Loading...
HomeMy WebLinkAboutNC0003760_Report_20210407 4 OupoNT DuPont Kinston Plant ' 4693 Hwy. 11 North Grifton,NC 28530 March 30,2021 CERTIFIED MAIL: 70162710000009589777 RETURN RECEIPT REQUESTED RECEIVED NC Division of Water Resources i -K 0 7 2021 NPDES Complex Permitting Unit 1617 Mail Service Center NCDEQ/DWRINPDES Raleigh,NC 27699-1617 Re: Permit No.NC0003760: A. (13) Schedule of Compliance Total Copper, Total Lead, Total Silver, and Total Zinc Outfalls 002 & 003 Year 4 Summary Report& CAP. The following compliance activities were addressed during the fourth year of the 5-year compliance schedule. a) Outfall 002 is listed as an intermittent stream by Army Corp of Engineers which would subject the proposed bioswale to 401/404 permitting. The site will table bio-swale project and pursue other treatment options for Outfall 002. Design on bio-swale complete. b) Additional Sampling and further study needed to select a filtration/catch basin type system for Outfall 002 on-site. c) Discussing equipment and structure needed to establish a new sample point at Outfall 003 is ongoing. d) Attached updated Corrective Action Plan (CAP) As the site closes out year four of the five-year compliance schedule, we will be selecting a BMP suitable for Outfall 002 and update CAP as items are added and complete. If you have any questions,please contact Jon Carpenter, Environmental Manager at 252-559-7024 Sincerely, borg Xenakis Plant Manager DuPont Kinston Plant DuPont Industrial Biosciences USA,LLC Page 1 of 1 4 OUPONT:- 4693 Hwy 11 N NPDES Permit No. NC0003760 Grifton, NC 28530 DuPont Industrial Biosciences USA, LLC April 1, 2019 (last update March 26, 2021) STORMWATER CORRECTIVE ACTION PLAN (CAP) This Stormwater Corrective Action Plan (Table 1) has been developed in conjunction with A. (13) Schedule of Compliance Total Copper, Total Lead, Total Silver, and Total Zinc for Outfalls 002& 003 to address compliance with the new lower limits for metals copper, lead, silver, and zinc for the two (Outfalls 002 &003) combined process/stormwater discharges at DuPont—Kinston Facility, National Pollutant Discharge Elimination System Permit No. NC0003760.The schedule included in this Plan provides a means for NCDEQ to assess the progress being made on each milestone. Table 1:Overall Schedule TASK MILESTONES COMPLETION DATES NCDEQ ACTION Phase 1 (Year 1 &2) Review new permit May 2017 Issued NPDES permit limits and effective on April 1, requirements and 2017 develop the CAP Review and update, as Audit Tradewaste Lab July 2017 needed,the sampling procedures and sample techniques used by methods ORC. Confirm with outside, Confirmed December 2017 certified lab on their Environment 1, sample handling Incorporated is techniques certified to handle all our stormwater sampling requirements Verify Smoking Policy Confirmed site policy is March 2018 for DuPont at the written in the Sorona Kinston Site Safety Manual, Section 2, Item 200, Rule#2 Select additional Collect samples near May 2017 sampling locations buildings and process above the actual and compile the monitoring point for additional data outfalls 002 &003 Submit summary Summarize year 1 April 1, 2018 Certified Mail signed report to Div. of Water schedule of compliance return receipt for the Resources A. (13.) summary letter. (March 27, 2018) Sampling events March 2019 April 1, 2018 throughout year 1 and year 2 Page 1 of 5 4 DUPONT 1_ U�O� 4693 Hwy 11 N NPDES Permit No. NC0003760 Grifton, NC 28530 TASK MILESTONES COMPLETION DATE NCDEQ ACTION Summarize findings Provide summary with April 2019 and conditions letter and CAP to Div. contributing metals to of Water Resources outfalls 002 &003 Confirm cooling chilled, ChemTreat SDS: No January 2019 and Boiler water metals listed in any of treatment chemicals the treatment don't contain metals chemicals Research possible Based on data, select March 2019 BMPs BMP(s)to improve water quality Meet with Kinston site Staff meeting March March 26, 2019 Leadership to present 26, 2019 led by Plant data and Manager recommendations for improvements Submit summary Certified mail cover April 1, 2019 Certified Mail signed report(with CAP)to letter and CAP return receipt for the Div. of Water according to A. (13.) summary letter. (April Resources Year 2 4, 2019) Phase 2(Year 3 &4) Pending approval of Receive