Loading...
HomeMy WebLinkAbout20121031 Ver 1_401 Application_20121112`0F w a p�rF9QG 1 Q -t 20 12 103 1 Office Use Only- Corps action ID no DWQ project no. Form Version 14 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a Type(s) of approval sought from the Corps ❑ Section 404 Permit ❑ Section 10 Permit lb Specify Nationwide Permit (NWP) number. or General Permit (GP) number- 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply), ❑ 401 Water Quality Certification — Regular ❑ Non404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express © Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ❑ No For the record only for Corps Permit ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below, ❑Yes ❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)7 ❑ Yes ® No 2. Project Information 2a Name of project. 512 Wildwood Drive 2b County Durham 2c Nearest municipality /town: Durham/Lebanon Township 2d Subdivision name, Lochaven Hills 2e NCDOT only, T.I.P. or state project no. 3. 3a Owner Information Name(s) on Recorded Deed. Nu- Britt, LLC D 3b Deed Book and Page No 7104, 157 3c Responsible Party (for LLC if applicable) Anthony C. Johnson U ._t1l 3d Street address 512 Wildwood Dr Durham, NC 27712 L Wetland, a 5, sate, Bran 3e City, state, zip, 3f Telephone no: 919 - 846 -1932 3g Fax no.. 919 - 847 -5645 3h. Email address. acnucap@gmail.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b Name, 4c Business name (if applicable): 4d Street address. 4e City, state, zip. 4f Telephone no.: 4g. Fax no.: 4h Email address - 5. AgentlConsultant Information (if applicable) 5a Name, 5b. Business name (if applicable), 5c Street address 5d City, state, zip 5e Telephone no.* Y Fax no.- 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no. (tax PIN or parcel ID) PIN 0824 -01 -35 -2687 1b Site coordinates (in decimal degrees): I Latitude. Longitude - 1c. Property size: 0.461 acres 2. Surface Waters 2a Name of nearest body of water to proposed project: Crooked Creek 2b Water Quality Classification of nearest receiving water, SD -IV; NSW, CA 2c. River basin: ENO ? Falls Basin 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This site is currently vacant with the central area of the site cleared and stabilized w/ temporary erosion control devices located in the area to receive the new structure The area is residential with site and adjoining zoned residential -20. 3b List the total estimated acreage of all existing wetlands on the property: 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property- 131 3d Explain the purpose of the proposed project. construct (move) a single family residence on the lot 3e Describe the overall project in detail, including the type of equipment to be used: Clear a construction area, dig footings and move an existing home on the lot. Equipment will consist of a rubber bra backhoe and a truck with house on D 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown Comments: 4b If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Lauren Witherspoon Agency /Consultant Company. Other- NC Division of Water Quality 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 8129/07 renewed XX/XX/XX (see attached letter) 5. Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes ❑ No Unknown 5b If yes, explain in detail according to `help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes © No 6b If yes, explain Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply)- ❑ Wetlands ❑ Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c Type of wetland 2d Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes(No W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c. Stream name 3d Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f, Average stream width (feet) 3g Impact length (linear feet) S1 Choose one S2 Choose one S3 - Choose one S4 Choose one S5 Choose one S6 - Choose one 3h Total stream and tributary impacts 1 Comments, Page 4 of 10 PCN Farm — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivii ually list all open water impacts below. 4a Open water impact number Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c. Type of Impact 4d Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments, 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a Pond ID number 5b Proposed use or purpose of pond 50 Wetland Impacts (acres) 5d Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g Comments* 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 51 Expected pond surface area (acres). 5j Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form. 6a Project Is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other. 6b. Buffer Impact number— Permanent (P) or Temporary T 6c. Reason for Impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet B1 P House location unnamed tributary of Crooked Creek No 0 221 B2 T construction zone same No 0 873 83 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h Total Buffer Impacts: 1,094 6i Comments. After placement of house, all areas impacted will be stabilized and planted. Site currently has erosion control measures in place which will be removed following site stabilization. NO WETLANDS IMPACTED Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Temporary erosion control measures / permanent cover & stabilization of site upon location or structure 1b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques See 1A 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c project? which mitigation option will be used for this ❑ Mitigation bank 11 Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank: 3b Credits Purchased (attach receipt and letter) Type. Choose one Type. Choose one Type' Choose one Quantity. Quantity. Quantity, 3c Comments: 4. Complete if Making a Payment to In4ieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested: linear feet 4c If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only): square feet 4e Riparian wetland mitigation requested. acres 4f. Non - riparian wetland mitigation requested: acres 4g Coastal (tidal) wetland mitigation requested: acres 4h Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires Yes No buffer mitigation? 6b If yes, then identify the square feet of Impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d. 6e. Zone Reason for impact Total Impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g., payment to private mitigation bank, permlttee responsible riparian buffer restoration, payment Into an approved In -lieu fee fund). No wetland is impacted. Soils on site are indicated as Hemdon Sift Loam above unnamed tributary. This is an upland sods and 6h Comments: Nason Sift Loam above unnamed tributary and upstream to road this is an upland sod created on sloping woodland Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes ® No lb If yes, then is a diffuse flow plan included? If no, explain why. Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan, explain why- 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan. 2e Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? 3b Which of the following locally- implemented stormwater management programs apply (check all that apply) ❑ Phase II ❑ NSW USMP Water Supply Watershed 0 Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? []Yes ❑ No 4. DWQ Stormwater Program Review 4a Which of the following state - implemented stormwater management programs apply (check all that apply): []Coastal counties ❑HQW HSession ORW Law 2006 -246 []Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? O Yes 0 No 5b Have all of the 401 Unit submittal requirements been met? [] Yes [] No Page 8of10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state/local) funds or the [3 Yes ❑ No use of public (federal/state) land? 1b If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State Oyes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter ) ❑ Yes ❑ No Comments, 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, F]Yes OX No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? []Yes ®No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat [] Yes ❑ No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑Yes ❑ No 5c If yes, indicate the USFWS Field Office you have contacted 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? 0 Yes ❑ No 6b What data sources did you use to determine whether your site would impact Essentiai Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b, What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑ No 8b If yes, explain how project meets FEMA requirements 8c. What source(s) did you use to make the floodplain determination? Nu -Britt, LLC by: Anthony C. Johnson, Manager Applicant/Agent's Printed Name ' C November 7, 2012 Date Applicant/Ag nt's Signatu (Agent's signature is valid only if an authorization letter from the applicant is provided Page 10 of 10