HomeMy WebLinkAboutWQ0040419_Compliance Inspection Report_20210412ROY COOPER
Governor
DIONNE DELLI-GATTI
Secretary
S. DANIEL SMITH
Director
United Parcel Service
2535 Edward Babe Gomez Avenue
Omaha, Nebraska 68107
Attn: Friedhelm Otto
NORTH CAROLINA
Environmental Quality
April 12, 2021
Subject: Compliance Evaluation Inspection
United Parcel Service Non -Discharge Groundwater Remediation Program
Permit No. WQ0040419
Guilford County
Dear Mr. Otto:
On March 18, 2021 staff of the North Carolina Division of Water Resources Winston-Salem
Regional Office (DWR) performed an announced routine compliance inspection of the United
Parcel Service groundwater remediation program. This inspection was conducted by DWR staff
member Jim Gonsiewski. Mr. Nick Miller of Arcadis G&M of North Carolina, Inc. (Arcadis)
and Mr. Todd Mixon, contractor for Arcadis, were present during this inspection. The inspection
reflects compliance with the permit.
If you have any questions regarding this letter, please contact Jim Gonsiewski or me at (336)
776-9800.
Sincerely,
DocuSigned by:
L4ti T . 3Micr
145B49E225C94EA...
Lon T. Snider
Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ — WSRO
cc: Denise Dixon — Arcadis G&M of North Carolina, Inc. (Electronic Copy)
Nick Miller — Arcadis G&M of North Carolina, Inc. (Electronic Copy)
Guilford County Environmental Health (Electronic Copy)
WSRO Electronic Files
Laserfiche Files
D_E
NORTHCAROLINA�
oew�tl.eM Wm�a.M Oui
North Carolina Department of Environmental Quality 1 Division of Water Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105
336.776.9800
Compliance Inspection Report
Permit: WQ0040419 Effective: 08/16/19 Expiration: 07/31/24 Owner : United Parcel Service Inc
SOC: Effective: Expiration: Facility: Former UPS Greensboro Facility
County: Guilford 3015 Thurston Ave
Region: Winston-Salem
Contact Person: Denise Dixon
Directions to Facility:
Greensboro NC 27406
Title: CPM Phone: 707-289-3261
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 03/18/2021
Entry Time 01:40PM Exit Time: 02:35PM
Primary Inspector: Jim J Gonsiewski Phone: 336-776-9704
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: Groundwater Remediation
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Record Keeping Well inventory
II Treatment Units Disposal units
(See attachment summary)
Inspection Type: Compliance Evaluation
▪ Wells
▪ Sampling
Page 1 of 3
Permit: WQ0040419 Owner - Facility: United Parcel Service Inc
Inspection Date: 03/18/2021 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Inspection Summary:
Met with Nick Miller,Arcadis G&M of North Carolina, Inc.(ARCADIS) and Todd Mixon, subcontractor for ARCADIS. Walked
the site and discussed the remediation system. According to Mr. Miller, the system operated very well. The only problem
was freezing of lines during cold weather. The inspection reflects compliance with the permit. The system was run twice:
Phase I: November 11, 2019 to February 27, 2020
Phase II: June 22, 2020 to September 24, 2020
Review of the data indicated the system was effective in removing dissolved phase concentrations of benezene and
napthalene to concentrations below the NCAC 2L Standards in three monitoring wells where there were previous 2L
exceedances. The influent and effluent data also indicated the system reduced volatile constituents to concentrations below
the laboratory detection limits.
Page 2 of 3
Permit: WQ0040419
Owner - Facility: United Parcel Service Inc
Inspection Date: 03/18/2021 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Page 3 of 3
View looking south of the remediation system located on the north side of the facility.
Closeup view of the granular activated carbon (GAC) filters at the remediation system.
View looking south of the remediation system. Note the piping above the garage door in which treated
groundwater is pumped from the remediation system to the injection wells.
View looking south of injection well IW-1. Well is located between the truck and the wall.