Loading...
HomeMy WebLinkAboutNC0050105_Construction Inspection_20060927Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Klimek, P.E. Director 0ENR— ion of Water Quality September 27, 2006 SEP 2 & 2006 Mr. Steven K. Blanchard, General Manager Public Works Commission City of Fayetteville Post Office Box 1089 Fayetteville, North Carolina 28302 Dear Mr. Blanchard: DWQ SUBJECT: PWC of the City of Fayetteville (1) Rockfish Creek WRF Expansion, Phase 2 and Cross Creek WRF Improvements — Contract No.2 (2) Standby Power Generdtirs Installation --Contract 2D Standby Power Generattks & Switchgear-Contract 2E (3) Cross Crek WRF Paving Improvements -Contract 1 SRF Project No. CS37043448 Interim Inspection & Final Inspection —Contract 1 The Construction Inspection Group (CIG) of the Construction Grants and Loans Section performed an interim inspection for the federally funded portion of the stibject project on September 19, 2006. This inspection was conducted in conjunction with the monthly progress meeting. Please note that our inspection report covers both loan administration arid construction. A copy of the inspection report isattached for your records. If you and/or your engineer have any questions regarding this ins ection, please contact me at (919) 715-6220. Sincerely, Antonio V. Evans, P.E. Environmental Engineer Construction Inspection Group - AVE/sd Attachment cc: Hazen and Sawyer DWQ Fayetteville Regional Office PMB/SRF CIG-Antonio Evans Construction Grants and Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone: 919-733-6900 / FAX: 919-715-6229 / Internet: www.nccgl.net An Equal Opportunity/Affirmative Action Employer 50% Recycled/10% Post Consumer Paper One NorthCarolina aturallj • Page l of 16 CONSTRUCTION GRANTS AND LOANS SECTION INSPECTION REPORT CITY OF FAYETTEVILLE-PWC CROSS CREEK PAVING IMPROVEMENTS — CONTRACT 1 ROCKFISH CREEK WRF EXPANSION, PHASE.2 AND CROSS CREEK WRF IMPROVEMENTS — CONTRACT 2 STANDBY PROWER GENERATOR INSTALLATION — CONTRACT 2D STANDBY POWER GENERATORS AND SWITCHGEAR = CONTRACT 2E SRF PROJECT NO. CS370434-08 September 19, 2006 LOAN ADMINISTRATION A. SRF LOAN . The overall loan amount is $17,442,000 with a 2.66% interest rate and a 20-year term. Construction was scheduled to be complete and interest oaks begun accruing on 9/29/05. B. LOAN PAYMENTS SRF Date of Last Disbursement(s) — September 1, 2006 Disbursed to Date — $16,247,036.00 Disbursement #32 - $183,023.00 Total Disbursement: 93% of SRF Loan Funds H. CONSTRUCTION ADMINISTRATION A. CONTRACT 1 Name Highland Paving Company, LLC Address — 2031 Middle Road, Fayetteville NC 28312 Original Contract Amount - $365,338.00 Amount Based on Latest Change Order — $384,482.08 Current Loan Eligible Contract Amount.- $384,482.08 Contract Description — General Construction Superintendent at Site — Unknown Date of NTP—12/5/06 Contract Time —180 calendar days Original Completion Date — 5/15/06 - Current Completion Date — 5/15/06 Current -Loan Eligible Contract Time Period —180 calendar days . Scheduled % Complete - 100% . Actual % Complete — Approximately 100% based on payment request through 8/11/06 - for work completed and .material stored. Page 2 of 16 CHANGE ORDER UPDATE Response or No. Approval Date Amount 1 4/28/06 2 8/2/06 3 8/2/06 B. CONTRACT 2 $19,144.08 $23,939.69 $(-)1,459.48 Time (Days) Remarks 9 undercut & extra stone - 12 undercut & extra stone 0 final quantity adjustments Name — Seaside Utilities, Inc. Address —1363 Old Hwy. 52, Moncks Corner, SC 29461 Original Contract Amount - $11,484,000.00 Amount Based on Latest Change Order — $13,845,186.40 Current Loan Eligible Contract Amount - $13,845,186.40 Contract Description — General Construction Superintendent at Site — Joe Bustamante Date of NTP—10/1/03 Contract Time — 975 calendar days Original Completion Date — 9/30/05 Current Completion Date — 6/2/06 Current Loan Eligible Contract Time Period — 975 calendar days Scheduled % Complete - 100% Actual % Complete - Approximately 98% based on payi lent request through 7/25/06 for work completed and material stored. CHANGE ORDER UPDATE Response or No. Approval Date 1 6/7/04 2 6/7/04 3 7/16/04 4 10/18/04 5 01/13/05 6 7/28/05 Time Amount (Days) Remarks $19,883.13 0 $136,612.23 0 $41,569.84 0 $5,634.60 0 $99,315.61 " 0 $1,797,276.00 184 cost of fine bubble diffusers & credit for clearing & spare gear reducer relocation of chlorine contact tank, add'l duct bank, & RAS pump station repairs mixed liquor channel, grit hatch, CCT drain line, & deduct MCC neutral conductor extra conductor wire @ Cross Creek IPS • -diffuser @ RFWRF & RAS . pump station @ CCWRF CCWRF Improvements Page 3 of 16 7 , 9/6/05 8 11/21/05 9 3/8/06 10 8/31/06 C. CONTRACT 2D $22,601.66 0 RAS flange coupling, RAS line relocation, RAS pump #3, & 3" conduit. $12,299.61 0 deduct: access ladder & outfall baffles add: neutral conductors, pipe extension, air pipe reducer $141,987.14 30 clarifier coating system @ CCWRF - $84,006.58 31 miscellaneous additions @RFWRF & CCWRF Name — Bryant Electric Company, Inc. Address - 215 Balfour Drive, Archdale, NC 27263 Original Contract Amount - $446,000 Amount Based on Latest Change Order — $468,259.89 Current Loan Eligible Contract Amount - $468,259.89 Contract Description — Electrical Construction Superintendent at Site — Barney Roberts Date of NIP —1/20/04 Contract Time — 270 calendar days . Original Completion Date 10/15/04 Current Completion Date—10/15/04.• Current Loan Eligible Contract Time Period — 270 calendar days Scheduled % Complete - 100% Actual % Complete — Approximately 100% based on final inspection. CHANGE ORDER UPDATE Response or No. Approval Date Amount 1 5/13/05 $22,259.89 2 1/25/06 $(-)3,197.00 D. CONTRACT 2E Name — Covington Diesel, Inc. Address — 8015 Piedmont Triad Parkway, Greensboro, 1\it 27409 Original Contract Amount - $740,957.00 Amount Based on Latest Change Order — $644,514.50 Current Loan Eligible Contract Amount - $644,514.50 Contract Description - Standby Power Generators and Switchgear Superintendent at -Site — N/A - .' Time (Days) Remarks 0 sectionalizing switch changes @ CCWRF & RFWRF 0 . deduct fencing and relocate PT cable Page 4of16 Date of NTP—1/20/04 Contract Time - 270 calendar days Original Completion Date —10/15/04 Current Completion Date —10/15/04 Current Loan Eligible Contract Time Period — 270 calendar days Scheduled % Complete - 100% - Actual % Complete — Approximately 100% based on final inspection. CHANGE ORDER UPDATE Response or Time No. Approval Date Amount (Days) Remarks 1 6/13/04 $(-)90,133.00 0 credit for switch gear & cost of weather proof enclosure 2 4/25/05 $(-)6,309.50 0 tax credit for change order #1 E. The Following Work Was Observed to Be Completed 1. Contract 1 Cross Creek WWTP The pavement base coarsehas been placed for aproximately 70% of the road surfaces. The removal of the subsurface material has been completed for the remainder of the road surfaces. The base coarse has been completed for the remainder of the road surfaces. The curb and guttet replacement has begun. The curb and gutter replacement has been completed. The overlay has been completed. Additional overlay change order #2 ha.s also been completed. 2. Contract 2 Rockfish Creek WWTP a. Junction Box Concrete has been placed for the base slab and the bottom half of the walls. The •reinforcing steel and approximately 50% of the formwork have been erected for the top half of the walls: Backfill has been placed for approximately 50% of the structure; The remainder of the formwork has been completed and concrete has been placed for the top half of the walls. The reinforcing steel and fotinwork for the top slab have been erected. Concrete has been placed for the top slab, all the formwork has been removed and backfill has been placed around the structure. Concrete has been placed for a removable concrete slab on top of the structure. Approximately 90% of tfie waterproof coating has been applied to the interior walls. The remainder of the waterproof coating has been applied to the interior walls. The influent bypass pumping has been completed and the cutout Of the 54-inch influent pipe inside the junction box has been completed. b. New Influent Pump Station The concrete has been placed for the sloped base slab for the screw pumps. Concrete has been placed for the bottotn half of the screw Page 5.of 16 pump exterior wall at elevation 76.50 feet. The reinforcing steel and approximately 50% of the formwork have been erected for the top half 'of the screw pump exterior walls at elevation $7.00 feet. The remainder of the formwork has been erected and concrete has been placed for the top half of the screw pump exterior walls at elevation 87.00 feet. Concrete has been placed for the Sdtith exterior wall. Reinforcing steel and 50% of the formwork have been erected for the South interior wall. Approximately 25% of the formwork has been erected for the screw pump channel walls. The remainder of the reinforcing steel and formwork has been completed and removed from the South interior wall. Concrete has been played for the suspended slab at elevation 82.00 feet at the South end. Concrete has been placed