Loading...
HomeMy WebLinkAbout20210448 Ver 1_Pre-Filing Meeting Request Attachment_20210224Preliminary ORM Data Entry Fields for New Actions ACTION ID #: SAW-Begin Date (Date Received): Prepare file folder Assign Action ID Number in ORM 1. Project Name [PCN Form A2a]: 2. Work Type:Private Institutional Government Commercial 3. Project Description / Purpose [PCN Form B3d and B3e]: 4. Property Owner / Applicant [PCN Form A3 or A4]: 5. Agent / Consultant [PNC Form A5 – or ORM Consultant ID Number]: 6. Related Action ID Number(s) [PCN Form B5b]: 7. Project Location – Coordinates, Street Address, and/or Location Description [PCN Form B1b]: 8. Project Location – Tax Parcel ID [PCN Form B1a]: 9. Project Location – County [PCN Form A2b]: 10. Project Location – Nearest Municipality or Town [PCN Form A2c]: 11. Project Information – Nearest Waterbody [PCN Form B2a]: 12. Watershed / 8-Digit Hydrologic Unit Code [PCN Form B2c]: Authorization: Section 10 Section 404 Section 10 and 404 Regulatory Action Type: Pre-Application Request Unauthorized Activity Compliance Standard Permit Nationwide Permit #39 Regional General Permit # Jurisdictional Determination Request No Permit Required Revised 20150602 ýïí ú ïì Ю±¶»½¬ Ù¿¬»©¿§ èë › ß¾»®¼»»² Þ´ª¼ò Û¨¬»²­·±² ¿²¼ Ô·²»¾»®¹»® μò λ¿´·¹²³»²¬ ì ̸»Ù¿¬»©¿§èë Ю±¶»½¬ô º±®³»®´§²¿³»¼Ì¸»Ô·²»¾»®¹»®Ý±²²»½¬±®Ð®±¶»½¬·­¿°´¿²²»¼°«¾´·½½±²²»½¬±®´±½¿¬»¼©·¬¸·²¬¸»Ù¿­¬±²·¿ Ô±¹·­¬·½­ Ý»²¬»® øÙÔÝ÷ °®±°»®¬§ò ̸» ½±²²»½¬±® ©·´´ °®±ª·¼» ·²¼»°»²¼»²¬ «¬·´·¬§ ¬± ¬¸» ®»­·¼»²¬­ ±º Ù¿­¬±²·¿ ¿²¼ Ô±©»´´ ¬¸¿¬ ´·ª» ¿²¼ ©±®µ ´±½¿´´§ò Ý·¬§ ±º Ù¿­¬±²·¿ ݸ®·­ Ì·²µ´»²¾»®¹ô ÐÉÍ øÕ·³´»§óر®²÷ ̸» °®±¶»½¬ ·­ ´±½¿¬»¼ ¾»¬©»»² É ï­¬ ͬ®»»¬ ¿²¼ ×óèë ·² Ù¿­¬±²·¿ ¿²¼ Ô±©»´´ô Ù¿­¬±² ݱ«²¬§ô ÒÝ øíëòîêçìïî Òô óèïòïïçîêì É÷ ïíéèìéô ïíéèéêô íððìçî Ù¿­¬±² Ù¿­¬±²·¿ Ü«¸¿®¬­ Ý®»»µ ͱ«¬¸ Ú±®µ Ý¿¬¿©¾¿ øðíðëðïðî÷ ì ì kimley-horn.com 200 South Tryon Street, Suite 200, Charlotte, NC 28202 704-333-5131 February 22, 2021 Mr. Bryan Roden-Reynolds Charlotte Regulatory Field Office US Army Corps of Engineers 8430 University Executive Park Drive Charlotte, NC 28262 Ms. Karen Higgins NC DWR, 401 & Buffer Permitting Unit 512 North Salisbury Street Raleigh, NC 27604 Re: Pre-Construction Notification (NWP 13 & 14) Project Gateway 85 – Aberdeen Blvd. Extension and Lineberger Rd. Realignment Gastonia, Gaston County, NC Dear Mr. Roden-Reynolds and Ms. Higgins: On behalf of our client, the City of Gastonia, Kimley-Horn (KH) is submitting the enclosed joint Section 404/401 Pre-Construction Notification (PCN) for the above-referenced project for your review pursuant to Nationwide Permits 13 & 14 and General 401 Water Quality Certification numbers 4134 & 4135. Authorization is requested to extend Aberdeen Boulevard and realign Lineberger Road. The approximately 13-acre project area consists of the limits of disturbance and a 70-foot roadway right- of-way and is located in Gastonia, Gaston County, NC. The proposed project seeks to construct the roadway infrastructure in two phases. Phase I seeks to extend Aberdeen Boulevard from the terminus of existing Aberdeen Boulevard east to existing Lineberger Road. Phase II seeks to realign Lineberger Road by shifting the entrance point along Lowell Road west, approximately one-third of a mile, and connecting south with Aberdeen Boulevard Extension. The center project area coordinates are 35.269218, -81.119589. The following information is included as part of this PCN submittal: l Project Summary Sheet l Agent Authorization l Pre-Construction Notification Form l Project Site Figures n Figure 1 – Vicinity n Figure 2 – USGS 7.5’ Topo (Gaston N & Mount Holly Quads) n Figure 3 – SSURGO Soils and NWI (2019 ESRI Aerial) n Figure 4 – Existing Conditions (2019 ESRI Aerial) n Figure 5 – Proposed Conditions (2019 ESRI Aerial) l Infrastructure Construction Plans for Gateway 85 l Compensatory Mitigation l Agency Correspondence Page 2 kimley-horn.com 200 South Tryon Street, Suite 200, Charlotte, NC 28202 704-333-5131 PROJECT BACKGROUND The Gateway 85 Project, formerly named The Lineberger Connector Project, is a well-known, previously planned public connector located within the Gastonia Logistics Center (GLC) property. The connector will provide independent utility to the residents of Gastonia and Lowell that live and work locally. The connector will decrease travel time for eastbound/westbound users and eliminate cut- through traffic in adjacent residential communities, providing safer neighborhoods for these residents. In addition to time savings for residents who may no longer need to commute along I-85, other travelers and the freight industry will benefit from the reduced congestion along the interstate. The “Lineberger Connector” project is currently included in the Gaston-Cleveland-Lincoln Metropolitan Planning Organization’s (GCLMPO) Comprehensive Transportation Plan (CTP) and has been included in the MPO’s long-range transportation plans for many years. The project is currently listed in the GCLMPO’s 2045 Metropolitan Transportation Plan (MTP) for completion in the 2035 horizon year. The owner of the GLC property has donated a 70-foot public right-of-way (ROW) to the City of Gastonia who is the applicant responsible for the design and construction of this project. PROPOSED IMPACTS TO POTENTIALLY JURISDICTIONAL WATERS Impacts to aquatic resources are proposed to be conducted in two phases at five separate and distant impact sites along both roadway corridors. The following summarizes the proposed impacts: Phase I – Aberdeen Blvd. Extension ·Impact Site 1 (1A, 1B, & 1C) o 1A (NWP14) – 168 linear foot (lf), 72-inch reinforced concrete pipe (RCP) placed within Stream 3 (Culvert A in plans). The pipe will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 lf riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non-erosive discharge velocities. 30 lf of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. o 1B (NWP14) – 127 lf, 84-inch RCP placed within Stream 1 (Culvert B in plans). The pipe will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 lf riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non-erosive discharge velocities. 30 lf of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. o 1C (NWP13) – 290 lf of bank stabilization is proposed on the left and right banks of S1 and S3 immediately adjacent and downstream of the proposed roadway crossing Culverts A and B. The existing banks in this area are erosive – lacking stable slopes and adequate vegetated cover. The banks will be graded back to a 3:1 slope providing a stable transition between the culverts and the existing channel banks. In addition Page 3 kimley-horn.com 200 South Tryon Street, Suite 200, Charlotte, NC 28202 704-333-5131 to stability, the sloped channel banks also offset the impact to the 100-year water surface elevation caused by the encroachment of the roadway fill. ·Impact Site 2 (NWP14) - 137 lf, 72-inch RCP placed within Stream 5 (Culvert C in plans). The pipe will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 lf riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non-erosive discharge velocities. 30 lf of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. ·Impact Site 3 (NWP14) – 0.06-ac to Wetland 11 results from grading necessary to construct the Aberdeen Extension. 0.01-ac of temporary impacts are necessary to perform the construction activities. Phase II – Lineberger Rd. Realignment ·Impact Site 4 (NWP14) – 214 lf of permanent stream impact to Stream 8 is requested for grading/fill necessary to realign Lineberger Road. S8 is influenced nearly exclusively by seasonal fluctuations in the water table; therefore, considering upstream impact by others which proposes to fill the stream origin as well as the construction of the roadway, installation of a French-drain system is proposed in place of a culvert to maintain subsurface drainage to S5. Since S8 is a relatively short reach from its origin to its confluence with S5, the applicant anticipates indirect impacts to the channel and therefore seeks authorization to account for the indirect stream impact, including compensatory mitigation. ·Impact Site 5 (NWP14) – 0.02-ac to Wetland 6 results from grading necessary to construct the Lineberger Road realignment. 0.01-ac of temporary impacts are necessary to perform the construction activities. Overall, the proposed project seeks authorization to permanently impact 646 lf of stream/potential non-wetland WoUS and 0.08-ac wetland/potential wetland WoUS under NWP14 for construction of the roadway. Authorization is requested under NWP13 to perform 290 lf of streambank stabilization to reduce bank erosion by grading banks to a more stable slope and planting with native riparian vegetation species. 90 lf of temporary stream/potential non-wetland WoUS impacts are necessary to install pump diversion operations at the three proposed culvert locations to allow for work in dry conditions. 0.02-ac temporary wetland/potential wetland WoUS impacts are requested for construction activities. AVOIDANCE AND MINIMIZATION The Aberdeen Blvd. Extension alignment is intended and designed to border the existing 68-foot Duke Power Easement which bisects the Gastonia Logistic Center property. Impacts to aquatic resources within this corridor could not be avoided by the proposed roadway; however, the proposed impact locations minimize impacts to higher quality resources since the general quality of each aquatic resource feature adjacent to the Duke Power Easement has been altered or degraded due to construction and regular maintenance of the easement. Page 4 kimley-horn.com 200 South Tryon Street, Suite 200, Charlotte, NC 28202 704-333-5131 The dimension, pattern, and profile of the streams above and below the proposed culverts will not be modified by altering the width or depth of the stream profile in connection with the construction activities. The width, height, and gradient of the proposed culverts have been modeled and sized sufficiently to pass the average historical low flow and spring flow without adversely altering flow velocity, as well as flood flows during major storm events. Culverts have been designed and will be constructed in a manner that minimizes destabilization and head cutting to the streams. Destabilizing the channel and head-cutting upstream have been considered and appropriate actions incorporated into the design and placement of the culverts. Culvert lengths have been reduced to the maximum extent practicable by implementing taller headwalls and maximizing side slopes to minimize stream impacts and will be installed in such a manner that the original stream profiles will not be altered. All culverts will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel beds, and to maintain the width of the stream channels. Rip-rap outlet dissipation will be placed in a manner that the boulders will be pushed or “keyed” into the channel beds so that the finished top elevation of the riprap will not exceed that of the original stream beds to prevent destabilization of the stream beds or banks downstream of the impact areas and to allow for aquatic life passage. Temporary impacts have been minimized to the greatest extent practicable to meet the needs of the project and do not pose adverse alterations to the existing channels. Erosion control measures implemented during the construction of the roadway will be removed immediately following the activities and any disturbance will be returned to pre-construction conditions. COMPENSATORY MITIGATION Compensatory mitigation will be met by the purchase of credits through the NC Division of Mitigation Services (NCDMS) in-lieu fee program. Compensatory mitigation is not proposed for wetland impacts associated with proposed grading/fill since the impacts for the entire project are less than 0.1-ac. The following table summarizes the compensatory mitigation proposal: Impact Site Impact Length (LF) Flow Regime NCSAM Rating Proposed Mitigation Ratio Required Credits Site 1A – S3 168 Perennial Medium 1.75:1 294 Site 1B – S1 127 Perennial Medium 1.75:1 223 Site 2 – S5 137 Perennial Medium 1.75:1 240 Site 4 – S8 214 Intermittent Low 1.25 268 TOTAL 646 1025 In total, 1,025 SMUs will be purchased from NCDMS for impacts associated with the proposed roadway project. Page 5 kimley-horn.com 200 South Tryon Street, Suite 200, Charlotte, NC 28202 704-333-5131 Please feel free to contact me at (704) 409-1802 if you have any questions or if additional information is necessary. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Chris Tinklenberg, PWS Environmental Scientist Attachments Project Summary Sheet kimley-horn.com 200 South Tryon Street, Suite 200, Charlotte, NC 28202 704-333-5131 Project Name: Gateway 85 - Aberdeen Blvd. Extension and Lineberger Rd. Realignment Applicant Name and Address: City of Gastonia (POC: Rusty Bost) 150 South York Street Gastonia, NC 28052 Telephone Number: 704-854-6635 Type of Request: Nationwide PCN (NWP #13 & #14) Individual Permit Application Jurisdictional Determination Other: Included Attachments: Project Plans USGS Map NRCS Soil Survey Agent Authorization Delineation Sketch Delineation Survey Data Forms (Up & Wet) NCDWR Stream Forms USACE Stream Forms NCDMS Confirmation Aerial Photo Site Photos Agency Correspondence Other: Other: Check if applicable: CAMA County Trout County Isolated Waters Section 7, ESA Section 106, NHPA EFH Mitigation Proposed ( NC EEP On-Site Off-Site Other) County: Gaston Nearest City/Town: Gastonia Waterway: Duharts Creek River Basin: South Fork Catawba H.U.C.: 03050102 USGS Quad Name: Gaston N and Mount Holly Property Size (acres): 13 acres Approx. Size of Jurisdiction on Site (acres): 0.10 Site Coordinates (in decimal degrees): 35.269412° N, -81.119264 °W Project Location: The project is located between W 1st Street and I-85 in Gastonia and Lowell, Gaston County, NC. Site Description: Existing land use is comprised of undeveloped forested land bound by residential and commercial development. Impact Summary (if applicable): Overall, the proposed project seeks authorization to permanently impact 646 lf of stream/potential non-wetland WoUS and 0.08-ac wetland/potential wetland WoUS under NWP14 for construction of the roadway. Authorization is requested under NWP13 to perform 290 lf of streambank stabilization to reduce bank erosion by grading banks to a more stable slope and planting with native riparian vegetation species. 90 lf of temporary stream/potential non-wetland WoUS impacts are necessary to install pump diversion ope rations at the three proposed culvert locations to allow for work in dry conditions. 0.02-ac temporary wetland/potential wetland WoUS impacts are requested for construction activities. NWP # Open Water (acres) Wetland (acres) Stream Channel Intermittent and/or Unimportant Aquatic Function Perennial and/or Important Aquatic Function Temp. Perm. Temp. Perm. Temp. Perm. Temp. Perm. lf ac lf ac lf ac lf Ac 13 290 14 0.08 214 437 Total 0.08 214 727 Total Permanent (Loss) Impact to Wetland Waters of the U.S. 0.08 ac Total Permanent (Loss) Impact to Non-Wetland Waters of the U.S 646 LF Kimley-Horn Contact: Chris Tinklenberg, PWS Direct Number: (704) 409-1802 Email: chris.tinklenberg@kimley-horn.com Page 1 of 15 PCN Form – Version 1.3 December 10, 2008 Version Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A.Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 13 & 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps?Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?Yes No 2. Project Information 2a. Name of project:Project Gateway 85 – Aberdeen Blvd. Extension and Lineberger Rd. Realignment 2b. County:Gaston 2c. Nearest municipality / town:Lowell and Gastonia 2d. Subdivision name:N/A 2e. NCDOT only, T.I.P. or state project no:N/A 3. Owner Information 3a. Name(s) on Recorded Deed:NP Gastonia Industrial, LLC 3b. Deed Book and Page No.5184 & 1270; 5185 & 0733 3c. Responsible Party (for LLC if applicable):Ian McDonald 3d. Street address:4825 NW 41st Street, Suite 500 3e. City, state, zip:Riverside, MO, 64150 3f. Telephone no.:816-384-2292 3g. Fax no.: 3h. Email address:imcdonal@northpointkc.com Page 2 of 15 PCN Form – Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: Municipality 4b. Name:The City of Gastonia (POC: Rusty Bost) 4c. Business name (if applicable): 4d. Street address:150 South York Street 4e. City, state, zip:Gastonia, NC, 28052 4f. Telephone no.:704-854-6635 4g. Fax no.: 4h. Email address:Rustyb@cityofgastonia.com 5. Agent/Consultant Information (if applicable) 5a. Name:Chris Tinklenberg, PWS 5b. Business name (if applicable):Kimley-Horn and Associates 5c. Street address:200 South Tryon Street, Suite 200 5d. City, state, zip:Charlotte, NC 28202 5e. Telephone no.:704-409-1802 5f. Fax no.: 5g. Email address:Chris.Tinklenberg@kimley-horn.com Page 3 of 15 PCN Form – Version 1.4 January 2009 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID):137847, 137876, 300492 1b. Site coordinates (in decimal degrees):Latitude: 35.269218 Longitude: - 81.119589 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size:12.65 acres (Project Boundary- LOD) 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project:Duharts Creek 2b. Water Quality Classification of nearest receiving water:C 2c. River basin:South Fork Catawba; HUC 03050102 Page 4 of 15 PCN Form – Version 1.4 January 2009 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area is currently undeveloped and is immediately adjacent to a 68-foot wide Duke Power Easement. Existing land use in the vicinity of the project includes residential neighborhoods, commercial development, and undeveloped forested/maintained properties. 3b. List the total estimated acreage of all existing wetlands on the property: 0.1-ac 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: The total length of all on-site streams is approximately 975 linear feet. 3d. Explain the purpose of the proposed project: The Gateway 85 Project, formerly named The Lineberger Connector Project, is a well-known, previously planned public connector located within the Gastonia Logistics Center (GLC) property. The connector will provide independent utility to the residents of Gastonia and Lowell that live and work locally. The connector will decrease travel time for eastbound/westbound users and eliminate cut-through traffic in adjacent residential communities, providing safer neighborhoods for these residents. In addition to time savings for residents who may no longer need to commute along I- 85, other travelers and the freight industry will benefit from the reduced congestion along the interstate. The “Lineberger Connector” project is currently included in the Gaston-Cleveland-Lincoln Metropolitan Planning Organization’s (GCLMPO) Comprehensive Transportation Plan (CTP) and has been included in the MPO’s long-range transportation plans for many years. The project is currently listed in the GCLMPO’s 2045 Metropolitan Transportation Plan (MTP) for completion in the 2035 horizon year. The owner of the GLC property has donated a 70-foot public right-of-way (ROW) to the City of Gastonia who is the applicant responsible for the design and construction of this project. Page 5 of 15 PCN Form – Version 1.4 January 2009 3e. Describe the overall project in detail, including the type of equipment to be used: Authorization is requested to extend Aberdeen Boulevard and realign Lineberger Road. The approximately 13-acre project area consists of the limits of disturbance and a 70-foot roadway right-of-way and is located in Gastonia, Gaston County, NC. The proposed project seeks to construct the roadway infrastructure in two phases. Phase I seeks to extend Aberdeen Boulevard from the terminus of existing Aberdeen Boulevard east to existing Lineberger Road. Phase II seeks to realign Lineberger Road by shifting the entrance point along Lowell Road west, approximately one-third of a mile, and connecting south with Aberdeen Boulevard Extension. Impacts to aquatic resources are proposed to be conducted in two phases at five separate and distant impact sites along both roadway corridors. The following summarizes the proposed impacts: Phase I – Aberdeen Blvd. Extension · Impact Site 1 (1A, 1B, & 1C) o 1A (NWP14) – 168 linear foot (lf), 72-inch reinforced concrete pipe (RCP) placed within Stream 3 (Culvert A in plans). The pipe will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 lf riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non-erosive discharge velocities. 30 lf of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. o 1B (NWP14) – 127 lf, 84-inch RCP placed within Stream 1 (Culvert B in plans). The pipe will be buried 12- inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 lf riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non-erosive discharge velocities. 30 lf of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. o 1C (NWP13) – 290 lf of bank stabilization is proposed on the left and right banks of S1 and S3 immediately adjacent and downstream of the proposed roadway crossing Culverts A and B. The existing banks in this area are erosive – lacking stable slopes and adequate vegetated cover. The banks will be graded back to a 3:1 slope providing a stable transition between the culverts and the existing channel banks. In addition to stability, the sloped channel banks also offset the impact to the 100-year water surface elevation caused by the encroachment of the roadway fill. · Impact Site 2 (NWP14) - 137 lf, 72-inch RCP placed within Stream 5 (Culvert C in plans). The pipe will be buried 12- inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 lf riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non-erosive discharge velocities. 30 lf of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. · Impact Site 3 (NWP14) – 0.06-ac to Wetland 11 results from grading necessary to construct the Aberdeen Extension. 0.01-ac of temporary impacts are necessary to perform the construction activities. Phase II – Lineberger Rd. Realignment · Impact Site 4 (NWP14) – 214 lf of permanent stream impact to Stream 8 is requested for grading/fill necessary to realign Lineberger Road. S8 is influenced nearly exclusively by seasonal fluctuations in the water table; therefore, considering upstream impact by others which proposes to fill the stream origin as well as the construction of the roadway, installation of a French-drain system is proposed in place of a culvert to maintain subsurface drainage to S5. Since S8 is a relatively short reach from its origin to its confluence with S5, the applicant anticipates indirect impacts to the channel and therefore seeks authorization to account for the indirect stream impact, including compensatory mitigation. · Impact Site 5 (NWP14) – 0.02-ac to Wetland 6 results from grading necessary to construct the Lineberger Road realignment. 0.01-ac of temporary impacts are necessary to perform the construction activities. General construction equipment, including but not limited to bulldozers, excavators, front-end loaders, etc. will be used for construction purposes. Page 6 of 15 PCN Form – Version 1.4 January 2009 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: SAW-2020-00836 Yes No Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Chris Tinklenberg, PWS Agency/Consultant Company: Kimley-Horn Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. The roadway construction proposes to be conducted in two phases – Phase I – Extension of Aberdeen Blvd. and Phase II – Realign Lineberger Road. Page 7 of 15 PCN Form – Version 1.4 January 2009 C.Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams - tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number – Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland (if known) 2d. Forested 2e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 2f. Area of impact (acres) W11 – Impact 3 P T Fill Headwater Forest Yes No Corps DWQ 0.06 W11 – Impact 3 P T Fill Headwater Forest Yes No Corps DWQ 0.01 W6 – Impact 5 P T Fill Non-Tidal Freshwater Marsh Yes No Corps DWQ 0.02 W6 – Impact 5 P T Fill Non-Tidal Freshwater Marsh Yes No Corps DWQ 0.01 2g. Total wetland impacts 0.1 2h. Comments: Impact Site 3 (NWP14) – 0.06-ac to Wetland 11 results from grading necessary to construct the Aberdeen Extension. 0.01-ac of temporary impacts are necessary to perform the construction activities. Impact Site 5 (NWP14) – 0.02-ac to Wetland 6 results from grading necessary to construct the Lineberger Road realignment. 0.01-ac of temporary impacts are necessary to perform the construction activities. Page 8 of 15 PCN Form – Version 1.4 January 2009 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number - Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 3f. Average stream width (feet) 3g. Impact length (linear feet) S3 – Impact 1A P T Culvert UT PER INT Corps DWQ 5 168 S3 – Impact 1A P T Impervious Dike and Pumped Diversion UT PER INT Corps DWQ 5 30 S1 – Impact 1B P T Culvert UT to Duharts Creek PER INT Corps DWQ 6 127 S1 – Impact 1B P T Impervious Dike and Pumped Diversion UT to Duharts Creek PER INT Corps DWQ 6 30 S3 – Impact 1C P T Bank Stabilization UT PER INT Corps DWQ 5 105 S1 – Impact 1C P T Bank Stabilization UT to Duharts Creek PER INT Corps DWQ 6 185 S5 – Impact 2 P T Culvert UT PER INT Corps DWQ 4 137 S5 – Impact 2 P T Impervious Dike and Pumped Diversion UT PER INT Corps DWQ 4 30 S8 – Impact 4 P T Fill UT PER INT Corps DWQ 5 214 3h. Total stream and tributary impacts 1026 3i. Comments: The proposed project seeks authorization to permanently impact 646 lf of stream/potential non-wetland WoUS under NWP14 for construction of the roadway. Authorization is requested under NWP13 to perform 290 lf of streambank stabilization to reduce bank erosion by grading banks to a more stable slope and planting with native riparian vegetation species. 90 lf of temporary stream/potential non-wetland WoUS impacts are necessary to install pump diversion operations at the three proposed culvert locations to allow for work in dry conditions. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number – Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) O1 P T O2 P T O3 P T O4 P T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. Page 9 of 15 PCN Form – Version 1.4 January 2009 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? Neuse Tar-Pamlico Other: Catawba Randleman 6b. Buffer impact number – Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 P T Yes No B2 P T Yes No B3 P T Yes No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The Aberdeen Blvd. Extension alignment is intended and designed to border the existing 68-foot Duke Power Easement which bisects the Gastonia Logistic Center property. Impacts to aquatic resources within this corridor could not be avoided by the proposed roadway; however, the proposed impact locations minimize impacts to higher quality resources since the general quality of each aquatic resource feature adjacent to the Duke Power Easement has been altered or degraded due to construction and regular maintenance of the easement. The dimension, pattern, and profile of the streams above and below the proposed culverts will not be modified by altering the width or depth of the stream profile in connection with the construction activities. The width, height, and gradient of the proposed culverts have been modeled and sized sufficiently to pass the average historical low flow and spring flow without adversely altering flow velocity, as well as flood flows during major storm events. Culverts have been designed and will be constructed in a manner that minimizes destabilization and head cutting to the streams. Destabilizing the channel and head-cutting upstream have been considered and appropriate actions incorporated into the design and placement of the culverts. Culvert lengths have been reduced to the maximum extent practicable by implementing taller headwalls and maximizing side slopes to minimize stream impacts and will be installed in such a manner that the original stream profiles will not be altered. All culverts will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate Page 10 of 15 PCN Form – Version 1.4 January 2009 burial necessary for aquatic passage, to accelerate the reestablishment of the channel beds, and to maintain the width of the stream channels. Rip-rap outlet dissipation will be placed in a manner that the boulders will be pushed or “keyed” into the channel beds so that the finished top elevation of the riprap will not exceed that of the original stream beds to prevent destabilization of the stream beds or banks downstream of the impact areas and to allow for aquatic life passage. 1b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Temporary impacts have been minimized to the greatest extent practicable to meet the needs of the project and do not pose adverse alterations to the existing channels. Erosion control measures implemented during the construction of the roadway will be removed immediately following the activities and any disturbance will be returned to pre-construction conditions. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If yes, mitigation is required by (check all that apply): DWQ Corps 2c. If yes, which mitigation option will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter)Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested:646 linear feet (1,025 SMUs) 4c. If using stream mitigation, stream temperature: warm cool cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: Compensatory mitigation will be met by the purchase of credits through the NC Division of Mitigation Services (NCDMS) in-lieu fee program. Compensatory mitigation is not proposed for wetland impacts associated with proposed grading/fill since the impacts for the entire project are less than 0.1-ac. To offset unavoidable impacts to streams 1,025 SMUs will be purchased from NCDMS for impacts associated with the proposed roadway project. 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 11 of 15 PCN Form – Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f.Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 12 of 15 PCN Form – Version 1.4 January 2009 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1.Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: Yes No 2.Stormwater Management Plan 2a. What is the overall percent imperviousness of this project?50% 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Stormwater is mitigated by over detaining within the overall project limits so that the overall development meets the oridinance requirements. Additionally the site has been design to attenuate post development peak flows to pre- development rates for the 25YR-24HR storm event, which is excess of the code requirements. 2e. Who will be responsible for the review of the Stormwater Management Plan? Certified Local Government DWQ Stormwater Program DWQ 401 Unit 3.Certified Local Government Stormwater Review 3a. In which local government’s jurisdiction is this project? 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): Phase II NSW USMP Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): Coastal counties HQW ORW Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Yes No Page 13 of 15 PCN Form – Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? Yes No 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: Yes No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? Yes No 2b. Is this an after-the-fact permit application? Yes No 2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. The roadway project seeks to provide independent utility for local residents of Gastonia and Lowell as well as provide access into and out of the GLC for employees and truck traffic. No additional development is proposed. