Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2021-01344_Well Construction - GW1_20210329
Print Form WELL CONSTRUCTION RECORD (GW-11 For Internal Use Only I.1Yell Contractor Information: Chant Mason 14.WATER 7AN tt ell CbnVaaor Name - re061 TO DFSCRD'PON 4254A 'a ft. ft. Ap IL 2 q( A. 'tC tfelfConvaaor Cenificetion Nwnber 15.OUTER CASING(formultl<uedweDs OR LINER Ua'-ileable N.W. Poole Well & Pump Co. FROM TO DIMIETER THICKNESS MATER AL + rL SU ft. 6 tn. .188 gal... —,ran.game Gun f�2ti9d�_2�� Y 16.INNER CASING OR TUEING ""mdelowd-last L R'ell Construction Perudd 7/: FROM TO DIAMEFER I THICKNESS I MATERIAL is all applmahle well'an s...........omi(s lLe.u1c.Coast Sta. .Variance,I'll.) 3.o,ell Use(check well use): fL n. In 15'ater Su Ip Well: 17.SCREEN pP FROM TO DIAMETER SLOTSILE THICKNESS MATERIAL IJAen,chural []Mumcipal/Public n. ft. in. Geothermal(I{eaGngKooling Suppy') Qc Residential Water Supply(Single) R [L In. -1Indusnial/Commercial [)Residential Water Supply(shared) 18.GROAT i Inl anon FROM TO MATERIAL EMPLACEMENT 61EII10D R"FOUNT i Nan-Water Supply Well: p rL 20 n. 1e 1 0� Dlomlonng Recoven fit. n. I Injection Well: rL R F)Aquifer Recharge Groundwater Remediation 19.SAND/GRAVEL PACK Ra ilcetle (�,\glrl(ef Storage and RCCUVPr)' ®$aINIy Banner FR061 TO MATERIAL EMPLACEMENT METHOD _jAquil Test �StonnwalerDrainage R A. DExperimental Techlwlogy ®Subsidence Control fL n. ;�'JCieolhennal(Closed Loop) Tracer 20.DRILLING LOG batoich idditlthal Stella if baessa' l Ge011tentla (H¢alln 'CCU In RCIOm) Other(explain under 421 Remarks FROM TO DESCRITTION cob,6Wn caNmak �Ln alu etc.) IL J fL U. 1SCI !.Date Well(s)CompkAed: C L 7 Well IDM fL fr' /��nL 3a.Well Location: lit-( IL 3O!{ n. Gf., - C LIo Zs� rL n. - �� aorbq-Owner Name Facility IDN o l'applicable) R n' 21 j l9 �f vas a V-Key C:( Via,I+JJt ]- 27a07 ft. n. FL n. Aaares,city.andzip W I 11.REMARI(S mint. HC-` steel drive shoe. ParulldcnlifiWistN. (PIN) Used hardened -h.Latitude and longitude in degrees/minutes/seconds or decimal degrees: i melt Geld.rueliqladlong is sulfidew) 22./Ceeertiification: N �. r U ' I T I l/ W :.!,Care)the well(S)O% Permanent or ©Temporar}' Sigmnue UCCerclf¢d Well Convex for Dale By signing this form,I hereto confy that the wells)was(were)constructed in arrordance i.is this a repair to an existing well: []Yes or ©X No with 15A NCAC 02C 0100 ar 15A si 02C.0200 Wdl C•onmuction Standards and that n ,e a repair,fill out knmm well ronsnurtiou information and explain the nature of the tho cllhis rtrord has been pow,ded w the w,11 awn,. under N21 r,n irk,ovum,m n,,die hark of t4is farm. 23.Site diagram or additional well details: 'd.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well mnstruclon.only I GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessar}'. _!gilled SUBMITTAL INSTRUCTIONS :'.Total well depth below land surface: O M-) .....h, le,�e0,l,c.ffde me, dt .(e,,ua 10 coat For All Wells: Submit this form within 30 days of completion of well p p / Jferor p 3rCU]00'arrd]�aJ/00') construction to the follmving. i0.Static water level below lop of casing: /V (ff) Division of Water Resources,Information Processing Unit, ..oar to-!is anove ra,ing,n.e 1617 Mail Senice Center,Raleigh,NC 27699-1617 -1.Borehole diameter: 6 (fn.) 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submft one copy of this form within 30 days of completion of well l2.Well construction riblo, method: canslrucifon to the following. - auger.rotary,cable,direct push,do l Division ofWater Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 131.7"laid(gpna) S^ Method of test: Blow 24c.For Water Supply&Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this forth within 30 days of t 36.D onisinf,di I)pe: HTH Amount: 1 Ib' completion of well construction to the county health department of the count)' where constructed. :'Gtt'-I North Carolina Deparnnenl of Environmental Quality-Division of Water Resmuces Revised 2]]-2016