HomeMy WebLinkAboutWQCS00054_NOV-2021-DV-0186 Response_20210331 (2)Union EST. 1842 March 31, 2021 Mr. W. Corey Basinger Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office 610 East Center Ave , Suite 301 Mooresville, NC 28115 Public Works 500 North Main Street Suite # 600 Monroe, NC 28112 T. 704-296-4210 Subject: Notice of Violation Tracking #: NOV-2021-DV-0186 Sanitary Sewer Overflows — February 2020 Collection System Permit — WQCS00054 Union County Dear Mr. Basinger: Union County has received the NOV referenced above for collection system overflows. Explanations of the overflows were on the BIMS Overflow Reporting Forms submitted by Union County Public Works (UCPW) to the NCDEQ. However, we have added a few additional facts in the explanations below. Incident # Date Location 202100454 2/10/2021 2856 Gray Fox Rd Response: The SSO listed in this section was due to an Air Release Valve (ARV) failure. The ARV is located on the Helmsville Road Pump Station Force Main. The failure occurred due to corrosion of the saddle connection below the valve above the shutoff. This corrosion caused the connection to weaken and when the pumps ran the spill occurred. We took immediate action by shutting pump station down and put a pumper truck on standby. We then replaced the saddle and the system was restored to normal operations. Incident # Date Location 202100953 2/10/2021 7001 Sedgwick Rd The SSO listed in this section was due to an obstruction causing a backup. The issue that caused the spill/blockage was a flow meter that came loose and wedged itself inside the gravity sewer. This spill occurred downstream from the Fieldstone Farms Pump Station. When discovered we took immediate action by shutting pump station down placing a pumper truck on standby. We then removed blockage and the system was restored to normal operations. UCPW also has an aggressive Capital Improvement Program throughout the next 5 years. The projects include: Crooked Creek Basin Improvements - $23,900,000 • Suburban Estates PS and FM - $1,000,000.00 Waxhaw Interceptor —$5,400,000 • WW PS Improvements - $3,500,000 UCPW's current CIP projects are also ongoing with projects including: • Blythe Creek Sewer Improvements - $6,200,000 ➢ Forest Park PS Replacement & Interceptor Improvements - $3,345,000 • Crooked Creek I&I Study & Remediation - $476,000 Union County Public Works continues to invest funds into SSES work, capital improvements, maintenance, FOG, and operations to improve the wastewater collection system. If further information or details regarding the CCWRF Improvements, as well as, the CIP projects listed above are required, please feel free to contact Greg Morgan, Superintendent/ORC, at 704-289- 3288 or myself at 704-296-4215. Thank you for your consideration on this issue. Sincerely, Andrew Neff, PE Water/Wastewater Division Director cc: Hyong Yi, Public Works Administrator Josh Brooks, Assistant Director, Water/Wastewater Operations Greg Morgan, Utility Field Services Superintendent/ORC Page 2 1