for the sloped base slab up to elevation 79.50 feet. Concrete has been placed for three of the four interior screw puriji channel walls up to elevation 99.83 feet. Approximately 50% of the forms has been erected.for the 4`i' interior screw pump wall arid the West exterior wall. Concrete has been placed for the North wall. Concrete has been placed for the remaining walls and the forms have been removed. The excavation has been completed and subgrade stone has been placed for the stairs on the West side of the structure. CCficrete has been placed for the lower stairs and walls and backfill has been placed. Concrete .and backfill have been placed for the upper stairs and walls. Concrete 'has been placed for the motor/gearbox pads. Approximately 90% of - the waterproof coating has been applied to the interior walls.. The remainder of the waterproof coating has been applied to the interior walls. Grout fill has been placed in the structure. The screw pumps have been set in place. Approximately 70% Of the ductwork, stairs, grating and handrails have been completed. 'I' he remainder of the aluminum stairs and grating has been completed. Approximately 95% of the ductwork for the wet well has been corripleted. The remainder. of the ductwork for the wet well has been cortipleted. Grouting has been completed on screw pumps #1 and #2 and they have been placed in service. Screw pumps #3 and #4 have beeii placed into service. c. Screening Facility The exterior wall forms have been erected for the bottom section of walls. Concrete has been placed for the bottom section of walls and reinforcing steel has been erected for the rem t hing sections of exterior walls. Concrete has been placed for the base slab and the interior/exterior walls to elevation 92.17 feet aliid the forms have not been removed. The remainder of the wall foriiis has been removed and approximately 50% of the forms and reinforcing steel has been erected for the suspended slab at elevation 93:t)0 feet. The remaining ,forms and reinforcing steel have been erected for the suspended slab and concrete has been placed for the suspended slab. -Grout fill has been placed in the structure. The slide gates afid_flumes have been set in place. The. flumes have been grouted.. The interior walls have been prepped for Waterproofing. The waterproofing has been completed Tap 6, of 16 ' and the form and bollards have been set in place for the dumpster pads. The remainder of the work on the slide gates lids been completed. Concrete has been placed for the dumpster pads. The yard hydrants have been completed. Startup has been completed and the equipment has been placed into service. d. Vortex Grit Removal Facility The demolition of aeration basin #1 drain pipe has been completed. The excavation has been completed.' Concrete has been placed for the base slab at elevation 68.00 feet. The interior Wall forms have been erected and approximately 40% of the reinforcing steel has been erected for the West wall (to elevation 92.33 feet). Approximately 50% of the forms have been erected for the East wall to elevation 75.00 feet. Concrete has been placed for the East wall to elevation 75.00 feet. Concrete has been placed for the SCiuth, West and North walls to elevation 92.33 feet. The fine grade and stone has been completed at elevation 70.33 feet. Approximately 80% of the backfill has been placed for the West.wall(to elev. 78:83 feet) and East wall (to elev. 74.33 feet). The remainder of the bacl{fill has been placed for the West wall. Concrete has been placed for the influent base slab at elevation 81.00 feet and the sloped suspended slab between elevations 81.00 feet and 76.50 feet. Concrete has been _ Slaced for the influent channel walls and the grit vortex collector watts to elevation 81.17 feet. Backfill has been placed and fine grading has been placed to elevation 81.17 feet. The forms have been refiioved from the effluent channel walls. Concrete has been placed for the remaining exterior walls to elevation 92.17 feet. Approximately 5t% of the forms and reinforcing steel has been erected for the suspended slab at elevation 93.00 feet. The remaining forms and reinforeing steel has been erected for the suspended slab and concrete has been placed for the suspended slab. The slide gates have been set in place. The interior walls have been prepped for waterproofing. Approximately 80% of the waterproofmg has been completed. The vdttex grit collectors have been installed. The remainder of the grit collection equipment has been installed and the waterproofing has been