CAP approval Corrective Action Plan from Div.of Water (CAP)from NCDEQ, Div. Resources of Water Resources Clean out any Complete basin Contracted with MPW sentiment found in the cleanout project by End to clean out catch stormwater catch of Summer 2019 basins along 002 and basins along the flow of 003. (completed on outfalls 002 &003 10/14/19 and 10/15/19) Cost$6,972 Consult with Supplier Seek supplier data on and test for impact of impact of water water treatment treatment chemicals chemicals on the and sample treated infrastructure water for metals Continue sampling Sample during the fall Outfalls 002 &003 of 2019 above the above sample location monitoring point for after cleaning out of each outfall stormwater catch basins Page 2 of 5 4 DUPONT► 4693 Hwy 11 N NPDES Permit No. NC0003760 Grifton, NC 28530 Request Engineering to Receive engineered 1/6/20—planning bid Request Engineering to design Bio Swale BMP plan to construct Bio process walk through design Bio-Swale BMP for for Outfall 002 (see Swale BMP scope of work. Bid Outfall 002(see Figure 1.) Figure 1.) award to Dewberry Design Complete, March Engineering on 212 3/31/2020 Determine applicability Note: NCDEQ Div. of Note: NCDEQ Div. of of Neuse Buffer Rules Water Resources Water Resources to bioswale project checked "Not Subject" checked "Not Subject" area dated August 17, 2020 dated August 17, 2020 Determination of November 3, 2020 stream classification Letter received. Army Corps of Engineers and impact to permitting requirements for bioswale project area Table Bio Swale due to November 3, 2020 stream determination Letter received from made by the Army USACE. Corps of Engineers TASK MILESTONES COMPLETION DATE NCDEQ ACTION Develop SOC for new SOC Complete 2/12/2020 monitoring point for Outfall 003 (see Figure 2.) Develop Scope of Work Scope of Work Pending approval to to establish new complete relocate sample point. monitoring point for Outfall 003 Seek Funding to move Funding approved for monitoring point to new monitoring point new location at Outfall for Outfall 003 003 Select Contractor& PO issued to contactor Requested PO on Request Purchase to construct new 4/8/2020 for Dewberry Order(PO)to construct monitoring location for to survey and design. the new monitoring Outfall 003 Cost$17,100.00 point on Outfall 003 Capital Project ID 9211000301 (3/25/2020)Survey Complete 5/26/2020 Submit summary Summarize year 3 Letter sent 4/13/2020 Certified Mail signed report to Div. of Water schedule of compliance Return rec return receipt for the Resources A. (13.) Page 3 of 5 DUPONT► 4693 Hwy 11N NPDES Permit No. NC0003760 Grifton, NC 28530 summary letter. (April 15, 2020) Construct Bio-Swale Complete Construction Capital Project ID BMP at Outfall 002 Project 9211000301 (3/25/2020) Install new Monitoring Complete Installation Point at Outfall 003 Project Submit summary Summarize year 4 Due by April 1, 2021 report to Div. of Water schedule of compliance Resources A. (13.) Phase 3(Year 5) Review Filter/Catch Select location and Basin Options determine flows/capacity Contracted with Renew Permit for Dewberry, 2610 Wycliff NPDES and new Permit Road, Suite 410 for Stormwater Raleigh, NC 27607 (Applications) Prepare separate Submittal of NPDES Due no later than NPDES Permit Permit application September 30, 2021 application (180 days prior to expiring) Prepare separate Submittal of Due no later than Stormwater Permit Stormwater Permit September 30, 2021 application application (180 days prior to expiring) NPDES Permit review Receive approval of TBD(Permit expires at Pending issuance of and approval by NC new NPDES Permit midnight March 31, new NPDES Permit Div. of Water 2022) Resources- NPDES Stormwater Permit Receive approval of TBD(Permit expires at Pending issuance of review and approval by new Stormwater midnight March 31, new Stormwater DEMLR Stormwater Permit 2022) permit Submit summary Summarize year 5 Due by April 1, 2022 report to Div. of Water ! schedule of compliance Resources A.(13.) Page 4 of 5 4OUPON11 4693 Hwy 11N NPDES Permit No. NC0003760 Grifton, NC 28530 Figure 1: Proposed BMP: Bio-Swale—Tabled Proposal Nium aye g� an. -OM*. gay#°' z (20111r t, • a20Q • Q�oOo Figure 2: Proposed site for new sampling location. ; Proposed New Sampling Location „► • • Outfall 003 Sampling Location Google Page 5 of 5