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater will not be generated by the municipal roadway project. Page 14 of 15 PCN Form – Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Kimley-Horn (KH) completed a threatened and endangered species assessment within the project site. Before conducting the field survey, KH reviewed state and federal records to determine if any listed species were known to occur within and/or in the general vicinity of the project area. A review of the U.S. Fish & Wildlife Service Information for Planning and Consultation (IPaC) System and the North Carolina Natural Heritage Program (NCNHP) was conducted to identify species that are known to occur within Gaston County. Following the review of available information, KH conducted a pedestrian survey of the project site to determine the available habitats on-site and the potential occurrence for listed species. Pedestrian surveys were conducted in April and September 2020. No individuals of listed species or critical habitat associated with a listed species were observed during the pedestrian surveys. Results of the pedestrian survey were provided to the USFWS to request their concurrence. Per the USFWS response: According to the information provided, suitable habitats also occur onsite for the federally threatened dwarf-flowered heartleaf (Hexastylis naniflora), and the federally endangered Schweinitz’s sunflower (Helianthus schweinitzii). However, targeted surveys for these species conducted during their respective optimal survey windows detected no evidence for these species. (See attached USFWS Concurrence Letter). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NCNHP element occurrence database did not indicate the presence of EFH within the project boundary. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? A request for a review of potential cultural resources was submitted to the North Carolina Department of Natural and Cultural Resources State Historic Preservation Office (NCSHPO) on April 3, 2020 for the Gastonia Logistics Center (GLC) property. NCSHPO responded on June 5, 2020 and stated the proposed project will adversely affect the National Register-eligible Caleb John Lineberger House (GS0327). Additionally, the letter notes that one previously recorded archaeological site (31GS376) consisting of the remains of an early twentieth-century domestic structure is present within the project area. (ER 20-0882) A Phase I Archaeological Survey and Phase II Testing were conducted per SHPO’s recommendation and formal Section 106 consultation with SHPO is underway for the GLC. The above listed cultural resource occurrencs are not located within or within the immediate vicinity of The Gateway 85 project area (LOD) and therefore, poses no adverse effects to the cultural resources. Page 15 of 15 PCN Form – Version 1.4 January 2009 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: USACE HEC-RAS version 4.1.0 was used to create the Corrected Effective plan. A model was created based on a surveyed surface and calibrated to the data obtained from North Carolina Flood Risk Information System (FRIS). The criteria for a no-rise certification state that there shall be no more than a 0.00’ foot rise within the 100-year BFE in the existing conditions watershed. When compared to the corrective effective model the proposed model does not increase the 100-year BFE. A Conditional Letter of Map Revision and Letter of Map Revision are not required since there is no increase in the 100-year BFE. A floodplain development permit and No-Rise/No-Impact certification will be submitted to satisfy the City of Gastonia permitting requirements for a floodplain development/zoning permit. 8c. What source(s) did you use to make the floodplain determination? FIRM 3710356500J Chris Tinklenberg, PWS Applicant/Agent's Printed Name _______________________________ Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) 2/23/2021 Date $*(17 $87+25,=$7,21)250 1DPH˛5XVW\%RVW¼&LW\RI*DVWRQLD $GGUHVV˛˘6RXWK<RUN6WUHHW*DVWRQLD1&˙˘ 3KRQH˛ˆ˙˘ˇˇ˘ (PDLO˛5XVW\E#FLW\RIJDVWRQLDFRP 3URMHFW1DPH'HVFULSWLRQ˛*DWHZD\˙˘¼$EHUGHHQ5RDGZD\([WHQVLRQ 'DWH˛)HEUXDU\ 7KH'HSDUWPHQWRIWKH$UP\ 86 $UP\&RUSVRI(QJLQHHUV:LOPLQJWRQ'LVWULFW $WWHQWLRQ˛0U %U\DQ5RGHQ¼5H\QROGV )LHOG2IFH˛&KDUORWWH5HJXODWRU\)LHOG2IFH 5H˛:HWODQG5HODWHG&RQVXOWLQJDQG3HUPLWWLQJ 7R :KRP ,W0D\&RQFHUQ˛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˙˝˝ $XWKRUL]HGWKLVWKH+GD\RI :DUH` 3ULQW3URSHUW\2ZQHUÀV1DPH 3URSHUW\2ZQHUÀV6LJQDWXUH &F˛.DUHQ+LJJLQV 1&'LYLVLRQRI:DWHU5HVRXUFHV %XIIHU3HUPLWWLQJ8QLW ˇ˘0DLO6HUYLFH&HQWHU 5DOHLJK1&ˆˇ˝˝ˇ˘ FIGURES Figure 1Vicinity MapGateway 85City of Gastonia February 2021 0 2,000 4,000Feet ± Legend Limits of D istu rb ance SAW-202 0-00836 PJD Study Are a ± 0 5 10Miles Lineberger RdRailroad St S Church StLog Cabin DrAberdeen BlvdCox Rd§¨¦85 ¬«7 Figure 2USGS Topographic Map (Gaston N and Mount Holly)Gateway 85City of Gastonia February 2021 0 1,000 2,000Feet ±Legend Limits of D istu rb ance SAW-202 0-00836 PJD Study Are a TaB LgB LgB LdD2 TaD TaD LdD2 LgB AmD TaD LcE TaD LdD2 ChA ChA ChA LdB2 LdB2 TaB TaB TaB TaB CfB CfB TaB LdD2 LdD2 TaD AmB AmBAmB AmB AmB AmB LgB LgB LgBTaD TaD CfBCfB CfB TaD TaD LdB2 LdB2 CfB Figure 3SSURGO SoilsGateway 85City of Gastonia February 2021 0 1,000 2,000Feet ± Legend Limits of Disturbance SAW-2020-00836 PJD Study Area SSURGO SoilsHydric Rating Not Hydric (0%) Hydric (1-32%) Hydric (33-65%) Hydric (66-99%) Figure 4Existing ConditionsGateway 85City of Gastonia February 2021 W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W19 W18S3 S4 S2 S1 S12 S6 S8 S7 S5 S9 W17 S11 S10 0 600 1,20 0Fe et Legend Limits of Disturbance SAW-2020-00836 PJD Study Area Wetlands Streams Intermittent Perennial ± Figure 5Proposed ConditionsGateway 85City of Gastonia February 2021 W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W19 W18S3 S4 S2 S1 S12 S6 S8 S7 S5 S9 W17 S11 S10 a b c 0 600 1,20 0Fe et Legend Limits of Disturbance SAW-2020-00836 PJD Study Area Wetlands Streams Intermittent Perennial Proposed Permanent Stream Impacts Proposed Permanent Wetland Impacts Proposed Grading ((( ((( (((Proposed R ip-Rap Apron Site Developm ent (By Others ) ± (( (( (( (( (( (( ((( ((( (( (( (( Impact Site 1Impact 1A: 168 LF Permanent - Culvert 30 LF - Temporary S3 S1 Impact Site 1Impact 1B: 127 LF Permanent - Culvert 30 LF - Temporary Impact Site 1Impact 1C: 290 LF Permanent - Bank Stabilization (( (( (( (( Impact Site 2137 LF - PermanentCulvert 30 LF - Temporary S5 W11 Impact Site 30.06 ac - PermanentGrading/Fill 0.01 ac - Temporary S8 W6 Impact Site 4214 LF - PermanentGrading/Fill Impact Site 50.02 ac - PermanentGrading/Fill 0.01 ac - Temporary a b c PERMIT DRAWINGS PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)SURVEYOR: ENGINEER: PROJECT OWNER AND CONSULTANT INFORMATION DEVELOPER: UTILITY AND GOVERNING AGENCIES CONTACT LIST: CITY OF GASTONIA, GASTON COUNTY, NORTH CAROLINA INFRASTRUCTURE CONSTRUCTION PLANS FOR SITE KIMLEY-HORN SHALL HAVE NO LIABILITY WHATSOEVER FOR ANY COSTS ARISING OUT OF THE CLIENT'S DECISION TO OBTAIN BIDS OR PROCEED WITH CONSTRUCTION BEFORE KIMLEY-HORN HAS ISSUED FINAL, FULLY-APPROVED PLANS AND SPECIFICATIONS. THE CLIENT ACKNOWLEDGES THAT ALL PRELIMINARY PLANS ARE SUBJECT TO SUBSTANTIAL REVISION UNTIL PLANS ARE FULLY APPROVED AND ALL PERMITS OBTAINED. EROSION CONTROL PLANNING AND DEVELOPMENT CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 704-854-6635 CONTACT: RUSTY BOST RUSTYB@CITYOFGASTONIA.COM GASTON NATURAL RESOURCES DEPARTMENT 1303 CHERRYVILLE HWY. DALLAS, NC 28034 704-922-2157 CONTACT: JOSEPH ALM GASTON NATURAL RESOURCES DEPARTMENT 1303 CHERRYVILLE HWY. DALLAS, NC 28034 704-922-2150 CONTACT: JONATHAN C BOERGER NCDOT (DIVISION 12, DISTRICT 1) NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DISTRICT 1 1702 E. MARION STREET SHELBY, NC 28151 980-552-4104 CONTACT: C. BLAKE GUFFEY CBGUFFEY@NCDOT.GOV NCDEQ (UTILITIES) TWO RIVERS UTILITIES 1300 N. BROAD ST. GASTONIA, NC 28054 704-866-6043 CONTACT: MIKE BYNUM MIKEB@TWORIVERSUTILITIES.COM CITY OF GASTONIA PUBLIC WORKS (TRAFFIC) CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 (704) 866-6843 CONTACT: DALE DENTON DALED@CITY OF GASTONIA.COM NCDEQ (WATER QUALITY) NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY NC DEPARTMENT OF ENVIRONMENTAL QUALITY 610 EAST CENTER AVENUE SUITE 301 MOORESVILLE, NC 28115 COORDINATOR: KELLY PHILLIPS (704) 663-1699 ENGINEERING CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 704-854-6641 CONTACT: KEITH LINEBERGER KEITHL@CITYOFGASTONIA.COM GASTON COUNTY NATURAL RESORUCES DEPARTMENT CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 704-854-6635 CONTACT: JONATHAN C. BOERGER JONATHAN.BOERGER@GASTONGOV.COM GASTON COUNTY NATURAL RESORUCES DEPARTMENT CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 704-854-6635 CONTACT: JOSEPH D. ALM JOSEPH.ALM@GASTONGOV.COM NOTES: NORTHPOINT DEVELOPMENT 4825 NW 41ST STREET SUITE 500 RIVERSIDE, MISSOURI 64150 PHONE (816) 888-7380 CONTACT: CALEB MOORE KIMLEY-HORN AND ASSOCIATES, INC. 200 SOUTH TRYON STREET SUITE 200 CHARLOTTE, NORTH CAROLINA 28202 PHONE (704) 333-5131 CONTACT: BLAKE DAY, P.E. ATLAS SURVEYING, INC. 10810 SOUTHERN LOOP BOULEVARD UNIT 18 PINEVILLE, NC 28134 PHONE (980) 949-8475 CONTACT: KEITH BURNS, P.L.S.COVER SHEETR100 NORTH GATEWAY 85 - ABERDEEN ROADWAY EXTENSION GENERAL EROSION CONTROL NOTES GENERAL UTILITY NOTES AS-BUILTS/RECORD DRAWINGS 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND MAINTAINING AS-BUILT INFORMATION WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES OR AT THE COMPLETION OF APPROPRIATE CONSTRUCTION INTERVALS AND SHALL BE RESPONSIBLE FOR PROVIDING AS-BUILT DRAWINGS TO THE OWNER FOR THE PURPOSE OF CERTIFICATION TO JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS-BUILT DATA SHALL BE COLLECTED BY A STATE OF NORTH CAROLINA PROFESSIONAL LAND SURVEYOR WHOSE SERVICES ARE ENGAGED BY THE CONTRACTOR. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING TO THE ENGINEER CERTIFIED RECORD SURVEYS SEALED BY A STATE REGISTERED PROFESSIONAL LAND SURVEYOR DEPICTING THE ACTUAL FIELD LOCATION OF ALL CONSTRUCTED IMPROVEMENTS. THE RECORD DRAWINGS SHALL BE PREPARED TO THE SAME LEVEL OF DETAILS AS PROVIDED ON THE DESIGN DRAWINGS. 3. THE CONTRACTOR SHALL PROVIDE TO THE ENGINEER AND OWNER RECORD DRAWINGS IN BOTH PDF AND AUTOCAD FORMAT FOR ALL PAVING, GRADING, AND STORMWATER BMPS, AND STORMWATER DRAINAGE PIPES AND STRUCTURES. 4. THE CONTRACTOR SHALL PROVIDE A SEPARATE UTILITY RECORD DRAWING IN AUTOCAD AND PDF FORMAT. THE RECORD DRAWINGS SHALL VERIFY ALL DESIGN INFORMATION INCLUDED ON THE DESIGN PLANS. 5. IN ADDITION TO THE OWNER AND ENGINEER REQUIRED SURVEYS, THE CONTRACTOR SHALL PROVIDE ADDITIONAL RECORD DRAWINGS AND AS-BUILT INFORMATION AS REQUIRED BY THE JURISDICTION. 1. REFER TO MASS GRADING AND INFRASTRUCTURE PLANS PREPARED BY KIMLEY-HORN FOR ALL EROSION CONTROL REQUIREMENTS. 2. PRIOR TO CONSTRUCTION THE CONTRACTOR MUST CLEARLY DELINEATE AND MARK OFF AREAS IDENTIFIED IN THE SWPPP OR IN THE FIELD, TO BE PROTECTED (SUCH AS STREAMS/WETLANDS, NATURAL BUFFERS, TREE, HABITATS OF ENDANGERED/THREATENED SPECIES, HISTORIC PROPERTIES, ETC.) 3. THE CONTRACTOR SHALL PROTECT ALL MONUMENTS, IRON PINS, AND PROPERTY CORNERS DURING CONSTRUCTION. 4. SEDIMENT CONTROL BMPS PROPOSED FOR SITE DEVELOPMENT HAVE BEEN DESIGNED TO ADDRESS CONSTRUCTION STORMWATER RUNOFF. IN THE EVENT THE BMPS BECOME INEFFECTIVE AT PREVENTING SEDIMENT FROM LEAVING THE SITE, IT IS THE CONTRACTORS RESPONSIBILITY TO IMPLEMENT ADDITIONAL BMPS.THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN BMPS AS DESCRIBED IN THE GENERAL PERMIT . ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BYTHE EROSION CONTROL INSPECTOR. 5. CONTRACTOR SHALL REVIEW THE GENERAL PERMIT PRIOR TO COMMENCING CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL KEEP A COPY OF THE APPROVED PLANS AND GENERAL PERMIT ONSITE AT ALL TIMES. 6. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION AND IS SUBJECT TO A FINE. 7. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE STATE WHICH THE WORK IS PERFORMED. 8. THE CONTRACTOR SHALL INSTALL AND MAINTAIN THROUGHOUT THE PROJECT CONSTRUCTION ALL EROSION CONTROL MEASURES SHOWN WITHIN THESE PLANS IN ACCORDANCE WITH APPLICABLE STATE EROSION AND SEDIMENT CONTROL REGULATIONS, 9. ALL CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH REGULATIONS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORM WATER GENERAL PERMIT. 10. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE. 11. CONSTRUCTION ENTRANCE SHALL BE LOCATED SO AS TO PROVIDE THE LEAST AMOUNT OF DISTURBANCE TO THE FLOW OF TRAFFIC IN AND OUT OF THE SITE. ADDITIONALLY, CONSTRUCTION ENTRANCE SHALL BE LOCATED TO COINCIDE WITH THE PHASING OF THE PAVEMENT REPLACEMENT. 12. POST CONSTRUCTION STORM WATER POLLUTION CONTROL MEASURES INCLUDE STABILIZATION BY PERMANENT PAVING, DRAINAGE SYSTEM STRUCTURE, OR LANDSCAPING. 13. TEMPORARY AND PERMANENT STABILIZATION PRACTICES AND BMP'S SHALL BE INSTALLED AT THE EARLIEST POSSIBLE TIME DURING THE CONSTRUCTION SEQUENCE. AS AN EXAMPLE, PERIMETER SILT FENCE SHALL BE INSTALLED BEFORE COMMENCEMENT OF ANY GRADING ACTIVITIES. OTHER BMP'S SHALL BE INSTALLED AS SOON AS PRACTICABLE AND SHALL BE MAINTAINED UNTIL FINAL SITE STABILIZATION IS ATTAINED. CONTRACTOR SHALL ALSO REFERENCE CIVIL AND LANDSCAPE PLANS SINCE PERMANENT STABILIZATION IS PROVIDED BY LANDSCAPING, THE BUILDING(S), AND SITE PAVING. 14. BMP'S HAVE BEEN LOCATED AS INDICATED ON THIS PLAN IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING PRACTICES IN ORDER TO MINIMIZE SEDIMENT TRANSFER. FOR EXAMPLE: SILT FENCES LOCATED AT TOE OF SLOPE AND INLET PROTECTION FOR INLETS RECEIVING SEDIMENT FROM SITE RUN-OFF. 15. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. 16. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 17. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. CONTACT PROJECT ENGINEER AND PROJECT EROSION CONTROL INSPECTOR TO ENSURE ADDITIONAL EROSION CONTROL MEASURES ARE INSTALLED PRIOR TO OFF-SITE GRADING. 18. ANY SPILLS OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OF REPORTABLE QUANTITIES AS DEFINED BY EPA OR THE STATE OR LOCAL AGENCY REGULATIONS, SHALL BE IMMEDIATELY REPORTED TO THE EPA NATIONAL RESPONSE CENTER (1-800-424-8802), AND AS REQUIRED BY THE GENERAL PERMIT. 19. THE CONTRACTOR SHALL MAINTAIN JURISDICTIONALLY REQUIRED BUFFERS OF UNDISTURBED NATURAL VEGETATION BETWEEN THE DISTURBED PORTIONS OF THE SITE AND SURFACES WATERS AT ALL TIMES. BUFFERS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THE JURISDICTION. 20. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF-SITE BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO THE APPROPRIATE GOVERNING ENTITY FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 21. CONTRACTOR SHALL PLACE EROSION CONTROL BLANKET (NORTH AMERICAN GREEN SC150 OR APPROVED EQUAL) ON ALL SITE AREAS WITH SLOPES GREATER THAN 2:1, AND IN THE BOTTOM AND SIDE SLOPES OF ALL SWALES. 22. NO PARKING SHALL BE LOCATED OUTSIDE THE LIMITS OF DISTURBANCE. 23. NO CONSTRUCTION LAYDOWN OR STAGING SHALL BE LOCATED OUTSIDE THE LIMITS OF DISTURBANCE. 24. ALL DRAINAGE SWALES MUST BE GRADED AND RIP-RAP MUST BE REPLACED AS REQUIRED TO CONTROL EROSION. RIP-RAP WILL CONSIST OF 50 - 125 POUND STONES PLACED AT ALL HEADWALLS, AND WHERE NOTED ON CONSTRUCTION DRAWINGS. SEE DETAIL SHEET FOR OUTFALL PIPE SIZE CHART. 25. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED FOR ADDITIONAL CONTRACTOR LAYDOWN AREA. CONTRACTOR TO COORDINATE WITH ENGINEER DURING CONSTRUCTION. THE LIMITS OF DISTURBANCE SHOULD CONTAIN ANY ADDITIONAL LAYDOWN AREAS. IF ADDITIONAL LAYDOWN AREA IS NEEDED OUT SIDE THE LIMITS OF DISTURBANCE, A REVISED EROSION CONTROL PLAN SHOULD BE REVIEWED AND PERMITTED. 26. PUMPING SEDIMENT LADEN WATER INTO ANY STORMWATER FACILITY THAT IS NOT DESIGNATED TO BE A SEDIMENT TRAP, DRAINAGEWAY, OR OFFSITE AREA EITHER DIRECTLY OR INDIRECTLY WITHOUT FILTRATION IS PROHIBITED. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. WATER REMOVED FROM TRAPS, BASINS, AND OTHER WATER HOLDING DEPRESSIONS OR EXCAVATIONS MUST FIRST PASS THROUGH A SEDIMENT CONTROL AND/OR FILTRATION DEVICE. WHEN DEWATERING DEVICES ARE USED, DISCHARGE LOCATIONS SHALL BE PROTECTED FROM EROSION. 27. ALL TEMPORARY STORMWATER EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED.TRAPPED SEDIMENT AND OTHER DISTURBED SOILS RESULTING FROM TEMPORARY MEASURES SHALL BE PROPERLY DISPOSED OF PRIOR TO PERMANENT STABILIZATION. 28. SOIL STOCKPILES SHALL NOT BE LOCATED IN A DRAINAGEWAY, STOCKPILES . FLOOD PLAIN AREA OR A DESIGNATED BUFFER. ALL STOCKPILES SHALL BE IMMEDIATELY STABILIZED AS REQUIRED BY THE GENERAL PERMIT GENERAL ACCESSIBILITY NOTES 1. THE CONTRACTOR SHALL REVIEW ALL APPLICABLE STATE AND LOCAL GUIDELINES AS THEY APPLY TO THE ACCESSIBILITY AND SIGNAGE. 2. ALL CONSTRUCTION SHALL BE VERIFIED BY THE CONTRACTOR TO BE IN COMPLIANCE WITH LOCALLY ADOPTED ACCESSIBILITY REGULATIONS. ANYTHING FOUND NOT IN COMPLIANCE SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 3. THE PROPOSED IMPROVEMENTS SHALL BE CONSTRUCTED COMPLIANT WITH THE LATEST EDITION OF THE ADA STANDARDS FOR ACCESSIBILE DESIGN AS PUBLISHED BY THE DEPARTMENT OF JUSTICE. UNLESS AND EXCEPT IN AREAS WHERE AN APPROVED STATEMENT FROM A SITE ENGINEER, SURVEYOR, OR ARCHITECT VERIFIES THAT SITE CONDITIONS EXIST WHERE THE TOPOGRAPHY OF THE SITE IS EXTREME AND ONLY ALTERNATE METHODS OF COMPLIANCE ARE POSSIBLE. 4. CURB RAMPS ALONG PUBLIC STREETS AND IN THE PUBLIC RIGHT-OF-WAY SHALL BE CONSTRUCTED BASED ON THE CITY STANDARD CONSTRUCTION DETAILS AND SPECIFICATIONS. 5. PRIVATE CURB RAMPS ON THE SITE (I.E. OUTSIDE PUBLIC STREET RIGHT-OF-WAY) SHALL CONFORM TO THE ADA STANDARDS FOR ACCESSIBLE DESIGN AND SHALL HAVE A DETECTABLE WARNING SURFACE THAT IS FULL WIDTH OF THE CURB RAMP, NOT INCLUDING FLARES. 6. ALL ACCESSIBLE ROUTES, GENERAL SITE AND BUILDING ELEMENTS, RAMPS, CURB RAMPS, STRIPING, AND PAVEMENT MARKINGS SHALL CONFORM TO ADA STANDARDS FOR ACCESSIBLE DESIGN, LATEST EDITION. 7. ANY COMPONENTS OF THE PROJECT SERVING MULTIFAMILY DWELLINGS IN BUILDINGS THAT HAVE 4 OR MORE UNITS PER DWELLING SHALL ALSO CONFORM TO THE FAIR HOUSING ACT (FHA), AND COMPLY WITH THE FAIR HOUSING ACT DESIGN MANUAL BY THE US DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. 8. BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY THAT SUITABLE ACCESSIBLE PEDESTRIAN ROUTES (PER ADA AND FHA) EXIST TO AND FROM EVERY DOOR AND ALONG SIDEWALKS, ACCESSIBLE PARKING SPACES, ACCESS AISLES, AND ACCESSIBLE ROUTES. IN NO CASE SHALL AN ACCESSIBLE RAMP SLOPE EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPE EXCEED 2.0 PERCENT. IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPE EXCEED 5.0 PERCENT. ACCESSIBLE PARKING SPACES AND ACCESS AISLES SHALL NOT EXCEED 2.0 PERCENT SLOPE IN ANY DIRECTION. 9. CONTRACTOR SHALL TAKE FIELD SLOPE MEASUREMENTS ON FINISHED SUBGRADE AND FORM BOARDS PRIOR TO PLACING PAVEMENT TO VERIFY THAT ACCESSIBLE SLOPE REQUIREMENTS ARE PROVIDED. CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO PAVING IF ANY EXCESSIVE SLOPES ARE ENCOUNTERED. NO CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR ADA COMPLIANCE ISSUES. GENERAL NOTES 1. ALL NECESSARY PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST OBTAIN ALL PERMITS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 2. THE CONTRACTOR MUST REVIEW AND MAINTAIN A COPY OF PERMITS COMPLETE WITH ALL CONDITIONS, ATTACHMENTS, EXHIBITS, AND PERMIT MODIFICATIONS IN GOOD CONDITION AT THE CONSTRUCTION SITE. THE COMPLETE PERMIT MUST BE AVAILABLE FOR REVIEW UPON REQUEST BY REGULATORY AGENCY REPRESENTATIVES. 3. THE CONTRACTOR SHALL PROTECT ALL MONUMENTS, IRON PINS, AND PROPERTY CORNERS DURING CONSTRUCTION. 4. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. 5. SITE BOUNDARY, TOPOGRAPHY, UTILITY AND ROAD INFORMATION TAKEN FROM A SURVEY BY A LAND SURVEYOR. ALL INFORMATION IS TO BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 6. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES 7. THE CONTRACTOR AND SUBCONTRACTORS SHALL OBTAIN A COPY OF THE STATE DEPARTMENT OF TRANSPORTATION STRUCTURE STANDARDS AND REGULATIONS (LATEST EDITION) AND BECOME FAMILIAR WITH THE CONTENTS PRIOR TO COMMENCING WORK, AND, UNLESS OTHERWISE NOTED, ALL WORK SHALL CONFORM AS APPLICABLE TO THESE STANDARDS AND SPECIFICATIONS. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL AND LABOR TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE APPROVING AUTHORITIES, SPECIFICATIONS AND REQUIREMENTS. CONTRACTOR SHALL CLEAR AND GRUB ALL AREAS UNLESS OTHERWISE INDICATED, REMOVING TREES, STUMPS, ROOTS, MUCK, EXISTING PAVEMENT AND ALL OTHER DELETERIOUS MATERIAL. 9. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL CITY, COUNTY AND STATE REGULATIONS AND CODES AND O.S.H.A. STANDARDS. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, INCLUDING BUT NOT LIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST SHALL BE INCLUDED IN BASE BID. AREAS TO BE DISTURBED SHALL BE IMPROVED PER THE CIVIL PLANS OR RESTORED TO THEIR ORIGINAL OR BETTER CONDITION. CONTRACTOR SHALL REPAIR ANY EXISTING FEATURES THAT ARE DAMAGED DURING CONSTRUCTION TO THE EXISTING OR BETTER CONDITION. 11. THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF THE CONSTRUCTION DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, GEOTECHNICAL REPORT AND SPECIAL CONDITIONS AND COPIES OF ANY REQUIRED CONSTRUCTION PERMITS. 12. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR APPROVAL OF THE OWNER AND NOTIFICATION TO THE ENGINEER. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITE WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES OWNER OF ANY OBLIGATION TO PAY FOR A RELATED CHANGE ORDER. 14. ALL WELLS DISCOVERED ON SITE THAT WILL HAVE NO USE MUST BE PLUGGED BY A LICENSED WELL DRILLING CONTRACTOR IN A MANNER APPROVED BY ALL JURISDICTIONAL AGENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY WELL ABANDONMENT PERMITS REQUIRED.ANY WELL DISCOVERED DURING EARTH MOVING OR EXCAVATION SHALL BE REPORTED TO THE APPROPRIATE JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER DISCOVERY IS MADE. 15. TRAFFIC CONTROL ON ALL STATE, LOCAL AND COUNTY RIGHTS-OF-WAY SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS OF THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. GENERAL PAVING NOTES 1. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITION BETWEEN PROPOSED PAVEMENT, EXISTING PAVEMENT AND ANY STRUCTURES. 2. THE PROPOSED SPOT ELEVATIONS SHOWN ARE FINISHED ELEVATIONS INCLUDING ASPHALT AND CONCRETE. REFER TO PAVEMENT SECTIONS AND CURB DETAILS TO ESTABLISH CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 3. ALL AREAS INDICATED AS PAVEMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL PAVEMENT SECTIONS AS INDICATED ON THE DRAWINGS. CONTRACTOR SHALL REVIEW THE RECCOMENDATIONS OF THE GEOTECHNICAL ENGINEER PRIOR TO PAVING. 4. WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED, THE CONTRACTOR SHALL SAW CUT A MINIMUM 2" DEEP FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS EXISTING OR AS INDICATED. 5. ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN JURISDICTIONAL RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH LOCAL OR COUNTY SPECIFICATIONS AND STANDARDS (LATEST EDITION) OR STATE DEPT. OF TRANSPORTATION SPECIFICATIONS AND STANDARDS (LATEST EDITION) IF NOT COVERED BY LOCAL OR COUNTY REGULATIONS. 6. ALL ON-SITE STRIPING IS TO BE PAINTED, UNLESS OTHERWISE NOTED. ALL STRIPING IN PUBLIC RIGHT-OF-WAY TO BE THERMOPLASTIC STRIPING. 7. TRANSVERSE EXPANSION JOINTS ARE TO BE PROVIDED IN CONCRETE SIDEWALKS AND COMBINED WALKS/CURBS WHERE SHOWN AND AT INTERVALS NOT TO EXCEED 12 X THE WIDTH OF THE WALK. 8. EXPANSION JOINTS SHALL BE INSTALLED IN CONCRETE PAVEMENTS AND WALKS AT ALL LOCATIONS WHERE PAVEMENTS AND WALKS ABUT A VERTICAL SURFACE SUCH AS A CURB, WALL, COLUMN, ETC. 9. CONTRACTION JOINTS SHALL BE PROVIDED AT EQUAL INTERVALS BETWEEN EXPANSION JOINTS IN CONCRETE WALKS. INSTALL CONTRACTION JOINTS AS SHOWN BUT IN NO CASE AT INTERVALS GREATER THAN 1.5 X THE WIDTH OF THE WALK. 10. CONTRACTOR SHALL COORDINATE PAVING IMPROVEMENTS TO AVOID TIRE MARKS FROM CONSTRUCTION ACTIVITY. FINAL PAVING SHALL BE AS SMOOTH AS POSSIBLE AND FREE FROM ANY CRACKS, SCRAPES, GOUGES, TIRE MARKS, ETC. CAUSED DURING CONSTRUCTION. 11. ALL NEW CONCRETE SHALL BE DOWELED INTO ALL EXISTING CONCRETE (PAVING, SIDEWALKS, CURB, ETC.). TRANSVERSE EXPANSION JOINTS ARE TO BE PROVIDED IN CONCRETE SIDEWALKS AND COMBINED WALKS/CURBS AS SHOWN ON THE DETAILS AND AT INTERVALS NOT TO EXCEED 12 TIMES THE WIDTH OF THE WALK. 12. ALL STRUCTURES SHALL BE ADJUSTED AS NECESSARY TO BE FLUSH WITH FINAL PAVEMENT. GENERAL DEMOLITION NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ANY PERMITS AND PAY FEES REQUIRED FOR DEMOLITION AND HAUL-OFF FROM THE APPROPRIATE AUTHORITIES. THESE FEES SHALL BE INCLUDED WITH THE BID. THE CONTRACTOR SHALL PREPARE ALL DOCUMENTS AND ACQUIRE APPROPRIATE PERMITS AS REQUIRED PRIOR TO THE COMMENCEMENT OF DEMOLITION. 2. DEMOLITION AS DEPICTED ON THE DEMOLITION PLAN IS INTENDED TO DESCRIBE GENERAL DEMOLITION AND UTILITY WORK. IT IS NOT INTENDED TO IDENTIFY EACH ELEMENT OF DEMOLITION OR RELOCATION. CONTRACTOR SHALL COORDINATE WITH THE OWNER AND APPROPRIATE UTILITY COMPANY PRIOR TO WORK. 3. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND LAWFUL DISPOSAL OF ALL STRUCTURES, PAVING, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL AS NECESSARY. 4. ASBESTOS OR ANY OTHER HAZARDOUS MATERIAL, IF FOUND ON SITE, SHALL BE REMOVED BY A LICENSED HAZARDOUS MATERIAL CONTRACTOR ONLY AFTER NOTIFICATION OF THE ENGINEER AND AUTHORIZATION TO PROCEED IS GIVEN BY THE OWNER 5. THE CONTRACTOR SHALL PUMP OUT BUILDING FUEL AND WASTE OIL TANKS (IF ANY ARE ENCOUNTERED) AND REMOVE FUEL TO AN APPROVED DISPOSAL AREA BY AN APPROPRIATELY LICENSED WASTE OIL HANDLING CONTRACTOR IN STRICT ACCORDANCE WITH FEDERAL AND STATE REQUIREMENTS ONLY AFTER NOTIFICATION OF THE ENGINEER AND AUTHORIZATION TO PROCEED IS GIVEN BY THE OWNER. 6. THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO ALL EXISTING FACILITIES AND OUTLOTS AT ALL TIMES. UTILITY SERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE SERVICE PROVIDERS AND COORDINATION THROUGH THE PROPERTY OWNER(S). THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES TO REMAIN IN PLACE. 7. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. 8. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. THE ITEMS SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. PRIOR TO THE START OF ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR ONSITE LOCATIONS OF EXISTING UTILITIES. 9. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN THE ANY ROAD RIGHT OF WAY DURING CONSTRUCTION 10. SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONTRACTOR SHALL CONSULT THE ENGINEER AND OWNER IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 11. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC., (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY THE OWNER 12. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING BUSINESSES AND PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE EXISTING IMPROVEMENTS AND CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. CONTRACTOR SHALL COORDINATE WITH THE OWNER(S)/ LEASEE(S) PRIOR TO ANY CONSTRUCTION TO ESTABLISH CUSTOMER ACCESS AND TRAFFIC FLOW DURING ALL PHASES. 13. SHOULD CONSTRUCTION ACTIVITIES DAMAGE EXISTING FEATURES, THE CONTRACTOR SHALL REPLACE THE FEATURES WITH NEW MATERIALS. DAMAGE TO ANY EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE. 14. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO AVOID UNNECESSARY DAMAGE TO EXISTING ROAD SURFACES. FINISHED SURFACES TO BE REMOVED OR DEMOLISHED SHALL BE CUT ALONG LINES OF JOINTS WHICH WILL PERMIT A NEAT SURFACE WHEN RESTORED. SAW CUT AT INTERFACE OF PAVEMENT OR CURB TO REMAIN. SAW CUT EXISTING PAVEMENT AT THE RIGHT-OF-WAY. SAW CUTS SHALL BE MADE FULL DEPTH THROUGH THE EXISTING PAVEMENT. DISCARDED PAVEMENT SHALL BE REMOVED WITHOUT UNDERMINING THE EXISTING PAVEMENT. IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IT'S REMOVAL AND REPAIR. 15. CONTRACTOR SHALL MAINTAIN ALL EXISTING PARKING, SIDEWALKS, DRIVES, ETC. CLEAR AND FREE FROM ANY CONSTRUCTION ACTIVITY AND/OR MATERIAL TO ENSURE EASY AND SAFE PEDESTRIAN AND VEHICULAR TRAFFIC TO AND FROM THE SITE. CONTRACTOR SHALL COORDINATE/PHASE ALL CONSTRUCTION ACTIVITY WITHIN PROXIMITY OF THE BUILDING AND UTILITY INTERRUPTIONS WITH THE PROPERTY OWNERS AND UTILITY PROVIDERS TO MINIMIZE DISTURBANCE AND INCONVENIENCE. 16. ALL EXISTING ITEMS TO REMAIN WHICH ARE DAMAGED DURING CONSTRUCTION SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT THE SOLE EXPENSE OF THE CONTRACTOR. 17. SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONTRACTOR SHALL CONSULT THE ENGINEER AND OWNER IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 18. ANY WATER WELLS ENCOUNTERED ARE TO BE BROUGHT TO THE PROJECT ENGINEER ATTENTION IMMEDIATELY AND PROPERLY ABANDONED BY A LICENSED WELL DRILLER. 19. ANY SEPTIC SYSTEMS ENCOUNTERED SHALL BE BROUGHT TO THE THE PROJECT ENGINEER ATTENTION IMMEDIATELY AND SHALL BE PROPERLY DEMOLISHED. GENERAL GRADING NOTES 1. ALL NECESSARY PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST OBTAIN ALL PERMITS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 2. BEFORE ANY EARTHWORK IS DONE, THE CONTRACTOR SHALL STAKE OUT AND MARK THE LIMITS OF PAVEMENT AND OTHER ITEMS ESTABLISHED IN THE PLANS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY ENGINEERING AND SURVEYING FOR LINE AND GRADE CONTROL POINTS RELATED TO EARTHWORK. 3. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 4. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADES. ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK, AND THIS MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 5. CONTRACTOR SHALL REVIEW, UNDERSTAND AND IMPLEMENT ALL REQUIRED EROSION AND SEDIMENTATION CONTROL MEASURES PRIOR TO ANY DISTURBANCE. 6. THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASS STAND IS WELL ESTABLISHED OR ADEQUATE STABILIZATION OCCURS. 7. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR BLASTING ROCK IF BLAST ROCK IS ENCOUNTERED. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL BLASTING AND SAFETY REQUIREMENTS 8. ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION SHALL BE REGRADED AND SEEDED. 9. THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE AND PLACE, COMPACT, AND MOISTURE CONDITION ALL FILL PER THE GEOTECHNICAL ENGINEERS SPECIFICATIONS. FILL MATERIAL SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL SHEETING, SHORING, BRACING AND SPECIAL EXCAVATION MEASURES REQUIRED TO MEET OSHA, FEDERAL, STATE AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THESE DRAWINGS. THE DESIGN ENGINEER ACCEPTS NO RESPONSIBILITY FOR THE DESIGN(S) TO INSTALL SAID ITEMS. 11. FIELD ADJUSTMENTS OF RIM ELEVATIONS OF STRUCTURES MAY BE REQUIRED TO MEET FIELD CONDITIONS. MAXIMUM HEIGHT OF ADJUSTING RINGS SHALL NOT EXCEED 12-INCHES. ADJUSTMENTS OF CASTINGS WHERE THE TOTAL HEIGHT OF ADJUSTING RINGS WOULD EXCEED 12 INCHES SHALL BE MADE BY REPLACING THE CONE AND/OR BARREL SECTION OF THE STRUCTURE. 12. WHERE GRADE MODIFICATIONS ARE SHOWN ADJACENT TO EXISTING VALVE BOX COVERS AND MANHOLE CASTINGS, THE VALVE BOX COVERS AND MANHOLE CASTINGS SHALL BE ADJUSTED FLUSH WITH THE PROPOSED GRADE. 