Loading...
HomeMy WebLinkAbout20071470 Ver 1_Meeting Minutes_20100407Submittal Review Comments Raleigh -Durham Roadbuilders 1071 Classic Road Apex, NC 27539 (919) 367-5100 voice, (919) 367-5197 fax RALEI _r URHAM nmm- uuuuuuuumuuuuuuuuuuuuuuumu ROAD = ILDERS Submittal: D-201 Description: Permit Application for Section B — NCTA & NCDOT Comments Date: 4/6/10 No 1 Sheet No. Hydraulics Comments NCTA COMMENT Culvert Profile Sheets: Include site number and sills if applicable. Do not include extraneous data. RESPONSE Site numbers added. Sill noted on Y4RPB CSR. No other sills included on other culverts as designed. 2 Hydraulics Comments Sheet 4: Show total pond impact. Sheet 4A added to include the remainder of the pond. Project surveys do not extend to full limit of pond. TDE is not required around full limit of pond. 3 Hydraulics Comments Sheet 7: do not show stilling basin. Stilling basin level turned off. 4 Hydraulics Comments Sheet 9: Check TDE lines. Duplicate TDE removed. 5 Hydraulics Comments Summary Sheet: 10' diameter impact for each drilled pier seems excessive. The finished diameter of the drilled shaft concrete is 4'-0". To construct the shafts in wetlands, an oversized casing (approximately 8'-0" diameter) is placed at the top of the shaft to contain the drilling spoils and allow for working room around the drilled shaft excavation for placing the reinforcing steel cage and pouring the concrete. Based on this, it is reasonable to assume that the disturbed area around the shaft will be contained within a 10'-0" diameter circle. The total impact of the additional 3'-0" "doughnut" around the 4'-0" diameter drilled shaft is equal to 10'-0" diameter which is very small area equal to 0.0015 acre per shaft. 6 Hydraulics Comments NEU comments in Doc. No. R-2635-00472, which was submitted under Submittal No. D-200. The comments from NEU provided to RDR by email have been addressed. 7 Hydraulics Comments Per DBT, the permit package will be submitted to Agencies as one application for both sections, R2635 A and B. Correct. One permit package will be submitted that includes the permit application for the R-2635A and R-2635B sections of the project. Page 1 of 1