Loading...
HomeMy WebLinkAboutNCS000409_CIP_20210330CITY OF BELMONT FY 202112022 CAPITAL IMPROVEMENTS PROGRAM Capital Improvement Revision Dale: CIP ID No. Expense Name: Material Storage Facility 2115/2021 SW-2011-15 Status: � No Action Taken to Date D Pretm nary Ptenrarg . ] Erg�rg a Proc rrnKnt Dmornents r ] Regulatory Approvals Received 'J Under Contract Comments: Project Type: r3 &46M 6 Growds -i water Ombibution L wastewate, cowcum .-: gnrrr water rl otr r (WentrN sebh,) .. , streets h sdewatks 0 Water Treatmert L. Wastewater Treatment , EquPrrarrK Description: The proposed facility will provide covered storage of materials used by the Street Department and Water & Sewer Department. Stored materials include salt/slag, dirt, sand, rock, and other construction materials. The facility will be roofed to prevent pollution from material runoff, particularly salt. Location: Wastewater Treatment Plant site in the old sludge drying beds location. Need 1 Benefit: Covered storage is necessary in order for the City to meet the requirements of the Phase 2 Stormwater regulations. Dry materials are more easily handled, particularly during inclement weather. Wet dirt can not be used to backftll water and sewer repair trenches. Justification: Salt and slag mixture tends to clump up when wet and does not spread well on pavements. The primary need for this facility is to meet Stormwater Permit requirements to prevent runoff from the stock piles. Other Information: Stockpile bin areas are needed. The building would be 2 sided with metal roof construction. Total Project Costs including Financing: $ 7,141,950 Department: Stormwater Contact: Chad Waldrup Cost Basis: A budget of $860,000 is proposed in 2020 based on vendor proposal for structure with roof only. This amount is adjusted for inflation at a 2% annual rate. 5 year financing is proposed. FY21122 FY22123 FY23124 FY24125 FY25126 After FY25126 Project Costs: Planning/Design: $ 80,000 Pmcuremenl Costs: Construction or Purchase Costs: $ 913,000 Total: $ - $ - $ 993,000 $ - $ - $ - rroject running: General Funds: Fees: Grants: Loans: $ 248,250 $ 238,320 $ 228,390 $ 426,990 Total: $ - $ - $ 248.250 $ 238,320 $ 228,390 $ 426,990 CITY OF BELMONT Capital Improvement Expense Name: Equipment - Street Sweeper FY 202112022 CAPITAL IMPROVEMENTS PROGRAM Revision Date: CIP ID No. 2/15/2021 SW-2017-41 Status: -) Ho ACOM Taken to Pate r ) Pmkffwury Plana ro 1-1 Bvi,eftg i PrOCuene t ow rnents [ Regulatory ApproyalS Rem under Coff"a Comments: Project Type: -J eui" 6 Grounds L' water oiwl6ution L wastewater CoWtion U Stnrmwater I I ottler ilderoy sWN) r- Sheets 6 Sdewaiks -, water Treatment Ci wastewater TreaHnent L•' Equipment Description: This vehicle is a replacement unit for the current sweeper that is used every day to sweep and vacuum City streets. The unit, the same as our current model, is both left and right steering drive. Location: Public Works Garage Need i Benefit: This equipment is required as a replacement of the current 2016 sweeper which will approach its useful life 2022. Justification: The City sweeps approximately 20 miles of roadways with curb and gutter The vehicle is also used for vacuum cleaning drainage basins. Other Information: The current sweeper is used 5 days per week. loci Costs Financing: $ 327,800 Department: 5tormwater Contact: Chad Waldrup Cost Basis: February 2020 vendor quote of $290,000 adjusted for inflation at a 2% annual rate. 3 year financing is proposed at 5% interest rate.