completed. The HVAC, lights and electrical boxes have been completer) and concrete has been placed for the dumpster pads. The yard hydraits have been completed. Startup has been completed and it has been placed into service. e. Distribution Chamber The reinforcing steel and the forms have been erected for the base slab. Concrete has been placed for the base slab and North wall. Approximately 60% of the reinforcing steel acid formwork has been erected for the remaining walls of the distribiition chamber. Concrete has been placed for the walls to elevation 92.17 feet The interior walls have been prepped for waterproofing. The waterproofing has Page7of16 been completed. The air piping has been set in place.. Startup has been completed and it has been placed intoservice. f. Electrical Building Concrete has been placed for the columns. Approximately 70% of the formwork; reinforcing steel and conduit has been installed for the suspended slab. Concrete has been placed fo .the suspended slab and the 8-inch masonry block walls have been erected. Approximately 70% of the brick veneer walls has been erected: The precast concrete roof has been set in place. The remainder of the brick veneer has been erected. The hollow core roof has been set in place. Additional . electrical components have been set in place acid some wire has been pulled. The remainder of the conduit has beefy completed and approximately 60% of the wire has been pulled; The remainder of the electrical panels has been set in place. The reiainder of the wire has been pulled, startup has been completed and it has been placed into service. g. Aeration Basin Improvements/Effluent Channel Construction Sheeting has been driven adjacent to the existing effluent aeration basin channel. The brackets have been installed and flowable-fill has been injected to support the existing effluent aeration basin channel (change order #3). Approximately 75% of the excavation has been completed for the new effluent aeration basin channel. The remainder of the excavation has been completed for the effluent channel: Approximately 60% of the reinforcing steel aiid formwork has been erected for the base slab of the proposed effhieiit channel between aeration basins 3 and 4. The remainder of the 'reinforcing steel has been erected and concrete has been placed for 50% of section- #1 base slab between aeration basins 3 and 4. Concrete has also been placed for 50% of section #1 walls. Concrete has been placed for the remaining portion of section #1 base slab and Walls. Aeration basin #4 has been drained and approximately 40% of the forms and reinforcing steel has been erected for the effluent channel ,wall inside aeration basin #4. Concrete has been placed for the effitient channel walls inside aeration basin #4. The diffusers have been replaced in aeration basin #4 (change order #5). Aeration basin #4 has been placed back in service. Concrete has been placed for the base slab of section #2 between aeration basins 3 and 4. Approximately 50% of the form and reinforcing steel has been erected for the walls: Concrete has been placed for the walls of section #2. Approximately 50% of aeration basin #4 exterior wall at the effluent channel hats been removed. The remainder of the aeration basin exterior wall (at the effluent channel) has been cut and removed and the 10-inch and 6-inch header pipe has been mounted. on the effluent channel wall. Aeration basin'#1 has - been drained and the 30-inch slide gate has been set in place and concrete has been placed for the influent box: Aeration basin #1 has been placed back into service.: Aeration basin #2 has been drained and Page 8 of 16 the 30-inch slide gate has been set in place arid concrete has been placed for the influent box. Concrete has beefi placed for the bases for the piers of the air piping. Approximately 60% of the influent structure has been completed and approximately 30% of the demolition of the walls on the effluent end has been completed for aeration basin #3. The remainder of the influent chamber box and weir gate has been completed for aeration basitf #3. The walls and adjacent base slab at the effluent end of aeration basin #3 has been • demolished. Concrete has been placed for the Base slab at the effluent end of aeration basin #3 and approximately 4t % of the reinforcing steel and formwork has been erected for the Walls. The remainder of the reinforcing. steel has been erected for the Wills (sections-3 & 4) of the effluent channel at aeration basin #3 and eoncrete has been placed for the inner walls. Concrete