13. ALL OPEN AREAS WITHIN THE PROJECT SITE SHALL BE SEEDED UNLESS INDICATED OTHERWISE ON THE LANDSCAPE PLAN. 14. IF DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE REQUIRED PERMITS. THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE DESIGN ENGINEER PRIOR TO ANY EXCAVATION. 15. STRIP TOPSOIL AND ORGANIC MATTER FROM ALL AREAS OF THE SITE AS REQUIRED. IN SOME CASES TOPSOIL MAY BE STOCKPILED ON SITE FOR PLACEMENT WITHIN LANDSCAPED AREAS BUT ONLY AS DIRECTED BY THE OWNER. 16. FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL JURISDICTIONAL AGENCY OR TO STATE DEPARTMENT OF TRANSPORTATION STANDARDS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 17. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PLANS. THE AREAS SHALL THEN BE SEEDDED AS SPECIFIED IN THE PLANS, FERTILIZED, MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE SEEDDED AND MULCHED AS SHOWN ON THE LANDSCAPING PLAN. 18. ALL CUT OR FILL SLOPES SHALL BE 3 (HORIZONTAL) :1 (VERTICAL) OR FLATTER UNLESS OTHERWISE SHOWN. THE CONTRACTOR SHALL COORDINATE WITH THE GEOTECHNICAL ENGINEER FOR APPROPRIATE SLOPE STABILIZATION ON ALL SLOPES STEEPER THAN 3:1. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. 19. SEED MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES WITHIN 48 HOURS OF COMPLETING FINAL GRADING, AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION, SEDIMENTATION OR TURBID DISCHARGES. 20. THE CONTRACTOR SHALL ENSURE THAT ISLAND PLANTING AREAS AND OTHER PLANTING AREAS ARE NOT COMPACTED AND DO NOT CONTAIN ROAD BASE MATERIALS. THE CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL AREAS ON THE SITE TO BE PLANTED AND PROPERLY DISPOSED OF IN A LEGAL MANNER. 21. UNLESS OTHERWISE RECOMMENDED BY THE GEOTECHNICAL ENGINEER. REFER TO THE GEOTECHNICAL REPORT OF ALL REQUIREMENTS. GENERAL FILL COMPACTION MUST MEET A MINIMUM OF 95% OF THE MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D698). THE UPPER 12 INCHES OF SUBGRADE IN PAVEMENT AREAS SHOULD BE COMPACTED TO AT LEAST 100% OF THE MATERIALS MAXIMUM STANDARD PROCTOR DRY DENSTIY (ASTM D698) OR AS DIRECTED BY A GEOTECHNICAL ENGINEER. FILL SHALL BE PLACED AND COMPACTED IN MAXIMUM 8" LIFTS. THE WATER CONTENT RANGE SHOULD BE WITHIN 3% OF OPTIMUM MOISTURE CONTENT. 22. GRADE ALL AREAS TO MAINTAIN POSITIVE SLOPE AWAY FROM BUILDING. 23. ALL SOIL USED FOR PLANTING SHALL CONSIST OF REGIONALLY APPROPRIATE SOILS. 24. UNSUITABLE FILL BENEATH BUILDING PADS AND PAVED SURFACES MUST BE EXCAVATED AND STORMWATER NOTES 1. REFER TO GENERAL UTILITY NOTES FOR ADDITIONAL REQUIREMENTS PERTAINING TO UNDERGROUND UTILITY AND STORMWATER PIPE INSTALLATION. 2. ALL NECESSARY PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST OBTAIN ALL PERMITS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 3. PIPE LENGTHS, GRADES, ELEVATIONS AND LOCATIONS SHOWN ARE APPROXIMATE ONLY. AS DIRECTED BY THE ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. 4. ALL STORM PIPE INSTALLED SHALL BE RCP OR HDPE, UNLESS SPECIFICALLY NOTED OTHERWISE. EXISTING STORMWATER PIPE MATERIALS, MODIFIED, DAMAGED OR DEFORMED, ETC. SHALL NOT BE REUSED UNLESS SPECIFICALLY DIRECTED BY THE ENGINEER. 5. ALL PIPES SHALL BE LAID ON STRAIGHT ALIGNMENT AND EVEN GRADES USING A PIPE LASER OR OTHER ACCURATE METHOD. 6. ALL PIPES SHALL BE BEDDED PER MANUFACTURER'S RECOMMENDATIONS. 7. ALL ALL DRAINAGE STRUCTURES SHALL BE CONSTRUCTED WITH (4) SIDED BEARING HEAVY DUTY H-20 RATED TRAFFIC RIMS AND GRATES 8. ALL CLEANOUT COVERS WITHIN THE PAVEMENT SECTIONS SHALL BE RATED FOR HEAVY DUTY TRAFFIC (H-20 RATED). 9. WEEPHOLES ARE TO BE CONSTRUCTED IN ALL DRAINAGE STRUCTURES, A MINIMUM OF 1 WEEPHOLE PER STRUCTURE. WEEPHOLES ARE TO BE CONSTRUCTED IN THE BOTTOM 1/3 OF STRUCTURE AND COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF FILTER FABRIC AND FILLED WITH #78 STONE. 10. CONTRACTOR SHALL PROVIDE CATCH BASIN INLET PROTECTION ON ALL EXISTING AND PROPOSED INLETS UNTIL CONTRIBUTING DRAINAGE AREAS ARE STABILIZED. ALL DRAINAGE STRUCTURES SHALL BE CLEANED OF DEBRIS AS REQUIRED DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE DRAINAGE FLOWS. 11. THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM WATER PIPING PER MANUFACTURER'S RECOMMENDATIONS. 12. GRADE ALL AREAS TO MAINTAIN POSITIVE SLOPE AWAY FROM BUILDING. 13. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITION BETWEEN PROPOSED PAVEMENT AND EXISTING PAVEMENT AND STORM STRUCTURES 14. DURING CONSTRUCTION AND AFTER FINAL GRADING, NO SURFACE WATER RUNOFF MAY BE DIRECTED TO ADJACENT PROPERTIES, AND ALL SURFACE WATER RUNOFF MUST BE ROUTED TO APPROVED DRAINAGE FACILITIES OR BE RETAINED ON SITE. ALL RUNOFF FROM THE SITE, BOTH DURING AND AFTER CONSTRUCTION, MUST BE FREE OF POLLUTANTS, INCLUDING SEDIMENT, PRIOR TO DISCHARGE. WATER DISTRIBUTION NOTES 1. CONTRACTOR TO LOCATE TIE-INS TO ALL BUILDINGS BASED ON ARCH / MECHANICAL, ELECTRICAL AND PLUMBING PLANS. 2. A MINIMUM HORIZONTAL SEPARATION OF 10 FEET BETWEEN WATER LINES AND SEWERS SHALL BE MAINTAINED AT ALL TIMES. A MINIMUM VERTICAL SEPARATION OF 18 INCHES BETWEEN WATER LINES AND SANITARY/STORM SEWERS SHALL BE MAINTAINED AT CROSSINGS. 3. IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY LINES, STORM LINES AND GAS LINES (EXISTING AND PROPOSED), THE SANITARY LINE SHALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING, THE WATER LINE SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE A MINIMUM OF 18" CLEARANCE. MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C-151) (CLASS 50). 4. WATER MAINS 10 INCHES AND SMALLER SHALL BE INSTALLED WITH A MINIMUM OF 36 INCHES OF COVER AS MEASURED FROM THE TOP OF THE PIPE TO THE FINAL FINISH GRADE ABOVE THE PIPE. WATER MAINS 12 INCHES AND LARGER SHALL BE INSTALLED WITH A MINIMUM OF 42 INCHES OF COVER AS MEASURED FROM THE TOP OF THE PIPE TO THE FINAL FINISH GRADE ABOVE THE PIPE. 5. THRUST BLOCKS OR JOINT RESTRAINTS SHALL BE INSTALLED ON ALL WATER LINES AT ALL BENDS, TEES AND HYDRANTS PER THE DETAILS. 6. PIPE LENGTHS SHOWN ARE MEASURED FROM CENTER TO CENTER OF FITTINGS AND APPURTENANCES ROUNDED TO THE NEAREST FOOT. 7. WATER LINES SHALL BE AS FOLLOWS: 6" AND LARGER, PVC C-900, DR-14, PER ASTM D 2241 6" AND LARGER DUCTILE IRON PIPE PER AWWA C150 SMALLER THAN 6" EITHER COPPER TUBE TYPE "L" (SOFT) PER ANSI 816.22 OR PVC, 200 P.S.I., PER ASTM D1784 AND D2241. 8. ALL WATER JOINTS ARE TO BE MECHANICAL JOINTS WITH THRUST BLOCKING. 9. THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FIRE DEPT. CONNECTION POINTS, OR OTHER WATER USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN ANY WATER METER AND ITS REQUIRED BACKFLOW PREVENTER. 10. BACKFLOW PREVENTION ASSEMBLIES TO BE INSTALLED ABOVE-GROUND SHALL BE INSTALLED WITHIN INSULATED ENCLOSURE AND PER JURISDICTIONAL REQUIREMENTS. ENCLOSURES SHALL INCLUDE DRAIN PORT(S) FOR DISCHARGE WATER. CONTRACTOR SHALL ENSURE THE BACKFLOW PREVENTION ASSEMBLY AND ENCLOSURE IS INSTALLED OUTSIDE OF SIGHT DISTANCE TRIANGLES AT INTERSECTIONS WITH VEHICULAR TRAVEL WAYS. 11. ALL BACKFLOW PREVENTERS SHALL BE HEATED. 1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AN ENCROACHMENT AGREEMENT PERMIT, AS REQUIRED, TO CONSTRUCT UTILITY CONNECTIONS. 2. REFER TO ARCHITECTURAL /MECHANICAL, ELECTRICAL AND PLUMBING PLANS FOR CONTINUATION OF UTILITIES WITHIN 5 FEET OF STRUCTURES. 3. THE CONTRACTOR IS RESPONSIBLE FOR HORIZONTALLY AND VERTICALLY LOCATING AND PROTECTING ALL PUBLIC OR PRIVATE UTILITIES (SHOWN OR NOT SHOWN) WHICH LIE IN OR ADJACENT TO THE CONSTRUCTION SITE. AT LEAST 48 HOURS PRIOR TO ANY DEMOLITION, GRADING, OR CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL CONTACT 811 FOR THE IDENTIFICATION OF EXISTING UTILITIES WITHIN THE SITE. 4. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO THE INFORMATION AVAILABLE TO THE ENGINEER AT THE TIME OF THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE ENGINEER. GUARANTEE IS NOT MADE THAT ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN OR THAT THE LOCATION OF THOSE SHOWN ARE ENTIRELY ACCURATE. FINDING THE ACTUAL LOCATION OF ANY EXISTING UTILITIES IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE DONE BEFORE COMMENCING ANY WORK IN THE VICINITY. FURTHERMORE, THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FOR TEMPORARY BRACING AND SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE, SWING OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED AND THEIR PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK. 5. SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED UTILITIES BE ENCOUNTERED, THE CONTRACTOR SHALL CONTACT THE OWNER IMMEDIATELY FOR DIRECTIONS. 6. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. AT LEAST 48 HOURS PRIOR TO ANY DEMOLITION, GRADING, OR CONSTRUCTION ACTIVITY THE CONTRACTOR SHALL NOTIFY THE UTILITY PROVIDER FOR PROPER IDENTIFICATION OF EXISTING UTILITIES WITHIN THE PROJECT SITE. THE CONTRACTOR SHALL COORDINATE ANY INTERRUPTION OF UTILITY SERVICE WITH OWNER(S) AND RESPECTIVE UTILITY COMPANY REPRESENTATIVE. 7. CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES INSPECTORS 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE. 8. CONTRACTOR SHALL SAW CUT, REMOVE, AND REPLACE ASPHALT PAVEMENT AS NECESSARY TO INSTALL UNDERGROUND ELECTRIC,TELEPHONE, SEWER, WATER, AND COMMUNICATION CONDUITS.PAVEMENTS, WALKS, CURBS AND OTHER SURFACE IMPROVEMENTS REQUIRING REMOVAL FOR INSTALLATION OF UNDERGROUND UTILITIES SHALL BE RESTORED TO THEIR PRESENT CONDITION UNLESS OTHERWISE SHOWN. 9. ALL ELECTRICAL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL POWER COMPANY STANDARDS. 10. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS.CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES. 11. PRESSURE UTILITY MAINS AND SERVICE LINES MAY NEED TO BE INSTALLED AT A DEPTH GREATER THAN THAT SPECIFIED OR SHOWN ON THE DRAWINGS TO CLEAR EXISTING AND PROPOSED CROSSING UTILITIES. IN SUCH CASES, THE CONTRACTOR SHALL INSTALL VERTICAL BENDS AS REQUIRED TO ACHIEVE APPROPRIATE CLEARANCE BETWEEN THE CROSSING UTILITIES. 12. WHERE GRADE MODIFICATIONS (CUT OR FILL) ARE SHOWN ADJACENT TO EXISTING VALVE BOX COVERS AND MANHOLE CASTINGS, THE VALVE BOX COVERS AND MANHOLE CASTINGS SHALL BE ADJUSTED FLUSH WITH THE PROPOSED GRADE. 13. THE CONTRACTOR SHALL MAINTAIN ALL FLOWS AND UTILITY CONNECTIONS TO EXISTING BUILDINGS, ETC. WITHOUT INTERRUPTION UNLESS/UNTIL AUTHORIZED TO DISCONNECT BY THE OWNER, UTILITY COMPANIES, AND GOVERNING AUTHORITIES. THE CONTRACTOR SHALL INSTALL AS NECESSARY, TEMPORARY SITE LIGHTING, GAS, SANITARY, WATER, STORM, ELECTRIC, TELEPHONE, AND CABLE SERVICES TO SERVICE BUILDING(S) TO REMAIN OPEN. 14. ALL PROPOSED STUBS SHALL BE CAPPED AND SHALL BE PROVIDED WITH FIELD MARKERS. 15. CONTRACTOR TO PROVIDE AND INSTALL CONDUIT FOR SITE LIGHTING PER SITE LIGHTING PLAN (BY OTHERS). 16. CONTRACTOR TO PROVIDE AND INSTALL CONDUIT FOR IRRIGATION PER IRRIGATION PLAN (BY OTHERS). 17. LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED, SURVEYED, AND APPROVED BEFORE BACKFILLING. 18. MINIMUM TRENCH WIDTH SHALL BE 2 FEET. 19. ALL CHANGES IN DIRECTION OF THE CONDUIT SHALL UTILIZE STANDARD SWEEPS WITH A MINIMUM BENDING RADIUS LISTED IN THE NEC. NO MORE THAN (2) 90-DEGREE BENDS WILL BE ALLOWED BETWEEN PULLING POINTS, OR A TOTAL OF 180 DEGREES COMBINED IN SEVERAL BENDS. PULL BOXES SHALL BE LOCATED EVERY 400 FEET UNLESS THE COMBINED TOTAL OF BENDS REQUIRE ADDITIONAL MANHOLES. 20. ALL UTILITIES SHOULD BE KEPT TEN (10') APART (PARALLEL) OR WHEN CROSSING 18" VERTICAL CLEARANCE (OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE). 21. THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER LATERALS, MANHOLES GRAVITY SEWER LINES AND DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS, EQUIPMENT, MACHINERY, TOOLS, MEANS OF TRANSPORTATION AND LABOR NECESSARY TO COMPLETE THE WORK IN FULL AND COMPLETE ACCORDANCE WITH THE SHOWN, DESCRIBED AND REASONABLY INTENDED REQUIREMENTS OF THE CONTRACT DOCUMENTS AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 22. DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS. SECURELY CLOSE ALL OPEN ENDS OF PIPE AND FITTINGS WITH A WATERTIGHT PLUG WHEN WORK IS NOT IN PROGRESS. THE INTERIOR OF ALL PIPES SHALL BE CLEAN AND JOINT SURFACES WIPED CLEAN AND DRY AFTER THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES SHALL BE PLUMB AND LOCATED ACCORDING TO THE PLANS. MAXIMUM PIPE JOINT DEFLECTION FOR CITY MAINTAINED LINES IS 12 OF THE MANUFACTURER'S RECOMMENDATION. 23. ALL PHASES OF INSTALLATION, INCLUDING UNLOADING, TRENCHING, LAYING AND BACK FILLING, SHALL BE DONE IN A FIRST CLASS WORKMANLIKE MANNER. ALL PIPE AND FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S RECOMMENDATIONS. CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE COATING OR LINING IN ANY DUCTILE IRON PIPE FITTINGS. ANY PIPE OR FITTING WHICH IS DAMAGED OR WHICH HAS FLAWS OR IMPERFECTIONS WHICH, IN THE OPINION OF THE ENGINEER OR OWNER, RENDERS IT UNFIT FOR USE, SHALL NOT BE USED. ANY PIPE NOT SATISFACTORY FOR USE SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROM THE JOB SITE, AND SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 24. WATER FOR FIRE FIGHTING SHALL BE AVAILABLE FOR USE PRIOR TO COMBUSTIBLES BEING BROUGHT ON SITE. 25. ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING SHALL BE COMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING JURISDICTIONAL AGENCY'S SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 26. UNDERGROUND WATER AND SANITARY SEWER LINES SHALL BE SURVEYED BY STATE LICENSED PROFESSIONAL LAND SURVEYOR PRIOR TO BACK FILLING. 27. CONTRACTOR SHALL PERFORM, AT HIS OWN EXPENSE, ANY AND ALL TESTS REQUIRED BY THE SPECIFICATIONS AND/OR ANY AGENCY HAVING JURISDICTION. THESE TESTS MAY INCLUDE, BUT MAY NOT BE LIMITED TO, INFILTRATION AND EXFILTRATION, TELEVISION INSPECTION AND A MANDREL TEST ON GRAVITY SEWER. A COPY OF THE TEST RESULTS SHALL BE PROVIDED TO THE UTILITY PROVIDERS, OWNER AND JURISDICTIONAL AGENCY AS REQUIRED. 28. IF DETERMINED NECESSARY BY THE LOCAL JURISDICTION, THE CONTRACTOR SHALL ABANDON EXISTING WATER METERS. CUT THE CORPS OFF, AND AIR-GAP THE SERVICES. 29. UNDERGROUND UTILITY, INCLUDING STORMWATER PIPES, SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS: A. NO MORE THAN 500 LF OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE LACED ON THE UPHILL SIDE OF TRENCHES. SANITARY SEWER NOTES 1. CONTRACTOR TO LOCATE LATERAL CONNECTIONS TO BUILDING PER PLUMBING PLANS. 2. PLACE CLEAN-OUTS ON SANITARY SEWER LATERALS AS REQUIRED BY PLUMBING CODE. 3. PIPE LENGTHS SHOWN ARE MEASURED FROM CENTER TO CENTER OF STRUCTURES AND ARE ROUNDED TO THE NEAREST FOOT. 4. A MINIMUM HORIZONTAL SEPARATION OF 10 FEET BETWEEN WATER LINES AND SEWERS SHALL BE MAINTAINED AT ALL TIMES. A MINIMUM VERTICAL SEPARATION OF 18 INCHES BETWEEN WATER LINES AND SEWERS SHALL BE MAINTAINED AT CROSSINGS. IN THE EVENT THAT MINIMUM SEPARATION REQUIREMENTS CANNOT BE MET, THE CONTRACTOR SHALL UTILIZE PRESSURE-TYPE WATER PIPE FOR THE SEWER PER DETAIL. 5. SANITARY SEWER PIPE SHALL BE AS FOLLOWS: 8" PVC SDR35 PER ASTM D 3034, FOR PIPES LESS THAN 12' DEEP 8" PVC SDR26 PER ASTM D 3034, FOR PIPES MORE THAN 12' DEEP 6" PVC SCHEDULE 40 DUCTILE IRON PIPE PER AWWA C150 6. WHENEVER VERTICAL DISTANCE BETWEEN OUTGOING AND INCOMING SEWERS IS MORE THAN 2 FEET A OUTSIDE DROP MANHOLE SHALL BE INSTALLED. 7. SANITARY SEWER STRUCTURES SHALL BE AS FOLLOWS: 48" DIAMETER PRECAST CONCRETE MANHOLE PER ASTM C478. 48" DIAMETER PRECAST POLYETHYLENE IN ACCORDANCE WITH ASTM D1248. MANHOLES SHALL HAVE A COMPRESSIVE STRENGTH THAT MEETS ASTM D2412. 8. ALL MANHOLES AND CLEANOUTS SHALL BE H20 TRAFFIC GRADE AND RATED WITH HEAVY DUTY COVERS AND FRAMES PER THE SAME. CONSTRUCTION TESTING 1. IT IS THE CONTRACTORS RESPONSIBILITY TO OBTAIN ALL TESTS REQUIRED BY THE JURISDICTIONAL AGENCIES HAVING AUTHORITY. 2. IF DETERMINED BY THE OWNER, THE CONTRACTOR SHALL PROVIDE ADDITIONAL CONSTRUCTION TESTING. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER FOR REQUIRED CONSTRUCTION TESTING. 3. TESTING OF MATERIALS REQUIRED FOR THE CONSTRUCTION OF THE PAVING IMPROVEMENTS SHALL BE PERFORMED BY AN APPROVED AGENCY FOR TESTING MATERIALS. THE TESTING LABORATORY AND THE PAYMENT OF SUCH TESTING SERVICES SHALL BE MADE BY THE OWNER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SHOW BY STANDARD TESTING PROCEDURES THAT THE WORK CONSTRUCTED DOES MEET THE REQUIREMENTS OF THE SPECIFICATIONS. 4. ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE TO BE SENT TO THE OWNER AND DESIGN ENGINEER OF RECORD DIRECTLY FROM THE TESTING AGENCY. 5. EACH BACKFLOW PREVENTION ASSEMBLY IS REQUIRED TO BE TESTED BY A JURISDICTIONALLY-APPROVED CERTIFIED TESTER PRIOR TO PLACING THE WATER SYSTEM IN SERVICE.PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)GENERAL NOTESR101 SANITARY SEWER NOTESSANITARY SEWER NOTESSANITARY SEWER NOTESSANITARY SEWER NOTES ALL SANITARY SEWER PIPE SHALL BE POLY-VINYL CHLORIDE OR CEMENT LINED ZINC COATED DUCTILE IRON (PRESSURE CLASS 350 MIN.). THESE STANDARD SPECIFICATIONS FOR SANITARY SEWER PIPE ARE INTENDED FOR SIZES UP TO AND INCLUDING 15" IN DIAMETER. MATERIAL AND CONSTRUCTION SPECIFICATIONS FOR PIPE SIZES IN EXCESS OF 15" IN DIAMETER SHALL REQUIRE APPROVAL BY THE CITY ENGINEER. IT IS THE INTENT OF THIS SPECIFICATION TO PROVIDE PIPE OF THE HIGHEST STANDARD KNOWN TO THE TRADE AND TO PROVIDE PIPE THAT IS FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS. ALL PIPE AND OTHER MATERIALS SHALL BE FIRST CLASS AND NO USED OR SECOND HAND PIPE OR MATERIALS WILL BE PERMITTED. FOR DEPTHS OF COVER OVER PIPE THREE FEET OR LESS, ONLY DUCTILE IRON SEWER PIPE MAY BE USED. FOR DEPTHS OF COVER OVER PIPE GREATER THAN THREE FEET, BUT LESS THAN TWENTY FEET, PVC OR CEMENT LINED ZINC COATED DUCTILE IRON MAY BE USED. FOR DEPTHS OF COVER OVER PIPE IN EXCESS OF TWENTY FEET, ONLY CEMENT LINED ZINC COATED DUCTILE IRON MAY BE USED. THICKNESS OF DIP SHALL BE AS SPECIFIED BY THE CITY ENGINEER. CLEARING THE CONTRACTOR WILL BE REQUIRED TO CLEAR, REMOVE, OR DISPOSE OF ALL NATURAL, ARTIFICIAL, OR MAN MADE OBSTRUCTIONS TO THE CONSTRUCTION AS INDICATED ON THE PROJECT PLANS, OR AS MAY BE EVIDENT AT THE TIME OF THE BIDDING OF CONSTRUCTION. THE CONTRACTOR WILL BE REQUIRED TO RESTORE THE CONSTRUCTION AREA AS CLOSE AS IS PRACTICAL TO THE CONDITION HE FOUND IT. CONTRACTOR SHALL BE FAMILIAR AND COMPLY WITH ALL RESTRICTIONS IMPOSED BY CLEAN WATER 401/404 OR OTHER PERMITS. ALL TREES, STUMPS, ROOTS AND OTHER DEBRIS SHALL BE REMOVED AND PROPERLY DISPOSED OF BY THE CONTRACTOR. FENCES, MAILBOXES, STREET SIGNS, SMALL SHRUBS, DRIVEWAYS, ROADS, SIDEWALKS, CURB AND GUTTER, WALLS, DRAINAGE SYSTEMS, POLES AND CABLES, ETC., SHALL BE PROTECTED. IF DAMAGED THEY SHALL BE RESTORED BY THE CONTRACTOR TO A CONDITION EQUAL TO THAT EXISTING AT THE DATE OF AWARD OF THE CONTRACT. ANY OPEN CUTS APPROVED BY THE CITY SHALL BE RESTORED WITH ASPHALT/CONCRETE THE SAME DAY AS THE DISTURBANCE BEGAN. ALL DISTURBED AREAS SHALL BE SEEDED, MULCHED, AND TACKED NO LATER THAN SEVEN (7) DAYS AFTER THE LAND DISTURBING ACTIVITY STARTED. FOR SPECIAL CONDITIONS REQUIRING FERROUS MATERIAL PIPE SEE SECTION 2.10. 8.01 CEMENT LINED ZINC COATED DUCTILE IRON SEWER PIPE DUCTILE IRON PIPE SHALL BE MANUFACTURED AND TESTED IN THE U.S.A. AND SHALL CONFORM TO AWWA SPECIFICATION C 151 AND ANSI STANDARD #A21-51 OR LATEST REVISION. CEMENT LININGS FOR DUCTILE IRON PIPE SHALL CONFORM TO AWWA SPECIFICATION C 104. EXTERIOR OF DUCTILE IRON PIPE SHALL BE COATED WITH A LAYER OF ARC-SPRAYED ZINC PER ISO 8179. THE MASS OF ZINC APPLIED SHALL BE 200 G/M2 OF PIPE SURFACE AREA. AN ASPHALTIC TOPCOAT LAYER SHALL BE APPLIED OVER THE ZINC TO A MINIMUM 2 MIL THICKESS. ZINC COATING SYSTEM SHALL CONFORM TO ISO 8179-1 “DUCTILE IRON PIPES - EXTERNAL ZINC BASED COATING - PART 1, SECOND EDITION 2004-06-01 OR LATEST REVISION. DUCTILE IRON PIPE SHALL BE MECHANICAL JOINT OR PUSH-ON JOINT TYPE. PUSH-ON JOINTS SHALL BE "BELL-TITE," "FASTITE" OR APPROVED EQUAL. ALL JOINTS FOR DUCTILE IRON PIPE SHALL CONFORM TO THE APPLICABLE DIMENSIONS AND WEIGHTS SHOWN IN THE TABLES IN AWWA C151 AND TO ANSI A 21.11 (AWWA C111) OR LATEST REVISION. ALL PIPE SHALL BE CLEAN AND SOUND WITHOUT DEFECTS THAT WILL IMPAIR THEIR SERVICE. REPAIRING OF DEFECTS BY WELDING OR OTHER METHODS SHALL NOT BE ALLOWED. ALL PIPE SHALL HAVE AN OUTSIDE PETROLEUM ASPHALTIC COATING OF APPROXIMATELY 1 MIL THICK. THE COATING SHALL BE APPLIED TO THE OUTSIDE OF ALL PIPE AND THE FINISHED COATING SHALL BE CONTINUOUS, SMOOTH, NEITHER BRITTLE WHEN COLD, NOR STICKY WHEN EXPOSED TO THE SUN, AND SHALL BE STRONGLY ADHERENT TO THE PIPE. THICKNESS FOR ALL DUCTILE IRON PIPE IN SHALL BE AS RECOMMENDED FOR THE PROPOSED DEPTH OF COVER IN THE MAY 2016 “DESIGN OF DUCTILE IRON PIPE” HANDBOOK AS PUBLISHED BY THE DUCTILE IRON PIPE RESEARCH ASSOCIATION, OR AS SHOWN ON THE PROJECT PLANS (WITH THE MINIMUM BEING PRESSURE CLASS 350). POLYETHYLENE ENCASEMENT - SEE SECTION 9.03 SOLID SLEEVES - SEE SECTION 9.06 8.02 PVC SANITARY SEWER PIPE AND FITTINGS PVC SEWER PIPE MAY BE PERMITTED ONLY IN AREAS THAT GENERATE DOMESTIC SEWAGE, ARE ZONED FOR RESIDENTIAL USE, AND WHERE ALL UP STREAM DRAINAGE AREAS HAVE RESIDENTIAL ZONING DESIGNATIONS AND USES. PVC SEWER PIPE MAY BE INSTALLED IN SOME COMMERCIAL DEVELOPMENT; HOWEVER, EACH PROJECT MUST BE EVALUATED AND APPROVED BY THE CITY ENGINEER ON A "CASE BY CASE" BASIS. WHEN 8" THRU. 15" DIAMETER POLYVINYL CHLORIDE (PVC) PIPE IS SPECIFIED ON THE APPROVED PROJECT PLANS, UNLESS OTHERWISE SPECIFIED, THE PVC PIPE SHALL BE AS SPECIFIED IN ASTM D-3034 WITH A STANDARD DIMENSION RATIO (SDR) OF 35, PVC SEWER PIPE SHALL BE FURNISHED WITH AN INTEGRAL BELL AND ELASTOMERIC GASKETED JOINT PERMANENTLY INSTALLED AT THE FACTORY IN ACCORDANCE WITH ASTM D-3212 AND ASTM F-477. THE PIPE SHALL BE FURNISHED IN NOMINAL LENGTHS OF 13 FEET OR AS APPROVED 20 FEET, SHALL BE GREEN IN COLOR, AND SHALL BE MANUFACTURED AND TESTED IN THE U.S.A. ALL PVC GRAVITY SEWER PIPE SHALL BE MANUFACTURED FROM MATERIAL MEETING THE MINIMUM REQUIREMENTS OF CELL CLASSIFICATION 12454, OR 12364-B AS PER ASTM D1784. THE PIPE MANUFACTURER SHALL CERTIFY THAT THIS REQUIREMENT HAS BEEN MET, AND THE PIPE SHALL BE APPROPRIATELY MARKED ACCORDING TO ASTM SPECIFICATIONS. SEWER AND WATER CROSSINGS SHALL BE AS SPECIFIED IN SECTION 2.10 OF THE CITY OF GASTONIA STANDARD SPECIFICATIONS. COUPLINGS FOR JOINTING PVC TO DUCTILE IRON PIPE (DIP) SEWER PIPE SHALL BE AS LISTED IN THE CITY'S APPROVED MATERIAL LIST OR AS SPECIFICALLY APPROVED. ALL FITTINGS USED ON PVC SEWER MAINS INCLUDING TEES FOR TAPS, SHALL MEET THE SAME SPECIFICATIONS AS THOSE OF THE PVC SEWER MAIN. TO COUPLE THE TAPPING TEES TO THE SEWER LATERAL BEND, IT WILL BE NECESSARY TO USE AN SDR 35 TO SCHEDULE 40 PVC SLIP-BY-HUB ADAPTER. SEE SECTION 8.18 OF THE CITY OF GASTONIA STANDARD SPECIFICATIONS FOR TAP REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE ADAPTERS, SEALS, AND TRANSITIONAL PIECES AS REQUIRED FOR CONNECTING TO OTHER PIPE OR STRUCTURES SHOWN ON THE DRAWINGS OR INDICATED IN THE BID DOCUMENTS. FLEXIBLE REPAIR COUPLINGS WILL NOT BE ALLOWED. ANY FIELD CUT ENDS SHALL BE AS PER THE PIPE MANUFACTURER'S AND AWWA'S RECOMMENDATIONS. IN ALL INSTANCES PVC PIPE SHALL BE INSTALLED IN AN ACCEPTABLE MANNER, TRUE TO LINE AND GRADE, WITH THE BELL ENDS FACING UP-GRADE. THE VARIOUS PIPES, REFERRED TO HEREIN, SHALL BE HANDLED, BELLED UP AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND ESTABLISHED ENGINEERING PRACTICES AS DESCRIBED IN THE VARIOUS PUBLICATIONS REFERENCED IN THIS DOCUMENT. SEE SECTION 8.15 ALSO. ALL PVC PIPE SHALL BE SHIPPED, STORED, AND PLACED AT THE PROJECT SITE IN A MANNER SO AS TO BE PROTECTED FROM TOTAL ACCUMULATED EXPOSURE TO SUNLIGHT AND ULTRA VIOLET RADIATION OF NO MORE THAN SIX (6) MONTHS, NO DEFECTS SHALL BE VISIBLE. ANY VISIBLE DEFECTS INCLUDING BUT NOT LIMITED TO CHALKING, DISCOLORATION, BLISTERS, OR LOSS OF SHEEN SHALL BE CAUSE FOR THE PIPE TO BE REJECTED AND REPLACED. ANY TESTING SUGGESTED IN LIEU OF THE ABOVE SHALL BE AT THE MANUFACTURER'S EXPENSE, ALL SUCH TEST SHALL BE PERFORMED BY AN INDEPENDENT LABORATORY. CLASS B BEDDING AS DESCRIBED ON STANDARD DETAIL 71B-5A LATEST REVISION SHALL BE USED WITH ALL PVC SEWER PIPE. THESE INSTALLATION REQUIREMENTS SHALL BE AS SPECIFIED IN ASTM D-2321, LATEST REVISION, TYPE IA GRANULAR EMBEDMENT (# 57 WASHED STONE) REGARDLESS OF GROUND WATER OR SOIL CONDITIONS; THE BEDDING SHALL BE INSTALLED TO 95% STANDARD PROCTOR. NATIVE MATERIALS OF CLASSES II, AND III MAY BE USED ABOVE THE PIPE SPRINGLINE AND SHALL BE PLACED AND COMPACTED AS SPECIFIED IN THE CITY OF GASTONIA STANDARD SPECIFICATIONS. THE MINIMUM DEPTH OF COVER SHALL BE 3 FEET AND THE MAXIMUM DEPTH OF COVER SHALL BE 30 FEET (DEPTHS GREATER THAN TWENTY FEET (20') REQUIRE PRE-APPROVAL BY THE CITY ENGINEER). NO BACKFILL MAY BE PLACED OVER THE PVC PIPE UNTIL THE CITY ENGINEER OR HIS DESIGNATED REPRESENTATIVE HAS VISUALLY INSPECTED THE GRAVEL BED AND PVC PIPE INSTALLATION. IF FOR ANY REASON BACKFILL IS PLACED PRIOR TO THE INSPECTION, THE CONTRACTOR WILL BE REQUIRED TO REMOVE THE BACKFILL TO ALLOW FOR THIS VISUAL INSPECTION. ALL COST FOR SAID REMOVAL AND REPLACEMENT OF BACKFILL, AS WELL AS ANY DEFECTS FOUND, SHALL BE AT THE CONTRACTOR'S AND/OR DEVELOPER SOLE EXPENSE. IN ADDITION TO OTHER TESTS, INCLUDING BUT NOT LIMITED TO SECTION 8.17 OF THE CITY OF GASTONIA STANDARD SPECIFICATIONS, A DEFLECTION TEST WILL BE REQUIRED TO BE PERFORMED NOT LESS THAN 30 DAYS FOLLOWING COMPLETION OF BACKFILL OPERATIONS. THE CONTRACTOR SHALL SUPPLY ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO PULL A MANDREL SIZED FOR A MAXIMUM OF 5% DEFLECTION OF THE ACTUAL PIPE INSIDE DIAMETER, AS DEFINED IN ASTM D-3034. THE MANDREL SHALL BE PROVIDED BY THE CONTRACTOR UNLESS THE CITY OF GASTONIA DECIDES TO SUPPLY IT. THE MANDREL SHALL BE PULLED THROUGH EACH SECTION OF PIPE FROM MANHOLE TO MANHOLE. THE MANDREL MUST SLIDE FREELY THROUGH THE PIPE WITH ONLY A NOMINAL HAND FORCE APPLIED. NO MECHANICAL FORCE SHALL BE USED IN PULLING THE MANDREL. ANY PIPE WHICH REFUSES THE MANDREL SHALL BE REMOVED AND REPLACED AND THE BEDDING SHALL BE PROPERLY CONSTRUCTED AS SPECIFIED TO PREVENT EXCESSIVE DEFLECTION. SUCH SECTIONS SHALL BE RE-TESTED AFTER COMPLETION OF BACKFILL. ALL COST FOR SUCH TESTING, REMOVAL, AND REPLACEMENT SHALL BE AT THE CONTRACTORS AND /OR DEVELOPERS SOLE EXPENSE. IF A DEVELOPER DESIRES TO USE PVC SEWER PIPE, PVC SEWER PIPE MUST BE USED THROUGHOUT THE DEVELOPMENT UNLESS DIP IS REQUIRED AND IS SHOWN ON THE PLANS APPROVED THE BY THE CITY ENGINEER. 8.03 MANHOLES MANHOLES SHALL BE BUILT WHERE SHOWN ON THE PLANS AND SHALL BE IN ACCORDANCE WITH CITY STANDARD NO. 71B-1 THRU 71B-4B AND THESE SPECIFICATIONS. DISTANCE BETWEEN MANHOLES SHALL VARY AS SHOWN ON THE PLANS, BUT THE MAXIMUM DISTANCE BETWEEN MANHOLES SHALL BE FOUR HUNDRED TWENTY FIVE FEET (425') FOR SEWER MAINS AND FIVE HUNDRED FEET (500') FOR OUTFALL LINES. VENTING SHALL BE PROVIDED AT INTERVALS NOT TO EXCEED 1,000'. INVERTS ARE TO HAVE A SMOOTH FINISH AND SHALL CONFORM TO CITY STANDARD NO. 71B-4 IN CROSS-SECTION. THERE SHALL BE A MINIMUM DROP OF 0.2 FEET WITHIN THE MANHOLE, BUT IN NO CASE SHALL IT EXCEED TWO AND ONE HALF FEET (2-1/2') , UNLESS AN OUTSIDE DROP IS CONSTRUCTED. MANHOLE WALLS SHALL BE PRE-CAST UNLESS SPECIAL PERMISSION IS GIVEN FOR BLOCK OR BRICK CONSTRUCTION. MANHOLE BOTTOMS SHALL BE CONSTRUCTED OF 3000 PSI CLASS "A" CONCRETE AND SHALL BE A MINIMUM OF SIX INCHES (6") IN THICKNESS. WHEN REQUIRED BY THE CITY ENGINEER, THE FOUNDATION FOR THE MANHOLE BOTTOMS SHALL BE STABILIZED BY PLACING NO. 57 WASHED STONE IN THE EXCAVATION. MANHOLE STEPS SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH CITY STANDARD DETAIL 71B-2. MANHOLE STEPS SHALL BE MADE WITH A NO. 3 REINFORCING ROD ENCAPSULATED IN A POLYPROPYLENE PLASTIC, AND SHALL BE AS SHOWN ON THE CITY'S APPROVED MATERIALS LIST OR SPECIFICALLY APPROVED BY THE CITY ENGINEER. CAST IRON MANHOLE COVERS AND FRAMES SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH CITY STANDARD NO. 71B-1. MANHOLE COVERS AND FRAMES SHALL BE SET IN MORTAR WITH EVEN BEARING. INSTALLATIONS OUTSIDE THE ROADWAY SHALL BE SET ON BUYTL RUBBER SEALANT AND MECHANICALLY SECURED; BOLTS SHALL BE COVERED IN CONCRETE MORTAR. AS A NORMAL POLICY, ALL MANHOLE RIM ELEVATIONS IN WELL MAINTAINED AREAS SUCH AS STREETS, PARKING LOTS, YARDS, BALL FIELDS, ETC., SHALL BE SET FLUSH WITH THE EXISTING GRADE. MANHOLE RIMS SET IN FIELDS, PASTURES, WOODS, ETC. , SHALL BE SET 6" ABOVE THE NATURAL EXISTING GRADE AND BACKFILLED FLUSH WITH THE RIM WITH A MAXIMUM SLOPE OF 4:1. MANHOLE RIMS IN FLOOD PLAIN AREAS, SHALL BE SET TWO (2) FEET ABOVE THE 100 YEAR FLOOD ELEVATION; OR A SEALED MANHOLE SHALL BE SET FLUSH WITH THE NATURAL EXISTING GROUND AND VENTED ACCORDING TO STANDARD DETAIL 71B-4A AND AS SHOWN ON THE PROJECT PLANS. THE CITY'S INSPECTOR MAY VARY FROM THIS POLICY IF SPECIAL FIELD CONDITIONS WARRANT IT. PLUGS AND SEALED STUBS SHALL BE PLACED AS REQUIRED BY THE PLANS OR AS DIRECTED BY THE CITY ENGINEER. CONTRACTOR SHALL FOLLOW MANUFACTURERS RECOMMENDATIONS FOR INTERNAL AND EXTERNAL SEALS OF ALL PRE-CAST JOINT SECTIONS. THE MASONRY HEIGHT FOR ADJUSTMENT OF GRADE ABOVE THE CONE SHALL BE 12 INCHES MAXIMUM. MANHOLES SHALL BE CLEANED, AND IN GOOD ORDER, AND SO KEPT UNTIL FINAL ACCEPTANCE OF THE JOB. ***BLOCK AND BRICK MANHOLE SPECIFICATIONS ARE INCLUDED HEREIN FOR USE WITH THE REPAIR OF EXISTING STRUCTURES ONLY. ALL NEW (PROPOSED) MANHOLES SHALL BE AS SPECIFIED IN SECTION 8.07 HEREIN. 8.04 MANHOLE BRICK ALL MANHOLE BRICK USED SHALL BE HARD ROUGH, SOUND CLAY BRICK OF FIRST CLASS QUANTITY, ESPECIALLY SUITABLE FOR THIS CLASS OF WORK AND SHALL CONFORM TO ASTM STANDARD NO. C-62 OR LATEST SUBSEQUENT REVISION. OVER-BURNED BRITTLE BRICK OR BRICK FROM BENCHES OF KILNS SHALL NOT BE ACCEPTED. THE BRICK SHALL BE SET AT THE TIME OF LAYING, EXCEPT WHEN LIABLE FOR FREEZING. THE BRICK SHALL BE LAID WITH FULL SHOVE JOINTS, FILLING UP THE JOINTS WITH MORTAR AND THE THICKNESS OF THE JOINTS ON THE INSIDE OF THE WALLS MUST NOT BE MORE THAN THREE- EIGHTHS (3/8") OF AN INCH IN WIDTH. 8.05 MANHOLE BLOCK ALL MANHOLE BLOCK USED IN CONSTRUCTION SHALL BE A STANDARD SIX INCH (6") THICK CONCRETE MANHOLE BLOCK AND SHALL CONFORM TO ASTM STANDARD NO. C-139 OR LATEST SUBSEQUENT REVISION AND SHALL AS SHOWN ON THE CITY'S APPROVED MATERIALS LISTOR AN APPROVED EQUAL. THE MANHOLE SHALL BE CONSTRUCTED OF TWO (2) TYPES OF BLOCK, THE BARREL BLOCK AND THE BATTERED ENTRANCE BLOCK. THE BARREL BLOCK SHALL FORM THE MAIN BODY OF THE MANHOLE AND SHALL FORM A CYLINDRICAL SECTION. THE STANDARD INSIDE DIAMETER OF THE CYLINDER SHALL BE FOUR FEET (4') FOR MANHOLES UP TO FOURTEEN FEET (14') IN DEPTH AND FIVE FEET (5') FOR MANHOLE SECTIONS GREATER THAN FOURTEEN FEET (14') IN DEPTH. THE TOP BATTERED SECTION SHALL FORM A CONICAL SECTION WHICH SHALL HAVE A FOUR FOOT (4') DIAMETER BASE AND SHALL BE CONSTRUCTED OF FOUR (4) COURSES OF EIGHT INCH (8") HIGH BATTERED BLOCKS. THESE BLOCKS SHALL BE DESIGNED SO AS TO REDUCE THE INSIDE DIAMETER BY SIX INCHES (6") PER COURSE. THE TOP DIAMETER OF THE MANHOLE SHALL BE TWENTY-FOUR INCHES (24"), AND SHALL BE THE STANDARD OPENING NEEDED FOR THE CAST IRON MANHOLE RING. THE BLOCKS SHALL BE EMBEDDED IN A MORTAR BED TO FORM 1/2" HORIZONTAL MORTAR JOINTS AND SHALL BE LAID END TO END WITHOUT MORTAR ON ENDS. AS EACH COURSE IS COMPLETED, THE END OPENINGS SHALL BE FILLED WITH MORTAR AND SHALL BE RODDED THOROUGHLY TO FORM A WATERTIGHT SEAL BETWEEN BLOCKS. 