SITE
HOECHST
CELANESE
VICINITY MAP
NTS
TOP PIPE 104.70
INFILTRATION AND
TOP PIPE 101.75
NOTE: ALL SLOPES SHALL NOT EXCEED
3:1 (HOR I ZONTAL: VERTICAL SLOPE)
o i 4 PROPOSED MARL t Q
g f J F PARKING AREA`
Ld
� 5 t
0 t to
o .t t +10 � ` � 't � •}, i �3 i ,i � Q�,+.moo
h
4
�.
rb
! I II
EXIST. MARL
, PARKING LOT +°? 1,c�o°+,00
EX1�1
'mil 1lk_
r
a I
GREEN
AREA
EXIST. I
WELD },o°'lb
BENCH MARK g�° �, �.�' y a� BENCH MARK
TOP PIPE 97.38 * �° +M�N2�19OO.D ��� _ `�pP TOP PIPE 99.74
R3 + + INV. 95.37+°L =K.- _ - - - - � �aplNV. 96.75 +�
j °EXIST. 24" CONC. PIPE
T - - - EDGE OF PAVEMENT -
U.S. HWY 421
SITE PLAN
i = 40'
i
ALL STATE
SUPPLY CO., INC.
1
3 99.a
98.0
NOT j PAVV~59G'f10NM0kYVMTY
Per"m WON M "i.n GONgH1"
cor mrA ralt 5FftL C.QORMAME
w/ OV*= i Cz0Tr-0+4reMl
art m velMm"
AMVi.. PAVEMWr 5WTM.
rA1/FoWN ' %C110 V
S"
A
C� v
42'
91,
Z
R2 R3
SITE WORK NOTES
1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIARIZED WITH EXISTING
CONDTIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE.
2. BLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS
OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN.
3. SRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS,
VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC
VATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION.
4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL
REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS.
5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE
REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY.
6. -ILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT.
7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED
EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND
=ILL QUANTITIES AND COMPLETE INSTALLATION TO SPFCIFIED GRADES.
8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE
PROPERLY PERMITTED FACILITY AS REQUIRED.
9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL
_XISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS
;N OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE
EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF
THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING.
10. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/
RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH
APPROPRIATE PERSONNEL,
11. EXISTING SURVEYING PERFORMED BY WILLIAM L. HOOD, III RLS AND SUPPLIED BY THE OWNER.
12. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE
THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER
PRIOR TO INSTALLATION.
13. FHE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT
HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER.
14. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES.
METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY
OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS.
15. ALL PAVEMENT, BASE AND SUBGRADE SHALL COMFORM TO NCDOT STANDARDS INCLUDING
WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS
OR OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NCDOT
TO MAINTAIN SAFETY AND TWO WAY TRAFFIC.
16. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORT
ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION. ALL AREAS SHALL BE
SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES.
17. CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH RUBBER GASKETED JOINTS
AND INSTALLED IN ACCORDANCE WITH MAINMIFACTURER'S REQUIREMENTS.
18. USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A
CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING,
NON BLEEDING. REFLECTIVE MATERIAL MAY BE ADDED AT OWNER'S OPTION FOR
NIGHT REFLECTING.
19. DUCTILE IRON SHALL BE CLASS 51.
20. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUMN COMPRESSIVE
STRENGTH OF 3000 PSI ® 28 DAYS - AIR ENTRAINED.
21. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR
BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE
PAID FOR BY THE CONTRACTOR.
22. SEE GEOTECHNICAL REPORT NO. DATED , BY
FOR ADDTIONAL REQUIREMENTS.
CONSTRUCTION SEQUENCE
1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR. FALL OF ONE FOOT FOR
EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL).
2. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED
!NCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION.
3. IF APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT BASIN
DURING CONSTRUCTION. REMOVE ACCUMULATION OF SILT AS -REQUIRED TO ALLOW . PROPER
FUNCTIONING. RESTORE POND TO DESIGN LEVELS AT THE COMPLETION OF CONSTRUCTION.
4. IF APPLICABLE, INSTALL DROP INLETS WITH INLET PROTECTION TO ACT AS SILT TRAPS
DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM
ENTEMNIG STORM DRAIN PIPING.
5. \STALL EROSION CONTROL Ir ir",SURES BEFORE BEGiVNIN^v CONSTRUCTION
BUT NOT LIMITED TO GRAVELLED CONSTRUCTION ENTRANCE, SILT FENCE, CHECK DAMS, ETC,
INSTALL ALL EROSION CONTROL MEASURES AS SOON AS POSSIBLE AFTER BEGINNING
CONSTRUCTION.
6. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. -
7. ALL DISTURBED AREAS SHALL BE SEEDED IN ACCORDANCE WITH SEEDING SCHEDULE AS
SOON AS POSSIBLE BUT NO LATER THAN 30 DAYS AFTER DISTURBANCE.
8. MAINTAIN ALL EROSION CONTROL MEASURES UNITL PROJECT IS COMPLETE.
9. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS
PLAN PROVE TO BE LESS EFFECTIVE,
10. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON ' COMPLETION OF CONSTRUCTION.
ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION.
1 zi �- 1
3.5 3.5 BOTTOM 92.0
HIGH GROUND WATER
ELEV. 89.0
TYPICAL POND CROSS SECTION
NTS
-8 BUG
�u84�/5
I 'z" C° 74
G,Z
4 Z& ]�
PROPOSED MARL
PARKING AREA
5� 1 f F �� 5 E C E I V E
2 JUN 171996
5
PROJ # JW � �
t�ooc�l5
{ el�7�
GD1 i ceI' '�� JUN 14 1996
r �
REVISIONS
I Description By
REVISED ENERGY
;DISSIPATOR SIZE PGT
ADDED POND
CROSS SECTION PGT
REVISED PGT
crnouweTro
CAR0
SSS1
L
S E A L
� •
17374
CREG4R���`•
%,,
1�11f11i111��`
DATE 09-14-95
DESIGN PGT
DRAWN MLH
C
1
SHEET 1
OF 1
9562