Loading...
HomeMy WebLinkAboutSW8970138_APPROVED PLANS_19971022STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT N0. SW�_ZUI DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 1 IN (S soc LEN FRC Ou1 OF SEC AN( U.S. HWY 1.7 SOUTHBOUND LANE m TOP OF BANK 5' WIDTH (7YP.) ,I EMERGENCY OVERFLOW EL. - 46.0 4" SOLID WALL STANDARD ADS POLYETHYLENE PIPE RIP RAP OUTLET PROTECTION x x I" LEGEND: x EXISTING SPOT GRADE x 47.5 PROPOSED SPOT GRADE EXISTING CONTOUR 45 PROPOSED CONTOUR GENERAL NOTES: 1. AS -BUILT AND TOPOGRAPHICAL INFORMATION TAKEN FROM "SURVEY FOR A-1 HITCH AND TRAILER SALES", PREPARED BY BOBBY M. LONG & ASSOC., DATED JANUARY 6, 1997, LAST REVISED MARCH 12. 1997. 2. REFER TO SOIL EROSION AND SEDIMENT CONTROL PLAN ENTITLED "SURVEY FOR A-1 HITCH AND TRAILER SALES", PREPARED BY BOBBY M. LONG & ASSOC., DATED JANUARY 6, 1997, REVISED MARCH 12, 1997 FOR MEASURES TO BE EMPLOYED DURING CONSTRUCTION AND FINAL STABILIZATION OF ALL DISTURBED AREAS. TORM WATER MANAGEMENT CALCULATION TOTAL SITE AREA: 5.77 AC GRASS 3,89 AC MARL 1.88 AC % IMPERVIOUS 1.88 AC/5.77 AC = 32.6%ZL VOLUME FROM 1" RAINFALL USING "SIMPLE METHOD" Rv = 0.05 + 0.009(I) = 0.05 + 0.009(32.6) Rv = 0.34 in/in VOLUME = 1 in x 0.34 in/in x 1 /12 ft/in x 5.77 AC 0.17 AC FT = 719 TO ACHIEVE REMOVAL OF 90% TSS W/O VEGETATIVE FILTER SURFACE AREA OF A 4' DEEP POND = 0.17 AC (FROM NCDEHNR TABLE SA=2.91 /100x5.77 AC) DESIGNED POND: ELEVATION AREA(SF) V UME ,CFI 45 7558A ® 0 46 10373A 8966 A A TOP OF STORAGE FROM 1" RAINFALL = 45.80 A A 150 LF SODDED BANK IS EMERGENCY OVERFLOW zj 4" SNAP COUPLING 6' VEGUATIVE SHELF AT 6:1 SLOPE 4' PERFORATED STANDARD r r POLYETHYLENE �`�/r�♦ SPLIT Ii CAP TOP OF STORAGE EL=45-so 1/4' 1/4' HARDWARE CUTH V-10. I��iSECURE W/STAI STEEL STRAPSI DETENTION POND & 0 UTFALL STRUCTURE N. T. 5. NOTE: SEED AND MULCH TOP OF BANK AND SWALE COMPLETE IN ACCORDANCE WITH THE SEDIMENT AND EROSION CONTROL PLAN GRASS SWALE N.T.S. DRIP RAP ( 6' THICKNESS ) ,,-FILTER FABRIC ,_l67 STONE ( 9" CORE HEIGHT ) DIRECTION OF FLOW NO 1. ALL STONE AND RIP RAP SHALL BE QUARRY GRANITE FREE FROM TRASH OR OTHER DELITERIOUS MATERIAL 2. FILTER FABRIC SHALL BE INSTALLED BETWEEN THE #57 STONE AND THE RIP RAP. THE FABRIC SHALL BE PLACED ACROSS 1 /2 OF THE BOTTOM AND ACROSS THE ENTIRE TOP OF THE 057 STONE. FILTER FABRIC SHALL BE MIRAFI 14ON OR APPROVED EQUAL. 3. STONE DAM CONSTRUCTION SHALL EXTEND ACROSS THE ENTIRE SWALE SECTION. THE HEIGHT SHALL BE 75X OF THE SWALE DEPTH. THE TOE OF THE DAM SHALL BE BURIED 3 TO 6 INCHES BELOW THE BOTTOM OF THE SWALE INVERT. STONE CHECK DAM N.T.S. TIMBER RAIL ROAD CROSS TIE EXIST. GRADE OR PROPOSED GRADE EXISTING MARL BASE (THICKNESS VARIES) STORMWATER NDTE: BURY TIMBER CROSS TIE MIN. 3 INCHES BELOW TOP OF EXISTING MARL BASE COURSE TIMBER C URB � E C E i V E N.T.S. GRAPHIC SCALE SEP 121997 D E M 30 0 15 30 so PROD #_ I I I I ( IN FEET ) 1 inch = 30 it. REVISION 5: MAKE POND V DEEPER FOR ADDITIONAL PROP. MARL 9-8-97 REVISION 4: REVISIONS PER NCDEHNR REVIEW COMMENTS 7-25-97 REVISION 3: REVISIONS PER NCDEHNR REVIEW COMMENTS 7-1-97 REVISION 2: REVISIONS PER NCDEHNR REVIEW COMMENTS 5-27-97 INCREASE POND SIZE FOR 90% TSS REMOVAL REVISION 1: REVISIONS PER NCDEHNR REVIEW COMMENTS 4-18-97 0 n u-� I 0 00 N I rM 0 m ai c 0 Q a� aV W nn n rn N t� U a m w N unun Cr 0 o0 az w �I w w z 0 ADO �- z 13. a f1, di L� w � o � �C� V 1 SCALE: 1 "=3O' PROJECT #: 97010 FILE #: 97010CVL.DW DESIGNED BY: A.S.D. DRAWN BY. A.S.D. CHECKED BY: A.S.D. DATE: 3-25-97 REVISION: 4-18-97 5-27-97 7-1-97 7-25-97 9-8-97 Lu =0 a o=oL � � a �. er � z a; c� CL x °i , �.�"�� "•���?�",,rid':^„r*a' e !1 }}}yy f��� ♦+♦��+T1��t •�a �+^Y ems! I SHEET NUMBER: LA P1r 4 ' 1 i