HomeMy WebLinkAbout20190495 Ver 1_Approval Letter SAW-2019-00487_20210401REPLY TO
ATTENTION OF:
Regulatory Division
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
January 5, 2021
Re: NCIRT Review and USACE Approval of the NCDMS Cowford Mitigation Site / Onslow Co./
SAW-2019-00487/ NCDMS Project # 100095
Mr. Tim Baumgartner
North Carolina Division of Mitigation Services
1652 Mail Service Center
Raleigh, NC 27699-1652
Dear Mr. Baumgartner:
The purpose of this letter is to provide the North Carolina Division of Mitigation Services
(NCDMS) with all comments generated by the North Carolina Interagency Review Team
(NCIRT) during the 30-day comment period for the Cowford Draft Mitigation Plan, which closed
on December 9, 2020. These comments are attached for your review.
Based on our review of these comments, we have determined that no major concerns
have been identified with the Draft Mitigation Plan, which is considered approved with this
correspondence. However, several minor issues were identified, as described in the attached
comment memo, which must be addressed in the Final Mitigation Plan.
The Final Mitigation Plan is to be submitted with the Preconstruction Notification (PCN)
Application for Nationwide permit approval of the project along with a copy of this letter. Issues
identified above must be addressed in the Final Mitigation Plan. All changes made to the Final
Mitigation Plan should be summarized in an errata sheet included at the beginning of the
document. If it is determined that the project does not require a Department of the Army permit,
you must still provide a copy of the Final Mitigation Plan, along with a copy of this letter, to the
appropriate USACE field office at least 30 days in advance of beginning construction of the
project. Please note that this approval does not preclude the inclusion of permit conditions in
the permit authorization for the project, particularly if issues mentioned above are not
satisfactorily addressed. Additionally, this letter provides initial approval for the Mitigation Plan,
but this does not guarantee that the project will generate the requested amount of mitigation
credit. As you are aware, unforeseen issues may arise during construction or monitoring of the
project that may require maintenance or reconstruction that may lead to reduced credit.
Thank you for your prompt attention to this matter, and if you have any questions
regarding this letter, the mitigation plan review process, or the requirements of the Mitigation
Rule, please call me at 919-554-4884, ext 60.
Sincerely,
BROWN ING.KIMBER
LY.DANIELLE.15276
83510
Digitally signed by
BROWNING.KIMBERLY.DANIELLE.
1527683510
Date: 2021.01.05 13:46:39 -05'00'
Kim Browning
Mitigation Project Manager
for Ronnie Smith, Deputy Chief
USACE Regulatory Division
Enclosures
Electronic Copies Furnished:
NCIRT Distribution List
Lindsay Crocker—NCDMS
Brad Breslow, Matt Butler—RES