8.06 PRECAST MANHOLES ALL PRECAST MANHOLE SECTIONS AND COMPONENTS SHALL CONFORM TO ASTM C-478-72 OR LATEST SUBSEQUENT REVISION. PRECAST MANHOLES SHALL BE THOSE AS AS SHOWN ON THE CITY'S APPROVED MATERIALS LIST OR APPROVED BY THE CITY ENGINEER; BUT IN ALL CASES SHALL MEET ALL PROVISIONS CONTAINED HEREIN. PRECAST MANHOLE SECTIONS SHALL CONSIST OF CIRCULAR SECTIONS WITH NOMINAL INSIDE DIAMETERS OF 48" AND 60". HEIGHTS OF THE SECTIONS MAY BE IN MULTIPLES OF 12" AT THE OPTION OF THE CONTRACTOR. THE NOMINAL WALL THICKNESS FOR 48" AND 60” DIAMETER SECTIONS SHALL BE MINIMUM OF 5", AND SHALL BE DESIGNED TO SUPPORT ALL DEAD LOAD AND HS-20 TRAFFIC LOADS. REINFORCEMENT FOR PRECAST MANHOLE SECTIONS SHALL CONSIST OF A SINGLE CAGE OF STEEL, PLACED AT THE APPROXIMATE CENTER OF THE WALL SECTION. THE 48" DIAMETER SECTIONS SHALL HAVE NOT LESS THAN 0.12 SQUARE INCHES OF CIRCUMFERENTIAL STEEL PER LINEAR FOOT OF BARREL AND THE 60" DIAMETER SECTION SHALL HAVE NOT LESS THAN 0.17 SQUARE INCHES OF CIRCUMFERENTIAL STEEL PER LINEAR FOOT OF BARREL. THE CAGE STEEL SHALL BE WELDED AT EVERY CIRCUMFERENTIAL WIRE, OR LAPPED 40 WIRE DIAMETERS AND TIED. THE WELDED SPLICE SHALL DEVELOP A TENSILE STRENGTH OF 50,000 PSI OF THE WIRE DIAMETER. JOINTS BETWEEN SECTIONS SHALL BE TONGUE AND GROOVE, AND SHALL PROVIDE 0.10' NOMINAL ANNULAR SPACE, HEIGHT SHALL BE 4”. JOINT SURFACES AND TOLERANCES SHALL BE AS PER ASTM C-361. ALL JOINTS SHALL BE SEALED WITH EITHER AN "O" RING SEAL CONFORMING TO ASTM C 443, OR WITH AN APPROVED BUTYL RUBBER SEALANT CONFORMING TO FEDERAL SPECIFICATION SS-S-210A, AASHTO M-198, FOR TYPE B-BUTYL RUBBER AS SHOWN ON THE CITY'S APPROVED MATERIALS LIST OR AS APPROVED BY THE CITY ENGINEER. CARE IS TO BE TAKEN WITH THE BUTYL RUBBER SEALANT TO MAKE SURE MANUFACTURER'S RECOMMENDATIONS AND OVERLAPS ARE PROPERLY FOLLOWED. BUTYL RUBBER SEALANT SHALL BE KEPT IN ORIGINAL CONTAINERS, STORED IN A COOL AREA AND KEPT FREE FROM FOREIGN MATERIALS. EXTERIOR OF ALL JOINTS SHALL BE SEALED PER MANUFACTURERS RECOMMENDATIONS. MANHOLE STEPS SHALL BE CAST, DRILLED, OR FIRMLY GROUTED IN PLACE SO AS TO ENSURE COMPLETELY WATERTIGHTNESS, ANY STEP HOLES SHALL NOT EXTEND THROUGH THE MANHOLE WALL. STEPS SHALL BE SPACED AT 16" CENTERS AND INSTALLED SO AS NOT TO INTERFERE WITH THE REINFORCING STEEL. STEPS SHALL BE NO. 3 REINFORCING ROD ENCAPSULATED IN A POLYPROPYLENE PLASTIC, AS SHOWN ON THE CITY'S APPROVED MATERIALS LIST OR AS APPROVED BY THE CITY ENGINEER NO MORE THAN TWO LIFT HOLES SHALL BE CAST INTO EACH SECTION. HOLES SHALL BE LOCATED SO AS NOT TO DAMAGE REINFORCING STEEL OR EXPOSE IT TO CORROSION. STEEL LOOPS MAY BE PROVIDED FOR HANDLING, IN LIEU OF LIFT HOLES. PRECAST CONICAL ECCENTRIC TRANSITION SECTIONS SHALL BE PROVIDED FOR REDUCTIONS IN DIAMETERS. THE TRANSITION MANHOLE SECTIONS SHALL CONFORM TO THE CROSS-SECTION AS SHOWN ON CITY STANDARD NO. 71B-4. THE HEIGHT OF THE TRANSITION SECTION SHALL NOT BE LESS THAN 24". TRANSITION AND BARREL SECTIONS SHALL BE FREE FROM FRACTURES, CRACKS AND SURFACE ROUGHNESS. ALL MANHOLE COMPONENTS SHALL BE CAPABLE OF PRODUCING A WATERTIGHT STRUCTURE. SPECIAL ENGINEER'S APPROVAL IS REQUIRED TO USE FLAT TRANSITION SLABS OR FLAT TOPS. MANHOLES SHALL HAVE PRECAST CONCRETE BOTTOMS WITH INTEGRAL WALLS EXTENDING TO A MINIMUM OF SIX INCHES (6") ABOVE THE TOP OF THE HIGHEST PIPE LINE, EXCEPT AS SHOWN ON THE PLANS. PRECAST MANHOLE SECTIONS SHALL BE AFFIXED TO A MONOLITHIC POURED BOTTOM TO PROVIDE A WATERTIGHT SEAL, AND CONSTRUCTED IN ACCORDANCE WITH CITY STANDARD DRAWING NO. 71B-4. PIPE OPENINGS SHALL HAVE A CAST-INPLACE RUBBER SLEEVE OR RUBBER BOOT COMPLYING WITH ASTM C 923 DESIGNED TO PROVIDE A FLEXIBLE WATERTIGHT SEAL AROUND THE PIPE AND BETWEEN THE SLEEVE/RUBBER BOOT AND THE MANHOLE AS SHOWN ON THE CITY'S APPROVED MATERIALS LIST OR APPROVED BY THE CITY ENGINEER. THE CONE SECTION SHALL BE THE ECCENTRIC TYPE, UNLESS APPROVED OTHERWISE FOR A SPECIFIC LOCATION FOR EACH USE. INVERTS OF THE MANHOLE SHALL BE CONSTRUCTED AS SPECIFIED IN SECTION 8.04 OF THESE SPECIFICATIONS. INVERTS SHALL BE POURED-IN-PLACE, USING THE BASE SECTION AS FORM, AND SHAPED AS REQUIRED FOR THE PROPER FLOW. SEPARATE POUR PRE-CAST INVERTS MAY BE USED, APPROVAL REQUIRED. HOLES OR OPENINGS LEFT IN BARREL SECTIONS FOR PIPE CONNECTIONS SHALL BE CONSTRUCTED SO AS TO PROVIDE A MINIMUM CLEARANCE BETWEEN PIPE AND EDGE OF OPENING AS RECOMMENDED BY THE MANUFACTURER OF THE BOOT TO BE INSTALLED. THIS SPACE MAY NEED TO BE MORTARED TO PRODUCE A WATERTIGHT SEAL AND SUPPORT THE PIPE, SEE THE MANUFACTURER'S RECOMMENDATIONS. ALKALINITY OF THE CONCRETE USED FOR THE MANHOLES SHALL BE ADEQUATE TO PROVIDE A LIFE FACTOR, AZ EQUAL TO THE CALCIUM CARBONATE EQUIVALENT TIMES THE COVER OVER THE REINFORCEMENT OF NO LESS THAN 0.35, FOR BASES, RISERS, CONES, TRANSITION AND ADJUSTMENT PIECES. CHEMICAL ADMIXTURES SHALL BE AS PER ASTM C 494. CALCIUM CHLORIDE OR ADMIXTURES CONTAINING CALCIUM CHLORIDE SHALL NOT BE USED. ANY INTERIOR PATCHING OF WALL PENETRATIONS SHALL BE BY USING A TWO-COMPONENT EPOXY GEL, SOLVENT FREE, MOISTURE INSENSITIVE, HIGH MODULUS, HIGH-STRENGTH, STRUCTURAL EPOXY PASTE ADHESIVE MEETING ASTM C-881, TYPE I AND II, GRADE 3, CLASS B AND C, EPOXY RESIN ADHESIVE. THE MASONRY HEIGHT FOR ADJUSTMENT OF GRADE ABOVE THE CONE SHALL BE 12 INCHES MAXIMUM. BUTYL RUBBER SEALANT SHALL BE PROVIDED BETWEEN THE FRAME, GRADE RINGS, AND ALL MANHOLE SECTIONS. CORROSION PROTECTION FOR MANHOLES 1. WHERE CORROSIVE CONDITIONS DUE TO SEPTICITY OR OTHER CAUSES ARE ANTICIPATED, CONSIDERATION SHALL BE GIVEN TO PROVIDING CORROSION PROTECTION ON THE INTERIOR OF THE MANHOLES. 2. WHERE HIGH FLOW VELOCITIES ARE ANTICIPATED, THE MANHOLES SHALL BE PROTECTED AGAINST DISPLACEMENT BY EROSION AND IMPACT. TIE-INS AT EXISTING MANHOLES SHALL BE CONSTRUCTED TO THE SAME STANDARDS AS SPECIFIED FOR NEW MANHOLES HEREIN. ANY EXCEPTIONS SHALL BE AS APPROVED BY THE ENGINEER. 8.07 CEMENT CEMENT USED SHALL BE OF A HIGH GRADE PORTLAND CEMENT OF A BRAND APPROVED BY THE CITY ENGINEER. IT SHALL MEET AASHTO M-85-49 OR LATEST SUBSEQUENT REVISION. CEMENT SHALL BE NEWLY MANUFACTURED, WELL HOUSED AND PRESERVED DRY FOR USE. NO CEMENT WHICH HAS BEEN INJURED BY AGE OR EXPOSURE SHALL BE USED. 8.08 SAND (FINE AGGREGATE) ALL SAND USED SHALL BE CLEAN, SHARP COARSE GRAIN SAND AND SHALL BE FREE FROM CLAY, LOAM OR ORGANIC MATTER AND SHALL BE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 8.10 WATER WATER USED IN PORTLAND CEMENT MORTAR OR CONCRETE SHALL BE FREE FROM OIL, ALKALI, OR OTHER ORGANIC SUBSTANCES. IF WATER IS USED FROM CITY'S SUPPLY, THE CONTRACTOR SHALL MAKE ARRANGEMENTS WITH THE CITY UTILITIES DEPARTMENT, AND SHALL BE REQUIRED TO METER SUCH WATER USED.BACKFLOW PREVENTION AND METERED USE WILL BE REQUIRED, THE CONTRACTOR SHALL SUPPLY ALL NECESSARY EQUIPTMENT, MATERIALS, AND LABOR. SEE SECTION 2.02. 8.11 MORTAR MORTAR FOR BRICK WORK SHALL BE COMPOSED OF ONE (1) PART PORTLAND CEMENT TO THREE (3) PARTS FINE AGGREGATE. DURING COLD WEATHER, MORTAR AND BRICK WORK MAY BE PLACED WHEN THE AIR TEMPERATURE IN THE SHADE IS 35° FAHRENHEIT OR ABOVE AND RISING. IT MAY NOT BE PLACED WHEN THE AIR TEMPERATURE IN THE SHADE IS 420 FAHRENHEIT AND FALLING. 8.12 CONCRETE CONCRETE USED SHALL CONSIST REDI-MIX CONCRETE COMPOSED OF PORTLAND CEMENT, FINE AGGREGATE, COARSE AGGREGATE, WATER AND ADMIXTURES TO A DESIGN MIX APPROVED BY THE CITY ENGINEER. IT SHALL HAVE A TWENTY-EIGHT (28) DAY COMPRESSIVE STRENGTH OF 3000 PSI. NO WATER SHALL BE ADDED TO THE MIX, EXCEPT THAT CALLED FOR IN THE MIX DESIGN. WATER ADDED TO THE CONCRETE ENROUTE TO THE JOB SITE OR ON THE JOB SITE SHALL BE REASON ENOUGH TO REJECT THE BATCH AND HAVE IT REMOVED FROM THE JOB. 8.13 MANHOLE FRAMES AND COVERS ALL CASTINGS SHALL BE OF GOOD QUALITY CAST IRON MANUFACTURED ON NUMBER ONE GRADE SCRAP OR EQUIVALENT. NO OTHER CASTING SHALL BE CONSIDERED. CASTINGS MUST BE FREE FROM BLOW HOLES, SAND HOLES AND ANY OTHER DEFECT, AND SHALL CONFORM STRICTLY TO THE DIMENSIONS SHOWN ON THE CITY'S STANDARD DRAWING NO. 71B-1. GRAY IRON CASTINGS MAY BE SUPPLIED WITH “NO PAINT”. WEIGHT OF THE MANHOLE RING AND COVER SHALL BE APPROXIMATELY 310 POUNDS. MACHINING ON CERTAIN PARTS OF THE MANHOLE RING AND COVER SHALL BE REQUIRED. THAT PORTION OF THE MANHOLE COVER WHICH IS TO BE MACHINED SHALL BE THE HORIZONTAL SURFACE ON THE UNDERSIDE WHICH COMES IN CONTACT WITH THE RING. THIS MACHINED SURFACE SHALL BE 1-- 3/8" IN WIDTH ALONG THE FULL CIRCUMFERENCE OF THE COVER. THAT PORTION OF THE MANHOLE RING OR FRAME WHICH IS TO BE MACHINED SHALL BE THE INSIDE HORIZONTAL SURFACE UPON WHICH THE COVER SITS. THIS MACHINED SURFACE SHALL BE ONE INCH (1") IN WIDTH, ALONG THE FULL CIRCUMFERENCE OF THE RING. THE MACHINING DESCRIBED ABOVE SHALL BE SO ACCOMPLISHED SO AS TO LEAVE THE MACHINED SURFACES IN A TRUE EVEN PLANE, SO THAT WHEN THE COVER IS PLACED ON THE RING IN ANY POSITION, THE MACHINED SURFACES WILL BE IN FULL CONTACT AND EVEN BEARING, WITH NO TILTING OR ROCKING MOTION. THE MACHINING TO BE DONE IS IN NO WAY INTENDED TO DECREASE THE THICKNESS OF THE PARTS MACHINED, BUT WILL HAVE THE DIMENSIONS SHOWN ON THE CITY'S STANDARD DRAWING. LOCKING WATERTIGHT COVERS FOR OUTFALL CONSTRUCTION LOCKING WATERTIGHT FRAMES AND COVERS SHALL BE USED ON OUTFALL CONSTRUCTION. FRAMES AND COVERS SHALL BE PRODUCED FROM ASTM A 48-74, CLASS 30 IRON. THE MINIMUM WEIGHT OF THE FRAME AND COVER SHALL BE 310 POUNDS, AS PER DETAIL 71B-1. THE FRAME FLANGE SHALL HAVE FOUR ONE-INCH HOLES AT 90 DEGREES FOR ANCHORING THE FLANGE TO THE CONCRETE MANHOLE WITH 4 EACH - 5/8” DIA. BOLTS. THE CONTRACTOR SHALL COORDINATE THE BOLT CIRCLE DIAMETER WITH THE MANHOLE AND FRAME SUPPLIERS. THE COVER SHALL HAVE FOUR HOLES FOR BOLTS AT 90 DEGREES FOR LOCKING THE COVER TO THE FRAME. THE FRAME SHALL BE TAPPED AND THE COVER ATTACHED USING FOUR HEXHEAD 1/2” X 1-3/4” BRASS OR STAINLESS STEEL BOLTS. A NEOPRENE GASKET SHALL BE PROVIDED BETWEEN THE COVER AND THE FRAME SEAT. BUTYL RUBBER SEALANT SHALL BE PROVIDED BETWEEN THE FRAME, GRADE RINGS, AND ALL MANHOLE SECTIONS. ONLY FRAMES AND COVERS MANUFACTURED AND TESTED IN THE U.S.A. WILL BE ALLOWED. MANHOLE COVERS ARE TO BE PROVIDED WITH TWO ONE-INCH DIAMETER HOLES FOR VENTILATION, UNLESS THE PROJECT PLANS INDICATE THAT THE MANHOLE IS TO BE VENTED TO A SPECIFIED ELEVATION OR A SEALED MANHOLE INDICATED. VENTED MANHOLES SHALL BE AS INDICATED ON THE PROJECT DETAILS AND STD. DETAIL 71B-4A AS REVISED 1/05/95 OR LATER REVISION. 8.14 CONCRETE ENCASING FOR PIPE ENCASING FOR PIPES SHALL CONSIST OF PLAIN 3000 PSI CLASS "A" CONCRETE AS A PROTECTIVE COVER AND REINFORCEMENT POURED AND FORMED TO THE CROSS-SECTION AS SHOWN IN CITY STANDARD DETAIL 71B-15. THIS PROTECTIVE COVER SHALL BE REQUIRED WHEN SHOWN OR INDICATED ON THE PLANS, OR WHEN DIRECTED BY THE CITY ENGINEER. 8.15 LAYING PIPE AND MAKING JOINTS THE PIPE SHALL BE LAID BEGINNING AT THE LOWER OR DOWN-STREAM END OF THE LINE AND SHALL PROGRESS CONTINUOUSLY UPSTREAM. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR LEAVE OUT ANY SECTION OF THE LINE TO WORK ON ANOTHER PORTION FURTHER UPGRADE, WITHOUT FIRST SECURING WRITTEN APPROVAL FROM THE ENGINEER. EACH JOINT OF PIPE SHALL BE LAID ACCORDING TO MANUFACTURES RECOMMENDATIONS AND, IN ACCORDANCE WITH LATEST REVISION OF ASTM A-746 FOR DUCTILE IRON PIPE ASTM FOR PVC. CARE SHALL BE TAKEN IN PLACING PIPE SO THAT PRIOR MADE JOINTS ARE NOT DISTURBED. COMPETENT PIPE LAYERS SHALL BE REQUIRED FOR PIPE INSTALLATION. LINES THAT DO NOT EXHIBIT TRUE LINE AND GRADE OR HAVE STRUCTURAL DEFECTS SHALL BE CORRECTED AT THE CONTRACTOR'S TOTAL EXPENSE. REFER TO SECTION 10.00 ALSO. AT THE END OF EACH DAYS WORK, THE CONTRACTOR SHALL PLUG ALL PIPE ENDS. TRENCH PREPARATION THE CONTRACTOR SHALL PREPARE THE PIPE TRENCH ACCORDING TO THE "PROJECT DETAILS, AND TO THE STANDARD SPECIFICATIONS" INCLUDING BUT NOT LIMITED TO SECTIONS 6.0, 8.0, 9.0, AND 10.0 THEREOF AND PIPE MANUFACTURER'S RECOMMENDATIONS. CLASS B BEDDING CLASS B BEDDING SHALL CONSIST OF BEDDING THE PIPE IN COMPACTED GRANULAR MATERIAL PLACED ON A BED OF GRANULAR MATERIAL ¼ THE PIPE DIAMETER BUT NOT LESS THAN 4”; AFTER JOINTING OF THE PIPE, EXTENDING THE COMPACTED GRANULAR MATERIAL ALONG THE SIDES OF THE PIPE TO THE LEVEL 1/2 THE DIAMETER OF THE PIPE, AND THE PLACEMENT OF COMPACTED SELECT BACKFILL MATERIAL TO A DEPTH OF 6" ABOVE THE TOP OF THE PIPE, ALL AS SPECIFIED HEREIN AND DETAILED ON THE DRAWINGS. THE GRANULAR BEDDING SHALL HAVE A WIDTH EQUAL TO THE WIDTH OF THE PIPE TRENCH AND THE LENGTH AS INDICATED ON THE DRAWINGS OR AS DIRECTED BY THE ENGINEER. GRANULAR MATERIAL USED FOR CLASS B BEDDING SHALL BE WASHED STONE CONFORMING TO THE GRADATION REQUIREMENTS OF THE N.C. DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR NO. 57 STANDARD SIZE AGGREGATE UNLESS OTHERWISE INDICATED ON THE PLANS. GRANULAR MATERIAL SHALL BE PLACED IN LAYERS NOT MORE THAN 6" IN THICKNESS AND EACH LAYER THOROUGHLY TAMPED WITH APPROVED MECHANICAL TAMPERS BEING EXTREMELY CAREFUL TO COMPLETELY FILL ALL SPACES UNDER AND ADJACENT TO THE PIPE. THE GRANULAR MATERIAL SHALL BE PLACED UNDER AND ADJACENT TO THE PIPE BY HAND IF NECESSARY TO COMPLETELY FILL ALL SPACES UNDER AND ADJACENT TO THE PIPE. ALL OTHER ASPECTS SHALL BE AS PER CLASS D BEDDING AND SECTION 8.15. SEE CITY STANDARD DETAIL 71B-5 CLASS C BEDDING CLASS C BEDDING SHALL CONSIST OF A ROUND BOTTOM TRENCH SITUATED SO THAT THE WIDTH OF THE CURVEATURE IS EQUAL TO ½ THE DIAMETER OF THE PIPE. ALL OTHER ASPECTS SHALL BE AS PER CLASS D BEDDING AND SECTION 8.15 SEE CITY STANDARD DETAIL 71B-5. CLASS D BEDDING CLASS D BEDDING SHALL CONSIST OF SQUARE CUT TRENCH BOTTOM WITH BELL HOLES. WHEREVER ROCK IS ENCOUNTERED FOR CLASS D BEDDING CONDITIONS THE ROCK SHALL BE REMOVED FOR AT LEAST 6" BELOW PIPE AND REPLACED WITH COMPACTED BACKFILL TO THE REQUIRED PIPE BEDDING GRADE. SEE SECTION 8.16 FOR BACKFILL. CONCRETE ENCASEMENT CONCRETE ENCASEMENT SHALL BE MADE OF 3000 PSI CLASS CONCRETE AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH DETAILS SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL OF THE ENGINEER HIS PROPOSED METHOD OF SUPPORTING THE SEWER TO MAINTAIN LINE AND GRADE WHILE THE CONCRETE ENCASEMENT IS BEING CONSTRUCTED. ALSO, SEE SECTION 8.14. TRENCH STABILIZATION (#57 WASHED STONE) WILL BE REQUIRED WHEN A WET OR POOR SUBGRADE CONDITION IS ENCOUNTERED BY THE CONTRACTOR AND WHEN IN THE CITY ENGINEER'S OPINION OTHER PROPER FOUNDATIONS CANNOT BE PROVIDED. REFER TO STANDARD SPECIFICATIONS SECTION 10.04 FOR ADDITIONAL REQUIREMENTS. ROCK EXCAVATION EXCAVATION OF HARD ROCK, LEDGE ROCK, OR BOULDERS LARGER THAN TWO CUBIC YARDS WHICH CAN NOT BE RIPPED, CLAWED, ETC., AND OR REMOVED BY CONVENTIONAL CONSTRUCTION METHODS WILL BE CONSIDERED AS ROCK EXCAVATION. ALL BLASTING OPERATIONS (USE OF EXPLOSIVES) SHALL BE CONDUCTED IN STRICT ACCORDANCE WITH EXISTING LAWS, RULES, AND REGULATIONS RELATIVE TO THE STORAGE AND USE OF EXPLOSIVES. BLASTING SHALL BE PERFORMED ONLY BY EXPERIENCED PERSONNEL WORKING ACCORDING TO ACCEPTED PRACTICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS INCLUDING, BUT NOT LIMITED TO THE CITY FIRE DEPARTMENT. THE CONTRACTOR SHALL COMPLY WITH THE CITY'S STANDARD SPECIFICATIONS INCLUDING, BUT NOT LIMITED TO SECTION 2.06. EXTREME CARE SHALL BE EXERCISED BY THE CONTRACTOR TO PREVENT INJURY TO ANY EXISTING PIPES, WATER, SEWER, GAS, POLES, WIRES, CABLES, DRAINS, BUILDINGS OR OTHER STRUCTURES OR UTILITIES EITHER BELOW OR ABOVE THE SURFACE OF THE GROUND. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGE RESULTING FROM THE USE OF EXPLOSIVES. WHERE THERE IS ANY POSSIBILITY OF DAMAGE BEING CAUSED BY BLASTING IT MAY BE NECESSARY TO RESORT TO DRILLING, WEDGING, AND SPLITTING TO REMOVE THE ROCK. ANY ROCK ENCOUNTERED SHALL BE EXCAVATED SIX INCHES (6") BELOW THE SUBGRADE OF THE PIPE BED. 8.16 BACKFILLING PIPE TRENCHES AS THE PIPE LINE IS LAID IT SHALL BE FIRMLY BEDDED WITH SUITABLE MATERIAL ON EACH SIDE AND THOROUGHLY TAMPED ON EACH SIDE OF AND UNDERNEATH THE PIPE. AS SOON AS PRACTICAL AFTER THE PIPE HAS BEEN LAID AND JOINTED, THE TRENCH SHALL BE BACKFILLED WITH SELECT MATERIAL AND THOROUGHLY TAMPED IN SIX INCH (6") LAYERS TO A DEPTH OF ONE FOOT (1') OVER THE TOP OF THE PIPE. EXTREME CARE SHALL BE EXERCISED IN BACKFILLING AND TAMPING TO PREVENT DAMAGE TO THE NEWLY MADE PIPE JOINTS AND TO THE PIPE ITSELF. THE TRENCH SHALL THEN BE BACKFILLED WITH SELECT MATERIALS, FREE OF LARGE STONES, IN SIX INCH (6") HORIZONTAL LAYERS AND THOROUGHLY COMPACTED. WHEN THE PIPE IS LOCATED IN STREETS, ROADS, AND DRIVEWAYS, THE BACKFILL SHALL BE COMPACTED AS SPECIFIED IN SECTION 5.03, PARAGRAPH (2).PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)UTILITY NOTESR102 WATER DISTRIBUTION NOTESWATER DISTRIBUTION NOTES SANITARY SEWER NOTES SANITARY SEWER NOTESSANITARY SEWER NOTES 8.17 TESTING THE CONTRACTOR SHALL MAKE THE CONSTRUCTION SITE AND PIPE INSTALLATION AVAILABLE TO THE CITY ENGINEER OR HIS REPRESENTATIVE AT ALL TIMES FOR PERFORMING TESTS ON THE MATERIALS AND CONSTRUCTION. THESE TESTS SHALL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING: (a)COMPACTION OF DITCH BACKFILL MATERIAL SHALL BE THOROUGHLY TAMPED AS SPECIFIED IN SECTION 5.05 OF THESE SPECIFICATIONS AND SHALL BE TESTED IN ACCORDANCE WITH AASHTO T99-57 TEST PROCEDURES FOR FIELD DENSITY. (b)ALIGNMENT AND GRADE THE LINES SHALL BE LAID STRAIGHT, WITHIN ONE FOURTH (1/4") INCH VARIATION PER JOINT, BUT IN ALL CASES SO THAT A FULL MOON IS VISIBLE FROM MANHOLE TO MANHOLE. LINES WHICH DO NOT EXHIBIT A TRUE LINE AND GRADE OR HAVE STRUCTURAL DEFECTS SHALL BE CORRECTED TO MEET THESE SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE COLOR VIDEO INSPECTION SERVICES ON NEW SEWER LINES AND/OR EXISTING CITY MAINTAINED SEWER LINES. INSPECTION OF SEWER LINES SHALL BE PERFORMED BY EXPERIENCED PERSONNEL TRAINED IN LOCATING BREAKS, OBSTACLES, AND SERVICE CONNECTIONS BY CLOSED CIRCUIT TELEVISION. THE INTERIOR OF THE LINE SHALL BE CAREFULLY INSPECTED TO DETERMINE THE LOCATION OF ANY CONDITIONS WHICH MAY INDICATE CURRENT OR FUTURE PROBLEMS OR NON-COMPLIANCE TO THE CONTRACT DOCUMENTS. ANY SUCH CONDITIONS SHALL BE NOTED AND CORRECTED AT THE CONTRACTOR EXPENSE. THE TELEVISION CAMERA USED FOR THE INSPECTION SHALL BE ONE SPECIFICALLY DESIGNED AND CONSTRUCTED FOR SUCH INSPECTION. LIGHTING FOR THE CAMERA SHALL BE TO ALLOW A CLEAR, COLOR PICTURE OF THE ENTIRE PERIPHERY OF THE PIPE. THE CAMERA SHALL BE CAPABLE OF A 360° VIEWING AREA. A BACKUP CAMERA SHALL BE AVAILABLE ON THE PROJECT SITE. THE CAMERA SHALL BE OPERABLE IN 100% HUMIDITY CONDITIONS. THE CAMERA, TELEVISION MONITOR, AND OTHER COMPONENTS OF THE VIDEO SYSTEM SHALL BE CAPABLE OF PRODUCING COLOR PICTURE QUALITY TO THE SATISFACTION OF THE ENGINEER, AND IF UNSATISFACTORY, THE EQUIPMENT SHALL BE REPLACED AND NO PAYMENT WILL BE MADE FOR ANY UNSATISFACTORY INSPECTION. THE PROJECT NAME, LOCATION, DATE, MANHOLE NUMBERS, SIZE AND TYPE PIPE, AND OTHER INFORMATION SPECIFIC TO THE LINE SEGMENT BEING INSPECTED SHALL BE VISIBLY DISPLAYED ON THE VIDEO VIEWING SCREEN FOR A MINIMUM OF 10 SECONDS, PRIOR TO CAMERA ENTRY INTO THE MANHOLE. UPON ENTRY INTO THE MANHOLE, THE SURFACES OF THE MANHOLE SHALL BE VIDEOED AND POTENTIAL DEFECTS NOTED. PRIOR TO ENTERING THE SEWER LINE, CONDITIONS OF THE MANHOLE/PIPE CONNECTION SHALL BE VIDEOED AND POTENTIAL DEFECTS NOTED. WHEN EXISTING SEWER FLOW DEPTH, AS MEASURED IN THE FIRST MANHOLE UPSTREAM OF THE SEWER SEGMENT BEING TELEVISED, EXCEEDS 20% OF THE SEWER LINE PIPE DIAMETER, THE CONTRACTOR SHALL IMPLEMENT WASTEWATER FLOW CONTROL METHODS, INCLUDING BUT NOT LIMITED TO BYPASS PUMPING, AT NO ADDITIONAL COST TO THE CITY. THE RATE OF TRAVEL SHALL NOT EXCEED 30 FEET PER MINUTE. AT EACH LINE DEFECT OR SERVICE CONNECTION, THE CAMERA SHALL COME TO A COMPLETE STOP AND THE SUBJECT PANNED. THE FOOTAGE METER COUNT SHALL BE CLEARLY VISIBLE. PRINTED TELEVISION INSPECTION LOGS SHALL BE RECORDED BY THE CONTRACTOR CLEARLY SHOWING THE DISTANCE FROM AN ADJACENT MANHOLE TO DISCERNABLE FEATURES SUCH AS BROKEN OR CRACKED PIPE, DEFECTIVE JOINTS, SERVICE LATERALS, AND IN EXISTING LINES PRESENCE OF SCALE CORROSION, GREASE BUILDUP, STORM SEWER CONNECTIONS, AND ANY OTHER UNUSUAL CONDITIONS. A COPY OF THE INSPECTION LOGS SHALL BE PROVIDED TO THE ENGINEER BY THE CONTRACTOR. A STANDARD CITY VIDEO INSPECTION LOG FORM SHALL BE PROVIDED TO THE CONTRACTOR BY THE ENGINEER. THE CONTRACTOR SHALL PROVIDE COLOR VIDEO RECORDINGS OF ALL THE SUBJECT LINES, THE RECORDINGS SHALL PROVIDE A VISUAL AND AUDIO RECORD OF PROBLEM AREAS OF THE LINES BEFORE AND AFTER ANY REHABILITATION. THE VIDEO RECORDING SHALL INCLUDE, AT A MINIMUM, A DISPLAY OF THE FOOTAGE METER AND A DISPLAY OF THE MANHOLE SEGMENT NUMBER BEING TELEVISED. WHERE APPROPRIATE, COMMENTS SHOULD BE INCLUDED BY CONCURRENT AUDIO RECORDING ON THE RECORDING OR ELECTRONIC DISPLAY. VIDEO RECORDING PLAYBACK SHALL BE AT THE SAME SPEED THAT IT WAS RECORDED. SLOW MOTION OR STOP-MOTION PLAYBACK FEATURES MAY BE SUPPLIED AT THE OPTION OF THE CONTRACTOR. THE CONTRACTOR SHALL CARRY OUT HIS OPERATIONS IN STRICT ACCORDANCE WITH ALL OSHA AND MANUFACTURER'S SAFETY REQUIREMENTS. PARTICULAR ATTENTION IS DRAWN TO THOSE SAFETY REQUIREMENTS INVOLVING ENTERING CONFINED SPACES. CLEANING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ANY HANG-UPS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, THE CONTRACTOR SHALL REMOVE THE CAMERA AND REPAIR ANY DAMAGE TO THE SEWER LINE. (c)INFILTRATION/EXFILTRATION (1)THE CONTRACTOR SHALL PROVIDE THE EQUIPMENT, MATERIALS AND LABOR NECESSARY TO CHECK THE LINES FOR INFILTRATION OR EXFILTRATION BEFORE THEY ARE PUT IN SERVICE. INFILTRATION OR EXFILTRATION IN EXCESS OF ONE HUNDRED (100) GALLONS PER DAY PER INCH-MILE OF SEWER WILL RESULT IN HAVING THE CONTRACTOR GO OVER THE LINES, ASCERTAIN WHERE THE LEAKAGE EXISTS, AND REPAIR THE LINES TO THE EXTENT NECESSARY TO BRING THE INFILTRATION OR EXFILTRATION DOWN WITHIN ACCEPTABLE LIMITS. THE CONTRACTOR SHALL TEST ONLY PIPE OF THE SAME DIAMETER AND FOR SUCH LENGTHS AS APPROVED BY THE ENGINEER. (2) EXFILTRATION TESTS SHALL BE CONDUCTED ON ALL GRAVITY SEWER LINES, UNLESS AUTHORIZED OTHERWISE BY THE CITY ENGINEER. THE LINE UNDER TEST SHALL BE PLUGGED AND FILLED WITH WATER IN SUCH A MANNER THAT THE MAXIMUM HYDROSTATIC HEAD AT ANY POINT IN THE LINE WOULD NOT EXCEED TEN FEET OF WATER. ALL MANHOLES SHALL BE TESTED. THE EXFILTRATION FROM THE LINE UNDER TEST SHALL NOT EXCEED 100 GALLONS PER INCH OF NOMINAL PIPE DIAMETER PER MILE OF PIPE PER TWENTY- FOUR HOURS. THE AMOUNT OF EXFILTRATION SHALL BE MEASURED BY THE INSPECTOR USING METHODS SPECIFIED BY THE CITY ENGINEER FOR THE PARTICULAR SITUATION. (3) WHERE GROUND WATER IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL FURNISH LABOR, EQUIPMENT, AND MATERIALS INCLUDING PUMPS, AND SHALL ASSIST THE ENGINEER IN MAKING INFILTRATION TESTS OF THE COMPLETED SEWER SECTION BEFORE IT CAN BE PLACED IN SERVICE OR CONNECTED TO ANY OTHER LINES. THE CONTRACTOR WILL FURNISH AND INSTALL THE MEASURING WEIRS OR OTHER MEASURING DEVICES. THE LENGTH OF LINE TO BE TESTED AT ANY TIME SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER. THE TOTAL INFILTRATION SHALL IN NO CASE EXCEED 100 GALLONS PER INCH OF DIAMETER, PER MILE OF PIPE PER DAY. THE TEST PERIOD SHALL BE TWENTY-FOUR HOURS, AND IF THE QUANTITY OF INFILTRATION IS IN EXCESS OF THE MAXIMUM ALLOWABLE, THE LEAKING JOINTS SHALL BE RELAID IF NECESSARY OR OTHER REMEDIAL CONSTRUCTION SHALL BE PERFORMED BY AND AT THE EXPENSE OF THE CONTRACTOR. THE SECTION OF SEWER SHALL THEN BE RETESTED AFTER REPAIRS ARE COMPLETED TO DETERMINE COMPLIANCE WITH THE SPECIFICATIONS. (4) THE INFILTRATION IN THE LINE SHALL BE CHECKED THRU A LOW PRESSURE EXFILTRATION AIR TEST. THE SANITARY SEWER PIPE AND LINES SHALL BE CAPABLE OF REACHING A CONSTANT PRESSURE OF 4 PSIG WITHIN THE TIME SPECIFIED IN TABLE 1 AND SHALL BE CAPABLE OF MAINTAINING THE PRESSURE FOR THE TIME LIMIT SPECIFIED IN TABLE 2. (5) ALL TESTS SHALL BE MADE IN THE PRESENCE OF THE CONTRACTOR OR HIS REPRESENTATIVE AND THE ENGINEER. (6) ANY AND ALL WORK NECESSARY TO BRING THE LINE INTO CONFORMANCE WITH THE INFILTRATION/EXFILTRATION SPECIFICATIONS SHALL BE PERFORMED BY THE CONTRACTOR AT NO COST TO THE CITY. ALL APPARENT SOURCES OF INFILTRATION SHALL BE REPAIRED. THE CITY RESERVES THE RIGHT TO REQUIRE THAT THE LINES BE TESTED IN SECTIONS SUCH THAT THE MAXIMUM ALLOWABLE STATIC HEAD IS IMPOSED ON AS MUCH OF THE LINE AS IS PRACTICABLE. (7) WHERE A STREAM IS NOT READILY AVAILABLE AS A SOURCE OF WATER TO USE FOR TESTING, WATER FROM THE CITY SYSTEM MAY BE USED, PROVIDING PROPER NOTIFICATION PROCEDURES FOR OPERATING VALVE HYDRANTS WILL BE REQUIRED. (8) MATERIALS AND CONSTRUCTION METHODS CALLED FOR IN THESE SPECIFICATIONS ARE OF SUCH NATURE AS TO INSURE MAXIMUM PROTECTION FOR THE SEWER FROM INFILTRATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SEWER CONFORMING TO THE ABOVE LIMITS FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. TABLE 1 TIME REQUIRED TO PRESSURIZE TO 4 PSIG* TIME (IN MINUTES) PIPE REACH OF LINE TESTED SIZE 20' 100' 200' 300' 400' 500' 600' 4” 6 SEC .0.5 1.0 1.5 1.9 2.4 3.0 6” 12 SEC. 1.0 2.2 3.2 4.4 5.8 6.4 8” 23 SEC. 1.9 3.8 6.0 7.6 9.6 11.6 10” 35 SEC. 2.9 5.8 8.8 11.6 14.6 17.6 12” 50 SEC. 4.2 8.4 12.6 16.8 21.2 25.6 15" 1.3 MIN. 6.6 3.2 19.8 26.4 35.0 39.6 18" 1.9 9.4 18.8 28.2 37.6 47.0 56.4 21" 2.5 12.6 25.2 37.8 50.4 63.0 75.6 24” 3.4 17.0 34.0 51.0 68.0 102.0 136.0 * THIS TABLE IS BASED ON THE COMPRESSOR UNIT MOUNTED ON A CHERNE AIR-LOC TESTING UNIT ASSUMING 5 CFM CAPACITY. TABLE 2 MINIMUM TEST TIME FOR VARIOUS PIPE SIZES NOMINAL PIPE SIZE IN. MIN/100 FT. T (TIME) NOMINAL PIPE SIZE IN. MIN/100 FT. T (TIME) 3 0.2 21 3.0 4 0.3 24 3.6 6 0.7 27 4.2 8 1.2 30 4.8 10 1.5 33 5.4 12 1.8 36 6.0 15 2.1 39 6.6 18 2.4 42 7.3 THE LOW PRESSURE AIR TEST SHALL BE PERFORMED AS SPECIFIED IN LATEST REVISION OF ASTM C 828 FOR VCP AND ASTM C924 FOR RCP. IF THE LINE PRESSURE DROPS MORE THAN 1 PSI DURING THE REQUIRED TEST TIME, THEN THE SECTION OF PIPE HAS FAILED THE TEST. FURTHERMORE, IN TESTING ANY SANITARY SEWER LINE, THE INFILTRATION/EXFILTRATION RATE SHALL BE LESS THAN 100 GALLONS PER INCH DIAMETER OF PIPE PER DAY PER MILE OF SANITARY SEWER. SEE SECTION 8.17(C) (1), (2), AND (3).. 8.18 TAPS/SERVICE CONNECTIONS (SEWER) ONLY AUTHORIZED PERSONNEL OF THE CITY OF GASTONIA UTILITIES DEPARTMENT SHALL BE PERMITTED TO MAKE SANITARY SEWER TAPS UNLESS THE DEVELOPER HAS RECEIVED PERMISSION, IN WRITING, FROM THE DIRECTOR OF TRU OR DESIGNATED REPRESENTATIVE, FOR AN APPROVED UTILITIES CONTRACTOR TO MAKE THESE TAPS. ALL TAPS SHALL BE MADE IN STRICT CONFORMANCE TO CITY REQUIREMENTS. NO TAP SHALL BE MADE BEFORE THE TESTS ARE COMPLETE AND APPROVED. SANITARY SEWER SERVICE CONNECTIONS MAY BE INSTALLED BY THE DEVELOPER OF PROPERTY UPON REQUEST. THE APPLICATION (FORM SUPPLIED BY THE CITY) SHOULD BE COMPLETED AND SENT TO THE DIRECTOR OF TRU. MATERIAL FOR THESE SERVICES WILL BE OBTAINED BY THE CONTRACTOR. MATERIALS USED IN MAKING THE SANITARY SEWER SERVICE CONNECTION SHALL CONFORM TO DETAIL 71B-19. FERNCO DONUT REQUIRED WHEN TYING INTO TEES. (SEE SECTION 8.03 FOR ADAPTERS AND FURTHER REQUIREMENTS FOR TAPS INTO PVC SEWER PIPE.) ALL MATERIAL WILL BE INSPECTED FOR COMPLIANCE BY TRU INSPECTOR PRIOR TO INSTALLATION. ALL SERVICES WILL BE INSPECTED PRIOR TO BACKFILL OPERATION FOR COMPLIANCE. THE BACKFILL AND COMPACTION OPERATION SHALL BE ACCORDING TO STANDARD PROCEDURE, AND THE STANDARD SPECIFICATIONS INCLUDING SECTION NO. 5.05. ALL TAPS SHALL BE MADE IN A METHOD APPROVED BY THE TRU, AND ACCORDING TO STANDARD DETAILS INCLUDING 71B-19. ALL TAPS INSTALLED BY CUTTING INTO THE SEWER MAIN SHALL BE MADE WITH THE USE OF A TAPPING/CORING MACHINE IF SADDLES ARE USED. (THE USE OF A HAMMER AND CHISEL OR OTHER MANUAL IMPACT METHODS WILL NOT BE ALLOWED.) ANY CUSTOMER SERVICE CONNECTION REQUIRED TO BE INSTALLED INTO ANY OUTFALL SANITARY SEWER LINE WILL BE TIED INTO EITHER A PROPOSED MANHOLE SHOWN ON THE PROJECT PLANS OR INTO AN ADDED MANHOLE AS REQUIRED AND APPROVED BY THE CITY ENGINEER. SEE SECTION 8.21 FOR SMOKE TESTING REQUIREMENT ON EXISTING TAPS TO BE RECONNECTED. PAVEMENT CUTS ACROSS PUBLIC STREETS FOR SERVICES SHALL BE AVOIDED. THE CONTRACTOR SHALL INSTALL THESE LINES USING AN AIR PRESSURE DRIVEN, PNEUMATIC "MOLE" OR AN AUGER TYPE MACHINE. IF AN OPEN CUT IS UNAVOIDABLE, THE CONTRACTOR SHALL SECURE APPROVAL FROM THE CITY ENGINEER PRIOR TO MAKING ANY STREET CUT FOR A SERVICE LINE. ALL TAP LOCATIONS SHALL BE SHOWN ON THE "AS-BUILT" PLANS AND SHALL BE MARKED ON THE TOP OF THE CURB WITH “ARROW” INDICATING THE WATER AND “X” INDICATING THE SEWER . SEE SECTION 2.34 FOR ADDITIONAL AS-BUILT REQUIREMENTS. 8.19 FORCE MAINS PIPE MATERIAL FOR FORCE MAINS SHALL BE EITHER CEMENT LINED DUCTILE IRON PIPE AS SPECIFIED IN SECTION 9.03 HEREIN OR PVC AWWA C- 900 AS SPECIFIED IN SECTION 9.02 HEREIN. ALL FORCE MAINS SHALL BE TESTED IN ACCORDANCE TO SECTION 9.12 HEREIN WITH THE MINIMUM TEST PRESSURE BEING 100 PSI. ALL BLOCKING/RESTRAINING FOR THE FITTINGS SHALL BE DESIGNED TO WITHSTAND THE TEST PRESSURE. A PROPERLY SIZED AND APPROVED AIR RELEASE VALVE IN A STANDARD MANHOLE SHALL BE PROVIDED AT ALL HIGH POINTS WHERE A NEGATIVE PRESSURE OF 10' MAY BE PRODUCED. A WEEP PIT OF NO. 57 STONE SHALL BE PROVIDED SIMILAR TO STANDARD DETAIL 71B-17. AIR RELEASE VALVES SHALL BE APPROVED BY THE CITY ENGINEER 8.22 ABANDONMENT AND SHUTDOWN OF EXISTING OPERATIONS OF UTILITIES THE CONTRACTOR SHALL SUPPLY ALL NECESSARY LABOR, EQUIPMENT, AND MATERIALS TO PLUG AND ABANDON IN PLACE THE EXISTING SANITARY SEWER OUTFALL SYSTEM AS INDICATED ON THE PROJECT PLANS. CONTINUOUS OPERATION OF THE CITY'S EXISTING SEWER SYSTEM IS OF CRITICAL IMPORTANCE. CONNECTION TO EXISTING SERVICES OR UTILITIES, OR OTHER WORK THAT REQUIRES THE TEMPORARY SHUTDOWN OF ANY EXISTING OPERATIONS OR UTILITIES SHALL BE PLANNED IN DETAIL WITH APPROPRIATE SCHEDULING OF THE WORK AND COORDINATED WITH THE UTILITY CUSTOMER AND THE ENGINEER. THE APPROVED SCHEDULE FOR SHUTDOWN OR RESTART SHALL BE INDICATED ON THE CONTRACTOR'S PROGRESS SCHEDULE, AND ADVANCE NOTICE SHALL BE GIVEN IN ORDER THAT THE CUSTOMER AND THE ENGINEER MAY WITNESS THE SHUTDOWN, TIE-IN, AND START-UP. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION OF EACH PROPERTY OWNER PRIOR TO DISRUPTION OF SERVICE, EXCEPT IN THE EVENT OF AN EMERGENCY SITUATION. THE CONTRACTOR SHALL COORDINATE HIS ACTIVITIES WITH ANY NON-CITY OWNED UTILITY. ONLY CITY PERSONNEL SHALL OPERATE ANY VALVES AND CONTROLS ON THE CITY'S EXISTING UTILITY SYSTEMS. THE TESTING, ACCEPTANCE, TAP AND MAINLINE TIE-OVERS SHALL BE COORDINATED SO AS TO ELIMINATE ANY DISRUPTIONS IN SERVICE. A SPILL, LEAKAGE, OR BY-PASS OF WASTEWATER SHALL NOT BE ALLOWED, THE CONTRACTOR AND HIS SURETIES SHALL HOLD HARMLESS AND DEFEND THE CITY FROM ANY PENALTIES WHICH MAY RESULT THEREOF. ALL MATERIALS AND EQUIPMENT (INCLUDING EMERGENCY EQUIPMENT) NECESSARY TO EXPEDITE THE TIE-IN SHALL BE ON HAND PRIOR TO THE SHUTDOWN OF EXISTING SERVICES OR UTILITIES. ALL EXISTING SEWER TAPS SHALL BE SMOKE TESTED (OR OTHER APPROVED METHOD) PRIOR TO RECONNECTION, TO MAKE SURE THAT NO CONNECTION OF STORM WATER OR OTHER IDENTIFIED ILLEGAL INFLOW IS PRESENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SUPPLY ALL LABOR, MATERIALS, AND EQUIPMENT TO PERFORM THESE TESTS AND TO NOTIFY THE RESIDENTS OF SUCH PLANNED TESTS. IT WILL BE THE CITY'S RESPONSIBILITY TO NOTIFY THE OWNER OF ANY ILLEGAL INFLOWS FOUND, AND TO BE SURE ALL REMEDIES ARE IN PLACE PRIOR TO ALLOWING THE CONTRACTOR TO CONNECT THE TAP TO THE NEW SEWER LINE, AND THAT THE REMEDIES ARE COMPLETED IN A TIMELY MANNER TO ALLOW THE CONTRACTOR TO COMPLETE HIS CONSTRUCTION WITHOUT ANY UNDUE DELAY. 8.23 DEMOLITION OF EXISTING MANHOLES FOLLOWING COMPLETION OF REPLACEMENT OF SEWER LINES AND CONNECTION OF HOUSE LATERALS, PLUG ALL SEWER LINES AT EACH MANHOLE ON THE ABANDONED SYSTEM WITH NON-SHRINK GROUT. REMOVE THE ABANDONED MANHOLES TO DEPTH OF 4 FEET BELOW GRADE AND FILL THE VOID WITH WASHED STONE TO 18-INCHES BELOW GRADE. THE WASHED STONE FILL SHALL BE COVERED WITH APPROVED FILTER FABRIC. FILL THE REMAINING WITH TOP SOIL. WHERE THE MANHOLE IS IN A PAVED AREA THE REMAINING SHALL BE FILLED WITH ABC TO THE BOTTOM OF THE UTILITY CUT PATCH. RESTORE ALL AFFECTED AREAS. 