has been placed for, the outer wall of sections 3. & 4. The bulkhead has been completed between aeration basins #2 and #3.. Aeration basin #3 has been placed back in service and aeration basin #2 has been taken out of seiice; The walls and base slab have been demolished for aeration basin #2. The influent ' channel has been demolished for aeration basifis #1 and #2 and the reinforcing steel and formwork has been erected for aeration basin #2. Aeration basin #1 has been placed into service. with flow from the new pump station and the new 36-inch PIE line. The effluent channel base slabs have been completed for section 5 and seetion 6 and the walls have been completed for section 5 and approximately 70% complete for section 6 at aeration basin #2. The remainder of the wall has been completed and the effluent channel has been placed in service at aeration basin #2. The 36-inch PTE line has been installed at aeration basin #2 and the excavation has been completed at aeration basin #3. The wall cores have been completed for aeration basin #4 for the 16- inch RAS line and the 30-inch PTE line. The 1 2-inch drain line has been completed and backfill has been placed try an elevation of the core for the 16-inch RAS line. The.wall cores have been completed for aeration basin #5 and the effluent channel at aeration basins #2 and #3 have been backfilled. The pipe wall penetrations have been completed for the influent RAS piping at aeration basins #4 and #5. . Approximately 20% of the demolition has been completed at aeration basin #1 influent and effluent ends. The remainder of the demolition has been completed at aeration basin #1. Corierete has been placed for the base slab (sections #7 and #8) and approximately 10% of the reinforcing steel and formwork has been erected for the walls at aeration basin #1 effluent channel. Concrete has been placed for the wall at aeration basin #4, however, the temporary bulkhead has not been removed. Concrete has been placed for the effluent channel Walls at aeration basin #1 and the temporary bulkhead has been removed. The old effluent channel between aeration basins 3 and 4 has been backfilled and abandoned in place. Approximately 80% of the handrail has been completed. The remainder of the handrail has been completed and aeration basin #1 has been backfilled. The Page 9 of 16 temporary bulkhead has been removed at aeration basin #4. The RAS lines have been put in operations at aeration basins 2, 3 and 5. h. Chlorine Contact Basin Approximately 50% of the excavation has been completed. The temporary supports have been erected over the existing 60-inch effluent line for the tie-in at the proposed influent and effluent line locations: The groundwater elevation was higher than expected so the excavation of this structure has been delayed bile to additional groundwater pumping efforts. A new. plan has been devised to . - dewater and place concrete for one section of base slab at a time starting with slab #2. Excavation -for slab #2 has been completed and subgrade stone has been placed. Concrete has been placed for base slab #2. Concrete has been placed for a porticdn of wall #12. Concrete has been placed for wall #5 and wall #13. The forms and reinforcing steel have been erected for approximately 50% and 30% of wall #6, respectively. The remainder of reinforcing steel and forms has been erected and concrete has been placed for wall #6. Concrete has been placed for 50% of slab #1. The interior forms. have been erected for the remainder of wall #12 and a portion of wall #1 that is adjacent to wall #12. Concrete has been placed for the retaining portion of slab #1 and wall #3. Approximately 90% of the c ircrete has been placed for walls: #1, #2, and #4. The remainder of the concrete has .been placed for walls: #1, #2, and #4. Concrete was placed for base slab #4 and walls: #7 and #14. Concrete has been placed for the suspended slab at the influent end of the basin. Concrete has been placed for slab #5 and approximately 70% of walls #9, #10, c4 #11. Concrete has been placed for the remainder of walls 9 thru 11 and the suspended slab at the effluent end. The tank drain lines have been installed from the sumps to the drain pump station and approximately 40% of the backfill has been placed. "The bypass pumping has been completed and demolition of the outfall line at the chlorine contract tank has been completed and tied -in to the basin. Concrete has been placed for base slabs #7 and #8 and walls #17 and #20. Concrete has been placed for walls #15 and #18 and approximately 