re: Charlotte Water — Mallard Creek WRF Trailer & Parking Improvements Phase 2 Gravity Sewer System Fast Track Application Dear Reviewer: On behalf of our client, Charlotte Water, Gavel & Dorn Engineering, PLLC (G&D) is pleased to submit the following documents for review relating to the Mallard Creek WRF Trailer and Parking Improvements Phase 2 Project: • (1) Check for application fee in the amount of $480.00; • (2) Copies of Fast Track Application and supporting documentation. Charlotte Water will be constructing a new 8-inch sanitary sewer main to service construction trailers located near the Mallard Creek Wastewater Reclamation Facility in Charlotte, NC. Total new private sanitary sewer main to be constructed is 513 LF. The flow will discharge to a public sewer maintained by Charlotte Water that is then directed to the Mallard Creek Wastewater Reclamation Facility. There will be 10 total office trailers and estimated 65 employees in the trailers. New sewer flow is based on the assumed 65 employees. Total permitted flow will be 1625 GPD. Please contact me at 704.724.5047 if you need any additional information for your review. Sincerely, GAVEL & DORN ENGINEERING, PLLC Sean Mayo, P.E. TABLE OF CONTENTS COVER LETTER FAST TRACK APPLICATION FTA 04-16 FLOW TRACKING ACCEPTANCE FORM FTSE 08-13 SITE MAPS STREAM CLASSIFICATIONS Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number:' v � . Or) P 444 be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: WOROS MOORESVILLE REGIONAL OFFICE 1. Applicant's name: Charlotte Water (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Joseph C. Wilson per 15A NCAC 02T .0106(b) Title: Chief Engineer 4. Applicant's mailing address: 5100 Brookshire Blvd City: Charlotte State: NC Zip: 28216- 5. Applicant's contact information: Phone number: (704) 336-1083 Email Address: cwilson@ci.charlotte.ne.us RECEIVED/NCDEQ/DWR APR - 7 2021 II. PROJECT INFORMATION: 1. Project name: Mallard Creek WRF Trailer and Parking Improvements Phase 2 2. Application/Project status: Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.337173° Longitude:-80.700157' 5. Parcel ID (if applicable): 05108126 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Sean Mayo, PE License Number: 036837 Firm: Gavel & Dorn Engineering, PLLC Mailing address: 6730 Freedom Drive City: Charlotte State: NC Zip: 28214- Phone number: (704) 919-1900 Email Address: smayo(igaveldorn.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Mallard Creek WWTP Permit Number: NC0030210 Owner Name: Charlotte Water V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ0003062 Downstream (Receiving) Sewer Size: 8 inch System \Vide Cullectu nSystem Peril ;` inb i(s) i WQCS Owner Name(s): Charlotte Water FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DBE;) been attached? ❑ Yes ❑No N/A 3. If the Applicant is a Home/Properly Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ►1N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Residential Leased ❑ School / preschool / day care ❑ Food and drink facilities Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home 5. Nature of wastewater : % Domestic/Commercial 100 % Commercial % Industrial (See 15A NCAC 02T .0103(20)) 1-4-Is there a Pretreatment Program in effect? ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .01 14(f)? ❑ Yes ® No If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow Office Employee 25 gal/shift 65 1625 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 1625 GPD a See 15 A NCAC 02T .01 14(b). (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42:A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A1 ANC-1C 021101 l4] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 1625 GPD (per;15, TNCAC 021 .0.114) r Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 513 PVC i Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) • Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC(Pumn Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15_1 NCAC 02"l_.0305(11)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): • Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): := It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. • If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 021 .0305(f) & ((2) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 021-.0 305(e) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage • If noncompliance with 02T.0305(f) or (}, see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No N/A See the Division's draft separation requirements for situations where separation cannot be meet • No variance is required if the alternative design criteria specified is utilized in design and construction • As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 0213 .0200? ❑ Yes ❑ No N/A • This would include Trout Buffered Streams per I SA NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Perri ittinBranch 5. Does project comply with 15A NCAC 021,0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per I S A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A,N( 1C 023 Iu102, "high -priority sewer" means any aerial sewer, sewer contacting surface waters. siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes No ❑ N/A If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORA: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 5A NCAC 02T, the Minimum Design Criteria for the Permitting_of Pump Stations and Force Mains (latest version), and the Gravity Sewer Mininium Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, Sean Mayo, P.E. (Professional Engineer's name from Application Item III.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. t11��t1lffli!!ltl�tryfi North Carolina Professional Engineer's seal, signature, and date: \�� CA1��gl�� a @ 9r 3'ea 36837 SEAL Y 1 3/17/21 ` 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Joseph C. Wilson, P.E. - Chief Engineer (Signature Authority's name & title from Application Item 1.3.) attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes I4 215.6k and 14 3-2 E 5.