8.24 PROGRESS OF PIPE LINE CONSTRUCTION THE WORK SHALL PROCEED IN A SYSTEMATIC MANNER SO THAT A MINIMUM OF INCONVENIENCE WILL RESULT TO THE PUBLIC IN THE COURSE OF CONSTRUCTION. IT IS, THEREFORE, NECESSARY TO CONFINE OPERATIONS TO AS SMALL A LENGTH OF WORK AREA PER CREW AS IS PRACTICAL. NORMALLY, THE TRENCHING EQUIPMENT SHALL NOT BE FARTHER THAN 200 FEET AHEAD OF EACH PIPE LAYING CREW OR SUCH DISTANCE AS NECESSARY TO PROVIDE MAXIMUM SAFETY. BACKFILL THE TRENCH SO NO SECTION OF PROPERLY LAID PIPE IS LEFT UNCOVERED LONGER THAN IS ABSOLUTELY NECESSARY. THE SAFETY CONDITIONS OF OPEN EXCAVATIONS SHALL BE THE CONTRACTOR'S RESPONSIBILITY. COMPLETELY BACKFILL AND CLEAN UP AFTER EACH SECTION OF PIPE HAS BEEN INSPECTED AND APPROVED. 8.25 PROTECTION OF EXISTING STRUCTURES EXISTING STRUCTURES ADJACENT TO THE PROJECT ARE SUSCEPTIBLE TO VIBRATION AND SETTLEMENT DAMAGE. THE CONTRACTOR IS ADVISED THAT HE MUST TAKE EXTREME CARE AND IN SOME CASES MUST IMPLEMENT SPECIAL CONSTRUCTION PROCEDURES WHEN PROCEEDING WITH HIS WORK TO ASSURE THAT THESE STRUCTURES ARE NOT DAMAGED. THE CONTRACTOR SHALL EXERCISE EXTREME CARE AND TAKE ALL PRECAUTIONS DURING EXCAVATION AND CONSTRUCTION OPERATIONS TO PREVENT DAMAGE TO ANY EXISTING STRUCTURE. ANY DAMAGE CAUSED BY THE CONTRACTOR SHALL BE REPORTED IMMEDIATELY TO THE CITY OF GASTONIA AND SUCH WORK SHALL BE REPAIRED AND/OR REPLACED BY THE CONTRACTOR IN A MANNER APPROVED BY THE CITY OF GASTONIA. ALL COSTS TO REPAIR AND/OR REPLACE ANY DAMAGE TO EXISTING STRUCTURES SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND SUCH REPAIR OR REPLACEMENT SHALL BE PERFORMED EXPEDITIOUSLY WITHOUT COST TO THE CITY OF GASTONIA. 9.0L WATER DISTRIBUTION PIPE ALL PIPE USED FOR WATER DISTRIBUTION LINES SHALL BE POLYVINYL CHLORIDE, OR CEMENT LINED ZINC COATED DUCTILE IRON PIPE. IT IS THE INTENT OF THIS SPECIFICATION TO PROVIDE PIPE OF THE HIGHEST STANDARD KNOWN TO THE TRADE AND TO PROVIDE PIPE THAT IS FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS. ALL PIPES AND OTHER MATERIALS SHALL BE FIRST CLASS MATERIALS AND NO USED OR SECOND HAND MATERIALS WILL BE PERMITTED. FOR PIPE SIZES TWO INCHES IN DIAMETER, EITHER COPPER TYPE K SOFT OR PVC PIPE SHALL BE USED. “MUNIPEX” CROSS LINKED POLYETHYLENE PIPE WILL BE CONSIDERED ON A CASE BY CASE BASIS. FOR PIPE SIZES SIX INCHES, EIGHT INCHES, OR TEN INCHES IN DIAMETER, EITHER CEMENT LINED ZINC COATED DUCTILE IRON PIPE (PC350), OR PVC (C-900-75) SHALL BE USED. FOR PIPE SIZES TWELVE INCHES OR SIXTEEN INCHES IN DIAMETER CEMENT LINED ZINC COATED DUCTILE IRON PIPE SHALL BE USED (MIN. PC350). FOR PIPE SIZES IN EXCESS OF SIXTEEN INCHES IN DIAMETER, THE CITY ENGINEER SHALL SPECIFY TYPE OF PIPE TO BE USED. SEE SECTION 2.0 FOR GENERAL INFORMATION INCLUDING BUT NOT LIMITED TO LAYOUT, STAKING, AND R/W REQUIREMENTS. FOR SPECIAL CONDI TIONS REQUIRING FERROUS MATERIAL PIPE SEE SECTION 2.10. 9.02POLYVINYL CHLORIDE WATER PIPE 2” PVC ALL 2" PVC PIPE SHALL BE MANUFACTURED AND TESTED WITHIN THE UNITED STATES OF AMERICA. IT SHALL BE TWIN GASKETED COUPLING OR INTEGRAL BELL AND O-RING RUBBER GASKET TYPE PIPE. ALL 2" PVC PIPE SHALL BE SUITABLE FOR USE AT A MAXIMUM HYDROSTATIC WORKING PRESSURE OF 200 PSI AT 730 FAHRENHEIT (STANDARD DIMENSION RATIO SDR 21) , AND SHALL CONFORM TO THE REQUIREMENTS AS SET FORTH IN COMMERCIAL STANDARD NO. CS-256063, ASTM 1598- 63T, ASTM D-2241 OR THE LATEST SUBSEQUENT REVISION. PVC PIPE SHALL COMPLY WITH AND SHALL BEAR THE NATIONAL SANITATION FOUNDATION (NSF) SEAL OF APPROVAL. ALL 2" PVC PIPE AND FITTINGS SHALL BE MADE FROM CLEAN, VIRGIN NSF APPROVED TYPE I, GRADE I POLYVINYL CHLORINE CONFORMING TO ASTM D 1784 RESIN SPECIFICATION ( EQUIVALENT TO, NEW CELL CLASSIFICATION 12454-B ). ALL 2" PVC WATER PIPE SHALL BE FURNISHED IN STANDARD LAYING LENGTHS OF 20 FEET, PLUS OR MINUS ONE INCH AND SHALL HAVE ONE OR BOTH ENDS TAPERED FOR USE WITH A TWIN GASKETED COUPLING OR WITH THE INTEGRAL THICKENED-WALL BELL. EACH COUPLING OR BELL SHALL ALLOW FOR THE CONTRACTION AND EXPANSION AT THE JOINTS. JOINTS SHALL BE SEALED WITH A GASKET OR RUBBER O-RING IN ACCORDANCE TO THE MANUFACTURER'S INSTRUCTIONS. COUPLINGS SHALL PERMIT 50 DEFLECTION (2-1/2 DEGREE EACH SIDE) OF THE PIPE WITHOUT ANY EVIDENCE OF INFILTRATION, EXFILTRATION, CRACKING OR BREAKING. SEE SECTION 9.11 ALSO. LUBRICATION USED ON JOINTS SHALL BE WATER SOLUBLE, NON-TOXIC, NON-OBJECTIONABLE TO TASTE AND ODOR IMPORTED TO THE FLUID, NON- SUPPORTING OF BACTERIA GROWTH AND HAVE NO DETERIORATING EFFECT ON THE PVC PIPE OR RUBBER GASKET , AS RECOMMENDED BY AWWA AND THE PIPE MANUFACTURER. ALL 2" PVC PIPE AND FITTINGS SHALL BE STORED AND PROTECTED FROM DIRECT SUNLIGHT TO PREVENT WARPING OR DEFORMATION UNTIL INSTALLED. MAXIMUM ACCUMULATED EXPOSURE SHALL BE SIX (6) MONTHS, WITH NO VISIBLE DEFECTS. ANY VISIBLE DEFECTS INCLUDING BUT NOT LIMITED TO CHALKING, DISCOLORATION, BLISTERS, OR LOSS OF SHEEN SHALL BE CAUSE FOR THE PIPE TO BE REJECTED AND REPLACED. ANY TESTING SUGG ESTED IN LIEU OF THE ABOVE SHALL BE AT THE MANUFACTURER'S EXPENSE, ALL SUCH TEST SHALL BE PERFORMED BY AN INDEPENDENT LABORATORY. ALL PIPE WHICH HAS WARPED OR OTHERWISE DEFORMED SHALL BE REJECTED AND SHALL BE REMOVED FROM THE PROJECT. 6”, 8”, 10” PVC PIPE ALL 6”, 8”, AND 10" PVC PIPE INSTALLED IN THE TRU SYSTEM SHALL BE DR-14 PRESSURE PIPE CONFORMING TO AWWA C-900, LATEST REVISION. DR 18 PVC MAY BE ALLOWED (IN LOW PRESSURE ZONES) . ALL OUTSIDE DIAMETERS SHALL BE COMPATIBLE WITH CAST AND DUCTILE IRON FITTINGS. ALL 6”, 8”, AND 10" PVC PIPE SHALL BE FURNISHED WITH AN ELASTOMERIC-GASKETED COMPRESSION TYPE JOINT, AND THE APPROPRIATE GASKET(S) SHALL BE FURNISHED WITH EACH LENGTH OF PIPE. PIPE BELLS SHALL BE INTEGRAL TO THE PIPE, SLEEVE COUPLINGS ARE NOT PERMITTED. ALL 6", 8", AND 10" PVC PIPES AND MATERIALS ARE TO BE TESTED ACCORDING TO THE REQUIREMENTS OF AWWA STANDARD C-900, LATEST REVISION. CERTIFIED TEST RESULTS SHALL BE PROVIDED TO THE CITY ENGINEER WHEN REQUESTED. THESE TESTS SHALL BE PERFORMED BY AN INDEPENDENT TESTING LABORATORY AT THE EXPENSE OF THE PIPE MANUFACTURER. ALL PVC PIPE SHALL BE MANUFACTURED AND TESTED WITHIN THE UNITED STATES OF AMERICA. ALL 6”, 8”, AND 10" PVC WATER PIPE WILL BE SHIPPED, STORED, AND STRUNG AT THE PROJECT IN A MANNER AS TO BE PROTECTED FROM TOTAL ACCUMULATED EXPOSURE TO SUNLIGHT AND POSSIBLE ULTRAVIOLET RADIATION OF NO MORE THAN SIX (6 ) MONTHS, WITH NO VISIBLE DEFECTS. ANY VISIBLE DEFECTS INCLUDING BUT NOT LIMITED TO CHALKING, DISCOLORATION, BLISTERS, OR LOSS OF SHEEN SHALL BE CAUSE FOR THE PIPE TO BE REJECTED AND REPLACED. ANY TESTING SUGGESTED IN LIEU OF THE ABOVE SHALL BE AT THE MANUFACTURER'S EXPENSE, ALL SUCH TEST SHALL BE PERFORMED BY AN INDEPENDENT LABORATORY. WHEN THE PLANS AND/OR PROPOSAL CALLS FOR THE USE OF PVC PIPE, A 14 GAUGE SOLID COPPER WIRE SHALL BE ATTACHED ON TOP OF THE P IPE TO AID IN LOCATING THE PIPE. THIS WIRE SHALL BE SECURED TO THE PIPE WITH DUCT TAPE NEAR EACH BELL AND AT THE CENTER OF EACH JOINT OF PIPE. THE WIRE SHALL BE FASTENED SECURELY TO EACH MAIN LINE VALVE AND FIRE HYDRANT. TRACER WIRE SHALL BE TESTED WITH A PIPE LOCATOR BEFORE ACCEPTANCE OF PROJECT. ANY SPLICE CONNECTION SHALL BE AS APPROVED BY THE CITY ENGINEER. 9.03 CEMENT LINED ZINC COATED DUCTILE IRON WATER PIPE DUCTILE IRON PIPE SHALL BE MANUFACTURED AND TESTED IN THE U.S.A. AND SHALL CONFORM TO AWWA SPECIFICATION C-151 AND ANSI STANDARD #A21-51 OR LATEST REVISION. CEMENT LININGS WITH AN ASPHALTIC SEAL COAT FOR DUCTILE IRON PIPE SHALL CONFORM TO AWWA SPECIFICATION C-104. SPECIAL LININGS SHALL BE SPECIFIED IN THE SPECIAL PROVISIONS EXTERIOR OF DUCTILE IRON PIPE SHALL BE COATED WITH A LAYER OF ARC-SPRAYED ZINC PER ISO 8179. THE MASS OF ZINC APPLIED SHALL BE 200 G/M2 OF PIPE SURFACE AREA. AN ASPHALTIC TOPCOAT LAYER SHALL BE APPLIED OVER THE ZINC TO A MINIMUM 2 MIL THICKESS. ZINC COATING SYSTEM SHALL CONFORM TO ISO 8179-1 “DUCTILE IRON PIPES - EXTERNAL ZINC BASED COATING - PART 1, SECOND EDITION 2004-06-01 OR LATEST REVISION. DUCTILE IRON PIPE SHALL BE MECHANICAL JOINT OR PUSH-ON JOINT TYPE. PUSH-ON TYPE JOINTS SHALL BE "BELL-TITE", "FASTITE", “TYTON”, OR APPROVED EQUAL. ALL JOINTS FOR DUCTILE IRON PIPE SHALL CONFORM TO THE APPLICABLE DIMENSIONS AND WEIGHTS SHOWN IN THE TABLES IN AWWA C-151 AND TO ANSI A-21.11 (AWWA C-111) OR LATEST REVISION. ALL PIPE SHALL BE CLEAN AND SOUND WITHOUT DEFECTS THAT WILL IMPAIR THEIR SERVICE. REPAIRING OF DEFECTS BY WELDING OR OTHER M ETHODS SHALL NOT BE ALLOWED. ALL PIPE SHALL HAVE AN OUTSIDE COATING OF A PETROLEUM ASPHALT COATING APPROXIMATELY 1 MIL THICK, AS PER AWWA. THE COATING SHALL BE APPLIED TO THE OUTSIDE OF ALL PIPE AND THE FINISHED COATING SHALL BE CONTINUOUS, SMOOTH, NEITHER BRITTLE WHEN COLD NOR STICKY WHEN EXPOSED TO THE SUN, AND SHALL BE STRONGLY ADHERENT TO THE PIPE. THICKNESS FOR ALL DUCTILE IRON PIPE IN THIS CONTRACT SHALL BE AS RECOMMENDED FOR THE PROPOSED DEPTH OF COVER IN THE "DESIGN OF DUCTILE IRON PIPE", AS PUBLISHED BY THE DUCTILE IRON PIPE RESEARCH ASSOCIATION, OR AS SHOWN ON THE PROJECT PLANS (WITH THE MINIMUM BEING PRESSURE CLASS 350). SEE FITTINGS FOR SPECIAL THICKNESS REQUIRED WITH RETAINING GLANDS FLANGED DUCTILE IRON PIPE FLANGED DUCTILE IRON SHALL BE CEMENT-MORTAR LINED AND SHALL CONFORM TO AWWA C-115, C-151 AND ANSI A21.15, A21.51 AS TO METAL THICKNESS AND QUALITY AND THE CEMENT LINING TO AWWA/ANSI C-104/A21.4, UNLESS SPECIFIED OTHERWISE. THE THICKNESS CLASS OR CLASSES SHALL BE 53. FLANGES SHALL BE SCREW TYPE, FACED AND DRILLED 125-POUND ANSI. FLANGES AND BOLTS SHALL CONFORM TO ANSI B16.1. THE DUCTILE IRON PIPE AND FLANGES SHALL BE RATED FOR 250 P.S.I. WORKING PRESSURE. GASKETS FOR FLANGED PIPE GASKET MATERIAL FOR FLANGED JOINTS IN CAST IRON SHALL BE CLOTH-INSERTED SHEET RUBBER GASKETS CONFORMING TO AWWA C207 AND ANSI B16.21, 1/8 INCH THICK. THE GASKET SHALL BE FULL-CUT, WITH HOLES TO PASS BOLTS. GASKET MATERIAL SHALL BE FREE FROM CORROSIVE ALKALI OR ACID INGREDIENTS. POLYETHYLENE ENCASEMENT POLYETHYLENE MATERIAL, THICKNESS AND WIDTH, SHALL CONFORM TO LATEST REVISION OF AWWA/ANSI C-105/A21.5 . ONLY TUBES SHALL BE USED ON THE MAIN PIPELINE. MINIMUM THICKNESS SHALL BE 8 MIL. THE INSIDE SURFACE OF THE POLYETHYLENE WRAP TO BE IN CONTACT WITH THE PIPE EXTERIOR SHALL BE INFUSED WITH A BLEND OF ANTIMICROBIAL BIOCIDE TO MITIGATE MICROBIOLOGICALLY INFLUENCED CORROSION AND A VOLATILE CORROSION INHIBITOR TO CONTROL GALVANIC CORROSION. POLYETHYLENE ENCASEMENT SHALL BE INSTALLED WHERE SHOWN ON THE DRAWINGS ON DUCTILE IRON PIPE, FITTINGS, AND VALVES IN ACCORDANCE WITH AWWA C105. METHOD C, USING POLYETHYLENE SHEETS, SHALL ONLY BE USED WHEN DIRECTED BY THE ENGINEER. 9.04 GATE VALVES ALL GATE VALVES SHALL HAVE A CAST IRON BODY, FULLY BRONZE MOUNTED, RESILIENT SEATED WEDGE VALVES WITH MECHANICAL JOINT HUBS AND SHALL BE PLACED AT LOCATIONS INDICATED ON CITY APPROVED PLANS IN ACCORDANCE TO CITY STANDARDS. GATE VALVES SHALL, OPEN COUNTERCLOCKWISE ( LEFT ), SHALL BE A NON-RISING STEM TYPE WITH 2-INCH SQUARE OPERATING NUT AND SHALL BE AWWA C-509 STANDARD DESIGN FOR 200 PSI WORKING PRESSURE FOR 12” AND SMALLER. GATE VALVES FOR 14-INCH OR LARGER DIAMETER PIPES SHALL BE BEVEL GEARED WITH GEAR CASE AND INDICATOR, GREASE PACKED, AND SHALL INCLUDE A 3-INCH BY-PASS AND VALVE (UNLESS AWWA SPECIFIES A LARGER BYPASS FOR THE SIZE VALVE), FOR HORIZONTAL INSTALLATION. AS PER AWWA SPEC., ALL SUCH VALVES SHALL INCLUDE ROLLERS, SCRAPERS, AND TRACKS, AND SHALL BE AWWA C-500 STANDARD DESIGN FOR 150 PSI FOR ALL 14” AND LARGER; UNLESS SPECIFIED OTHERWISE IN THE SPECIAL PROVISIONS OR PROPOSAL. GATE VALVES SHALL BE THOSE SHOWN ON THE CITY'S APPROVED MATERIALS LIST OR AN APPROVED EQUAL. GATE VALVES SHALL BE PLACED AS SHOWN ON CITY STANDARD DRAWING 71B-6 AND ON THE CITY APPROVED PLANS OR AS DIRECTED BY THE CITY ENGINEER. THE GATE VALVE SHALL BE INSTALLED SO THAT THE OPERATING STEM IS PLUMB, LENGTHWISE IN THE TRENCH. VALVE BOXES SHALL BE CENTERED OVER THE OPERATING NUT AND SHALL STAND PLUMB, WITH THE TOP OF THE VALVE BOX SET FLUSH WITH THE FINISHED SURFACE. BOXES SHALL BE SET IN SUCH A MANNER THAT THE OPERATING WRENCH MAY BE INSERTED ON THE OPERATING NUT AND THE VALVE OP ERATED WITHOUT UNDUE STRESS OR DIFFICULTY. VALVES INSTALLED AT DEAD END MAINS SHALL BE SECURELY RODDED IN ACCORDANCE WITH CITY STANDARD DRAWING 71B-9 FROM THE PLUG TO THE VALVE AND FROM THE VALVE TO THE DEADMAN. THIS WILL ALLOW THE FUTURE REMOVAL OF THE DEAD END PLUG. 9.05TAPPING SLEEVE AND VALVE ALL TAPPING SLEEVES AND VALVES SHALL BE CAST IRON OR DUCTILE IRON AND BE MANUFACTURED AND TESTED WITHIN THE U.S.A. ACCORDING TO AWWA SPECIFICATIONS. ALL TAPPING SLEEVES AND VALVES SHALL BE AS PER THE CITY'S APPROVED MATERIALS LIST OR AN APPROVED EQUAL. ALL TAPPING SLEEVES SHALL BE FULL SIZE CIP OR DIP, MJ WITH SPLIT/BOLTED GLANDS; OR FULL BODY STAINLESS STEEL. ALL TAPPING SLEEVES SHALL BE THOSE AS APPROVED BY THE CITY ENGINEER. 9.06 WATER PIPE FITTINGS FOR ALL WATER LINES GREATER THAN TWO-INCHES IN DIAMETER, ALL FITTINGS SHALL BE CAST/DUCTILE IRON MECHANICAL JOINT AND SHALL HAVE A MINIMUM WORKING PRESSURE OF 150 PSI, SHALL BE MANUFACTURED AND TESTED WITHIN THE U.S.A. AND SHALL MEET AWWA C-110 STANDARDS AND (ANSI 21.11) FOR MECHANICAL JOINT PIPE. FITTINGS FOR TWO-INCHES IN DIAMETER SHALL BE SAME MATERIAL SPECIFICATION AS THE PIPE MATERIAL. COMPACT DUCTILE IRON FITTINGS MAY BE USED IN LIEU OF THE STANDARD CAST IRON OR DUCTILE IRON FITTINGS. ALL COMPACT DUCTILE IRON FITTINGS SHALL BE MECHANICAL JOINT AND SHALL HAVE A MINIMUM WORKING PRESSURE OF 350 PSI, SHALL BE MANUFACTURED AND TESTED WITHIN THE U.S.A. AND SHALL MEET AWWA/ANSI C-153/A21-53 AND AWWA/ANSI C-LLL/A21.11 FOR MECHANICAL JOINT PIPE. ALL FITTINGS LARGER THAN TWO (2) INCHES IN DIAMETER SHALL HAVE A CEMENT-MORTAR LINING AND SEAL COATING IN ACCORDANCE WITH AWWA/ANSI C-104/A21.4. DUCTILE IRON FITTINGS MAY BE ALSO SUPPLIED WITH A 6-8 MIL NOMINAL THICKNESS FUSION BONDED EPOXY COATING INTERNALLY AND EXTERNALLY, CORNFORMING TO THE REQUIREMENTS OF AWWA/ANSI C550 AND C116/A21.16. ALL TEE, BENDS, PLUGS, ETC. SHALL BE INSTALLED IN ACCORDANCE TO STANDARD DETAILS 71B-6 THRU 71B-9B. RETAINER GLANDS MAY BE USED IN LIEU OF TIE RODS AND CONCRETE BLOCKING FOR THE INSTALLATION OF BENDS, AND FIRE HYDRANT LEG VALVES AND FITTINGS. RETAINER GLANDS WILL NOT BE ALLOWED FOR USE WITH PLUGS ON THE END OF A LINE. ALL RETAINER GLANDS SHALL BE USED WITH MECHANICAL JOINT DUCTILE IRON OR CAST IRON PIPE AND FITTINGS; AND SHALL MEET SPECIFICATIONS AWWA C-111 (ANSI A21-11) LATEST REVISION, FOR RUBBER GASKET JOINTS TABLE 11-1 MECHANICAL JOINT DIMENSION. RETAINER GLANDS FURNISHED SHALL BE APPROVED BY FACTORY MUTUAL, UNDERWRITER'S LABORATORIES, AND THE CITY ENGINEER FOR THE CITY OF GASTONIA. FLANGED FITTINGS SHALL CONFORM TO ANSI B16.1 AND SHALL BE FACED AND DRILLED 125-POUND ANSI. THE FITTINGS SHALL BE 250 PSI RATED WORKING PRESSURE AND CEMENT-MORTAR LINED TO SAME THICKNESS SPECIFIED FOR PIPE. RETAINING GLANDS, DIP RETAINING GLANDS FOR USE ON DUCTILE IRON MECHANICAL JOINT PIPE SHALL BE AS SPECIFIED HEREIN. MINIMUM PRESSSURE CLASS 350 DIP MAY BE USED WITH RETAINING GLANDS THAT INCORPORATE THE USE OF BREAKAWAY AT SPECIFIED TORQUE "AUTO TORK" BOLTS AND CONTOURED WEDGE FACE CONTACTS TO THE PIPE, OR WITH RETAINING GLANDS THAT INCORPORATE MACHINED SERRATIONS FOR EXACT FIT AND 360O CONTACT AND SUPPORT OF THE PIPE WALL, SAME AS SPECIFIED IN "RETAINING GLANDS, PVC". RETAINING GLANDS, PVC JOINT RESTRAINT DEVICES FOR PVC PIPE SHALL CONSIST OF MULTIPLE GRIPPING WEDGES INCORPORATED INTO A FOLLOWER GLAND MEETING THE APPLICABLE REQUIREMENTS OF ANSI/AWWA C110/A21.10. RESTRAINT DEVICES SHALL BE MANUFACTURED OF HIGH STRENGTH DUCTILE IRON, ASTM A 536, GRADE 65-45-12. BOLTS/CONNECTING HARDWARE SHALL BE OF HIGH STRENGTH LOW ALLOW MATERIAL IN ACCORDANCE WITH AWWA/ANSI C111/A21.11. ALL JOINT RESTRAINT DEVICES FOR PVC SHALL CARRY A WATER WORKING PRESSURE RATING EQUIVALENT TO THE FULL RATED PRESSURE OF THE PVC PIPE THEY ARE INSTALLED ON, WITH A MINIMUM OF 2:1 SAFETY FACTOR IN ANY NOMINAL PIPE SIZE. IN ADDITION, THEY SHALL MEET OR EXCEED THE REQUIREMENTS ASTM STANDARD F1674, STANDARD TEST METHOD FOR JOINT RESTRAINT FOR PRODUCTS FOR USE WITH POLYVINYL CHLORIDE (PVC) PIPE. NOTARIZED CERTIFICATION FROM THE MANUFACTURER OF THE RESTRAINT DEVICE SHALL BE PROVIDED WITH SUBMITTALS. RESTRAINT DEVICES SHALL BE AS ON THE CITY'S APPROVED MATERIAL LIST OR AN APPROVED EQUAL. SOLID SLEEVES - CAST IRON SLEEVE COUPLING WITH MECHANICAL JOINT ENDS AND ALLOY BOLTS AND FOLLOWER. USE PIPE MANUFACTURER'S STANDARD SLEEVE. FLAP VALVES SHALL BE CLOW FLANGED END FLAP VALVE MODEL F-3012, TROY MODEL A-2540-6, OR APPROVED EQUAL. 9.07 VALVE BOXES VALVE BOXES SHALL BE STANDARD CAST IRON EXTENSION VALVE BOXES 5-1/4 INCH SHAFT FOR THE APPROPRIATE COVER OVER THE PIPE, NORMALLY 36" TO 48". ALL VALVE BOXES SHALL BE CAST IRON AND SHALL BE THOSE MANUFACTURED AND TESTED WITHIN THE U.S.A. ALL BOXES SHALL BE TWO SECTIONS WITH BOTH TOP AND BOTTOM SECTIONS EQUIPPED WITH A FLANGE FOOTING. ADJUSTMENTS TO VARYING DEPTHS SHALL BE BY A SLIDI NG JOINT. SCREW TYPE EXTENSIONS ARE NOT ACCEPTABLE. VALVE BOX DEPTH SHALL BE COMPATIBLE FOR ADJUSTMENT FOR THE DEPTH OF WATER LINE BURY, CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE BURY DEPTH NECESSARY. SEE DETAIL 71B-7 FOR PROTECTOR RING DIMENSIONS FOR LOCATIONS OUTSIDE THE PAVEMENT SECTION VALVE BOXES SHALL BE THOSE LISTE ON THE CITY'S APPROVED MATERIAL LIST OR AN APPROVED EQUAL. 9.08 FIRE HYDRANTS FIRE HYDRANTS SHALL BE CAST IRON BODY, FULL BRONZE MOUNTED, SUITABLE FOR A WORKING PRESSURE OF 150 POUNDS PER SQUARE INCH AND SHALL BE IN ACCORDANCE WITH THE LATEST SPECIFICATION OF THE AWWA FIRE HYDRANTS SHALL BE CONSTRUCTED IN A MANNER PERMITTING WITHDRAWAL OF INTERNAL WORKING PARTS WITHOUT DISTURBING THE BARREL OR CASTING. HYDRANTS SHALL HAVE A BREAKABLE SAFETY FLANGE IN THE BARREL AND SAFETY COUPLING IN VALVE STEM. FIRE HYDRANT VALVE, WHEN SHUT, SHALL BE REASONABLY TIGHT WHEN UPPER PORTION OF BARREL IS BROKEN OFF. VALVE OPENING SHALL BE AT LEAST 4 -1/2" IN DIAMETER, WITH NET AREA OF WATERWAY AT SMALLEST PART, WITH VALVES WIDE OPEN, NOT LESS THAN 120 PERCENT OF VALVE OPENING. HOSE NIPPLES SHALL BE BRONZE OR NON-CORROSIVE METAL. EACH HYDRANT SHALL HAVE TWO 2-1/2" NIPPLES, NATIONAL STANDARD THREADS AND ONE STEAMER NOZZLE OPENING 4-7/8" O. D. , WITH THREADS OR FITTINGS CONFORMING TO THE LOCAL FIRE JURISDICTION STANDARD. HYDRANTS SHALL BE PAINTED WITH ONE COAT OF ZINC CHROMATE PRIMER AND ONE COAT (ACCEPTABLE FOR FINAL COAT) OF PORCELAINIZED ENAMEL, STANDARD COLOR AS USED BY THE LOCAL FIRE DEPARTMENT, OR APPROVED EQUAL. ALL CAST IRON PARTS BELOW GROUND LINES SHALL BE COATED WITH A BLACK ASPHALTUM VARNISH. FIRE HYDRANTS SHALL BE AS LISTED ON THE CITY'S APPROVED MATERIAL LIST. HYDRANTS SHALL BE SET ON A BASE OF TWELVE INCHES (12") OF THOROUGHLY COMPACTED WASHED STONE. THE HYDRANT SHALL BE SECURELY RODDED/RESTRAINED IN ACCORDANCE WITH CITY STANDARD DRAWING NO. 71B-9 TO PREVENT BLOWING-OFF UNDER PRESSURE. ALL HYDRANTS SHALL BE SET PLUMB. CLEAN, COARSE WASHED STONE SHALL BE PLACED AROUND THE BARREL OF THE HYDRANT TO WITHIN TWELVE INCHES (12") OF THE GROUND LEVEL AND SHALL CONFORM TO THE TYPICAL SECTION AS SHOWN ON CITY STANDARD DRAWING NOS. 71B-7, 71B-8, 71B-9, AS APPLICABLE. CARE SHALL BE EXERCISED TO AVOID EARTH MATERIALS BEING MIXED WITH THE STONE BACKFILL MATERIAL. THE FIRE HYDRANT ASSEMBLY (WHICH WOULD INCLUDE THE HYDRANT, 6" VALVE AND VALVE BOX, 1-6" TEE, 2 SECTIONS OF 6" PIPE, RODDING, AND OTHER FITTINGS) SHALL BE CAST IRON WITH MECHANICAL JOINT CONNECTIONS. SLIP JOINT PIPE OR FITTINGS WILL NOT BE PERMITTED FOR FIRE HYDRANT ASSEMBLIES. HYDRANTS SHALL HAVE 6-INCH MECHANICAL JOINT HUB WITH STRAPPING LUGS, PENTAGON OPERATING NUT (1-1/4" MEASURED FROM ONE FLAT SIDE TO AN OPPOSITE POINT). THE HYDRANT VALVE SHALL OPEN IN A CLOCKWISE (RIGHT) DIRECTION AND THE DIRECTION OF OPENING SHALL BE INDICATED ON THE HEAD OF THE HYDRANT. FIRE HYDRANTS SHALL BE INSTALLED, AS SHOWN ON CITY OF GASTONIA STANDARD DRAWING 71B-6 THRU 71B-9, AS SHOWN ON THE APPROVED PLANS, OR AS DIRECTED BY THE CITY ENGINEER. ALL NEW FIRE HYDRANTS INSTALLED OR EXISTING FIRE HYDRANTS TAKEN OUT OF SERVICE SHALL BE KEPT "BAGGED" OR "TAGGED", INDICATING THEM AS BEING OUT OF SERVICE. THE CONTRACTOR SHALL MAINTAIN THIS INDICATION UNTIL THE WATER SYSTEM HAS BEEN APPROVED BY THE CITY OF GASTONIA FOR PLACING INTO SERVICE. THE CONTRACTOR SHALL THEN REMOVE THE "BAGS" OR "TAGS" AS HE CHECKS ALL VALVES TO MAKE SURE THE SYSTEM IS IN SERVICE.PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)UTILITY NOTESR103 WATER DISTRIBUTION NOTESWATER DISTRIBUTION NOTESWATER DISTRIBUTION NOTES 9.09 BLOW-OFF VALVES BLOW-OFF VALVES SHALL BE CONSTRUCTED AT THE END OF ALL DEAD END LINES, EXCEPT WHERE THERE IS A FIRE HYDRANT INSTALLED ON THE LINE WITHIN FIFTY (50) FEET OF THE DEAD END OF THE LINE. SEE SECTION 9.04 FOR RODDING TO DEADMAN. A TEMPORARY BLOW-OFF VALVE MAY BE PROVIDED FOR CLEANING AND TESTING OF THE LINE DURING CONSTRUCTION. AFTER ALL TESTS HAVE BEEN COMPLETED AND THE LINE APPROVED, THE CONTRACTOR SHALL REMOVE THE TEMPORARY BLOW-OFF VALVE AND REPLACE IT WITH A T/2 PLUG OR A TWO- INCH PLUG. PIPE MATERIALS FOR 3/4" AND 2" BLOW-OFFS SHALL BE ALL BRASS (IPS) PIPE CONFORMING TO ASTM B43-02(2004) OR LATEST REVISION. FITTINGS SHALL BE BRASS, CONFORMING TO ASTM B62-02 OR LATEST REVISION, OR FEDERAL SPECIFICATION WW-P-460. WHEN THE INSTALLATION IS BEHIND CURB AND GUTTER OR BEHIND THE SHOULDER OF THE ROAD, A CITY STANDARD WATER METER BOX, AS APPRO VED BY THE PUBLIC WORKS/UTILITIES DIRECTOR OR THE CITY ENGINEER, MAY BE USED IN LIEU OF THE TWO STANDARD VALVE BOXES, AS SHOWN ON DETAIL 71B-9B. 9.10 TRENCH EXCAVATION WATER LINES SHALL BE LAID AT THE LOCATION AS SHOWN ON CITY STANDARD DRAWING NO. 71D-15, 71D-15A AND 71B-6 THRU 71B-9, AND UNLESS OTHERWISE SPECIFIED OR SHOWN ON THE PLANS SHALL HAVE A NOMINAL COVER OF THIRTY-SIX (36") INCHES FOR 2-INCH, 6-INCH, AND 8-INCH PIPE AND FORTY-TWO (42") INCHES FOR ALL PIPE TEN (10") INCHES OR MORE IN DIAMETER. UTILITY AND STORM DRAINAGE CROSSINGS MAY REQUIRE DEEPER INSTALLATIONS. THE CONTRACTOR SHALL “POTHOLE” EXCAVATE AT KNOWN UTILITY CROSSING LOCATIONS FOR THE IDENTIFICATION OF CONFLICTS AND ADJUSTMENT OF ALIGNMENT AND GRADE ACCORDINGLY. SEE SECTIONS 8.17 (A) AND 5.05 FOR COMPACTION TEST REQUIREMENTS. TRENCH STABILIZATION (#57 WASHED STONE) WILL BE REQUIRED WHEN A WET OR POOR SUB-GRADE CONDITION IS ENCOUNTERED BY THE CONTRACTOR AND WHEN IN THE CITY ENGINEER'S OPINION OTHER PROPER FOUNDATIONS CANNOT BE PROVIDED. REFER TO STANDARD SPECIFICATIONS SECTION 10.02 FOR ADDITIONAL REQUIREMENTS. WASHED STONE SCREENING DUST SHALL BE SPREAD PRIOR TO PLACING ANY TRENCH MATERIAL ON ANY PAVEMENT. THIS IS TO ALLOW FOR THE THROUGH CLEANING OF THE PAVEMENT ( NO DISCOLORATION OR DEBRIS ). ROCK EXCAVATION EXCAVATION OF HARD ROCK, LEDGE ROCK, OR BOULDERS LARGER THAN TWO CUBIC YARDS WHICH CAN NOT BE RIPPED, CLAWED, ETC., AND OR RE MOVED BY CONVENTIONAL CONSTRUCTION METHODS WILL BE CONSIDERED AS ROCK EXCAVATION. ALL BLASTING OPERATIONS (USE OF EXPLOSIVES) SHALL BE CONDUCTED IN STRICT ACCORDANCE WITH EXISTING LAWS, RULES, AND REGULATION S RELATIVE TO THE STORAGE AND USE OF EXPLOSIVES. BLASTING SHALL BE PERFORMED ONLY BY EXPERIENCED PERSONNEL WORKING ACCORDING TO ACCEPTED PRACTICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS INCLUDING, BUT NOT LIMITED TO THE CITY FIRE DEPARTMENT. THE CONTRACTOR SHALL COMPLY WITH THE CITY'S STANDARD SPECIFICATIONS INCLUDING, BUT NOT LIMITED TO SECTION 2.06. EXTREME CARE SHALL BE EXERCISED BY THE CONTRACTOR TO PREVENT INJURY TO ANY EXISTING PIPES, WATER, SEWER, GAS, POLES, WIRES, CABLES, DRAINS, BUILDINGS OR OTHER STRUCTURES OR UTILITIES EITHER BELOW OR ABOVE THE SURFACE OF THE GROUND. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGE RESULTING FROM THE USE OF EXPLOSIVES. WHERE THERE IS ANY POSSIBILITY OF DAMAGE BEING CAUS ED BY BLASTING IT MAY BE NECESSARY TO RESORT TO DRILLING AND WEDGING TO REMOVE THE ROCK. ANY ROCK ENCOUNTERED SHALL BE EXCAVATED SIX INCHES (6") BELOW THE SUBGRADE OF THE PIPE BED. 9.11 PIPE LAYING AT THE START OF CONSTRUCTION, ANY EXISTING VALVES TO BE USED AS ISOLATION VALVES TO THE NEW PROJECT LINES, SHALL BE VISUALLY INSPECTED BY THE INSPECTOR, CONTRACTOR, AND AS NECESSARY BY TRU REPRESENTATIVE. ANY LEAKS SHALL BE REPAIRED OR ISOLATION CONSTRUCTION METHOD USED, SEE SECTION 9.14. EACH JOINT OF PIPE SHALL BE LAID ACCORDING TO MANUFACTURES RECOMMENDATIONS AND IN ACCORDANCE WITH LATEST REVISION OF AWWA C -600 FOR DUCTILE IRON AND CAST IRON PIPE, AND AWWA C-900 FOR PVC. THE NOMINAL ALLOWABLE DEFLECTION FOR ALL THE PIPES LISTED SHALL BE 1/2 OF THE MANUFACTURER'S RECOMMENDED MAXIMUM DEFLECTION PER JOINT. THE ENGINEER MAY VARY FROM THIS CITY POLICY WHEN PRUDENT. COMPETENT PIPE LAYERS SHALL BE REQUIRED FOR PIPE INSTALLATION. THE CONTRACTOR SHALL PLUG ALL PIPE ENDS, AT THE END OF EACH DAYS WORK. WHERE ROCK IS ENCOUNTERED, THE ROCK SHALL BE EXCAVATED A MINIMUM OF SIX INCHES BELOW THE PIPE GRADE AND THE CUT SHALL BE BACK FILLED TO GRADE WITH AN APPROVED EARTH MATERIAL. 9.12 HYDROSTATIC TESTS THE CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT AND TESTS. AFTER THE PIPE HAS BEEN LAID AND PARTIALLY BACKFILLED AND BEFORE ANY SERVICE TAPS HAVE BEEN MADE, THE NEWLY LAID PIPE AND APPURTENANCES SHALL BE SUBJECT TO A HYDROSTATIC PRESSURE AND LEAKAGE TEST. THE OPERATING PRESSURE GRADIENT AT THE LOWEST POINT OF THE PROPOSED SYSTEM SHALL BE DETERMINED BY ONE OF THE FOLLOWING METHODS AS DIRECTED BY THE CITY ENGINEER. (a) THE OPERATING GRADIENT PRESSURE SHALL BE DETERMINED AT A SIMILAR POINT ON THE EXISTING SYSTEM IN THE IMMEDIATE AREA OF THE PROJECT. (b) THE PRESSURE GRADIENT SHALL BE TAKEN AT THE LOWEST POINT ON THE PROPOSED SYSTEM. AFTER THE OPERATING PRESSURE GRADIENT HAS BEEN DETERMINED, THE TEST PRESSURE SHALL BE 50 PERCENT GREATER THAN OPERATING PRESSURE GRADIENT. IN NO CASE SHALL THE TEST PRESSURE BE LESS THAN 125 PSI, THE MAXIMUM TEST PRESSURE SHALL BE 200 PSI. NO TEST SHALL BE MADE FOR AT LEAST 36 HOURS AFTER THE LAST CONCRETE THRUST OR REACTION BLOCK HAS BEEN POURED WITH HIGH EARLY-STRENGTH CEMENT OR AT LEAST SEVEN DAYS AFTER THE LAST CONCRETE THRUST OR REACTION BLOCK HAS BEEN CAST WITH STANDARD CEMENT. THE DURATION OF THE TEST SHALL BE TW O HOURS, UNLESS OTHERWISE DIRECTED BY THE CITY ENGINEER. EACH SECTION OF THE PIPELINE SHALL BE SLOWLY FILLED WITH WATER AND THE SPECIFIED TEST PRESSURE SHALL BE APPLIED BY MEANS OF A PUMP CONNECTED TO THE PIPE IN A MANNER SATISFACTORY TO THE CITY ENGINEER. THE PUMP, PIPE CONNECTIONS, AND ALL NECESSARY APPARATUS SHALL BE FURNISHED BY THE CONTRACTOR. THE CONTRACTOR SHALL ALSO FURNISH THE NECESSARY PERSONNEL TO ADMINISTER THE TEST UNDER THE INSPECTION OF THE CITY ENGINEER OR HIS REPRESENTATIVE. SEE SECTION 2.02 FOR USE OF CITY WATER. DURING THE FILLING OF THE PIPE AND BEFORE THE APPLICATION OF THE SPECIFIED TEST PRESSURE, ALL AIR SHALL BE EXPELLED FROM THE PIPELINE, ADDITIONAL CORPORATION STOPS/CURB STOPS MAY BE NECESSARY. DURING THE TEST, ALL PIPE, FITTINGS, VALVES, HYDRANTS, AND COUPLIN GS SHALL BE CAREFULLY EXAMINED FOR LEAKAGE. PRESSURE IN THE NEW WATER LINE SHALL BE MAINTAINED WITHIN 5 PSI OF THE TEST PRESSURE. THE TEST PRESSURE SHALL BE MAINTAINED FOR AT LEAST TWO HOURS, AFTER WHICH THE PRESSURE OF THE LINE SHALL BE MEASURED AND LOGGED BY THE CITY INSPECTOR. ANY WATER ADDED TO MAINT AIN THE TEST PRESSURE SHALL BE LOGGED BY THE CITY INSPECTOR. IF THIS PRESSURE IS LESS THAN THE REQUIRED TEST PRESSURE, THE CONTRACTOR SHALL ADD MEASURED AMOUNTS OF WATER UNTIL THE LINE IS BROUGHT BACK TO THE TEST PRESSURE. THE AMOUNT OF WATER ADDED SHALL THEN BE COMPA RED TO THE ALLOWABLE LEAKAGE VALUES FROM THE AWWA FORMULA BELOW. ANY JOINT OR SECTION OF PIPE WHICH IS NOT WITHIN THE ALLOWABLE VALUE SHALL BE REJECTED AND SHALL BE REPLACED OR REPAIRED AND THE TEST SHALL THEN BE REPEATED UNTIL THE RESULTS ARE SATISFACTORY. TABLE 1. AWWA ALLOWABLE LEAKAGE FORMULA L = ND ( SQUARE ROOT OF P ) 7400 L = ALLOWABLE LEAKAGE IN GPH N =NO. COUPLINGS (JOINTS) D =DIAMETER OF PIPE IN INCHES P = AVERAGE TEST PRESSURE IN PSI NOTE: WHEN TESTING AGAINST CLOSED METAL-SEATED VALVES, AN ADDITIONAL LEAKAGE PER CLOSED VALVE OF 0.0078 GAL./HR./IN. OF NOMINAL VALVE SIZE WILL BE ALLOWED. WHERE LINES HAVE BEEN ONLY PARTIALLY BACKFILLED OR WHERE LINES HAVE BEEN UNCOVERED FOR INSPECTION OR CORRECTION, THE CONTRACT OR SHALL BACKFILL AND TAMP THESE AREAS AS PRESCRIBED ELSEWHERE IN THESE SPECIFICATIONS. CARE SHALL BE TAKEN NOT TO DISTURB OR DAMAGE THE PIPE. 9.13 TAPS/SERVICE CONNECTIONS (WATER) ONLY AUTHORIZED PERSONNEL OF THE CITY OF GASTONIA UTILITIES DEPARTMENT SHALL BE PERMITTED TO MAKE WATER TAPS UNLESS THE DEVELOPER HAS RECEIVED PERMISSION, IN WRITING, FROM THE CITY'S PUBLIC WORKS AND PUBLIC UTILITIES DIRECTOR OR DESIGNATED REPRESENTATIVE, FOR AN APPROVED UTILITIES CONTRACTOR TO MAKE THESE TAPS. ALL TAPS SHALL BE MADE, WITH THE WATER MAIN UNDER NORMAL OPERATING PRESSURE, IN STRICT CONFORMANCE TO CITY REQUIREMENTS. NO TAP SHALL BE MADE BEFORE THE PRESSURE AND STERILIZATION TESTS ARE COMPLETE AND APPROVED. WHERE EXISTING WATER LINES ARE TO BE ABANDONED, THE CONTRACTOR WILL BE REQUIRED TO ABANDON AND PLUG THE WATER LINES AND SERVICE TAPS. THE CONTRACTOR SHALL ALSO INSTALL A NEW TAP/SERVICE CONNECTION FROM THE NEW WATER LINE TO THE EXISTING METER. THE NEW TAPS AND ABANDONING OF THE OLD LINES SHALL BE PERFORMED IN ORDER TO CAUSE THE LEAST DISRUPTION IN SERVICE AS IS POSSIBLE. NO TAPS MAY BE INSTALLED UNTIL ALL TESTS ARE COMPLETED AND APPROVED. WATER SERVICE CONNECTIONS MAY BE INSTALLED BY THE DEVELOPER OF PROPERTY UPON REQUEST. THE APPLICATION (FORM SUPPLIED BY THE CITY) SHOULD BE COMPLETED AND SENT TO THE DIRECTOR OF TRU. MATERIAL FOR THESE SERVICES WILL BE OBTAINED BY THE CONTRACTOR WITH THE EXCEPTION OF WATER METERS. MATERIALS USED IN MAKING THE WATER SERVICE CONNECTION SHALL BE AS AS APPROVED BY TRU TAP APPROVALS ARE SUBJECT TO CHANGE WITHOUT NOTICE, AS SUCH A CURRENT LIST OF APPROVED TAP MATERIALS WILL BE AVAILABLE AT THE TWO RIVERS UTILITIES, 1300 N. BROAD ST. ALL MATERIAL WILL BE INSPECTED FOR COMPLIANCE BY WATER AND SEWER DIVISION INSPECTOR PRIOR TO INSTALLATION. ALL SERVICES WILL BE INSPECTED PRIOR TO BACKFILL OPERATION FOR COMPLIANCE. THE BACKFILL AND COMPACTION OPERATION SHALL BE ACCORDING TO STANDARD PROCEDURE, AND THE STANDARD SPECIFICATIONS INCLUDING SECTION 5.05. ALL TAPS SHALL BE MADE IN A METHOD APPROVED BY THE CITY ENGINEER, AND ACCORDING TO STANDARD DETAILS INCLUDING 71B-20, 71B-21, 71B-22 AND ANY SPECIAL PROJECT DETAILS INCLUDED IN THE PLANS. IN THE EVENT THAT A WATER METER IS COLLOCATED WITH A PROPOSED DRIVEWAY, THE WATER METER SHALL BE RE-LOCATED OUT OF THE PROPOSED DRIVEWAY. NO FITTINGS WILL BE PERMITTED IN THE RELOCATION OF THE WATER METER. IF THE WATER METER CANNOT BE EFFECTIVELY RELOCATED WITHOUT THE USE OF FITTINGS, THE BUILDER/DEVELOPER SHALL INSTALL A NEW SERVICE LINE OF SUFFICIENT LENGTH OF PIPE, FROM THE CORPORATION STOP AT THE MAIN TO THE NEW METER LOCATION. PAVEMENT CUTS ACROSS PUBLIC STREETS FOR SERVICES SHALL BE AVOIDED. THE CONTRACTOR SHALL INSTALL THESE LINES USING AN AIR PRE SSURE DRIVEN, PNEUMATIC "MOLE" OR AN AUGER TYPE MACHINE. IF AN OPEN CUT IS UNAVOIDABLE, THE CONTRACTOR SHALL SECURE APPROVAL FROM THE CITY ENGINEER PRIOR TO MAKING ANY STREET CUT FOR A SERVICE LINE. NO WATER TAP SHALL BE PERMITTED UNTIL THE CURB AND GUTTER HAS BEEN INSTALLED. ALL TAP LOCATIONS SHALL BE PLUSED IN ON THE "AS-BUILT" PLANS AND SHALL BE MARKED ON THE TOP OF THE CURB WITH “ARROW” INDICATING THE WATER AND “X” INDICATING THE SEWER . SEE SECTION 2.34 FOR ADDITIONAL AS-BUILT REQUIREMENTS. 