HomeMy WebLinkAbout20210521 Ver 1_SAW-2021-00485 USACE Permit_20210330 U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2021-00485 County: Hyde County U.S.G.S.Quad:Green Island
GENERAL PERMIT (REGIONAL AND NATIONWIDE)VERIFICATION
Permittee: Brian Doliber
NCDOT Ferry Division
Address: 159 Lucinda Lane
Powells Point NC,27966
Telephone Number: (252)232-8025
Size(acres) 3 Nearest Town Ocracoke
Nearest Waterway Pamlico Sound RiverBa sin Pamlico
USGS HUC 03020105 Coordinates Latitude:35.189815
Longitude:-75.780365
Location description: The project area is located on NC 12 in the Southdock Ferry Basin on the north end of Ocracoke Island
in Hyde County,North Carolina.
Description of projects area and activity: NCDOT/Ferry Division proposes to repair/replace mooring dolphins within the
Southdock Ferry Basin on Ocracoke Island.
Applicable Law: ❑ Section 404(Clean Water Act,33 USC 1344)
® Section 10(Rivers andHarbors Act,33 USC 403)
Authorization: Regional General Permit Number and/orNationwide Permit Number:3
SEE ATTACHED RGP or NWP GENERAL,REGIONAL AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
conditions and your submitted application and attached information dated March 4th,2021.Any violation of the attached
conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class
I administrative penalty,and/or appropriate legal action.
This verification will remainvalid until the expiration date identified below unless the nationwide and/or regional general permit
authorization is modified,suspended or revoked. If,prior to the expiration date identified below,the nationwide and/or regional
genera l p erm it authorization is reissued and/or modified,this verification will remain valid until the expiration date identified below,
provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit
authorization expires or is suspended,revoked,or is modified,such that the activity would no longer comply with the terms and
conditions of the nationwide permit, activities which have commenced (i.e., are under construction)or are under contract to
commence in reliance upon the nationwide and/or regional general permit,will remain authorizedprovided the activity is complete d
within twelve months of the date of the nationwide and/or regional general permit's expiration,modification or revocation,unless
discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization.
Activities subj ect to Section 404(as indicated above)may also require an individual Section 40 1 Water Quality Cert ific at ion. You
should contact the NC Division of WaterResources(telephone 919-807-6300)to determine Section401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (C AMA),
prior to beginning work you must contact the N.C.Division of Coastal Management in Elizabeth City,NC,at(252)264-3901.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,
State or local approvals/permits.
If there are any questions regarding this verification,any of the conditions of the Permit,or the Corps of Engineers regulatory
program,please contact Kyle Barnes at(910)251-4584 or Kyle.W.Barnes@usace.army.mil.
Corps Regulatory Official: .A-- Date: March 30,2021
Expiration Date of Verification: arch 18,2022
A.Determination of Jurisdiction:
1. ® There are waters on the above described project area thatmaybe subject to Section404 ofthe Clean Water Act(CWA)(33
USC§ 1344)and/or Section 10 of theRivers andHarbors Act(RHA)(33 USC§403).This preliminary determination is not an
appealable a ctionunder the Regulatory Program Administrative Appeal Pro c ess(Reference 33 CFR Pa rt 3 3 1). However,you
may request an approved JD,which is an appealable action,by contacting the Corps district for further instruction. Please note,
if work is authorizedby either a general or nationwide permit,andyou wish to request an appeal of an approvedJD,the appeal
must be received bythe Corps andthe appealprocess concludedpriorto the commencement of any work in waters of theUnited
States andpriorto any work that could alter the hydrology of waters ofthe United States.
2. ❑ There are Navigable Waters of the United States within the above describedproject area subjectto the permit requirements
of Section 10 ofthe Rivers and Harbors Act(RHA)(33 USC§403)and Section 404 of the Clean Water Act(CWA)(33 USC§
1344). Unless there is a change in the law or our publishedregulations,this determination maybe relied upon for a periodnot to
exceed fiveyears from the date of this notification.
3. ❑ There are waters,including wetlands,within the above describedproject area that are subject to the permit requirements of
Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or ourpublished regulations,
this determination maybe relied upon for a periodnot to exceed five years from the date of this notification.
4. ❑ A jurisdiction determination was not completed with this request. Therefore,this is not an appealable action. However,you
may request an approved JD,which is an appealable action,by contacting the Corps for further instruction.
5. ❑ The aquatic resources within the a bove describedproj ect area have been identified under a previous action. Please reference
the approvedjurisdictional determination issued . Action ID:SAW-
B.Basis For Jurisdictional Determination: N/A.An Approved JD has not been completed.
C.Remarks: Waters within project area are subject to ebb and flow of tides.
D.Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps'Clean Water Act jurisdiction for the particular site identified in
this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or
your tenant are USDA Program participants,or anticipate participation in USDA programs,you should request a certified wetland determination
from the local office of the Natural Resources Conservation Service,prior to starting work.
