Loading...
HomeMy WebLinkAboutNC0043745_Wasteload Allocation_19890615NPDES DOCUMENT SCANNING COVER SHEET NC0043745 Old Dock Elementary WWTP NPDES Permit: Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Return Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: June 15, 1989 This document is printed on reuse paper - ignore any content on the re-srerse side Class: PERMIT NO.: NCO() •JLY/ r-� NPDES WASTE LOAD ALLOCATION FACILITY NAME: 1/O�- ����%/` C/e4 fi /eP/.2 v/ Facility Status: (clrcls one) Permit Status: (circle one) MaJor Minor( Pipe No: Ga/ Design Capacity (MGD): Domestic (% of Flow): Industrial (% of Flow): PROPOSED 111OOIE'iCA11ON UNPHORT ED NEW 16F�k /09 PLOTW Comments: RECEIVING STREAM: -)1:1'2P /4 (—Sot/ Sub -Basin: 4(93 07'7 • Reference USGS Quad: 4-2 Yi3/E County: fi/��4ed- Regional Office: As Fa Mo . Ra (circle one) Requested By Prepared By: Reviewed By: CGU ;irridc (please attach) Date: 6 /15' g Modeler Date Rec. CAS L1VeI9c1 574, Drainage Area (mil) Avg. Streamflow (cfs)• d 7Q10 (cfs) C) Winter 7Q10 (cfs) __C_30Q2 (cfs) n Toxicity Limits: IWC % (circle one) Acute / Chronic Instream Monitoring: /l `/ Parameters a,1 em(&rat/M) (L fi v, � Cet4k v`' Upstream y Location(2b0W d] 01 /2 Downstream % Location&)0.35w1- 11)01A- UT 2r)i /11P r)vx/ dir6 Road Y0{��2 Cl `�i A i �~ Effluent Characteristics Su r Lo,ii uWk. WI'i&- BODa (mg/11 1 15 NH3 N (mg/I) .2 L/ D.O. (mg/I) (p to Ca TSS (mg/1) • 3 D 30 36 F. Col. (/100m1) /pub 1 WO pH (SU) (J ('G% 0-1 Pr-opos-edr Zinc. f5,aer r‘L(6ru-r GtABr-) al 100 PuroPtiokbyS iAtr 000d 1 c)/56Gia,lk (UKL A- - C IA- / w u.� VVa c 'la 4le - Comments: siLiUdd-e a/ V , Mmmucd Request No. :5246 Permit Number Facility Name Type of Waste Status Receiving Stream Stream Class Subbasin County Regional Office Requestor Date of Request Quad WASTELOAD ALLOCATION APPROVAL FORM NC0043745 OLD DOCK ELEMENTARY SCHOOL DOMESTIC EXISTING UT GUM SWAMP RUN C-SWAMP 030757 COLUMBUS WIRO MACK WIGGINS 4/26/89 K. 2 4 N E Wasteflow 5-Day BOD Ammonia Nitrogen Dissolved Oxygen TSS Fecal Coliform pH (mgd): (mg/1): (mg/1): (mg/1): (mg/1): (#/100m1): (SU): Drainage Area Average Flow Summer 7Q10 Winter 7010 3002 RECOMMENDED EFFLUENT LIMITS SUMMER 0.005 5 2 6 30 1000 6-9 WINTER 0.005 10 4 6 30 1000 6-9 MONITORING (sq mi) (cfs) (cfs) (cfs) (cfs) . 0.0 . 0.0 . 0.0 . 0.0 0.0 EXIST 0.005 15 4 6 30 1000 6-9 1 RECEIVED it.m 81989 PERMITS & ENG!NEERiNG Upstream (Y/N): Y Location: ABOVE DISCHARGE POINT Downstream (Y/N): Y Location: ^'0.35 MI DNSTR ON UT AT UNIMPROVED DIRT ROAD COMMENTS LIMITS PER RECOMMENDATION OF WILMINGTON REGIONAL OFFICE. RECOMMEND INSTREAM MONITORING FOR D.O., TEMPERATURE, FECAL COLIFORM, AND CONDUCTIVITY. RECOMMEND REMOVAL OF DISCHARGE I4WEN AN ALTERNATIVE BECOMES AVAILABLE. INSTREAM MONITORING REQUIRMENETS MAY BE DROPPED WHEN THE FACILITY AGREES, IN WRITING, TO A SCHEDULE FOR REMOVAL OF THEIR POINT -SOURCE DISCHARGE. SEE ATTACHED MEMO CONCERNING INSTREAM MONITORING REQUIREMENTS. Revieed by: ch. Support Supervisor Regional Supervisor Permits & Engineering _ Recommended by LL - RETURN TO TECHNICAL SERVICES BY rr-subn�r Date V 01g _ Date ‘7,5yP 60(17 JIJN 29 1985 Date Date 07)15 67 If$7 CICJ .D0C6 E .1(ya 5ch o ( C Ul &-om 6wany ' 6Th757 1h5J2awu 1 -�th- aw, 4/4-eA e-yn wi 6 - s r al/ 2 Co )0vx,bv5 Co. 6c),-00(s Lu -LG UhGo-4 cukt- soc_okkiy C �o 4i1 fig) °KO (O-v a il ) Li4Lev_ 1kte. 1Og4. 