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Date: Mar 17, 2021 FORM: FTA 04-16 Page 5 of 5 PROJECT NAME: ENGINEER'S SEAL RECEIVED/NCDEQ/DWR APR - 7 2021 MOORESVILWQROS LE REGIONAL OFFICE MALLARD CREEK WRF TRAILER AND PARKING IMPROVEMENTS PHASE 2 Final Audit Report 2021-03-17 Created: 2021-03-17 By: Sean Mayo (smayo@gaveldorn.com) Status: Signed Transaction ID: CBJCHBCAABAALI-5fJDggt2viAWZF2RDAgpVf74yZbpw "FTA 04-16" History t Document created by Sean Mayo (smayo@gaveldorn.com) 2021-03-17 - 9:03:01 PM GMT- IP address: 74.218.191.130 Document emailed to Joseph C. Wison (cwilson@ci.charlotte.nc.us) for signature 2021-03-17 - 9:03:21 PM GMT Email viewed by Joseph C. Wison (cwilson@ci.charlotte.nc.us) 2021-03-17 - 9:08:38 PM GMT- IP address: 205.141.6.135 G Document e-signed by Joseph C. Wison (cwilson@ci.charlotte.nc.us) Signature Date: 2021-03-17 - 9:17:57 PM GMT - Time Source: server- IP address: 205.141.6.135 Agreement completed. 2021-03-17 - 9:17:57 PM GMT FLOW TRACKING ACCEPTANCE FORM (FTSE 08-13) CHARLOTTE March 3, 2021 Mrs. Tesha Okioga Charlotte Water 5100 Brookshire Boulevard Charlotte, NC 28216 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE MALLARD CREEK WRF PHASE 2 TRAILER AND PARKING IMPROVEMENTS 12330 NORTH TRYON STREET, CHARLOTTE, NC 28262 CLTWATER TRACKING# 2021936 After an analysis of the sanitary sewer associated with the proposed design of project, 2021936, MALLARD CREEK WRF PHASE 2 TRAILER AND PARKING IMPROVEMENTS, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 1,625 gallons per day (65 emp x 25 gpd/emp) at the connection point(s) indicated on the submitted utility plan for transmission to the Mallard Creek Wastewater Treatment Plant; NPDES permit number NC0030210, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see attached NCDEQ-FTSE form. Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater system is accepted on a first come first served basis. The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained construction has not started within two (2) years of issuance of this flow acceptance, and payment for any service connections have not been received within two (2) years of issuance of this flow acceptance letter, this flow acceptance approval shall be rescinded, and a new flow acceptance request must be made. The CAP analysis performed determines available capacity within the existing public gravity sewer system. The developer is responsible for any additional private or public sewer infrastructure required to convey flow from the proposed development to the existing public gravity sewer. If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, GIAZIlerw►.o- Avvzo{,a• Guillermo Anzola Engineering Assistant Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 28216 charlottewater.org Operated by the City of Charlotte Division of vier Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Charlotte Water Project Name for which flow is being requested: Mallard Creek WRF Phase 2 Trailer and Parking Improvements More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Mallard Creek WWTP b. WWTP Facility Permit #: NC0030210 All flows are in MGD c. WWTP facility's permitted flow 12.00 d. Estimated obligated flow not yet tributary to the WWTP 1.099 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 9.433 0.001625 10.532 87.8% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstream Facility Name (Sewer): Line to Withrow Subdivision Downstream Permit Number: Unknown Page 1 of 6 FTSE IOn18 III. Certification Statement: Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Chief Engineer Title of Signing Official Date Page 2 of 6 FTSE 10-18 8x11 SITE MAPS Date Printed: 3/19/2021 9:58:52 AM -S a — a O c = w v E a gN ✓ m • O ,O U o. b ✓ o L U O O) a. c a a,t6 N E a N t6 E • c N N E c c o O O aV • 2, T 0 L c 7 � N U co v a� ro E o ui `F c6 • > • O a va o y • c a 0 O U • v v .O `a 0 0 ▪ L -O U) N N a E O U O c a O c m E aT+ � C � • c O •'- U m .n c N U_ U N ▪ a a c c 0 T v CD• N E• � ao v aviy o • f0 c oL Z.µ'v o m m C w L • - a 0 c c c Ly d c L. 0 CDU L c a 2 o E N t0 W 0 a o 2.' c, o. 2 c O O a O 2 E • N ✓ o LE Nw- N O E O = N • a) a_ o N F e STREAM CLASSIFICATIONS (WSCAS 01-15) State of North Carolina Department of Environmental Quality Division of Water Resources Division of Water Resources Watershed Classification Attachment (WSCAS 01-15) Along with this form, submit a color copy of a USGS Topographic Map to identify the project area and waterbodies. Each map or maps must show the location of the sewer system and include location identifiers where the system traverses over or near waterbodies. The map should have location ID's for each different waterbody and corresponding classifications should be recorded. Include the completed form and map portions with the permit application for submittal to the appropriate review agency. A list of the Division's regional offices, their county coverage, and contact information can be obtained from: http://portal.ncdenr.org/web/wq/home/ro Location ID Name of Waterbody' River Basin Waterbody Stream Index No. Waterbody Classification 1 Mallard Creek Yadkin Pee -Dee 13-17-5 C 1 If unnamed, indicate "unnamed tributary to X", where X is the named waterbody to which the unnamed tributary joins. I certify that as a Registered Professional Engineer in the State of North Carolina that I have diligently followed the Division's instructions for classifying waterbodies and that the above classifications are inclusive of the stated project, complete and correct to the best of my knowledge and belief. PE Seal, Signature and Date