E. Appeals Information for Approved Jurisdiction Determinations(as indicated in A2 and A3 above).
If you object to this determination,you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process(NAP)fact sheet and Request for Appeal(RFA)form. If you request to appeal this determination you must submit a
completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Philip Shannin,App eal Review Officer
60 Forsyth Street SW,Room 1 OM 15
Atlanta,Georgia 30303-8801
Phone:(404)562-5137
In order for an RFA to be accepted bythe Corps,the Corps must determine that it is complete,that it meets the criteria for appeal
under 33 CFR part 331.5,andthat it has been receivedby the Division Office within 60 days ofthe date ofthe NAP. Should you
decide to submit an RFA form,it must be received at the above address byN/A.
It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence.
Corps Regulatory Official: _ Cki•l‘gil---
yle Barnes
Date of JD: March 30,2021 Expiration Date ofJD:N/A
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please complete our Customer
Satisfaction Survey,located online at http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0.
SAW-2021-00485
SPECIAL CONDITIONS
A. The NCDOT Ferry Division shall implementthe"Guidelines for Avoiding Impacts to the West Indian Manatee:
Precautionary Measures for Construction Activities in North Carolina Waters"as identified by the USFW Service.
Action ID Number: SAW-2021-00485 County: Hyde County
Permittee: Brian Doliber
NCDOT Ferry Division
Project Name: Southdock Dolphin Repair& Maintenance/Hyde County/Div 1
Date Verification Issued: March 30,2021
Project Manager: Kyle Barnes
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Kyle Barnes
Please note that your permitted activity is subject to a compliance inspection by a U. S.Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty,or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
OTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Brian Doliber NCDOT Ferry Division File Number: SAW-2021-00485 Date: March 30,2021
Attached is: See Section below
• INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A
• PROFFERED PERMIT (Standard Permit or Letter of permission) B
• PERMIT DENIAL C
• APPROVED JURISDICTIONAL DETERMINATION D
• PRELIMINARY JURISDICTIONAL DETERMINATION E
SECTION I- The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If youreceiveda Standard Permit,you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission(LOP),you may accept the LOP andyourwork is authorized. Your signature
on the Standard Permit or acceptance o f the LOP means that you accept the permit in its entirety,and waive all rights to appeal the
permit,including its terms and conditions,and approvedjurisdictionaldeterminations associated with the permit.
• OBJECT: If you object to the permit(Standard or LOP)b ecause o f certain terms and conditions therein,you may request that the
permit be modified accordingly.You must complete Section II of this form and return the form to the district engineer. Your
objections must be received by the district engineer within 60 days of the date ofthis notice,or you will forfeit your right to appeal
the permit in the future. Upon receipt ofyour letter,the district engineer will evaluate your objections and may:(a)modify the
permit to address all of your concerns,(b)modify thepermit to address some of your objections,or(c)not modify the permit
having determined that the permit should be issued as previously written. After evaluating your objections,the district engineer
will send you a proffered pennit for your reconsideration,as indicated in Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If youreceiveda Standard Permit,you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission(LOP),you may accept the LOP andyourwork is authorized. Your signature
on the Standard Permit or acceptance ofthe LOP means thatyou a ccept the permit in its entirety,and waive all rights to appeal the
permit,including its terms and conditions,and approved j urisdictional determinations associated with the permit.
• APPEAL: If you choose to decline the proffered permit(Standard or LOP)because of certain terms and conditions therein,you
may appeal the declinedpermit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form
and sending the form to the division engineer. This form must be received by the division engineer within 60 days ofthe date of
this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or
provide new information.
• ACCEPT: You do not need to notify the Corps to accept an approvedJD. Failure to notify the Corps within 60 days of the date of
this notice means that you accept the approved JD in its entirety,and waive allrights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD,you may appeal the approvedJD under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by
the division engineer within 60 days ofthe date ofthis notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps
regarding the preliminary JD. The Preliminary JD is not appealable. If you wish,you may request an approved
JD(which may be appealed),by contacting the Corps district for further instruction. Also you may provide new
information for further consideration by the Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your
objections to an initial proffered permit in clear concise statements. You may attach additional information to
this form to clarify where your reasons or objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record,the Corps
memorandum for the record of the appeal conference or meeting, and any supplemental information that the
review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps
may add new information or analyses to the record. However,you may provide additional information to clarify
the location of information that is already in the administrative record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/orthe If you only have questions regardingthe appealprocess you may
appealprocess you may contact: also contact:
District Engineer,Wilmington Regulatory Division, Mr. Philip Shannin,Administrative Appeal Review Officer
Attn: Kyle Barnes CESAD-PDO
2407 West 5th Street U.S. Army Corps of Engineers, South Atlantic Division
Washington,North Carolina 27889 60 Forsyth Street,Room 10M15
Atlanta,Georgia 30303-8801
Phone:(404)562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel,and any government
consultants,to conduct investigations of the project site during the course of the appealprocess. You will be provided a 15 day
notice of any site investigation and will have the opportunity to participate in all site investigations.
Date: Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer,Wilmington Regulatory Division,Attn: Kyle Barnes,2407 West 5th Street
Washington,North Carolina 27889
For Permit denials,Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer,Commander,U.S. Army Engineer Division,South Atlantic,Attn: Mr.Philip Shannin, Administrative
Appeal Officer,CESAD-PDO, 60 Forsyth Street, Room 10M15,Atlanta, Georgia 30303-8801
Phone: (404)562-5137