Loading...
HomeMy WebLinkAboutNCG140309_Inspection Report_20210412ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director Southern Concrete Materials Attention: Jeff Lamm Post Office Box 5395 Asheville, North Carolina 28813 NORTH CAROLINA Environmental Quality April 12, 2021 Subject: Compliance Evaluation Inspection Southern Concrete Materials -Asheville Permit: NCG140000 Certificate of Coverage: NCG140309 Buncombe County, North Carolina Dear Mr. Lamm: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on March 30, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sind Isaiah Reed, EI, CPSWQ, M 4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources EQ Asheville Regional office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 u9 m+cu+o��rvA o.p.,u,emmu.,,�,...m ou.; 828.296.4500 Compliance Inspection Report Permit: NCG140309 Effective: 08/01/17 Expiration: 06/30/22 Owner : Southern Concrete Materials SOC: Effective: Expiration: Facility: Southern Concrete Materials -Asheville County: Buncombe 80 Pond Rd Region: Asheville Asheville NC 28806 Contact Person: James F Combest Title: Phone: 82$-253-6421 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/30/2021 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 10:OOAM Exit Time: 11:OOAM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140309 Owner -Facility: Southern Concrete Materials Inspection Date: 03/30/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On March 30, 2021 this facility was inspected for compliance. I met with Chad Anderson on site. During the inspection, the following items were noted: 1) The Stormwater Pollution Prevention Plan was found to be incomplete at the time of the inspection. Specifically concerning the spill log, training documentation, and Non -SW discharge certification. 2) Secondary containment has not been provided for all bulk storage of liquid materials on site. A containment barrier has been installed but a floor drain is present inside the barrier which drains to the outside of the structure. Be advised that secondary containment is also required for form release, DEF tanks and other liquid materials which may be kept on site. This facility remains under notice of deficiency. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 Permit: NCG140309 Owner - Facility: Southern Concrete Materials Inspection Date: 03/30/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? E ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? E ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? E ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ N ❑ ❑ Comment: The SWPPP was found to be incomplete at the time of the inspection Qualitative Monitorina Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment Analytical Monitorina Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ N ❑ Comment: Analytical Monitoring has not been correctly documented Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3