9.14 STERILIZATION OF COMPLETED LINES THE CONTRACTOR, BEFORE ANY NEW PIPE IS PLACED INTO SERVICE, SHALL FILL, DISINFECT, AND TEST THE LINE AS PER AWWA C-651, LATEST REVISION. THE LINES SHALL BE FILLED SLOWLY TO ELIMINATE ANY POSSIBILITIES OF BACKFLOW OR CONTAMINATION OF THE EXISTING LINES WITH THE HIGH CL2 CONTENT WATER. ISOLATION VALVES ON THE SYSTEM SHALL BE COVERED WITH STONE ( OR TAGGED ) TO INHIBIT ANY ACCIDENTAL OPENING AND CONSEQUENTLY CROSS CONTAMINATION, SEE SECTION 9.11. TO FILL, ONLY ONE VALVE SHALL BE OPEN AT ANY GIVEN TIME. IF PROPER TECHNIQUE IS NOT DEMONSTRATED BY THE CONTRACTOR, THE CITY MAY REQUIRE HIM TO ISOLATE HIS NEW CONSTRUCTION AND FILL AND TEST W ITH A CROSS-CONNECTION CONTROL DEVICE AS APPROVED BY THE CITY ENGINEER, SEE AWWA C-651 OPTIONAL SEC. 4.3.9. IF ISOLATION IS REQUIRED , THEN THE SUBSEQUENT FINAL TIE-IN SHALL BE A SANITARY TIE-IN AS DESCRIBED IN AWWA C-651 SECTION 4.6. THE CONTRACTOR SHALL DISINFECT THE LINE BY THE ADDITION AND THOROUGH DISPERSION OF A CHLORINE SOLUTION (DERIVED FROM LIQUID CHLORINE BLEACH) IN CONCENTRATIONS SUFFICIENT TO PRODUCE A CHLORINE RESIDUAL OF AT LEAST 100 PPM IN THE WATER THROUGHOUT THE DISTRIBUTION SYSTEM. THIS SOLUTION MUST REMAI N IN THE LINES FOR AT LEAST 24 HOURS, AFTER WHICH THE CHLORINE RESIDUAL SHALL BE AT LEAST 10 PPM. THEN THE LINES ARE TO BE FLUSHED BY THE CONTRACTOR AND BACTERIOLOGICAL SAMPLES TAKEN BY THE CITY INSPECTOR. NO WATER SHALL BE TURNED ON FOR PUBLIC USE UNTIL STERILI ZATION APPROVAL IS GIVEN BY THE CITY. THE FOLLOWING TEST PROCEDURES SHALL BE INCORPORATED IN CONJUNCTION WITH THE ABOVE : 1)A CITY CONSTRUCTION INSPECTOR MUST BE PRESENT TO OPERATE EXISTING VALVES WHEN FLUSHING OR FILLING A NEW LINE. 2) LIQUID BLEACH ( INDUSTRIAL STRENGTH, 15% FREE CL2 ) SHALL BE USED AS THE DISINFECTANT. 3) AFTER FLUSHING THE DISINFECTING SOLUTION FROM NEW LINES, THE INSPECTOR SHALL TAKE SAMPLES (FOR CHEMICAL ANALYSIS) FROM BOTH THE NEW WATER LINES AND THE CITY MAINTAINED LINES BEING USED AS A WATER SOURCE. AFTER SAMPLES ARE COLLECTED FOR A CHEMICAL ANALYSIS THE NEW LINE IS TO BE LEFT IDLE FOR A MINIMUM OF 24 HOURS. AFTER THE 24 HOUR PERIOD, SAMPLES SHALL AGAIN BE COLLECTED FROM THE NEW LINE AND THE CITY MAINTAINED LINES FOR CHEMICAL AND BACTERIOLOGICAL ANALYSIS. THESE SAMPLES WILL BE ANALYZED TO DETERMINE IF THE NEW LINE HAS BEEN ADEQUATELY DISINFECTED. 4)ALL CHEMICAL AND BACTERIOLOGICAL SAMPLES MUST BE DELIVERED TO THE CITY LAB (BY THE INSPECTOR) NO LATER THAN 3:00 P.M. MONDAY-FRIDAY. 5)ALL NEW LINES SHALL BE FLUSHED AT A VELOCITY OF 4 FEET PER SECOND FOR SUFFICIENT TIME TO DISCHARGE A MINIMUM OF 2 TIMES THE TOTAL VOLUME OF THE ENTIRE LINE. ADDITIONAL FLUSHING MAY BE REQUIRED AS DEEMED NECESSARY BY THE FIELD ENGINEERS. THE RESPONSIBILITIES OF SAMPLE COLLECTION WILL BE SHARED BETWEEN CONSTRUCTION INSPECTIONS AND THE CITY LAB. CONSTRUCTION INSPECTIONS WILL COORDINATE AND COLLECT THE INITIAL SET OF SAMPLES FOR EACH SEGMENT OF NEW WATER LINES; THE CITY LAB WILL COL LECT THE FOLLOW-UP SAMPLES. IF THE TEST RESULTS ARE NOT ACCEPTABLE, THE CONTRACTOR SHALL REPEAT STERILIZATION AND RETEST LINES. THE CITY RESERVES THE RIGHT TO MAKE ANY TESTS ON THE SYSTEM BY CITY EMPLOYEES AS MAY BE DEEMED NECESSARY BY THE CITY ENGINEER. ONLY AUTHORIZED PERSONNEL OF THE CITY SHALL OPERATE VALVES IN THE EXISTING DISTRIBUTION SYSTEM. 9.15 TEMPORARY PLUGS THE CONTRACTOR SHALL SEAL OFF ALL EXPOSED ENDS OF PIPE BEFORE TERMINATING WORK AT ANYTIME. AT THE END OF EACH DAYS WORK OR AT ANY TIME THE PIPE LAYING OPERATION IS STOPPED OR DELAYED, THE CONTRACTOR SHALL PROVIDE A WATER TIGHT SEAL AT ALL EXPOSED ENDS OF PIPE OR FITTINGS. 9.16 BACKFLOW PREVENTION ALL BACK FLOW DEVICES SHALL BE AS PER AWWA C-506, LATEST REVISION. PROPER TYPE BACKFLOW PREVENTION DEVICES MUST BE INSTALLED ON WATER LINES DESIGNED TO SERVE NON-POTABLE WATER SYSTEMS SUCH AS SPRINKLER FIRE PROTECTION SYSTEMS AND IRRIGATION SYSTEMS. IF ANY CHEMICALS SUCH AS ANTI-FREEZE CHEMICALS ARE TO BE ADDED INTO SPRINKLER FIRE PROTECTION SYSTEMS, REDUCED PRESSURE BACKFLOW PREVENTERS MUST BE INSTALLED. IF NO CHEMICALS ARE TO BE ADDED INTO SPRINKLER FIRE PROTECTION SYSTEMS, DOUBLE DETECTOR CHECK VALVE ASSEMBLIES OR REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTERS MUST BE PROVIDED . ALL BACKFLOW PREVENTION DEVICES MUST HAVE A DETECTOR METER UNLESS METERED SEPARATELY. ALL BACKFLOW PREVENTION DEVICES MUST BE APPROVED BY THE FOUNDATION FOR CROSS-CONNECTION CONTROL & HYDRAULIC RESEARCH, UNIVERSITY OF SOUTHERN CALIFORNIA. PLANS AND SPECIFICATIONS FOR EACH BACKFLOW PREVENTION DEVICE SHALL BE SUBMITTED TO AND APPROVED BY THE N.C. DEPARTMENT OF HUMAN RESOURCES FOR THE SPECIFIED DEGREE OF HAZARD IN ADDITION TO APPROVAL BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. THE UTILITY DEPT. SHALL KEEP AN UP TO DATE LIST OF APPROVED BACKFLOW DEVICES, THE CONTRACTOR SHALL USE SAID MATERIAL CURRENT AT THE TIME OF APPROVAL OF A CUSTOMER SERVICE. SEE SECTION 9.14 FOR BACKFLOW PREVENTION DURING TESTING/FILLING. 9.17 AIR RELEASE VALVE THE CONTRACTOR SHALL SUPPLY ALL MATERIAL, EQUIPMENT, AND LABOR NECESSARY TO INSTALL AND CONSTRUCT AIR RELEASE VALVES IN LOCATIONS SHOWN ON THE PROJECT PLANS OR AS DIRECTED BY THE CITY ENGINEER. THE AIR VALVE SHALL BE INSTALLED IN AN APPROVED PRECAST MANHOLE AC CORDING TO STANDARD DETAIL 71B-17, LATEST REVISION. ALL “AIR RELEASE VALVES” SHALL BE IRON-BODIED, BRONZE MOUNTED WITH 1” OR 2” AIR VALVE OPENING, AND SHALL BE ABLE TO WITHSTAND A HYDROSTATIC TEST PRESSURE OF 350 P.S.I. ALL “AIR RELEASE VALVES” SHALL BE WITH VACUUM CHECK UNIT AND SHALL BE AS LISTED IN THE CITY'S APPROVED MATERIALS LIST. 9.18 ABANDONMENT AND SHUTDOWN OF EXISTING OPERATIONS OF UTILITIES, TIE-INS, RODDING/BLOCKING VERIFICATION THE CONTRACTOR SHALL SUPPLY ALL NECESSARY LABOR, EQUIPMENT, AND MATERIALS TO PLUG AND ABANDON IN PLACE THE EXISTING WATER DISTRIBUTION SYSTEM AS INDICATED ON THE PROJECT PLANS. CONTINUOUS OPERATION OF THE CITY'S EXISTING WATER SYSTEM IS OF CRITICAL IMPORTANCE. CONNECTION TO EXISTING SERVICES OR UTILITIES, OR OTHER WORK THAT REQUIRES THE TEMPORARY SHUTDOWN OF ANY EXISTING OPERATIONS O R UTILITIES SHALL BE PLANNED IN DETAIL WITH APPROPRIATE SCHEDULING OF THE WORK AND COORDINATED WITH THE UTILITY CUSTOMER AND THE ENGINEER . THE APPROVED SCHEDULE FOR SHUTDOWN OR RESTART SHALL BE INDICATED ON THE CONTRACTOR'S PROGRESS SCHEDULE, AND ADVANCE NOTICE SHALL BE GIVEN IN ORDER THAT THE CUSTOMER AND THE ENGINEER MAY WITNESS THE SHUTDOWN, TIE-IN, AND START-UP. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION OF EACH PROPERTY OWNER PRIOR TO DISRUPTION OF SERVICE, EXCEPT IN THE EVE NT OF AN EMERGENCY SITUATION. THE CONTRACTOR SHALL COORDINATE HIS ACTIVITIES WITH ANY NON-CITY OWNED UTILITY. ONLY CITY PERSONNEL SHALL OPERATE ANY VALVES AND CONTROLS ON THE CITY'S EXISTING UTILITY SYSTEMS. THE TESTING, ACCEPTANCE, TAP AND MAINLINE TIE-OVERS SHALL BE COORDINATED SO AS TO ELIMINATE ANY DISRUPTIONS IN SERVICE. SEE SECTION 9.12 AND 9.14 ALSO. ALL MATERIALS AND EQUIPMENT (INCLUDING EMERGENCY EQUIPMENT) NECESSARY TO EXPEDITE THE TIE-IN SHALL BE ON HAND PRIOR TO THE SHUTDOWN OF EXISTING SERVICES OR UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ANY AND ALL RODDING/BLOCKING PRIOR TO THE REMOVAL OF ITEMS INCLUDING BUT NOT LIMITED TO PLUGS, CAPS, AND FIRE HYDRANTS. THE VALVES ISOLATING THESE APPURTENANCES HAS TO BE RODDED TO THE ASSOCIATED TEE AND/OR DEADMAN, OR TEMPORARY BLOCKING IS REQUIRED PRIOR TO REMOVAL OF THE ITEMS SO MENTIONED. WHEN NECESSARY OR EXPEDIENT THE CONTRACTOR SHALL PROVIDE SUCH TEMPORARY BLOCKING. TEMPORARY BLOCKING IS LIMITING IN SCOPE AND SHOULD BE USED FOR ONLY SHORT PERIODS, NORMALLY LESS THAN ONE (1) DAY. PROGRESS OF PIPE LINE CONSTRUCTION THE WORK SHALL PROCEED IN A SYSTEMATIC MANNER SO THAT A MINIMUM OF INCONVENIENCE WILL RESULT TO THE PUBLIC IN THE COURSE OF CONSTRUCTION. IT IS, THEREFORE, NECESSARY TO CONFINE OPERATIONS TO AS SMALL A LENGTH OF WORK AREA PER CREW AS IS PRACTICAL. NORMALLY, THE TRENCHING EQUIPMENT SHALL NOT BE FARTHER THAN 200 FEET AHEAD OF EACH PIPE LAYING CREW OR SUCH DISTANCE AS NECESSARY TO PROVIDE MAXIMUM SAFETY. BACKFILL THE TRENCH SO NO SECTION OF PROPERLY LAID PIPE IS LEFT UNCOVERED LONGER THAN IS ABSOLUTEL Y NECESSARY. THE SAFETY CONDITIONS OF OPEN EXCAVATIONS SHALL BE THE CONTRACTOR'S RESPONSIBILITY. COMPLETELY BACKFILL AND CLEAN UP AFTER EACH SECTION OF PIPE HAS BEEN INSPECTED AND APPROVED. 9.19 DRY BORE AND JACK (HIGHWAY UNDERCROSSINGS) THE CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO INSTALL THE WATER LINE WITHOUT OPEN CUTTING THE PAVEMEN T WHERE INDICATED ON THE PLANS. THE ENCASING PIPE MAY BE JACKED THROUGH DRY BORES SLIGHTLY LARGER THAN THE PIPE, BORED PROGRES SIVELY AHEAD OF THE LEADING EDGE OF THE PIPE. CONTINUOUS CHECK SHALL BE MADE AS TO THE ELEVATION, GRADE, AND ALIGNMENT OF EACH SUCC ESSIVE SECTION OF PIPE AS WELL AS THE TRACKS UPON WHICH THE BORING RIG TRAVELS. THE BORING OPERATION SHALL BE CONTINUOUS TO ITS COMPLETION. IN THE EVENT AN OBSTRUCTION IS ENCOUNTERED DURING THE BORING AND JACKING, THE AUGER IS TO BE WITHDRAWN AND THE EXCESS PIPE CU T OFF, CAPPED, AND FILLED WITH 1:3 PORTLAND CEMENT GROUT AS SUFFICIENT PRESSURE TO FILL ALL VOIDS. A NEW SITE WILL T HEN PICKED FOR A NEW BORE. IF AN OPEN CUT IS ALLOWED, THEN THE ABORTED LENGTH SHALL BE UTILIZED AND PAID FOR AT 100% OF THE UNIT BID PRICE FOR COMPLETED BORES. THE REMAINING LENGTH ALLOWED TO BE INSTALLED BY OPEN CUT SHALL BE PAID AS PER PIPE INSTALLED BY OPEN CUT AS DESCRIBED IN SECT IONS INCLUDING BUT NOT LIMITED TO 9.01 AND 9.14. THE CARRIER PIPE SHALL BE PROTECTED SO AS TO PREVENT AS MUCH FOREIGN MATERIAL FROM ENTERING AS IS POSSIBLE. THIS INSTALLATION WILL HAVE TO PASS THE TESTS IN THE SECTION 9.13 BEFORE IT CAN BE PLACED INTO SERVICE. SEE SPECIAL PROVISIONS AND PLANS FOR CONTROLLING AGENT NOTIFICATION REQUIREMENTS. THE OPERATION ACROSS THE HIGHWAY RIGHT-OF-WAY MUST CONFORM TO REQUIREMENTS OF THE PERMITTER. EXECUTE ALL NECESSARY AGREEMENTS AND/OR PERMITS BEFORE ENTERING UPON OR COMMENCING ANY WORK IN THE HIGHWAY RIGHT-OF-WAY. COMPLY, ALSO, WITH THE APPLICABLE REQUIREMENTS OF THE GENERAL CONDITIONS AND THE SUPPLEMENTARY CONDITIONS. THE WATER LINE CARRIER PIPE SHALL BE CLASS 52 DUCTILE IRON PIPE, MECHANICAL JOINT WITH RETAINING GLANDS. THE MINIMUM GAUGE OR WALL THICKNESS SHALL CORRESPOND TO THE SIZE OF CASING SELECTED FROM THE FOLLOWING. HOWEVER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING THE GAUGE CONSISTENT WITH HIS OPERATION: GAUGE TABLE FOR RAILROAD CROSSINGS MINIMUM WALL THICKNESS FOR SMOOTH STEEL CASING PIPE FOR E80 LOADING (ASTM A139 GRADE B; AWWA C-200) NOMINAL DIAMETER (INCHES) WHEN COATED OR CATHODICALLY WHEN NOT COATED NOMINAL THICKNESS (INCHES) OR CATHODICALLY PROTECTED PROTECTED NOMINAL THICKNESS (INCHES) 12-3/4 AND UNDER 0.188 0.188 14 0.188 0.250 16 0.219 0.281 18 0.250 0.312 20 AND 22 0.281 0.344 24 0.312 0.375 26 0.344 0.406 28 0.375 0.438 30 0.406 0.469 32 0.438 0.500 34 AND 36 0.469 0.531 38 0.500 0.562 40 0.531 0.594 42 0.562 0.625 44 AND 46 0.594 0.656 48 0.625 0.688 50 0.656 0.719 52 0.688 0.750 54 0.719 0.781 56 AND 58 0.750 0.812 60 0.781 0.844 62 0.812 0.875 64 0.844 0.906 66 AND 68 0.875 0.938 70 0.906 0.969 72 0.938 1.000 THE EXTERIOR COAL-TAR ENAMEL PROTECTIVE COATING TO BE SUPPLIED IN ACCORDANCE WITH AWWA C-203, THE STEEL CASING PIPE MINIMUM THICKNESS MAY BE REDUCED BY 0.063 INCHES, AS PER THE TABLE FOR E80. GAUGE TABLE FOR NCDOT (STREET) CROSSINGS (H-20 LOADINGS) DIAMETER INCHESSMOOTH STEEL PIPE MINIMUM THICKNESS, INCHES 15-24ASTM A139, GRADE B 0.250 AWWA C-200 THE CONTRACTOR SHALL PROVIDE A STRAPPED TIMBER CRADLE UNDER BARREL OF PIPE, JOIN PIPE, AND SLIDE INTO CASING. PIPE BARRELS SH ALL BEAR CONTINUOUSLY ON CRADLES. SUPPORTS: CARRIER PIPE SHALL BE SUPPORTED ON EITHER APPROVED “SPIDER” SUPPORTS AS INDICATED ON THE PLANS (NOT LESS THAN TWO SUPPORTS PER LENGHTH OF PIPE), OR LUMBER SKIDS (PIPE BARREL SHALL BEAR CONTINUOUSLY ON SKIDS). LUMBER SHALL BE CEDAR, OR NO. 2 OR BETTER SOUTHERN YELLOW PINE. LUMBER SHALL BE PRESSURE TREATED WITH APPROVED ROT-RESISTANT TREATMENT FOR GROUND CONTACT. METHOD OF TREATMENT IN ACCORDANCE WITH THE APPLICABLE PORTION OF THE AWPA MANUAL STANDARDS. ALL TIMBERS SHALL BE CUT TO SIZE BEFORE THE MATERIAL IS GIVEN THE PRESERVATIVE TREATMENT. SEE STANDARD DETAIL 71B-25. STAINLESS STEEL BANDS: ONE-HALF INCH WIDE BY 0.020-INCH THICK, 304 STAINLESS STEEL BANDS, OR EQUAL. PRIOR TO THE START OF THE WORK, SUBMIT SATISFACTORY EVIDENCE TO THE ENGINEER THAT ALL BOND AND INSURANCE COVERAGE REQUIREMENT S CALLED FOR BY THE PERMITTER HAVE BEEN COMPLIED WITH. ALL PROPOSED CONSTRUCTION METHODS AND MATERIALS FOR THE UNDERCROSSING SHALL BE APPROVED BY THE ENGINEER AND PERMITTER PRIOR TO THE CROSSING OPERATION, AND NO CONSTRUCTION SHALL BE STARTED UNTIL WRITTEN AP PROVAL TO PROCEED FROM THE PERMITTER HAS BEEN SUBMITTED TO THE ENGINEER. PLACING SEALS AT ENDS OF CASING: AFTER THE CARRIER PIPE HAS BEEN TESTED AND APPROVED, PLACE 3/16-INCH BLACK NEOPRENE RUBBER SEALS, OR 8” MASONRY PLUG, AS SHOWN ON THE DRAWINGS. ENCROACHMENT APPROVAL MAY REQUIRE WEEP PITS, CONTRACTOR SHALL BE RESPONSIBLE TO CHECK WITH THE PERMIT REQUIREMENTS AND INCLUDE THEM IN HIS BID.PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)UTILITY NOTESR104 PROPOSED BOUNDARY INFORMATION PROPOSED TOPO INFORMATION PROPOSED EROSION CONTROL INFO PROPOSED PAVEMENT INFORMATION 234+00 PROPOSED UTILITY INFORMATION GV PROPOSED STRUCTURAL INFORMATION PLANTING INFORMATION PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)LEGENDR105 DESIGN SPEED = 30 MPH POSTED SPEED LIMIT = 25 MPH ABERDEEN BOULEVARD EXTENSION TRANSITION TOP OF CURB TO GUTTER ELEVATION R=20' 2' FULL DEPTH ASPHALTC&G 20' EXISTING 2'-6" CURB & GUTTER DETAIL 4 - CURB AND GUTTER END TREATMENT 2 1/2" MIN. MILL 25' TO 50' AS DIRECTED BY ENGINEER ADJACENT 1' MIN MIN. MILLING LIMITS TIE NEW PAVEMENT TO EXISTING MILL AND OVERLAY LANE WIDTH NEW PAVEMENT - FULL DEPTH (SEE CORRESPONDING TYPICAL SECTION FOR REQUIRED PAVEMENT STRUCTURE) SAWCUT EXISTING PAVEMENT WHERE REQUIRED TO SAWCUT EXISTING PAVEMENT TO INSTALL FULL DEPTH PAVEMENT, MILL FROM SAWCUT LOCATION TO NEXT ADJACENT LANE PRIOR TO SAWCUTTING EXISTING PAVEMENT AND INSTALLATION OF NEW PAVEMENT AND / OR NEW CURB AND GUTTER. DETAIL 1 - METHOD OF WEDGING DETAIL 2 - INCIDENTAL MILLING DETAIL 1.5" MIN. 1.5" 1 1/2" C3 C1 D2 D1 E2ORC2 3" MIN. U C1 U V1U 6 IN. MIN. EXCAVATION LINE 6 IN. 6 IN. E1 R1 DETAIL 6 - CONCRETE CURB & GUTTER, BITUMINOUS CONC. BASE COURSE DETAIL TYPICAL SECTION NO. 1 -L- STA 48+20.00 TO STA 75+12.02 CL -L- ABERDEEN BOULEVARD *SEE CROSS SECTIONS FOR ACTUAL CROSS SLOPES NOTES: 1) PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED. 2) SEE CROSS SECTIONS FOR SUPERELEVATION RATES. 3) USE REINFORCED SOIL SLOPES WHERE SLOPE IS GREATER THAN 2:1. PAVEMENT SCHEDULE D1 C2 C1 R1 (PRELIMINARY PAVEMENT DESIGN) T COMPACTED EARTH MATERIAL U EXISTING PAVEMENT W WEDGING DETAIL FOR RESURFACING 1'- 6" CONCRETE CURB AND GUTTER E1 V1 MILL APPROX. 1.5" AND REPLACE WITH 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YARD. PROP. APPROX. 2.0" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AT AN AVERAGE RATE OF 224 LBS. PER SQ. YARD. PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C, AT AN AVERAGE RATE OF 448 LBS PER SQ. YARD (ONE LIFT). PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YARD. R2 3 :1 (T Y P .) 2:1 (TYP.) EXISTING GROUND EXISTING GROUND 4 :1 (T Y P .) 0.020.08 11'7' 4' E1 D1 C2T 3:1 (TYP.) 2 :1 (T Y P .)EXISTING GROUND EXISTING GROUND 4:1 (TYP.) 0.02 0.08 11'7' 4' E1D1C2 T EXISTING GROUND EXISTING GROUND -L- STA 28+25 TO STA 32+25 GUARDRAIL EXISTING GROUND EXISTING GROUND CL -Y1- FUTURE ROAD EXISTING GROUND EXISTING GROUND 0.020.08 11'7' 4' E1 D1 C2T EXISTING GROUND EXISTING GROUND 0.02 0.08 E1D1C2 T 2'- 6" CONCRETE CURB AND GUTTER 2:1 1 .5 :1 M A X 2 :11.5:1 MAX 8" AGGREGATE BASE COURSE *SEE CROSS SECTIONS FOR ACTUAL CROSS SLOPES EXISTING GROUND EXISTING GROUND -Y- STA TO STA 6'2' GUARDRAIL 6'2' EXISTING GROUND EXISTING GROUND TYPICAL SECTION NO. 2 -Y- STA 29+00.00 TO STA 56+08.35 1.5:1 MAX1.5 :1 M A X 4 :1 (T Y P .) 2:1 (TYP.)3 :1 (T Y P .) 3:1 (TYP.) 2 :1 (T Y P .)4:1 (TYP.) 2:1 2 :1 M A X 2 :12:1 MAX 2:1 MAX2:1 M A X 6'2'2'6' 4'4' 4'4'PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)TYPICAL SECTIONSR200 PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)DETAILSR201 VARIABLE VARIABLE PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)DETAILSR202 PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)DETAILSR203 H. Scale:1"=40' | V. Scale: 1"=10' -L- ABERDEEN BOULEVARD PROPOSED GROUND EXISTING GROUND ELEVATION REPRESENTS EXISTING GROUND ELEVATION REPRESENTS PROPOSED GROUND BEGIN GRADE STA 48+20.00 (SEE ABERDEEN PHASE PLANS BEYOND THESE LIMITS) [][][] PROPOSED FULL DEPTH PAVEMENT LEGEND FOR PROPOSED IMPROVEMENTS PROPOSED OVERLAY PROPOSED MILL AND INLAY PROPOSED DITCH PROPOSED GUARD RAIL PROPOSED RIP-RAP PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)ROADWAY PLAN ANDPROFILER300START OF ABERDEEN EXTENSION TIE INTO STA 48+20SEE OFFSITE ROADWAY CONSTRUCTION PLANSPREPARED BY KIMLEY HORNABERDEEN BLVD 27+00 TO 48+20NORTH MATCHLINE -L- STA 58+50 - SEE SHEET R301 H. Scale:1"=40' | V. Scale: 1"=10' -L- ABERDEEN BOULEVARD PROPOSED GROUND EXISTING GROUND ELEVATION REPRESENTS EXISTING GROUND ELEVATION REPRESENTS PROPOSED GROUND [][][] PROPOSED FULL DEPTH PAVEMENT LEGEND FOR PROPOSED IMPROVEMENTS PROPOSED OVERLAY PROPOSED MILL AND INLAY PROPOSED DITCH PROPOSED GUARD RAIL PROPOSED RIP-RAP PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)ROADWAY PLAN ANDPROFILER301MATCHLINE -L- STA 70+50 - SEE SHEET R302MATCHLINE -L- STA 58+50 - SEE SHEET R300NORTH H. Scale:1"=40' | V. Scale: 1"=10' -L- ABERDEEN BOULEVARD PROPOSED GROUND EXISTING GROUND ELEVATION REPRESENTS EXISTING GROUND ELEVATION REPRESENTS PROPOSED GROUND [][][] PROPOSED FULL DEPTH PAVEMENT LEGEND FOR PROPOSED IMPROVEMENTS PROPOSED OVERLAY PROPOSED MILL AND INLAY PROPOSED DITCH PROPOSED GUARD RAIL PROPOSED RIP-RAP PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)ROADWAY PLAN ANDPROFILER302MATCHLINE -L- STA 70+50 - SEE SHEET R301NORTH Impact Site 1 - S3 Impact 1A: 168 LF Permanent - Culvert 30 LF - Temporary Impact Site 1 - S1 Impact 1B: 127 LF Permanent - Culvert 30 LF - Temporary Impact Site 2 - S5 137 LF - Permanent Culvert 30 LF - Temporary Impact Site 3 - W11 0.06 ac - Permanent Grading/Fill 0.01 ac - Temporary Impact Site 4 - S8 214 LF - Permanent Grading/Fill Impact Site 5 - W6 0.02 ac - Permanent Grading/Fill 0.01 ac - Temporary Impact Site 1 - S1 & S3 Impact 1C: 290 LF Permanent - Bank Stabilization H. Scale:1"=40' | V. Scale: 1"=4' CULVERT-A Profile Data 131 LF OF 72" RCP @ 1.84% CULVERT BURIED 1-FEET PROPOSED GRADE FOR ABERDEEN ROAD EXISTING GRADE1.00'TOP OF SILL ELEV:703.26 HEADWALLSTA:11+99.28ELEV:709.84HEADWALLSTA:13+30.31ELEV:707.43BASE FLOW LINE 3"-4" ABOVE EX. GRADE TOP OF SILL ELEV:700.85 HEADWALL WINGWALLS HEADWALL WINGWALLS H. Scale:1"=40' | V. Scale: 1"=4' CULVERT-B Profile Data 95 LF OF84" RCP @ 2.34% CULVERT BURIED 1-FEET PROPOSED GRADE FOR ABERDEEN ROAD EXISTING GRADE1.00'HEADWALLSTA:12+00.31ELEV:710.43HEADWALLSTA:12+95.31ELEV:708.20TOP OF SILL ELEV:700.54 TOP OF SILL ELEV:702.76 EXISTING 10" PVC CROSSING TOP: 698.27 (TO BE ABANDONED) BASE FLOW LINE 3"-4" ABOVE EX. GRADE PROPOSED GRADE HEADWALL WINGWALLS HEADWALL WINGWALLS H. Scale:1"=40' | V. Scale: 1"=4' TRIBUTRARY A-A 0+00704.51+00 FUTURE GRADE EXISTING GRADE H. Scale:1"=40' | V. Scale: 1"=4' TRIBUTARY B-B 0+00703.61+00 FUTURE GRADE EXISTING GRADE H. Scale:1"=40' | V. Scale: 1"=4' TRIBUTARY A_B 0+00701.71+00 FUTURE GRADE EXISTING GRADE ABERDEEN STREAMCROSSINGR501NORTHNORTHPREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)REFER TO SHEET C503 FOR CULVERT A AND CULVERT B DETAILS REFER TO SHEET C503 STREAM STABILIZATION DETAILS H. Scale:1"=40' | V. Scale: 1"=4' CULVERT-C Profile Data 79 LF OF72" RCP @ 1.66% CULVERT BURIED 1-FEET PROPOSED GRADE FOR ABERDEEN ROAD EXISTING GRADE1.00'TOP OF SILL ELEV:711.42 TOP OF SILL ELEV:710.11HEADWALLSTA:-0+04.06ELEV:718.00HEADWALLSTA:0+74.84ELEV:716.69BASE FLOW LINE 3"-4" ABOVE EX. GRADE HEADWALL HEADWALL ABERDEEN &LINEBERGER STREAMCROSSINGR502NORTHPREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)NORTH PVC PLUG INSTALLED FLUSH W/ GRADE IN GRASS AREAS GRASS PAVEMENT CAST IRON FRAME AND LID (US FOUNDRY COVER USF NO. 7621) INSTALLED FLUSH WITH GRADE IN PAVEMENT AREAS (H20 LOAD) 12" O.C. CONC. SQR. COLLAR IN PVMT AREAS PAVEMENT AREAS UNPAVED AREAS BACKFILL WITH SELECT EXCAVATED MATERIAL FOR BACKFILL WITH COMPACTED GRANULAR MATERIAL UNDER6"EXTENSION SAME SIZE AS STORM SEWER RUN PLUG & SEAL FOR FUTURE CONNECTION OR CONTINUATION OF MAIN. 1/8 BEND 45° WYE *SLOPE PER PLAN STORM SEWER RUN *(1% MIN. SLOPE FOR PIPES LESS THAN 12" Ø) (6" Ø MIN.) UNDERDRAIN CLEANOUT PAVEMENT EARTH BACKFILL 6"FILTER FABRIC TO MEET AASHTO M252 TO MEET AASHTO M252 (6" DIAM. UNLESS OTHERWISE SHOWN) SECTION PAVEMENT 48" Max.FINISH GRADE PLASTIC PIPE PERFORATED COMPACTED #8 STONE 6 "6"18" Min.18" Min.6"6 " #8 WASHED GRAVEL 6" DIAM. PERFORATED PLASTIC PIPE48" Max.6"TOPSOIL YARD AREASPAVEMENT AREAS FINISH GRADE OUTLET TO STORM STRUCTURE OR DAY LIGHT TO SWALE PER PLAN MAINTAIN POSITIVE FLOW TO OUTLET STONE BASE UNDERDRAIN/SUBSURFACE DRAIN (SSD) TYPICAL HEADWALL INSTALLATION NOT TO SCALE HEADWALL DETAIL TYPICAL HEADWALL INSTALLATION NOT TO SCALE C PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)STREAM CROSSINGDETAILSR503 Not to Scale1TITLE TYPICAL HEADWALL INSTALLATION NOT TO SCALE HEADWALL DETAIL TYPICAL HEADWALL INSTALLATION NOT TO SCALE A TYPICAL HEADWALL INSTALLATION NOT TO SCALE HEADWALL DETAIL TYPICAL HEADWALL INSTALLATION NOT TO SCALE B PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)EXAMPLE OF PUMP-AROUND OPERATION PLAN VIEW SIDE VIEW SEQUENCE OF CONSTRUCTION FOR CULVERT STABILIZED OUTLET A A SECTION A-A PLAN GEOTEXTILE DEWATER DIRT BAG GENERAL NOTES PLAN VIEW A A SECTION A-A D B A PUMP-AROUND OPERATIONA ENERGY DISSIPATOR PUMP OUTLETD GEOTEXTILE DEWATERING DIRT BAGB IMPERVIOUS DIKEC A LIVE STAKE DETAIL LIVE STAKE (IN EARTH) PLAN VIEWTYPICAL CROSS SECTION LIVE STAKESE COIR MATTING FOR STREAM BANKSF STREAM CROSSINGDETAILSR504 H. Scale:1"=40' | V. Scale: 1"=4' EXST SS_1 TO SS2200 H. Scale:1"=40' | V. Scale: 1"=4' EXST SS_2 TO SS1900 PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)PUBLIC SEWER PLANAND PROFILER600 PLAN VIEW - ABERDEEN EXTENSION (48+20.00 - 58+50.00 ) SCALE: 1" = 40'MATCHLINE -L- STA 58+50 - SEE SHEET R301 H. Scale:1"=40' | V. Scale: 1"=4' SS2200 TO SS2400 PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)PUBLIC SEWER PLANAND PROFILER601 PLAN VIEW - ABERDEEN EXTENSION (58+00.00 - 65+00.00 ) SCALE: 1" = 40' H. Scale:1"=40' | V. Scale: 1"=4' SS2400 TO SS2600 PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)PUBLIC SEWER PLANAND PROFILER602 PLAN VIEW - ABERDEEN EXTENSION (68+50.00 - 75+23.00 ) SCALE: 1" = 40' H. Scale:1"=40' | V. Scale: 1"=4' Aberdeen Extension STA:48+00 to STA:58+50 700 705 710 715 720 725 730 735 740 745 750 755 700 705 710 715 720 725 730 735 740 745 750 755 49+00730.550+00723.351+00719.852+00720.053+00724.054+00730.255+00737.256+00743.657+00747.158+00747.612" DIP PUBLIC WATER LINE (ABERDEEN EXTENSION) APPROXIMATELY 2675 LF IN 20' SECTIONS REMOVE EXISTING 12" CAP AND CUT IN 45° HORIZ. BEND TO CONNECT TO EXISTING 12" DIP PUBLIC WATER LINE EXISTING GRADE PROPOSED GRADE ALLOWABLE DEFLECTION PER CITY OF GASTONIA IS 1/2 THE MANUFACTURERS ALLOWABLE DEFLECTION (SEE SECTION 9.00 WATER DISTRIBUTION PER GASTONIA REQUIREMENTS)5'-10"GATE VALVES STA: 53+10.336" F.H.A.3' MINGATE VALVES STA: 58+10.376" F.H.A.2' MINSTA:50+52.70 72" RCP INV:701.02 STA:52+09.97 84" RCP INV:700.62 8" DI SEWER 45° HORZ. BENDS 45° HORZ. BENDS 45° HORZ. BEND3' MIN3' MINPREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)PUBLIC WATER PLANAND PROFILER700 PLAN VIEW - ABERDEEN EXTENSION (48+00.00 - 58+50.00 ) SCALE: 1" = 40' H. Scale:1"=40' | V. Scale: 1"=4' Aberdeen Extension STA:58+50 to STA:70+50 710 715 720 725 730 735 740 745 750 755 760 765 710 715 720 725 730 735 740 745 750 755 760 765 59+00747.360+00746.961+00745.662+00741.263+00735.264+00727.965+00725.866+00727.767+00733.468+00741.469+00749.470+00756.3EXISTING GRADE PROPOSED GRADE GATE VALVES 12" DIP PUBLIC WATER LINE (ABERDEEN EXTENSION) APPROXIMATELY 2675 LF IN 20' SECTIONS 3' MINGATE VALVES ALLOWABLE DEFLECTION PER CITY OF GASTONIA IS 1/2 THE MANUFACTURERS ALLOWABLE DEFLECTION (SEE SECTION 9.00 WATER DISTRIBUTION PER GASTONIA REQUIREMENTS)3' MINSTA: 62+846" F.H.A.STA: 67+84.046" F.H.A.2' MINSTA:64+79.60 72" RCP INV:709.79 STA:66+02.28 18" RCP INV:718.24 2' MIN8" DI SEWER PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)PUBLIC WATER PLANAND PROFILER701 PLAN VIEW - ABERDEEN EXTENSION (58+50.00 - 70+50.00 ) SCALE: 1" = 40' H. Scale:1"=40' | V. Scale: 1"=4' Aberdeen Extension STA:70+50 to STA:75+50 735 740 745 750 755 760 765 770 775 780 735 740 745 750 755 760 765 770 775 780 71+00759.972+00760.373+00759.274+00760.775+00 EXISTING GRADE PROPOSED GRADE GATE VALVES 12" DIP PUBLIC WATER LINE (ABERDEEN EXTENSION) APPROXIMATELY 2675 LF IN 20' SECTIONS ALLOWABLE DEFLECTION PER CITY OF GASTONIA IS 1/2 THE MANUFACTURERS ALLOWABLE DEFLECTION (SEE SECTION 9.00 WATER DISTRIBUTION PER GASTONIA REQUIREMENTS)3' MINSTA: 72+84.086" F.H.A.STA: 74+75.3912" 90° BEND& 6" F.H.A. WITH BLOW OFFSEE CITY DETAIL 71B-9PREPARED FOR©GATEWAY 85CITY OF GASTONIA0PRELIMINARY PLANS - BID SET KHA(GASTONIA LOGISTICS CENTER)PUBLIC WATER PLANAND PROFILER702 PLAN VIEW - ABERDEEN EXTENSION (70+50.00 - 75+50.00 ) SCALE: 1" = 40' PREPARED FOR©PROJECT GASTONIADEVELOPMENT0ISSUED FOR CONSTRUCTION PLAN SET KHANORTHPOINTCITY UTILITY DETAILS(SEWER)R801 PREPARED FOR©PROJECT GASTONIADEVELOPMENT0ISSUED FOR CONSTRUCTION PLAN SET KHANORTHPOINTCITY UTILITY DETAILS(WATER)R802 AGENCY CORRESPONDENCE North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Roy Cooper Office of Archives and History Secretary Susi H. Hamilton Deputy Secretary Kevin Cherry Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 June 5, 2020 Addie Lasitter Addie.Lasitter@kimley-horn.com Kimley-Horn 200 South Tryon Street, Suite 200 Charlotte, NC 282020 Re: Develop industrial space and associated infrastructure, between Lowell Road and Interstate 85, Gastonia, Gaston County, ER 20-0882 Dear Ms. Lasitter: Thank you for your email of April 3, 2020, regarding the above-referenced undertaking. We have reviewed your submittal and offer the following comments. We apologize for the delay in our response and any inconvenience it may have caused. This project will adversely affect the National Register-eligible Caleb John Lineberger House (GS0327). We advise that project management determine if federal permitting, funding, or approval will be required, as Section 106 of the National Historic Preservation Act requires the resolution of adverse effects to historic properties. As always, we encourage the applicant to avoid th e adverse effect and if that cannot be accomplished then to minimize or mitigate. We would be happy to facilitate contact between the applicant and historic preservation groups that may be interested in the relocation of the house. There is one previously recorded archaeological site (31GS376) within the project area. It consists of the remains of an early twentieth-century domestic structure. When the site was documented in 2016, further archaeological investigations were recommended to assess whether the site is eligible for listing in the National Register of Historic Places (NRHP). One architectural resource, the Caleb John Lineberger House (GS0327), is also located within the project area. This house was determined eligible for listing in th e NRHP under Criterion B for its association with Gaston County textile industry pioneer, Caleb John Lineberger, and under Criterion C for Architecture. Archaeological investigations were not conducted round the house. We recommend that prior to the initiation of any ground disturbing activities within the project area that archaeological site 31GS376 be relocated and assessed for listing in the NRHP. We also recommend that the area surrounding the Caleb John Lineberger House by investigated for archaeological remains that may contribute to the resource’s NRHP eligibility. Please note that our office requests consultation with the Office of State Archaeology Review Archaeologist to discuss appropriate field methodologies prior to archaeological field investigations. This work should be conducted by an experienced archaeologist that meets the Secretary of the Interior professional qualification standards. A list of archaeological consultants who have conducted or expressed an interest in contract work in North Carolina is available at https://archaeology.ncdcr.gov/archaeological - consultant-list. The archaeologists listed, or any other experienced archaeologist, may be contacted to conduct the recommended survey. One paper copy and one digital copy (PDF) of all resulting archaeological reports, as well as a digital copy (PDF) of the North Carolina Site Form for each site recorded, should be forwarded to the Office of State Archaeology (OSA) through this office, for review and comment as soon as they are available and in advance of any construction or ground disturbance activities. OSA’s Archaeological Standards and Guidelines for Background Research, Field Methodologies, Technical Reports, and Curation can be found online at: https://files.nc.gov/dncr- arch/OSA_Guidelines_Dec2017.pdf. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation’s Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comments, please contact Renee Gledhill-Earley, environmental review coordinator, at 919-814-6579 or environmental.review@ncdcr.gov. In all future communication concerning this project, please cite the above- referenced tracking number. Sincerely, Ramona Bartos, Deputy State Historic Preservation Officer North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Roy Cooper Secretary D. Reid Wilson Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 814-6570/814-6898 February 11, 2021 R. Blake Day, P.E. Blake.Day@kimley-horn.com Kimley-Horn 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 Re: Draft Report, Phase I Archaeological Survey and Phase II Testing for the Proposed Lowell Road Industrial Development, Gastonia, Gaston County, ER 20-0882 Dear Mr. Day: Thank you for transmitting the draft report for the above-referenced project, which was received by our office on December 22, 2021. We have reviewed the report and offer the following comments. The archaeological investigations focused on two areas within the larger proposed project area, the area immediately around the Caleb John Lineberger House (GS0327) and archaeological site 31GS376. This archaeological site was recorded in 2016 for a North Carolina Department of Transportation (NCDOT) project but was not fully delineated or assessed as it extended outside of NCDOT’s project area. The Caleb John Lineberger House was recorded as part of an architectural survey for the same NCDOT project, and it was determined eligible for listing in the National Register of Historic Places (NRHP) under Criteria B and C, but it was not evaluated for its archaeological significance under Criterion D. The area around the Lineberger house was investigated with remote sensing (ground penetrating radar or GPR) and systematic shovel testing. The GPR survey did identify several anomalies; however, most were interpreted as being associated with more recent land use and landscape modifications. No artifacts were found during shovel testing in the area around the house. No further archaeological investigations are recommended in the area around house. We concur with this recommendation, and we also agree with the request for the North Carolina Office of State Archaeology (OSA) to be notified should any archaeological deposits or features such as a privy or trash pits be uncovered during house demolition and construction activities in the vicinity of the Linberger House. Field investigations at 31GS376 consisted of GPR survey, shovel testing, and test unit excavation. The site is interpreted as an early- to mid-twentieth century tenant farm, likely associated with the nearby Lineberger house. No features were identified, and the artifact assemblage was described as light to moderate. The report authors also note that the soil is deflated from farming and modern logging has impacted site, and the archaeological deposits have low potential to address the research questions that were posed at the onset of the investigations. We concur with the recommendation presented in the report that 31GS376 be considered not eligible for listing in the NRHP. We do note that the report states that the gravesite of Mathew Armstrong, a neighbor of the Lineberger’s based on census records, is located about 500 meters east of the Lineberger house and approximately 200 meters northeast of 31GS376. We believe that the direction from site 31GS376 is a typographical error and should instead read northwest. While outside of the area initially recommended for archaeological investigations, the OSA requests that the cemetery be delineated and recorded with a cemetery site form (https://files.nc.gov/dncr-arch/Cemetery_Site_Form.pdf) and that an appropriate avoidance and/or treatment plan be developed to ensure human burials are not inadvertently impacted by the proposed development. Based on information available online, as of 2013, there appeared to be at least two burials marked within the cemetery and there could be additional burials present (https://www.findagrave.com/cemetery/2479409/mathew-armstrong-cemetery). Please note that cemeteries are protected under NC General Statutes Chapter 14-148 and 14-149, and are afforded consideration under Chapter 65. If unmarked human skeletal remains are encountered during construction, the provisions of North Carolina General Statute Chapter 70, Article 3 apply. Construction activities should immediately cease and the county medical examiner should be contacted. Finally, we wish to remind you that we have previously determined this project will adversely affect the National Register-eligible Caleb John Lineberger House (GS0327) (the actual structure and setting rather than any potential associated archaeological remains). Pursuant to our June 5, 2020, correspondence, we encourage the applicant to avoid the adverse effect and if that cannot be accomplished then to minimize or mitigate, in compliance with Section 106 of the National Historic Preservation Act. If avoidance is not feasible, we would be happy to facilitate contact between the applicant and historic preservation groups that may be interested in the relocation of the house. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation’s Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill-Earley, environmental review coordinator, at 919-814-6579 or environmental.review@ncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, Ramona Bartos, Deputy State Historic Preservation Officer cc: Danny Gregory, New South Associates dgregory@newsouthassoc.com Bryan Roden-Reynolds bryan.roden-reynolds@usace.army.mil Ian McDonald imcdonald@northpointkc.com United States Department of the Interior FISH AND WILDLIFE SERVICE Asheville Field Office 160 Zillicoa Street Asheville, North Carolina 28801 September 18, 2020 Taylor Kiker Kimley Horn 200 South Tryon Street, Suite 299 Charlotte, North Carolina 28202 Taylor.kiker@kimley-horn.com Dear Taylor Kiker Subject: NorthPoint ; Gaston County, North Carolina Log No. 4-2-20-486 The U.S. Fish and Wildlife Service (Service) has reviewed the information provided in your correspondence dated September 14, 2020 (received September 15, 2020), wherein you solicit our comments regarding project -mediated impacts to federally protected species. We submit the following comments in accordance with the provisions of the Fish and Wildlife Coordination Act , as amended (16 U.S.C. 661-667e); the National Environmental Policy Act (42 U.S.C. §4321 et seq.); and section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1543) (Act). Project Description According to the information provided, the proposed project would entail the construction of an undisclosed development on approximately 380 undeveloped, forested acres in Gastonia, North Carolina. Onsite habitats appear to consist of mixed successional forest, cleared open space, maintained rights of way, riparian habitats, perennial stream, forested wetlands, and transitional edge habitats. Your correspondence does not identify a federal nexus with the p roposed project. Your correspondence indicates that jurisdictional Waters of the U.S. are present onsite, but proposed impacts, and impact avoidance measures were not described. We request that you provide our office with this information to complete our evaluation of the proposed action1. Federally Listed Endangered and Threatened Species Suitable summer roosting habitat may be present in the project area for the federally threatened northern long-eared bat (Myotis septentrionalis). However, the final 4(d) rule (effective as of 1 Pursuant to 50 CFR §402.02, the Action Area includes all areas to be affected directly or indirectly by the Federal action and not merely the immediate area involved in the action. Moreover, the Effects of the Action are all consequences to listed species or critical habitat that are caused by the proposed action, including the consequences of other activities that are caused by the proposed action. A consequence is caused by the proposed action if it would not occur but for the proposed action and it is reasonably certain to occur. Effects of the action may occur later in time and may include consequences occurring outside the immediate area involved in the action (see also 50 CFR §402.17) 2 February 16, 2016), exempts incidental take of northern long -eared bat associated with activities that occur greater than 0.25 miles from a known hibernation site, and greater than 150 feet from a known, occupied maternity roost during the pup season (June 1 – July 31). Based on the information pro vided, the project (which may or may not require tree clearing) would occur at a location where any incidental take that may result from associated activities is exempt under the 4(d) rule. Although not required, we encourage you to avoid any associated tree clearing activities during this animal’s maternity roosting season from May 15 – August 15. According to the information provided, suitable habitats also occur onsite for the fed erally threatened dwarf-flowered heartleaf (Hexastylis naniflora), and the federally endangered Schweinitz’s sunflower (Helianthus schweinitzii). However, targeted surveys for these species conducted during their respective optimal survey windows detected no evidence for these species. In accordance with the Act, it is the responsibility of the appropriate federal agency or its designated representative to review its activities or programs and to identify any such activities or programs that may affect endangered or threatened species or their habitats. If it is determined that the proposed activity may adversely affect any species federally listed as endangered or threatened, formal consultation with this office must be initiated. The Service appreciates the opportunity to provide these comments. Please contact Mr. Byron Hamstead of our staff at Byron_Hamstead@fws.gov, if you have any questions. In any future correspondence concerning this project, please reference our Log Number 4 -2-20-486. Sincerely, - - original signed - - Janet Mizzi Field Supervisor AGENCY CORRESPONDENCE COMPENSATORY MITIGATION February 24, 2021 Rusty Bost City of Gastonia 150 S. York Street Gastonia, NC 28052 Expiration of Acceptance: 8/24/2021 Project: Gateway 85 County: Gaston The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (DMS) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below. Please note that this decision does not assure that participation in the DMS in-lieu fee mitigation program will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact permitting agencies to determine if payment to the DMS will be approved. You must also comply with all other state, federal or local government permits, regulations or authorizations associated with the proposed activity including G.S. § 143-214.11. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification within this time frame, this acceptance will expire. It is the applicant’s responsibility to send copies of the permits to DMS. Once DMS receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the in-lieu fee to be paid by an applicant is calculated based upon the Fee Schedule and policies listed on the DMS website. Based on the information supplied by you in your request to use the DMS, the impacts for which you are requesting compensatory mitigation credit are summarized in the following table. The amount of mitigation required and assigned to DMS for this impact is determined by permitting agencies and may exceed the impact amounts shown below. River Basin Impact Location (8-digit HUC) Impact Type Impact Quantity Catawba 03050102 Warm Stream 646 Upon receipt of payment, DMS will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the In-Lieu Fee Program instrument dated July 28, 2010. Thank you for your interest in the DMS in-lieu fee mitigation program. If you have any questions or need additional information, please contact Kelly.Williams@ncdenr.gov. Sincerely, FOR James. B Stanfill Asset Management Supervisor cc: Chris Tinklenberg, agent USACE AID #: NCDWR #: PROJECT / SITE INFORMATION: 1. Project name (if any): 2. Date of evaluation: 3. Applicant/owner name: 5. County: 6. Nearest named water body 7. River Basin: on USGS 7.5-minute quad: 8. Site coordinates (decimal degrees, at lower end of assessment reach): STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): 10. Length of assessment reach evaluated (feet): 11. Channel depth from bed (in riffle, if present) to top of bank (feet): Unable to assess channel depth. 12. Channel width at top of bank (feet):13. Is assessment reach a swamp stream?Yes No 14. Feature type: Perennial flow Intermittent flow Tidal Marsh Stream STREAM RATING INFORMATION: 15. NC SAM Zone: Mountains (M) Piedmont (P) Inner Coastal Plain (I) Outer Coastal Plain (O) 16. Estimated geomorphic valley shape (skip for a b Tidal Marsh Stream):(more sinuous stream, flatter valley slope)(less sinuous stream, steeper valley slope) 17. Watershed size: (skip Size 1 (< 0.1 mi2) Size 2 (0.1 to < 0.5 mi 2) Size 3 (0.5 to < 5 mi 2)Size 4 (≥ 5 mi2) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? Yes No If Yes, check all that appy to the assessment area. Section 10 water Classified Trout Waters Water Supply Watershed ( I II III IV V) Essential Fish Habitat Primary Nursery Area High Quality Waters/Outstanding Resource Waters Publicly owned property NCDWR riparian buffer rule in effect Nutrient Sensitive Waters Anadromous fish 303(d) List CAMA Area of Environmental Concern (AEC) Documented presence of a federal and/or state listed protected species within the assessment area. List species: Designated Critical Habitat (list species): 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? Yes No 1.Channel Water – assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) A Water throughout assessment reach. B No flow, water in pools only. C No water in assessment reach. 2.Evidence of Flow Restriction – assessment reach metric A At least 10% of assessment reach in-stream habitat or riffle-pool sequence is adversely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impounded on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates). B Not A 3.Feature Pattern – assessment reach metric A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). B Not A. 4.Feature Longitudinal Profile – assessment reach metric A Majority of assessment reach has a substantially altered stream profile (examples: channel down-cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). B Not A 5.Signs of Active Instability – assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down-cutting (head-cut), active widening, and artificial hardening (such as concrete, gabion, rip-rap). A < 10% of channel unstable B 10 to 25% of channel unstable C > 25% of channel unstable 6.Streamside Area Interaction – streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB A A Little or no evidence of conditions that adversely affect reference interaction B B Moderate evidence of conditions (examples: berms, levees, down-cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) C C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a Gateway 85 4/14/2020 35.266594, -81.122176 S1 ~100 lf City of Gastonia 4. Assessor name/organization: Chris Tinklenberg / Kimley Horn Gaston Catawba Duharts Creek Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if any supplementary NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NC SAM FIELD ASSESSMENT FORM Accompanies User Manual Version 2.1 INSTRUCTIONS:Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User 2 8 man-made feature on an interstream divide 7.Water Quality Stressors – assessment reach/intertidal zone metric Check all that apply. A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) B Excessive sedimentation (burying of stream features or intertidal zone) C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem D Odor (not including natural sulfide odors) E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in the "Notes/Sketch" section. F Livestock with access to stream or intertidal zone G Excessive algae in stream or intertidal zone H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.) I Other: (explain in "Notes/Sketch" section) J Little to no stressors 8.Recent Weather – watershed metric For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours B Drought conditions and rainfall exceeding 1 inch within the last 48 hours C No drought conditions 9 Large or Dangerous Stream – assessment reach metric Yes No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10.Natural In-stream Habitat Types – assessment reach metric 10a. Yes No Degraded in-stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in-stream hardening [for example, rip-rap], recent dredging, and snagging) (evaluate for size 4 Coastal Plain streams only, then skip to Metric 12) 10b.Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) A Multiple aquatic macrophytes and aquatic mosses F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) G Submerged aquatic vegetation B Multiple sticks and/or leaf packs and/or emergent H Low-tide refugia (pools) vegetation I Sand bottom C Multiple snags and logs (including lap trees) J 5% vertical bank along the marsh D 5% undercut banks and/or root mats and/or roots K Little or no habitat in banks extend to the normal wetted perimeter E Little or no habitat 11.Bedform and Substrate – assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11a.Yes No Is assessment reach in a natural sand-bed stream? (skip for Coastal Plain streams) 11b.Bedform evaluated. Check the appropriate box(es). A Riffle-run section (evaluate 11c) B Pool-glide section (evaluate 11d) C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c.In riffles sections, check all that occur below the normal wetted perimeter of the assessment reach – whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain Streams and Tidal Marsh Streams). Not Present (NP) = absent, Rare (R) = present but ≤ 10%, Common (C) = > 10-40%, Abundant (A) = > 40-70%, Predominant (P) = > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P Bedrock/saprolite Boulder (256 – 4096 mm) Cobble (64 – 256 mm) Gravel (2 – 64 mm) Sand (.062 – 2 mm) Silt/clay (< 0.062 mm) Detritus Artificial (rip-rap, concrete, etc.) 11d.Yes No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12.Aquatic Life – assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12a. Yes No Was an in-stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. No Water Other: 12b. Yes No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to “individuals” for size 1 and 2 streams and “taxa” for size 3 and 4 streams. Adult frogs Aquatic reptiles Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) Beetles (including water pennies) Caddisfly larvae (Trichoptera [T]) Asian clam (Corbicula ) Crustacean (isopod/amphipod/crayfish/shrimp) Damselfly and dragonfly larvae Dipterans (true flies) *********************************REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS****************************Check for TidalMarsh Streamsonly Mayfly larvae (Ephemeroptera [E]) Megaloptera (alderfly, fishfly, dobsonfly larvae) Midges/mosquito larvae Mosquito fish (Gambusia ) or mud minnows (Umbra pygmaea) Mussels/Clams (not Corbicula ) Other fish Salamanders/tadpoles Snails Stonefly larvae (Plecoptera [P]) Tipulid larvae Worms/leeches 13.Streamside Area Ground Surface Condition – streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB A A Little or no alteration to water storage capacity over a majority of the streamside area B B Moderate alteration to water storage capacity over a majority of the streamside area C C Severe alteration to water storage capacity over a majority of the streamside area (examples include: ditches, fill, soil, compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14.Streamside Area Water Storage – streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB A A Majority of streamside area with depressions able to pond water ≥ 6 inches deep B B Majority of streamside area with depressions able to pond water 3 to 6 inches deep C C Majority of streamside area with depressions able to pond water < 3 inches deep 15.Wetland Presence – streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB Y Y Are wetlands present in the streamside area? N N 16.Baseflow Contributors – assessment reach metric (skip for size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. A Streams and/or springs (jurisdictional discharges) B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) C Obstruction that passes some flow during low-flow periods within assessment area (beaver dam, bottom-release dam) D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage) E Stream bed or bank soil reduced (dig through deposited sediment if present) F None of the above 17.Baseflow Detractors – assessment area metric (skip for Tidal Marsh Streams) Check all that apply. A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) B Obstruction not passing flow during low flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) C Urban stream (≥ 24% impervious surface for watershed) D Evidence that the stream-side area has been modified resulting in accelerated drainage into the assessment reach E Assessment reach relocated to valley edge F None of the above 18.Shading – assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider “leaf-on” condition. A Stream shading is appropriate for stream category (may include gaps associated with natural processes) B Degraded (example: scattered trees) C Stream shading is gone or largely absent 19.Buffer Width – streamside area metric (skip for Tidal Marsh Streams) Consider “vegetated buffer” and “wooded buffer” separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB A A A A ≥ 100-feet wide or extends to the edge of the watershed B B B B From 50 to < 100-feet wide C C C C From 30 to < 50-feet wide D D D D From 10 to < 30-feet wide E E E E < 10-feet wide or no trees 20.Buffer Structure – streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB A A Mature forest B B Non-mature woody vegetation or modified vegetation structure C C Herbaceous vegetation with or without a strip of trees < 10 feet wide D D Maintained shrubs E E Little or no vegetation 21.Buffer Stressors – streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: Abuts < 30 feet 30-50 feet LB RB LB RB LB RB A A A A A A Row crops B B B B B B Maintained turf C C C C C C Pasture (no livestock)/commercial horticulture D D D D D D Pasture (active livestock use) 22.Stem Density – streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB A A Medium to high stem density B B Low stem density C C No wooded riparian buffer or predominantly herbaceous species or bare ground 23.Continuity of Vegetated Buffer – streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10-feet wide. LB RB A A The total length of buffer breaks is < 25 percent. B B The total length of buffer breaks is between 25 and 50 percent. C C The total length of buffer breaks is > 50 percent. 24.Vegetative Composition – First 100 feet of streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB A A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. B B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear-cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. C C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non-characteristic species or communities inappropriately composed of a single species or no vegetation. 25.Conductivity – assessment reach metric (skip for all Coastal Plain streams) 25a. Yes No Was a conductivity measurement recorded? If No, select one of the following reasons. No Water Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). A <46 B 46 to < 67 C 67 to < 79 D 79 to < 230 E ≥ 230 Notes/Sketch: Notes of Field Assessment Form (Y/N) Presence of regulatory considerations (Y/N) Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) (4) Floodplain Access (4) Wooded Riparian Buffer (4) Microtopography (3) Stream Stability (4) Channel Stability (4) Sediment Transport (4) Stream Geomorphology (2) Stream/Intertidal Zone Interaction (2) Longitudinal Tidal Flow (2) Tidal Marsh Stream Stability (3) Tidal Marsh Stream Geomorphology (1) Water Quality (2) Baseflow (2) Streamside Area Vegetation (3) Upland Pollutant Filtration (3) Thermoregulation (2) Indicators of Stressors (2) Aquatic Life Tolerance (2) Intertidal Zone Filtration (1) Habitat (2) In-stream Habitat (3) Baseflow (3) Substrate (3) Stream Stability (3) In-stream Habitat (2) Stream-side Habitat (3) Stream-side Habitat (3) Thermoregulation (2) Tidal Marsh In-stream Habitat (3) Flow Restriction (3) Tidal Marsh Stream Stability (4) Tidal Marsh Stream Geomorphology (3) Tidal Marsh In-stream Habitat (2) Intertidal Zone Habitat Overall LOW LOW LOW LOW MEDIUM MEDIUM LOW NA NA MEDIUM NA LOW HIGH LOW NA NA NA NA LOW HIGH (3) Tidal Marsh Channel Stability (3) Streamside Area Attenuation Function Class Rating Summary (1) Hydrology NA HIGH HIGH LOW LOW NA NO MEDIUM Stream Site Name Gateway 85 Date of Evaluation LOW (4) Tidal Marsh Channel Stability LOW LOW NA NA HIGH NA HIGH NC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 LOW LOW USACE/ All Streams NCDWR Intermittent NA NA (2) Flood Flow Chris Tinklenberg / Kimley Horn 4/14/2020 NO YES NO Perennial (2) Baseflow Stream Category Assessor Name/Organization MEDIUM Pb2 USACE AID #: NCDWR #: PROJECT / SITE INFORMATION: 1. Project name (if any): 2. Date of evaluation: 3. Applicant/owner name: 5. County: 6. Nearest named water body 7. River Basin: on USGS 7.5-minute quad: 8. Site coordinates (decimal degrees, at lower end of assessment reach): STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): 10. Length of assessment reach evaluated (feet): 11. Channel depth from bed (in riffle, if present) to top of bank (feet): Unable to assess channel depth. 12. Channel width at top of bank (feet):13. Is assessment reach a swamp stream?Yes No 14. Feature type: Perennial flow Intermittent flow Tidal Marsh Stream STREAM RATING INFORMATION: 15. NC SAM Zone: Mountains (M) Piedmont (P) Inner Coastal Plain (I) Outer Coastal Plain (O) 16. Estimated geomorphic valley shape (skip for a b Tidal Marsh Stream):(more sinuous stream, flatter valley slope)(less sinuous stream, steeper valley slope) 17. Watershed size: (skip Size 1 (< 0.1 mi2) Size 2 (0.1 to < 0.5 mi 2) Size 3 (0.5 to < 5 mi 2)Size 4 (≥ 5 mi2) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? Yes No If Yes, check all that appy to the assessment area. Section 10 water Classified Trout Waters Water Supply Watershed ( I II III IV V) Essential Fish Habitat Primary Nursery Area High Quality Waters/Outstanding Resource Waters Publicly owned property NCDWR riparian buffer rule in effect Nutrient Sensitive Waters Anadromous fish 303(d) List CAMA Area of Environmental Concern (AEC) Documented presence of a federal and/or state listed protected species within the assessment area. List species: Designated Critical Habitat (list species): 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? Yes No 1.Channel Water – assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) A Water throughout assessment reach. B No flow, water in pools only. C No water in assessment reach. 2.Evidence of Flow Restriction – assessment reach metric A At least 10% of assessment reach in-stream habitat or riffle-pool sequence is adversely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impounded on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates). B Not A 3.Feature Pattern – assessment reach metric A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). B Not A. 4.Feature Longitudinal Profile – assessment reach metric A Majority of assessment reach has a substantially altered stream profile (examples: channel down-cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). B Not A 5.Signs of Active Instability – assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down-cutting (head-cut), active widening, and artificial hardening (such as concrete, gabion, rip-rap). A < 10% of channel unstable B 10 to 25% of channel unstable C > 25% of channel unstable 6.Streamside Area Interaction – streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB A A Little or no evidence of conditions that adversely affect reference interaction B B Moderate evidence of conditions (examples: berms, levees, down-cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) C C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a 2 5 NC SAM FIELD ASSESSMENT FORM Accompanies User Manual Version 2.1 INSTRUCTIONS:Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if any supplementary NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. Gateway 85 4/14/2020 35.269063, -81.122176 S3 ~100 lf City of Gastonia 4. Assessor name/organization: Chris Tinklenberg / Kimley Horn Gaston Catawba Duharts Creek man-made feature on an interstream divide 7.Water Quality Stressors – assessment reach/intertidal zone metric Check all that apply. A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) B Excessive sedimentation (burying of stream features or intertidal zone) C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem D Odor (not including natural sulfide odors) E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in the "Notes/Sketch" section. F Livestock with access to stream or intertidal zone G Excessive algae in stream or intertidal zone H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.) I Other: (explain in "Notes/Sketch" section) J Little to no stressors 8.Recent Weather – watershed metric For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours B Drought conditions and rainfall exceeding 1 inch within the last 48 hours C No drought conditions 9 Large or Dangerous Stream – assessment reach metric Yes No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10.Natural In-stream Habitat Types – assessment reach metric 10a. Yes No Degraded in-stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in-stream hardening [for example, rip-rap], recent dredging, and snagging) (evaluate for size 4 Coastal Plain streams only, then skip to Metric 12) 10b.Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) A Multiple aquatic macrophytes and aquatic mosses F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) G Submerged aquatic vegetation B Multiple sticks and/or leaf packs and/or emergent H Low-tide refugia (pools) vegetation I Sand bottom C Multiple snags and logs (including lap trees) J 5% vertical bank along the marsh D 5% undercut banks and/or root mats and/or roots K Little or no habitat in banks extend to the normal wetted perimeter E Little or no habitat 11.Bedform and Substrate – assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11a.Yes No Is assessment reach in a natural sand-bed stream? (skip for Coastal Plain streams) 11b.Bedform evaluated. Check the appropriate box(es). A Riffle-run section (evaluate 11c) B Pool-glide section (evaluate 11d) C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c.In riffles sections, check all that occur below the normal wetted perimeter of the assessment reach – whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain Streams and Tidal Marsh Streams). Not Present (NP) = absent, Rare (R) = present but ≤ 10%, Common (C) = > 10-40%, Abundant (A) = > 40-70%, Predominant (P) = > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P Bedrock/saprolite Boulder (256 – 4096 mm) Cobble (64 – 256 mm) Gravel (2 – 64 mm) Sand (.062 – 2 mm) Silt/clay (< 0.062 mm) Detritus Artificial (rip-rap, concrete, etc.) 11d.Yes No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12.Aquatic Life – assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12a. Yes No Was an in-stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. No Water Other: 12b. Yes No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to “individuals” for size 1 and 2 streams and “taxa” for size 3 and 4 streams. Adult frogs Aquatic reptiles Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) Beetles (including water pennies) Caddisfly larvae (Trichoptera [T]) Asian clam (Corbicula ) Crustacean (isopod/amphipod/crayfish/shrimp) Damselfly and dragonfly larvae Dipterans (true flies) *********************************REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS****************************Check for TidalMarsh Streamsonly Mayfly larvae (Ephemeroptera [E]) Megaloptera (alderfly, fishfly, dobsonfly larvae) Midges/mosquito larvae Mosquito fish (Gambusia ) or mud minnows (Umbra pygmaea) Mussels/Clams (not Corbicula ) Other fish Salamanders/tadpoles Snails Stonefly larvae (Plecoptera [P]) Tipulid larvae Worms/leeches 13.Streamside Area Ground Surface Condition – streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB A A Little or no alteration to water storage capacity over a majority of the streamside area B B Moderate alteration to water storage capacity over a majority of the streamside area C C Severe alteration to water storage capacity over a majority of the streamside area (examples include: ditches, fill, soil, compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14.Streamside Area Water Storage – streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB A A Majority of streamside area with depressions able to pond water ≥ 6 inches deep B B Majority of streamside area with depressions able to pond water 3 to 6 inches deep C C Majority of streamside area with depressions able to pond water < 3 inches deep 15.Wetland Presence – streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB Y Y Are wetlands present in the streamside area? N N 16.Baseflow Contributors – assessment reach metric (skip for size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. A Streams and/or springs (jurisdictional discharges) B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) C Obstruction that passes some flow during low-flow periods within assessment area (beaver dam, bottom-release dam) D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage) E Stream bed or bank soil reduced (dig through deposited sediment if present) F None of the above 17.Baseflow Detractors – assessment area metric (skip for Tidal Marsh Streams) Check all that apply. A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) B Obstruction not passing flow during low flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) C Urban stream (≥ 24% impervious surface for watershed) D Evidence that the stream-side area has been modified resulting in accelerated drainage into the assessment reach E Assessment reach relocated to valley edge F None of the above 18.Shading – assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider “leaf-on” condition. A Stream shading is appropriate for stream category (may include gaps associated with natural processes) B Degraded (example: scattered trees) C Stream shading is gone or largely absent 19.Buffer Width – streamside area metric (skip for Tidal Marsh Streams) Consider “vegetated buffer” and “wooded buffer” separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB A A A A ≥ 100-feet wide or extends to the edge of the watershed B B B B From 50 to < 100-feet wide C C C C From 30 to < 50-feet wide D D D D From 10 to < 30-feet wide E E E E < 10-feet wide or no trees 20.Buffer Structure – streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB A A Mature forest B B Non-mature woody vegetation or modified vegetation structure C C Herbaceous vegetation with or without a strip of trees < 10 feet wide D D Maintained shrubs E E Little or no vegetation 21.Buffer Stressors – streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: Abuts < 30 feet 30-50 feet LB RB LB RB LB RB A A A A A A Row crops B B B B B B Maintained turf C C C C C C Pasture (no livestock)/commercial horticulture D D D D D D Pasture (active livestock use) 22.Stem Density – streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB A A Medium to high stem density B B Low stem density C C No wooded riparian buffer or predominantly herbaceous species or bare ground 23.Continuity of Vegetated Buffer – streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10-feet wide. LB RB A A The total length of buffer breaks is < 25 percent. B B The total length of buffer breaks is between 25 and 50 percent. C C The total length of buffer breaks is > 50 percent. 