130 Si�UYYct u4 r !uVM 1005 2o. C koOL J Cd/ e-Y, r% Rcvtc/ ; 1(nov DIVISION OF ENVIRONMENTAL MANAGEMENT ? 1989 re - 5Ob, //o,� 67d4 / � `�-J MEMORANDUM May To: Don Safrit From: Carla Sanderson Through: Tom Stockton Trevor Clement Subject: Old Dock Elementary School NPDES NO. NC0043745 Columbus County Instream Monitoring Data On April 26, 1989, Technical Support received a WLA request for renewal of the Old Dock Elementary School NPDES permit. The existing permit requirements for this facility include instream monitoring for temperature, dissolved oxygen, and fecal coliform. Central Files has not received any instream data for this facil- ity. This data is necessary to evaluate the impact of the dis- charge on the receiving water. Furthermore, the noncompliant nature of this facility stresses the importance for them to adhere to these monitoring requirements in order to assess the existing impact on the stream. If you have any questions please contact me at (919) 733-5083, ext. 514. cc: David Foster WLA File Central Files :t1 fp State of North Carolina Department of Natural Resources and Community Development 1X/ilmingron Regional Office lames G.Martin, Governor - Fob Jamieson William 11''. Cobey, Jr , Secretary Re`,ional Manager - DIVISION OF ENVIRONMENTAL MANAGEMENT ----- fMrch 23, 1989 Mr. R. Mitciell Tyler Columbus Co my Board of Education P. 0. Box 729 Whiteville, North Carolina 28472 Subject: NPDES Compliance, Strategy Columbus County Schools Dear Mr. Tyler: On March 6, 1989, Messrs. Donald Safrit, and Ed Beck of this office met with you to discuss resolution of the current non -compliant condition of the treatment facilities serving eight of the County's schools. It is understood that an engineering consultant has been employed to evaluate the alternatives for achieving compliance. It was also determined that the school board will request entrance into a Special Order by Consent which will contain interim effluent limitations and construction schedules that are reasonable to allow construction of adequate facilities or other feasible alternatives. As discussed in the meeting, alternatives which allow elimination of the discharge to surface waters should be most diligently pursued. If a reasonable non -discharge alternative - can not be found for any- of the schools, then the treatment facilities must be upgraded to meet final effluent limits of 5 mg/1 BOD and 2 mg/1 Ammonia. A time period of sixtywas 60 ( } days y requested for submittal of a preliminary engineering proposal. While this appears to be a reasonable time period, I feel that progress toward entrance into an Ordier should proceed without delay. A date for submittal of the engineering proposal can be included in an Order. Mr. R. Mitchell Tyler March 23, 1989 Page Two You should begin immediately to draft a schedule of actions to be taken to achieve compliance. Within 30 days following receipt of this letter, please submit a request for entrance into a Special Order by Consent. Mr. Safrit and Mr. Beck will be willing to work with you and answer any questions you may have. in erely, etal/j// A. Preston How , Jr., P.E. Regional Supervisor APH:EB:trw 'cc: WiRO, CF