50% of the forms has been erected for walls #16 and #19. Concrete has been placed for the remainder of the walls (#16 and #19). The hydrostatic test has: been complete for channels 2 and 3 and placement of backfill has started. The drain pump station has been installed and the backfill has been placed around the remaining perimeter of the structure. The startup has been completed. i. Maintenance Building Concrete has been placed for the Maintenance building base slab. The structural steel has been erected and the doorframes have been set. The 8-inch masonry walls were approximately 50% complete. The 8-inch masonry-block/brick veneer walls were approximately 70% complete. The remainder of the block/brick veneer walls has been • Page 10 of 16 j- erected. The metal siding has been erected for the sides and roof and approximately 30% of the insulation has beers placed on the interior walls and roof. The remainder of the roof, dcdors and insulation has been completed and approximately 30% of the painting has been completed. The remainder of the painting has been completed and approximately 50% of the HVAC has been set place. The remainder of the HVAC has been completed, the floor has been sealed and the building has been placed in service. Aerobic Digesters and Blower Concrete has been placed for approximately 91% of both digesters. One of the digesters was ready to begin the hydrostatic test. The hydrostatic 'tests have been completed for both digesters. Approximately 75% of the under slab drainage has been completed. The remainder of the under slab drainage has been completed and the structure has been backfilled. The air distribtition piping has been installed on the floor of digesters #4 and #5. 'the slide gates have been installed in digester #4. Approximately 30% of the hand rail has been installed. The slide gates have been installed Ili aeration basin #5. Another 20% of the hand railing has been installed at digesters #4 and #5. The bridge between. aerations #4-and #5 has been completed. Concrete has been placed for the stairs and the air header support columns. -Approximately 70% of the air header piping has been installed. The air header .piping has been completed for digester #4. The remainder of the stairs and hand railing has been completed. The remainder of the air piping has been completed; wire terminations have been completed, and startup has been completed. Aerated digester #4 has been placed in service and the deliyery date for the blower is two weeks (January 31, 2006). Blower #5 has been set in place and approximately 80% of the blower piping has been installed. Aerated sludge basin #5 has been placed in sei Vice. Approximately 90% of the blower #5 installation has been coiiipleted. Approximately 95% of the blower #5 installation has been cotiipleted. Approximately 50% of the fence has been erected around digesters #4 and #5. The fence has been completed and tied to the existing fencing at both ends. k. Yard .Piping The 60-inch influent line from the influent jufiction box to the influent pump station has been completed. Manhole 41 has been set in place .at aerobic digester #5. Approximately 80% of the 12-inch sludge line and 80% of the 4-inch scum line have been installed to digesters #4 and #5. The 36-inch PTE line from the distribution chamber to aeration basin #1 has been installed. The remainder of the 12-inch sludge line and the 4-inch scum line has been Completed at digesters #4 and. #5. The 18-inch sludge drain line has been completed at digesters #4 and #5. The remainder of the yard piping at digesters #4 and #5 has been completed and tested. Process drain MH #5 has been Page 11 of 16 installed and the 6-inch grit classifier line has been installed to MH #5. The 18-inch process drain line and MH #2, #3; #4 and #6 have been installed: The 2-inch non -potable line has been installed at the grit facility and the influent pump station. The 20=inch RAS force main has been, completed to the junction box. The M-inch PTE line has been installed for aeration basin #2. The 20-ifit>h RAS force main has been backfilled. The 36-inch PTE line has been completed for aeration basin #3. The 30-inch PTE line has been completed for aeration basin #4 and aeration basin #4 has been placed back in service. The 30-inch RAS line has been installed from the Y- connection to the tie-in adjacent to aeration basin #5 and from aeration basin #5 to aeration basin #3. The force main from -the chlorine contact tank pump station to the MH #3 has been completed. The 16- inch RAS piping and the drainage piping have been set in place at aeration basin #2 and #3. The remainder of the RAS piping has been completed. 