HomeMy WebLinkAboutSW8960609_CURRENT PERMIT_19960805STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO. SW_*L ao(
DOC TYPE CURRENT PERMIT
}
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE,
YYYYM M D D
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor --� F1
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
August 5, 1996
Mr. Stephen L. Wheeless, President
BWB Associates
6600 Windmill Way
Wilmington, North Carolina 28405
Subject: Permit No. SW8 960609
Brewer Equipment Company
High Density Commercial Stormwater Project
New Hanover County
Dear Mr. Wheeless:
The Wilmington Regional Office received the Stormwater Management Permit Application for Brewer Equipment
Company on June 10, 1996, with final information on July 17, 1996. Staff review of the plans and specifications has
determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC
2H.1000. We are forwarding Permit No, SW8 960609 dated August 5, 1996, for the construction of the project, Brewer
Equipment Company building additions.
This permit shall be effective from the date of issuance until August 5, 2006, and shall be subject to the conditions and
limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit.
Failure to establish an adequate system for operation and maintenance of the stormwater management system will result
in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
ajudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be
in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this
permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at
(910) 395-3900.
Sincerely,
Dave Adkins
Regional Water Quality Supervisor
DAlarl: S:1WQSISTORMWATIPERMIT1960609.AUG
cc: Jim Honeycutt, P.E.
Tony Roberts, New Hanover County Inspections
Beth Easley, New Hanover County Engineering
Linda Lewis
�wilmington ' Regional Office
Central Files
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919
An Equal Opportunity Affirmative Action Employer
State Stormwater Management Systems
Permit No. SW8 960609
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended,
and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
BWB Associates
Brewer Equipment Company
New Hanover County
FOR THE
construction, operation and maintenance of a Detention Pond in compliance with the provisions of 15A NCAC
2H .1000 (hereafter referred to, as the "stormwater rules ") and the approved stormwater management plans and
specifications and other supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until August 5, 2006 and shall be subject to the
following specified conditions and Iimitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in the application and
other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of
this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 42,652
square feet of impervious area.
3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the
permit.
2
Project Name:
Permit Number:
Location:
Applicant:
Mailing Address:
Application Date:
Water Body Receiving Stormwater Run
Classification of Water Body:
If Class SA, chloride sampling results:
Pond Depth:
Permanent Pool Elevation:
Total Impervious Surfaces Allowed:
Offsite Area entering Pond:
Green Area entering Pond:
Required Surface Area:
Provided Surface Area:
Required Storage Volume:
Provided Storage Volume:
Temporary Storage Elevation:
Controlling Orifice:
State Stormwater Management Systems
Permit No. SW8 960609
DIVISION OF WATER QUALITY
PROJECT DATA SHEET
Brewer Equipment Company
960609
New Hanover County
Mr. Stephen L. Wheeless, President
B BWAssociates
6600 Windmill Way
Wilmington, North Carolina 28405
June 10, 1996
off: Smith Creek
"C Sw"
NIA
5 feet
48 MSL
42,652 square feet
NIA square feet
14,938 square feet
3,043 square feet
3,053 square feet
3,439 cubic feet
3,760 cubic feet
48.96 NiSL
I" pipe
I
State Stormwater Management Systems
Permit No. SW8 960609
4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved
plans.
5. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -
upon area.
6. ' The following items will require a modification to the permit:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision of the project area.
f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan.
In addition, the Director may determine that other revisions to the project should require a modification to the
permit.
7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time
schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies
of revised plans and certification in writing to the Director that the changes have been made.
II. SCHEDULE OF COMPLIANCE
1. The permittee will comply with the following schedule for construction and maintenance of the stormwater
management system:
a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for
it's intended use prior to the construction of any built -upon surface except roads.
b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be
repaired immediately.
2. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be
followed in it's entirety and maintenance must occur at the scheduled intervals including, but not limited.to:
a. Semiannual scheduled inspections .(every 6 months).
b. Sediment removal.
C. Mowing and revegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping.
g. Access to the outlet structure must be available at all times.
3. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ.
The records will indicate the date, activity, name of person performing the work and what actions were taken.
4. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this
permit, the approved plans and specifications, and other supporting data.
4
State Stormwater Management Systems
Permit No. SW8 960609
Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this
permitted facility, a certification must be received from an appropriate designer for the system installed certifying
that the permitted facility has been installed in accordance with this permit, the approved plans and specifications,
and other supporting documentation. Any deviations from the approved plans and specifications must be noted
on the Certification.
A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of
ten years from the date of the completion of construction.
III. GENERAL CONDITIONS
1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is
a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality
accompanied by an application fee, documentation from the parties involved, and other supporting materials as
may be appropriate. The on
of this request will be considered on its merits and may or may not be
approved.
2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-
215.6(a) to 143-215.6(c).
The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which
have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the
Permittee shall take iriimediate corrective action, including those as may be required by this Division, such as
the construction of additional or replacement stormwater management systems.
5. The permittee grants DEHNR Staff permission to enter the property for the purpose of inspecting all components
of the permitted stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit
modification, revocation and reissuance or termination does not stay any permit condition.
Permit issued this the 5th day of August, 1996.
TH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
A. Preston Howard, Jr., P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SWS 960609
5
State Stormwater Management Systems
Permit No. SW$ 960609
Brewer Equipment Company
Stormwater Permit No. SWS 960609
New Hanover County
Engineer's Certification
I, , as a duly registered Professional Engineer in the State of North
Carolina, having'been authorized to observe (periodically/weekly/full time) the construction of the project,
(Prof ect)
for (Project Owner) hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the project construction such that the construction was observed to be built within
substantial compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
I
Signature
Registration Number
Date
RI