Loading...
HomeMy WebLinkAboutNCS000409_Outfall Inspections_20210330System Material Size Drains To Maintenance ments 19 Inspection Element ID �ffi Needed TweMW C5-OF5- RCP W/ 18 CATAWBA Y OUTLET SW Inspection LOFTINPARK HEADWALL RIVER NEEDS TO BE - DWS CLEANED OF SEDIMENT BUILD UP OUTLET NEEDS TO BE CLEANED OF SEDIMENT BUILD UP C5-OF4- RCP W/ FES 24 CATAWBA N OBSERVED SW Inspection LOFTINPARK RIVER FLOW IS - DWS AREA DRAINAGE RUNOFF, MTKITMAI C6-OF2- CORRUGATED 24 CATAWBA N SEDIMENTS SW Inspection WWTP METAL PIPE RIVER AT END OF - DWS PIPE SEDIMENTS AT END OF PTPP C6-OF1- CORRUGATED 24 CATAWBA N SW Inspection WWTP METAL PIPE RIVER - DWS C5-MOF1- CORRUGATED 36 Catawba river N SW Inspection RIVER DR METAL PIPE - DWS A4-OF1- RCP W/ RIP 15 UNNAMED N SMALL SW Inspection TODDEXT RAP APRON TRIBUTARY AMOUNT OF -DWS TO HALLS GRIT AND ROCKY BRANCH GRAVEL AT ni ITI ET C6-CVIN1- CORRUGATED 114" N SW Inspection HANKS CREEK METAL PIPE - DWS C6-OF1- RCP W/ RIP 24 NANCY N SW Inspection HANKSCREEK RAP APRON HANKS - DWS C6-OF3- RCP W/ RIP 36 NANCY Y Outfall pipe SW Inspection HANKSCREEK RAP APRON HANKS se ererated - DWS Page: 1 of 3 Asset inspection Report 3/1/2021-3/30/2021 .. . ., �. NO Outfall OS, R Y N 3/24/2021 NONE N/A inspection Outfall OS, R, C Y N 3/24/2021 NONE N/A inspection Major outfall I Y N 3/11/2021 NONE N/A inspection Major outfall I Y N 3/11/2021 NONE N/A inspection Major outfall R, C Y Y 3/11/2021 NONE CLEAR inspection Inspected R Y N 3/10/2021 NONE NONE Outfall Outfall I, R Y Y 3/4/2021 NONE CLEAR ins ection Outfall R Y Y 3/4/2021 NONE CLEAR ins ection Outfall R Y Y 3/4/2021 NONE CLEAR ins ection Page: 2 of 3 Clarity N/A Floatables NONE Deposits/St ains SEDIMENTS Vegetation NORMAL Biological None N/A NONE NONE NORMAL None N/A N/A SEDIMENTS NORMAL None N/A N/A NONE NORMAL None CLEAR NONE NONE NORMAL Bacteria/Algae NONE NONE SEDIMENTS NORMAL None CLEAR NONE NONE NONE None CLEAR NONE NONE NONE None CLEAR NONE NONE NONE Bacteria/Algae 3/30/2021 Page: 3 of 3