1. Electrical The duct bank has been installed at the influent pump station. The - conduit has been installed at the Electrical Building suspended slab. The MCC has been received and set inside the Electrical Building. Approximately 20% of the duct bank has been installed at the digesters. The duct bank has been completed ffom the influent pump station to the grit facility. Concrete has been placed for the primary electrical service duct bank and transformer pad. The transformers have been set at the influent pump station and the wire has been pulled. Approximately 99% of the electrical has been completed at the influent pump station/Electrical Building and fiber optics has been completed to the Operations Building. The•femainder of the .electrical has been completed at the influent ptifnp station and the chlorine contact tank. Approximately 70% of the electrical work has been completed for the controls at the aeration basins. m. Demolition Approximately 40% of the demolition of the influent pump station has been completed. The remainder of the influent pump station has been demolished and removed off site. 3. Contract 2 Cross Creek WWTP Approximately 40% of the demolition has been; cdnipleted for influent screw pump (ISP) #3. The remainder of the demolition has been completed and the new ISP #3 has been set in plate. The contractor has grouted ISP #3. The contractor has removed appf ximately 80% of the grout for ISP #3 due to the grout prematurely setting up. The remainder of the grout from ISP #3 has been removed: New Oita has been placed for ISP #3 and approximately 95% of startup for ISP ##3 has been completed. The remainder of the startup has been completed fair ISP #3 and ISP #2 Page 12 of 16 has been demolished. Concrete has been placed fat the motor/gearbox pad for ISP #2. ISP #2 has been set in place. The stai=tfzp has been completed for ISP #2 and the demolition has been completed for ISP #1. ISP #1 has been set (approximately 95 percent) in place. Startup has been completed for ISP #1 and it has been placed back into service: The demolition of clarifier #3 has been completed and work has begafi replacing RAS pump station piping. The masonry wall at the grit facility has been completed. The demolition has been completed for RAS purrips: #3, #4, and #5. The miscellaneous metals at the receiving station have been completed. The demolition of RAS pumps #1 and #2 have been cdthpleted and the piping modifications have been completed for RAS pumps #1, #2, #3, #4, and #5. The primary sludge pump #1 has been demolisher: The primary sludge pump #1 has been installed and awaiting startup. Approximately .10% of the formwork has been erected to shore up the latifider trough at clarifier #3. The demolition of diffuser piping at aeration basin #3 has been completed and approximately 90% of the RAS ptifhp station piping has been painted. The grit removal pumps have been 'received. The diffused aeration equipment in aeration basin #3 has been installed and startup has been completed. Concrete has been placed for the launder trough at clarifier #3. The air release valves have been installed at the anaerobic digesters. Concrete has been placed for the stairs at the influent pump station. The demolition of grit removal pump #1 has been completed and approximately 90% of the installation of new grit femoval pump #1 has been completed. The work at the thickened residual storage tank has been completed. The motor/drive and bearings have been replaced for intermediate ISP pump #1. The #3 primary sludge pump has been completed and the air release valves have been set in place for the pumps. Approximately 20% of the primer coating has beeti applied to the walls of clarifier #3. The remainder of the coating system l'ias been applied to the walls of clarifier #3 and approximately 80% of the clarifier equipment has been completed. The remainder of the grit pumps and primary sludge pumps has been installed. Approximately 80% of the storm drainage modifications has been completed. The diffuser piping in aeration basin #4 has been completed and the basin has been put back into service. Intermediate ISP pumps #1 and #2 have been completed and placed in service. Intermediate pump ISP #3 has been completed and placed in service and the demo of intermediate pump. ISP #4 has been completed. Primary sludge pump #2 has been completed and placed in service: The storm sewer work has been set in place and it was