Loading...
HomeMy WebLinkAboutNCC212011_ESC Approval Submitted_20210405ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY July 30, 2019 LETTER OF RECEIPT OF EROSION CONTROL PLAN City of Hickory Attention: Warren Wood, City Manager 76 North Center Street Hickory, North Carolina 28658 RE: Project Name: Southern Lutetium Circle/ Trivium Parkway Phase III Project ID: CATAW-2020-002 County: Catawba Project Location: Robinwood Road Submitted By: Civil & Environmental Consultants, Inc., Shad Walters Date Received by LQS: July 24, 2019 Plan Type: New ESC Plan Reviewer: Chris Graybeal Dear Mr. Wood: This office has received an erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)). The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G,S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan. Commencement or continuation of a land-dishubing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. State ofNorth Carolina Environmental Quality Energy, Mineral andLend Resources Mooresville Regional Office 610 East Center Ave Ste 301 Mooresville, NC 28115 7046631699 T Letter of Receipt of Erosion Control Plan City of Hickory July 30, 2019 Page 2 of 2 If you have questions, please do not hesitate to contact the ESC plan reviewer listed above. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, 2�_ envy S. Llywelyn Environmental Specialist Land Quality Section c: Civil &Environmental Consultants, Inc Attention: Shad Walters 3701 Arco Corporate Drive, Suite 400 Charlotte, NC 28273 ROY COOPER Governor MICEIAEL S. REGAN Secretary S. DANIEL SMITH Dlredor NORTH CAROLINA Environmental Quality August 12, 2019 LETTER OF APPROVAL City of Hickory Attention: Warren Wood, City Manager 76 North Center Street Hickory; North Cuolina 28601 RE:. Project Name: Southern Lutetium Circle (Trivium Parkway Phase III Acres Approved: 10.53 Project ID: CATAW-2020-002 County: Catawba City: Hickory Address: Robinwood Road River Basin: Catawba Stream Classification: Other Submitted By: City of Hickory Date Received by LQS: July 24, 2019 Plan Type: New Dear Mr. Wood: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the. date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and cormect NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOl permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file. at the job site: North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 'l(lA�rn il.90 Letter of Approval City of Hickory August 12, 2019 Page 2 of 2 The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1ka) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act, deral and State Acceptance and approval of this plan is conditioned upon your compliance with Fe water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or I pproval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Enclosures: Certificate of Approval NCGOI Fact Sheet c: Civil &Environmental Consultants, Inc Attention: Shad W. Walters, PE 3701 Arco Corporate Drive, Suite 400 Charlotte, North Carolina 28273 Inspection Department Si ly, Christopher Graybeal Assistant Regional Engineer Land Quality Section