July 30, 2019
LETTER OF RECEIPT OF EROSION CONTROL PLAN
City of Hickory
Attention: Warren Wood, City Manager
76 North Center Street
Hickory, North Carolina 28658
RE: Project Name: Southern Lutetium Circle/ Trivium Parkway Phase III
Project ID: CATAW-2020-002
County: Catawba
Project Location: Robinwood Road
Submitted By: Civil & Environmental Consultants, Inc., Shad Walters
Date Received by LQS: July 24, 2019
Plan Type: New
ESC Plan Reviewer: Chris Graybeal
Dear Mr. Wood:
This office has received an erosion and sediment control plan for the project listed above which
was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S.
113A-57 (4)).
The Act requires that all persons disturbing an area of one or more acres of land must obtain
approval of a soil erosion control plan prior to the commencement of the land -disturbing activity
(G,S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days
prior to the activity and the approving authority must approve or disapprove the submitted plan
within 30 days of receipt. Failure of the approving authority to approve or disapprove the
submitted plan within the 30-day period will be deemed approval of the plan.
Commencement or continuation of a land-dishubing activity under the jurisdiction of this Act
prior to the approval of an erosion and sediment control plan is a violation of the Act.
The approval of an erosion and sediment control plan is conditioned on the applicant's
compliance with Federal and State water quality laws, regulations and rules.
State ofNorth Carolina Environmental Quality Energy, Mineral andLend Resources
Mooresville Regional Office 610 East Center Ave Ste 301 Mooresville, NC 28115
7046631699 T
Letter of Receipt of Erosion Control Plan
City of Hickory
July 30, 2019
Page 2 of 2
If you have questions, please do not hesitate to contact the ESC plan reviewer listed above. Your
cooperation in this matter is appreciated and we look forward to working with you on this
project.
Sincerely,
2�_
envy S. Llywelyn
Environmental Specialist
Land Quality Section
c: Civil &Environmental Consultants, Inc
Attention: Shad Walters
3701 Arco Corporate Drive, Suite 400
Charlotte, NC 28273
ROY COOPER
Governor
MICEIAEL S. REGAN
Secretary
S. DANIEL SMITH
Dlredor
NORTH CAROLINA
Environmental Quality
August 12, 2019
LETTER OF APPROVAL
City of Hickory
Attention: Warren Wood, City Manager
76 North Center Street
Hickory; North Cuolina 28601
RE:. Project Name: Southern Lutetium Circle (Trivium Parkway Phase III
Acres Approved: 10.53
Project ID: CATAW-2020-002
County: Catawba
City: Hickory
Address: Robinwood Road
River Basin: Catawba
Stream Classification: Other
Submitted By: City of Hickory
Date Received by LQS: July 24, 2019
Plan Type: New
Dear Mr. Wood:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be
posted at the job site. This plan approval shall expire three (3) years following the. date of approval,
if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of March 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
cormect NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for coverage under the NCGOl permit. However, on or after May 1, 2019, a $100 fee
will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept
on file. at the job site:
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
'l(lA�rn il.90
Letter of Approval
City of Hickory
August 12, 2019
Page 2 of 2
The approved E&SC plan as well as any approved deviation.
2. The NCGOI permit and the COC, once it is received.
Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1ka) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this project,
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act,
deral and State
Acceptance and approval of this plan is conditioned upon your compliance with Fe
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
I
pproval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Enclosures: Certificate of Approval
NCGOI Fact Sheet
c: Civil &Environmental Consultants, Inc
Attention: Shad W. Walters, PE
3701 Arco Corporate Drive, Suite 400
Charlotte, North Carolina 28273
Inspection Department
Si ly,
Christopher Graybeal
Assistant Regional Engineer