Loading...
HomeMy WebLinkAboutSW8970138_CURRENT PERMIT_19971022STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. I SW DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE._ _ YYYYMMDD State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director October 22, 1997 Mr. Donald Carson, Owner A-1 Hitch and Trailer Sales 346 Ocean Highway West Supply, NC 28462 Subject: Permit No. SW8 970138 Modification A-1 Hitch and Trailer Sales High Density Commercial Stormwater Project Brunswick County Dear Mr. Carson: The Wilmington Regional Office received a modification to the Stormwater Management Permit Application for A -I Hitch and Trailer Sales on September 12, 1997, with final information on October 21, 1997. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 970138 Modification dated October 22, 1997, for the construction of A-1 Hitch and Trailer Sales. This permit shall be effective from the date of issuance until October 22, 2007, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, 4 C 1`,/—". S V--� l 4'- , f— Rick Shiver, P.G. Acting Regional Water Quality Supervisor RSSlarl: S:IWQSISTORMWATIPERMIT1970138.00T cc: Amie Drucker, P.E. Delaney Aycock, Brunswick County Inspections Linda Lewis Wilmington Regional Office Central Files P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer State Stormwater Management Systems Permit No. SW8 97QI38 Modification ,i 11 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Donald Carson, Owner A -I Hitch and Trailer Sales Brunswick County FOR THE construction, operation and maintenance of a detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules ") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered apart of this perm it. This permit shall be effective from the date of issuance until October 22, 2007 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 81,893 ftz of impervious area. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the perm it. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 2 M State Stormwater Management Systems 'Permit No. SW8 9701.38 Modification Project Name: PermitNumber: Location: Applicant: Mailing Address: DIVISION OF WATER QUALITY PROJECT DATA SHEET A-1 Hitch and Trailer Sales Application Date: Water Body Receiving Stormwater Runoff: Classification of Water Body: If Class SA, chloride sampling results: Pond Depth: Permanent Pool Elevation: Total Impervious Surfaces Allowed: Offsite Area entering Pond: Required Surface Area: Provided Surface Area: Required Storage Volume: Provided Storage Volume: Temporary Storage Elevation: Controlling Orifice: 970138 Modification Brunswick County Mr. Donald Carson, Owner A-1 Hitch and Trailer Sales 346 Ocean Highway West Supply, NC 28462 September 12, 1997 Doe Creek "CSw HQW" nla 4' feet 45 FMSL 81,893 W None 7,305 ftZ 7,55$ ftz 7,189 W 8,965 W 46 FMSL 2 linear feet of 4"ADS perforated pipe with 2.01 in slot area per linear foot pipe 3 State Stormwater Management Systems Permit No. SW$„970138 Modification I%f I, The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 6. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. C. Further subdivision or sale of any of all of the project area. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. In addition, the Director may determine that other revisions to the project should require a modification to the permit. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surface except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. All connections into the stormwater system from future areas/outparcels shall be made such that short- circuiting of the system does not occur. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. JZ. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. FAI State Stormwater Management Systems Permit No. SWS 970138 Modification 5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 7. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. III. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143- 215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DEHNR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 22nd day of October, 1997. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION - 1' C kL- �i l--, l'y L l- L-, r� A. Preston Howard, Jr., P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 970138 Modification 5 State Stormwater Management Systems Permit No. SW8 970138 Modification A-1 Hitch and Trailer Sales Stormwater Permit No. SW8 970138 Modification Brunswick County Engineer's Certification I, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, ject) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL 2 POND MAINTENANCE REQUIREMENTS Project Name:,. _A A Hi4ch 4 Tr�i lgr 526 5 Permittee: 2ld Carson► ownee- Address: 34(o Ocean H i UL Z94&2- 0 G PhoneNo. 916 -155 & 025 I. Monthly, or after every runoff producing rainfall event, whichever comes first: A. Inspect the trash rack; remove accumulated debris, repair/replace if it is not functioning. B. Inspect and clear the orifice of any obstructions. If a pump is used as the drawdown mechanism, pump operation will be checked. A log of test runs of the pump will be kept on site and made available to DWQ personnel upon request. C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas before the next rainfall event. If the pond is operated with a vegetated filter, the filter will be checked for sediment �1Pc accumulation, trash accumulation, erosion and proper operation of the flow spreader mechanism. Repairs/cleaning will be done as necessary. II. Quarterly (Four times a year): A. Inspect the collection system (ie. catch basins, piping, grassed swales) for proper functioning. Accumulated trash will be cleared from basin grates, basin bottoms, and piping will be checked for obstructions and cleared as required. B. Pond inlet pipes will be checked for undercutting. Riprap or other energy dissipation structures will be replaced, and -broken pipes will be repaired. III. Semi-annually (twice a year): A. Accumulated sedvnent from the bottom of the outlet structure will be removed. in lei sw ale B. The41-W—Awbnay- -.will be checked at various points. Sediment removal is required when the depth is reduced to 75 % of the original forebay design depth of 1. S ' . C. Grassed swales, including the vegetated filter if applicable, will be reseeded twice a year as necessary. ,_ ,5 POND MAINTENANCE REQUIREMENTS PAGE 2 IV. -Annually (Once a year): A. The pond depth will be checked at various points. Sediment removal is required when the depth is reduced to 75 % of the original design depth or Y, whichever is greater. Design depth is ', measured vertically from the orifice down to the pond's bottom. Sediment must be removed to at least the original design depth. �� �u V. General: lov ' A. Mowing of the side slopes will be accomplished according to the season. Maximum grass height will be 6". B. Cattails are encouraged along the pond perimeter, however they will be removed when they cover more than 1/2 the surface area of the pond. The best time to cut them is at the end of the growing season, in November. Environmentally sensitive chemicals for use in killing cattails can also be used. Contact your nearest Agricultural Extension Agent. C. The orifice/pump is designed to draw down the pond in 2-5 days. If drawdown is not accomplished in that time, the orifice will be replaced with a larger or smaller orifice. Slow drawdown may be attributed to a clogged system. The source of the clogging will be found and eliminated. D. All components of the detention pond system will be kept in good working order. Repair or replacement components will meet the original design specifications as per the approved stonnwater plan. If previously approved components are determined to be ineffective, the component must .be redesigned and/or replaced. VI. Special Requirements: hereby acknowledge that I am the financially (please print or type nlntte clearly) responsible party for maintenance of this detention pond. I will be responsible for the performance of the maintenance,as outlined above, as part of the Stor nwater Management Permit received for this project. Signature: Date: Revised 2/25/97