24.Vegetative Composition – First 100 feet of streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB A A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. B B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear-cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. C C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non-characteristic species or communities inappropriately composed of a single species or no vegetation. 25.Conductivity – assessment reach metric (skip for all Coastal Plain streams) 25a. Yes No Was a conductivity measurement recorded? If No, select one of the following reasons. No Water Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). A <46 B 46 to < 67 C 67 to < 79 D 79 to < 230 E ≥ 230 Notes/Sketch: Notes of Field Assessment Form (Y/N) Presence of regulatory considerations (Y/N) Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) (4) Floodplain Access (4) Wooded Riparian Buffer (4) Microtopography (3) Stream Stability (4) Channel Stability (4) Sediment Transport (4) Stream Geomorphology (2) Stream/Intertidal Zone Interaction (2) Longitudinal Tidal Flow (2) Tidal Marsh Stream Stability (3) Tidal Marsh Stream Geomorphology (1) Water Quality (2) Baseflow (2) Streamside Area Vegetation (3) Upland Pollutant Filtration (3) Thermoregulation (2) Indicators of Stressors (2) Aquatic Life Tolerance (2) Intertidal Zone Filtration (1) Habitat (2) In-stream Habitat (3) Baseflow NC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 LOW MEDIUM USACE/ All Streams NCDWR Intermittent NA NA (2) Flood Flow Chris Tinklenberg / Kimley Horn 4/14/2020 NO YES NO Perennial (2) Baseflow Stream Category Assessor Name/Organization HIGH Pb1 Stream Site Name Gateway 85 Date of Evaluation HIGH MEDIUM LOW NA NA LOW NA MEDIUM (3) Tidal Marsh Channel Stability (3) Streamside Area Attenuation Function Class Rating Summary (1) Hydrology NA LOW MEDIUM MEDIUM MEDIUM NO HIGH MEDIUM HIGH MEDIUM MEDIUM NA MEDIUM HIGH USACE AID #: NCDWR #: PROJECT / SITE INFORMATION: 1. Project name (if any): 2. Date of evaluation: 3. Applicant/owner name: 5. County: 6. Nearest named water body 7. River Basin: on USGS 7.5-minute quad: 8. Site coordinates (decimal degrees, at lower end of assessment reach): STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): 10. Length of assessment reach evaluated (feet): 11. Channel depth from bed (in riffle, if present) to top of bank (feet): Unable to assess channel depth. 12. Channel width at top of bank (feet):13. Is assessment reach a swamp stream?Yes No 14. Feature type: Perennial flow Intermittent flow Tidal Marsh Stream STREAM RATING INFORMATION: 15. NC SAM Zone: Mountains (M) Piedmont (P) Inner Coastal Plain (I) Outer Coastal Plain (O) 16. Estimated geomorphic valley shape (skip for a b Tidal Marsh Stream):(more sinuous stream, flatter valley slope)(less sinuous stream, steeper valley slope) 17. Watershed size: (skip Size 1 (< 0.1 mi2) Size 2 (0.1 to < 0.5 mi 2) Size 3 (0.5 to < 5 mi 2)Size 4 (≥ 5 mi2) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? Yes No If Yes, check all that appy to the assessment area. Section 10 water Classified Trout Waters Water Supply Watershed ( I II III IV V) Essential Fish Habitat Primary Nursery Area High Quality Waters/Outstanding Resource Waters Publicly owned property NCDWR riparian buffer rule in effect Nutrient Sensitive Waters Anadromous fish 303(d) List CAMA Area of Environmental Concern (AEC) Documented presence of a federal and/or state listed protected species within the assessment area. List species: Designated Critical Habitat (list species): 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? Yes No 1.Channel Water – assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) A Water throughout assessment reach. B No flow, water in pools only. C No water in assessment reach. 2.Evidence of Flow Restriction – assessment reach metric A At least 10% of assessment reach in-stream habitat or riffle-pool sequence is adversely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impounded on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates). B Not A 3.Feature Pattern – assessment reach metric A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). B Not A. 4.Feature Longitudinal Profile – assessment reach metric A Majority of assessment reach has a substantially altered stream profile (examples: channel down-cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). B Not A 5.Signs of Active Instability – assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down-cutting (head-cut), active widening, and artificial hardening (such as concrete, gabion, rip-rap). A < 10% of channel unstable B 10 to 25% of channel unstable C > 25% of channel unstable 6.Streamside Area Interaction – streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB A A Little or no evidence of conditions that adversely affect reference interaction B B Moderate evidence of conditions (examples: berms, levees, down-cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) C C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a Gateway 85 4/14/2020 35.263409, -81.116850 S5 ~100 lf City of Gastonia 4. Assessor name/organization: Chris Tinklenberg / Kimley Horn Gaston Catawba Duharts Creek Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if any supplementary NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NC SAM FIELD ASSESSMENT FORM Accompanies User Manual Version 2.1 INSTRUCTIONS:Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User 3 8 man-made feature on an interstream divide 7.Water Quality Stressors – assessment reach/intertidal zone metric Check all that apply. A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) B Excessive sedimentation (burying of stream features or intertidal zone) C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem D Odor (not including natural sulfide odors) E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in the "Notes/Sketch" section. F Livestock with access to stream or intertidal zone G Excessive algae in stream or intertidal zone H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.) I Other: (explain in "Notes/Sketch" section) J Little to no stressors 8.Recent Weather – watershed metric For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours B Drought conditions and rainfall exceeding 1 inch within the last 48 hours C No drought conditions 9 Large or Dangerous Stream – assessment reach metric Yes No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10.Natural In-stream Habitat Types – assessment reach metric 10a. Yes No Degraded in-stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in-stream hardening [for example, rip-rap], recent dredging, and snagging) (evaluate for size 4 Coastal Plain streams only, then skip to Metric 12) 10b.Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) A Multiple aquatic macrophytes and aquatic mosses F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) G Submerged aquatic vegetation B Multiple sticks and/or leaf packs and/or emergent H Low-tide refugia (pools) vegetation I Sand bottom C Multiple snags and logs (including lap trees) J 5% vertical bank along the marsh D 5% undercut banks and/or root mats and/or roots K Little or no habitat in banks extend to the normal wetted perimeter E Little or no habitat 11.Bedform and Substrate – assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11a.Yes No Is assessment reach in a natural sand-bed stream? (skip for Coastal Plain streams) 11b.Bedform evaluated. Check the appropriate box(es). A Riffle-run section (evaluate 11c) B Pool-glide section (evaluate 11d) C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c.In riffles sections, check all that occur below the normal wetted perimeter of the assessment reach – whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain Streams and Tidal Marsh Streams). Not Present (NP) = absent, Rare (R) = present but ≤ 10%, Common (C) = > 10-40%, Abundant (A) = > 40-70%, Predominant (P) = > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P Bedrock/saprolite Boulder (256 – 4096 mm) Cobble (64 – 256 mm) Gravel (2 – 64 mm) Sand (.062 – 2 mm) Silt/clay (< 0.062 mm) Detritus Artificial (rip-rap, concrete, etc.) 11d.Yes No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12.Aquatic Life – assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12a. Yes No Was an in-stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. No Water Other: 12b. Yes No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to “individuals” for size 1 and 2 streams and “taxa” for size 3 and 4 streams. Adult frogs Aquatic reptiles Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) Beetles (including water pennies) Caddisfly larvae (Trichoptera [T]) Asian clam (Corbicula ) Crustacean (isopod/amphipod/crayfish/shrimp) Damselfly and dragonfly larvae Dipterans (true flies) *********************************REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS****************************Check for TidalMarsh Streamsonly Mayfly larvae (Ephemeroptera [E]) Megaloptera (alderfly, fishfly, dobsonfly larvae) Midges/mosquito larvae Mosquito fish (Gambusia ) or mud minnows (Umbra pygmaea) Mussels/Clams (not Corbicula ) Other fish Salamanders/tadpoles Snails Stonefly larvae (Plecoptera [P]) Tipulid larvae Worms/leeches 13.Streamside Area Ground Surface Condition – streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB A A Little or no alteration to water storage capacity over a majority of the streamside area B B Moderate alteration to water storage capacity over a majority of the streamside area C C Severe alteration to water storage capacity over a majority of the streamside area (examples include: ditches, fill, soil, compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14.Streamside Area Water Storage – streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB A A Majority of streamside area with depressions able to pond water ≥ 6 inches deep B B Majority of streamside area with depressions able to pond water 3 to 6 inches deep C C Majority of streamside area with depressions able to pond water < 3 inches deep 15.Wetland Presence – streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB Y Y Are wetlands present in the streamside area? N N 16.Baseflow Contributors – assessment reach metric (skip for size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. A Streams and/or springs (jurisdictional discharges) B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) C Obstruction that passes some flow during low-flow periods within assessment area (beaver dam, bottom-release dam) D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage) E Stream bed or bank soil reduced (dig through deposited sediment if present) F None of the above 17.Baseflow Detractors – assessment area metric (skip for Tidal Marsh Streams) Check all that apply. A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) B Obstruction not passing flow during low flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) C Urban stream (≥ 24% impervious surface for watershed) D Evidence that the stream-side area has been modified resulting in accelerated drainage into the assessment reach E Assessment reach relocated to valley edge F None of the above 18.Shading – assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider “leaf-on” condition. A Stream shading is appropriate for stream category (may include gaps associated with natural processes) B Degraded (example: scattered trees) C Stream shading is gone or largely absent 19.Buffer Width – streamside area metric (skip for Tidal Marsh Streams) Consider “vegetated buffer” and “wooded buffer” separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB A A A A ≥ 100-feet wide or extends to the edge of the watershed B B B B From 50 to < 100-feet wide C C C C From 30 to < 50-feet wide D D D D From 10 to < 30-feet wide E E E E < 10-feet wide or no trees 20.Buffer Structure – streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB A A Mature forest B B Non-mature woody vegetation or modified vegetation structure C C Herbaceous vegetation with or without a strip of trees < 10 feet wide D D Maintained shrubs E E Little or no vegetation 21.Buffer Stressors – streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: Abuts < 30 feet 30-50 feet LB RB LB RB LB RB A A A A A A Row crops B B B B B B Maintained turf C C C C C C Pasture (no livestock)/commercial horticulture D D D D D D Pasture (active livestock use) 22.Stem Density – streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB A A Medium to high stem density B B Low stem density C C No wooded riparian buffer or predominantly herbaceous species or bare ground 23.Continuity of Vegetated Buffer – streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10-feet wide. LB RB A A The total length of buffer breaks is < 25 percent. B B The total length of buffer breaks is between 25 and 50 percent. C C The total length of buffer breaks is > 50 percent. 24.Vegetative Composition – First 100 feet of streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB A A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. B B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear-cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. C C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non-characteristic species or communities inappropriately composed of a single species or no vegetation. 25.Conductivity – assessment reach metric (skip for all Coastal Plain streams) 25a. Yes No Was a conductivity measurement recorded? If No, select one of the following reasons. No Water Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). A <46 B 46 to < 67 C 67 to < 79 D 79 to < 230 E ≥ 230 Notes/Sketch: Notes of Field Assessment Form (Y/N) Presence of regulatory considerations (Y/N) Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) (4) Floodplain Access (4) Wooded Riparian Buffer (4) Microtopography (3) Stream Stability (4) Channel Stability (4) Sediment Transport (4) Stream Geomorphology (2) Stream/Intertidal Zone Interaction (2) Longitudinal Tidal Flow (2) Tidal Marsh Stream Stability (3) Tidal Marsh Stream Geomorphology (1) Water Quality (2) Baseflow (2) Streamside Area Vegetation (3) Upland Pollutant Filtration (3) Thermoregulation (2) Indicators of Stressors (2) Aquatic Life Tolerance (2) Intertidal Zone Filtration (1) Habitat (2) In-stream Habitat (3) Baseflow (3) Substrate (3) Stream Stability (3) In-stream Habitat (2) Stream-side Habitat (3) Stream-side Habitat (3) Thermoregulation (2) Tidal Marsh In-stream Habitat (3) Flow Restriction (3) Tidal Marsh Stream Stability (4) Tidal Marsh Stream Geomorphology (3) Tidal Marsh In-stream Habitat (2) Intertidal Zone Habitat Overall MEDIUM MEDIUM HIGH LOW MEDIUM MEDIUM HIGH NA NA HIGH NA MEDIUM HIGH HIGH NA NA NA NA HIGH MEDIUM (3) Tidal Marsh Channel Stability (3) Streamside Area Attenuation Function Class Rating Summary (1) Hydrology NA MEDIUM MEDIUM HIGH HIGH NA NO MEDIUM Stream Site Name NorthPoint Gastonia Logistics Center Date of Evaluation MEDIUM (4) Tidal Marsh Channel Stability LOW LOW NA NA LOW NA MEDIUM NC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 LOW MEDIUM USACE/ All Streams NCDWR Intermittent NA NA (2) Flood Flow Chris Tinklenberg / Kimley Horn 4/14/2020 NO YES NO Perennial (2) Baseflow Stream Category Assessor Name/Organization MEDIUM Pb2 USACE AID #: NCDWR #: PROJECT / SITE INFORMATION: 1. Project name (if any): 2. Date of evaluation: 3. Applicant/owner name: 5. County: 6. Nearest named water body 7. River Basin: on USGS 7.5-minute quad: 8. Site coordinates (decimal degrees, at lower end of assessment reach): STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): 10. Length of assessment reach evaluated (feet): 11. Channel depth from bed (in riffle, if present) to top of bank (feet): Unable to assess channel depth. 12. Channel width at top of bank (feet):13. Is assessment reach a swamp stream?Yes No 14. Feature type: Perennial flow Intermittent flow Tidal Marsh Stream STREAM RATING INFORMATION: 15. NC SAM Zone: Mountains (M) Piedmont (P) Inner Coastal Plain (I) Outer Coastal Plain (O) 16. Estimated geomorphic valley shape (skip for a b Tidal Marsh Stream):(more sinuous stream, flatter valley slope)(less sinuous stream, steeper valley slope) 17. Watershed size: (skip Size 1 (< 0.1 mi2) Size 2 (0.1 to < 0.5 mi 2) Size 3 (0.5 to < 5 mi 2)Size 4 (≥ 5 mi2) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? Yes No If Yes, check all that appy to the assessment area. Section 10 water Classified Trout Waters Water Supply Watershed ( I II III IV V) Essential Fish Habitat Primary Nursery Area High Quality Waters/Outstanding Resource Waters Publicly owned property NCDWR riparian buffer rule in effect Nutrient Sensitive Waters Anadromous fish 303(d) List CAMA Area of Environmental Concern (AEC) Documented presence of a federal and/or state listed protected species within the assessment area. List species: Designated Critical Habitat (list species): 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? Yes No 1.Channel Water – assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) A Water throughout assessment reach. B No flow, water in pools only. C No water in assessment reach. 2.Evidence of Flow Restriction – assessment reach metric A At least 10% of assessment reach in-stream habitat or riffle-pool sequence is adversely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impounded on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates). B Not A 3.Feature Pattern – assessment reach metric A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). B Not A. 4.Feature Longitudinal Profile – assessment reach metric A Majority of assessment reach has a substantially altered stream profile (examples: channel down-cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). B Not A 5.Signs of Active Instability – assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down-cutting (head-cut), active widening, and artificial hardening (such as concrete, gabion, rip-rap). A < 10% of channel unstable B 10 to 25% of channel unstable C > 25% of channel unstable 6.Streamside Area Interaction – streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB A A Little or no evidence of conditions that adversely affect reference interaction B B Moderate evidence of conditions (examples: berms, levees, down-cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) C C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a 1 3 NC SAM FIELD ASSESSMENT FORM Accompanies User Manual Version 2.1 INSTRUCTIONS:Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if any supplementary NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. Gateway 85 4/14/2020 35.270488, -81.110974 S8 ~50 lf City of Gastonia 4. Assessor name/organization: Chris Tinklenberg / Kimley Horn Gaston Catawba Duharts Creek man-made feature on an interstream divide 7.Water Quality Stressors – assessment reach/intertidal zone metric Check all that apply. A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) B Excessive sedimentation (burying of stream features or intertidal zone) C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem D Odor (not including natural sulfide odors) E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in the "Notes/Sketch" section. F Livestock with access to stream or intertidal zone G Excessive algae in stream or intertidal zone H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.) I Other: (explain in "Notes/Sketch" section) J Little to no stressors 8.Recent Weather – watershed metric For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours B Drought conditions and rainfall exceeding 1 inch within the last 48 hours C No drought conditions 9 Large or Dangerous Stream – assessment reach metric Yes No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10.Natural In-stream Habitat Types – assessment reach metric 10a. Yes No Degraded in-stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in-stream hardening [for example, rip-rap], recent dredging, and snagging) (evaluate for size 4 Coastal Plain streams only, then skip to Metric 12) 10b.Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) A Multiple aquatic macrophytes and aquatic mosses F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats)G Submerged aquatic vegetation B Multiple sticks and/or leaf packs and/or emergent H Low-tide refugia (pools) vegetation I Sand bottom C Multiple snags and logs (including lap trees)J 5% vertical bank along the marsh D 5% undercut banks and/or root mats and/or roots K Little or no habitat in banks extend to the normal wetted perimeter E Little or no habitat 11.Bedform and Substrate – assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11a.Yes No Is assessment reach in a natural sand-bed stream? (skip for Coastal Plain streams) 11b.Bedform evaluated. Check the appropriate box(es). A Riffle-run section (evaluate 11c) B Pool-glide section (evaluate 11d) C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c.In riffles sections, check all that occur below the normal wetted perimeter of the assessment reach – whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain Streams and Tidal Marsh Streams). Not Present (NP) = absent, Rare (R) = present but ≤ 10%, Common (C) = > 10-40%, Abundant (A) = > 40-70%, Predominant (P) = > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P Bedrock/saprolite Boulder (256 – 4096 mm) Cobble (64 – 256 mm) Gravel (2 – 64 mm) Sand (.062 – 2 mm) Silt/clay (< 0.062 mm) Detritus Artificial (rip-rap, concrete, etc.) 11d.Yes No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12.Aquatic Life – assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12a. Yes No Was an in-stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. No Water Other: 12b. Yes No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to “individuals” for size 1 and 2 streams and “taxa” for size 3 and 4 streams. Adult frogs Aquatic reptiles Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) Beetles (including water pennies) Caddisfly larvae (Trichoptera [T]) Asian clam (Corbicula ) Crustacean (isopod/amphipod/crayfish/shrimp) Damselfly and dragonfly larvae Dipterans (true flies) *********************************REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS****************************Check for TidalMarsh Streamsonly Mayfly larvae (Ephemeroptera [E]) Megaloptera (alderfly, fishfly, dobsonfly larvae) Midges/mosquito larvae Mosquito fish (Gambusia ) or mud minnows (Umbra pygmaea) Mussels/Clams (not Corbicula ) Other fish Salamanders/tadpoles Snails Stonefly larvae (Plecoptera [P]) Tipulid larvae Worms/leeches 13.Streamside Area Ground Surface Condition – streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB A A Little or no alteration to water storage capacity over a majority of the streamside area B B Moderate alteration to water storage capacity over a majority of the streamside area C C Severe alteration to water storage capacity over a majority of the streamside area (examples include: ditches, fill, soil, compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14.Streamside Area Water Storage – streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB A A Majority of streamside area with depressions able to pond water ≥ 6 inches deep B B Majority of streamside area with depressions able to pond water 3 to 6 inches deep C C Majority of streamside area with depressions able to pond water < 3 inches deep 15.Wetland Presence – streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB Y Y Are wetlands present in the streamside area? N N 16.Baseflow Contributors – assessment reach metric (skip for size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. A Streams and/or springs (jurisdictional discharges) B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) C Obstruction that passes some flow during low-flow periods within assessment area (beaver dam, bottom-release dam) D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage) E Stream bed or bank soil reduced (dig through deposited sediment if present) F None of the above 17.Baseflow Detractors – assessment area metric (skip for Tidal Marsh Streams) Check all that apply. A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) B Obstruction not passing flow during low flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) C Urban stream (≥ 24% impervious surface for watershed) D Evidence that the stream-side area has been modified resulting in accelerated drainage into the assessment reach E Assessment reach relocated to valley edge F None of the above 18.Shading – assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider “leaf-on” condition. A Stream shading is appropriate for stream category (may include gaps associated with natural processes) B Degraded (example: scattered trees) C Stream shading is gone or largely absent 19.Buffer Width – streamside area metric (skip for Tidal Marsh Streams) Consider “vegetated buffer” and “wooded buffer” separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB A A A A ≥ 100-feet wide or extends to the edge of the watershed B B B B From 50 to < 100-feet wide C C C C From 30 to < 50-feet wide D D D D From 10 to < 30-feet wide E E E E < 10-feet wide or no trees 20.Buffer Structure – streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB A A Mature forest B B Non-mature woody vegetation or modified vegetation structure C C Herbaceous vegetation with or without a strip of trees < 10 feet wide D D Maintained shrubs E E Little or no vegetation 21.Buffer Stressors – streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: Abuts < 30 feet 30-50 feet LB RB LB RB LB RB A A A A A A Row crops B B B B B B Maintained turf C C C C C C Pasture (no livestock)/commercial horticulture D D D D D D Pasture (active livestock use) 22.Stem Density – streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB A A Medium to high stem density B B Low stem density C C No wooded riparian buffer or predominantly herbaceous species or bare ground 23.Continuity of Vegetated Buffer – streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10-feet wide. LB RB A A The total length of buffer breaks is < 25 percent. B B The total length of buffer breaks is between 25 and 50 percent. C C The total length of buffer breaks is > 50 percent. 24.Vegetative Composition – First 100 feet of streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB A A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. B B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear-cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. C C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non-characteristic species or communities inappropriately composed of a single species or no vegetation. 25.Conductivity – assessment reach metric (skip for all Coastal Plain streams) 25a. Yes No Was a conductivity measurement recorded? If No, select one of the following reasons. No Water Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). A <46 B 46 to < 67 C 67 to < 79 D 79 to < 230 E ≥ 230 Notes/Sketch: Notes of Field Assessment Form (Y/N) Presence of regulatory considerations (Y/N) Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) (4) Floodplain Access (4) Wooded Riparian Buffer (4) Microtopography (3) Stream Stability (4) Channel Stability (4) Sediment Transport (4) Stream Geomorphology (2) Stream/Intertidal Zone Interaction (2) Longitudinal Tidal Flow (2) Tidal Marsh Stream Stability (3) Tidal Marsh Stream Geomorphology (1) Water Quality (2) Baseflow (2) Streamside Area Vegetation (3) Upland Pollutant Filtration (3) Thermoregulation (2) Indicators of Stressors (2) Aquatic Life Tolerance (2) Intertidal Zone Filtration (1) Habitat (2) In-stream Habitat (3) Baseflow (3) Substrate (3) Stream Stability (3) In-stream Habitat (2) Stream-side Habitat (3) Stream-side Habitat (3) Thermoregulation (2) Tidal Marsh In-stream Habitat (3) Flow Restriction (3) Tidal Marsh Stream Stability (4) Tidal Marsh Stream Geomorphology (3) Tidal Marsh In-stream Habitat (2) Intertidal Zone Habitat Overall NC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 LOW MEDIUM USACE/ All Streams NCDWR Intermittent NA NA (2) Flood Flow Chris Tinklenberg / Kimley Horn 4/14/2020 NO YES NO Intermittent NA MEDIUM HIGH LOW (2) Baseflow Stream Category Assessor Name/Organization LOW Pb1 Stream Site Name MEDIUM NA NorthPoint Gastonia Logistics Center Date of Evaluation LOW (4) Tidal Marsh Channel Stability NA NA LOW LOW LOW LOW MEDIUM MEDIUM NA NA HIGH NA MEDIUM LOW (3) Tidal Marsh Channel Stability (3) Streamside Area Attenuation Function Class Rating Summary (1) Hydrology LOW LOW NA NA NA NA NA MEDIUM MEDIUM LOW MEDIUM LOW LOW LOW NA NO NA NA MEDIUM NA NA NA NA LOW NO NA NA LOW MEDIUM NA NA NA LOW LOW MEDIUM LOW LOW MEDIUM LOW LOW LOW LOW LOW LOW MEDIUM LOW LOW LOW MEDIUM NA NA LOW NA MEDIUM HIGH LOW