Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8080907_COMPLIANCE_20120410
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 c>9,09 b DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD State Stormwater Management Systems • Permi No. SW8 080907 MOD AAV Company Stormwater Permit No. SW8 080907 MOD Onslow Couniv Designers Certification IM I A LACY AC as a duly registered 7 j 1 in the State of North Carolina, having been authorized to observe (periodically/ �- -AWsw) the construction of the project, ��Tt��M t4c� 1 fi;rs' (Project) ^I for AAffile 6of &SC G,wp L4I'fv17 (Project Owner) hereby state that, to the best of my abiliti4s, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans i nd specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: P10014 Signature Registration Number 0 ! YY 3 3 Date Z 1 Z,i 1 Zal z I I M. ECEIVE"1, APR 10 2012 Page 6 of 7 State Stormwater Management Systems Permit No. SW8 080907 MOD Certification Requirements: A-j— The drainage area to the system contains approximately the permitted acreage. The drainage area to the system contains no more than the permitted j amount of built -upon area. r 3. All the built -upon area associated with each permitted drainage area of the project is graded such that the runoff drains to the system. WA4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure elevations are per the approved plan. F . The bypass structure is located per the approved plans. . A Trash Rack is provided on the outlet/bypass structure. . All slopes are grassed with permanent vegetation. P9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 1* 12. All required design depths are provided. 0 13. All required parts of the system Ere provided. 14. The required system dimensions are provided per the approved plans. 15. The orifice is correctly sized and located. cc: NCDENR-DWQ Regional Office Page 7of7 Camp Leieune SW Permit Renewal; Number Measure Type Treatment Number Permit Number Expiration Date Inspection Date Status 1 WDP 5WP 152 SW8 060147 12/31/2020 6/30/2020 In Compliance 1 WDP 5WP 153 SW8 060147 12/31/2020 6/30/2020 In Compliance 2 WDP 5WP 080 SW8 060832 10/6/2020 6/9/2020 In Compliance 3 SF SWP 386 SW8080313 3/20/2019 6/4/2020 In Compliance 4 SF SWP 429 SW8 080740 9/1/2020 Not Built 4 WDP SWP 430 SW8 080740 9/1/2420 Not Built 4 WDP SWP 431 SW8080740 9/1/2020 Not Built 4 WDP 5WP432 SW8 080740 9/1/2020 Not Built 4 WET SWP 151 SW8 080740 9/10/2020 6/9/2020 In Compliance 5 SF SWP 221 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 5 SF SWP 222 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 5 SF SWP 223 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 5 SF SWP 224 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 5 SF SWP 225 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 6 WDP 5W13 301 SW8 090630 9/8/2020 1/21/2020 In Compliance 6 WDP SWP 302 5W8 090630 9/8/2020 7/28/2020 In Compliance 6 WDP SWP 303 SW8 090630 9/8/2020 1/21/2020 In Compliance 6 WDP SWP 304 SW8090630 9/8/2020 1/21/2020 In Compliance 6WDP SWP305 SW8 090630 9/8/2020 1/21/2020InCompiiance 6 WDP SWP 306 SW8 090630 9/8/2020 1/21/2020 in Compliance 6 WDP SWP 307 SW8 090630 9/8/2020 7/28/2020 In Compliance 7 WDP SWP250 SW8090815 10/22/2020 6/15/2020 In Compliance 7 WDP 5WP 360 5W8 090815 10/22/2020 6/29/2020 In Compliance 8 WDP SWP 211 SW8 090901 9/21/2020 6/9/2020 In Compliance 8 WDP 5WP 212 SW8090901 9/21/2020 6/9/2020 In Compliance 8 WDP SWP 213 SW8090901 9/21/2020 5/6/2020 In Compliance 8 WDP SWP 230 5W8 090901 9/21/2020 6/8/2020 In Compliance 9 WDP SWP 214 SW8 100201 6/11/2020 6/29/2020 In Compliance 9 WDP SWP 261 SW8 100201 6/11/2020 7/28/2020 In Compliance 9 WDP SWP 262 SW8 100201 6/11/2020 6/29/2020 In Compliance 9 WDP SWP 263 SW8 100201 6/11/2020 7/28/2020 In Compliance 10 IB SWP 311 SW8 120509 5/30/2020 S/6/2020 Not in Compliance 10 IB SWP 312 SW8 120509 5/30/2020 5/6/2020 Not in Compliance 11 WOP SWP 315 SW8 1208OG 8/15/2020 6/29/2020 In Compliance 12 WDP 5WP 013 SW8 920705 3/7/2018 6/15/2020 In Compliance $6,060 SWP 2211222/223/224/225 Legend CLJN CI_ Impoundment _Stormwater CLJN.CL. StormwaterUtf IftySegment N SCALE 1.2,500 0 001002 0.04 Kllomelers 0 001 0 02 0.04 Miles ELEVATION IN FEET 20 FOOT CONTOUR INTERVAL { .0 " This Gamp Lejeune map was produced by Michael Taylor at G-F Dept. ECB, 12 Past Lane. michael.c taytor5@usmc,mil 910451-9657 Feb 2020 Data CredalSource 2002 Digital Globe ! © 2003 Space Imaging Map generated using the Geographic Information System Managed by me instaliaton Geospabal information R Services Olrice Regional Geospatial information & Services DivisWn GF. Manna Corps Installations East - Marine Corps Base Camp Lejeune FOR REFERENCE ONLY FOR OFFICIAL USE ONLY (FOLIO) NOT TO BE USED FOR TARGETING OR NAVIGATION Disclaimer Although every effort has been made to ensure the acarracy of intonnatran. errors and condtions ongmating trom the physical sources used to devWM One latabase may be reflected in the data supplied The requaSWr must b2 aware of data Conditions and ultimately bear responsibbi ty for Tie appropnate use of the information With respect to possible errors, ongrnal map scale. owecton methoduoM currency of data. aril odwl speahc Conditions to Certain data. This rnfamrabon does riot depict all passible resoutcas Field venr>cation of all data is required for site -specific projects ThdS intorrnabon is deemed r9liabili but nor guaranteed