determined that the soil was pumping and may need to be replaced. Blower #1 has been set in place and approximately 90% of the piping has been installed. Approximately 95% of blower #1 installation has been completed. Intermediate ISP pump #4 has been completed arid placed in service. The demolition of ISP pump #5 has been completed. ISP #5 has been placed back into service. The curb and gutter have been completed at the septage receiving station. Clarifier #3 has been placed baler into service. Blower #1 has been placed back into service. The subsurface stone has been placed at the'$eptage receiving station. The pavifig has been completed at c Page 13 of 16 the septage receiving station. The gate has been set in place at the septage receiving station. 4. Contract 2D Concrete has been, placed for pads for generators (at Rockfish WRF and Cross Creek WRF), their respective 5000-gallon fuel tank pads, and their transformers pads. 'Concrete has also been placed for the pads of the proposed Control Buildings at each generator site: The conduit between the generator and the Control Building has been installed at both locations. The generator, Control Building, control panel, and the fuel tank have been set in.place at the Rockfish WRF and the Cross Creek WRF. Wire - has been pulled between the generator, Control Building and transformer at both generator sites. The terminations of the wire have been completed for the Control Building and the transformer. The grounding grid has been installed at the Cross Creek location. The grounding grid has been installed at the Rock Fish location. The load bank tests have been completed for both generators. 5. Contract 2E The generators, have been delivered to the Rockfish WRF and the Cross Creek WRF sites. E. Work Schedule for next Month 1. Contract 1 Cross Creek WRF Work has been completed. 2. Contract 2 Rockfish WRF a. Place aeration basin #1 back into service. b. Complete RAS flow meters for aeration basins 1 and 4. c. Complete fine grading, curb & gutter, paving, and yard inlets. 3. Contract 2 Cross Creek WRF a. Complete installation of the security gate at the septage receiving station. b. Startup residual storage tank. 4. Contract 2D Work has been completed. 5. Contract 2E Work has been completed. Page 14 of 16 IH. CONSTRUCTION INSPECTION CHECKLIST A. CONSTRUCTION SITE: 1. Weather 70's/ overcast Site Conditions: dry 2. Storage/Protection of Stored Materials and Equipment Adequate: Yes"I No 3. Safe Conditions/Methods Observed: Yes 4L. No , If not, note:. 4. 4. Were Unsafe Practices Brought to the Inspector's, Contractor's or Recipient's Attention? Yes • No N/A Site Comments: B. ENGINEERING/INSPECTION: 1. Resident Inspector On -Site: Yes 4L No 2. Inspector's Records, Reports, Shops, Files, Etc. ReViewed: Yes 4 No 3. Copies of Required Testing (concrete, soil, other) keports Reviewed: Concrete: Yes 4 No Soil: Yes 4 No Other: Yes 4 No 4. As-Builts Being Kept Up -To -Date: Yes L. No 5. Comments or Recommendations: C. CONTRACTOR(s): 1. N.C. OSHA/Labor Laws Posted: Yes L. No „ 2. Up -To -Date Construction Schedule (Bar graph, CPM) Posted: Yes No 3. Contractor(s) Coordination of Work Observed: Yes No N/A 4 4. Comment on Any Known Delays/Impacts in Contleting Contract(s) as per Contractor: 5. If Construction Appears Not to be Completed as Per Contract Estimate, Additional Time Needed for Completion: D. PROJECT PROGRESS/PAYMENTS 1. Payment Milestones Discussed: Yes No 4 2. Work Completed Acceptable for Reimbursement Yes L. No Page 15 of 16 GENERAL COMMENTS/RECOMMENDED ACTIONS A. This inspection was held in conjunction with the monthly progress meeting. Progress meetings are scheduled on the third Tuesdayof each month at the construction site at 1:30 p.m. for contract 2. The next progress meeting has been scheduled for October 17, 2006. - B. The following construction related items were not available dtiring the final inspection for Contract 1 (Highland Paving). Either the contactor or the engineer should provide them to the owner prior to fmal payment. 1. As -built drawings; 2. Approved plans and specifications; 3. Engineers Certification; 4. Certification of Completion; C. The following construction related items were available for teiiew during the final inspection for Contract 1 (Highland Paving): 1. Test reports; 2. Inspectors daily logs; 3. Approved shop drawings and submittals; 4. Final sales tax report; 5. Consent of Surety to final payment; 6. Final adjusting change order; D. The substantial completion date for Contract 1 (Highland Paving) has been determined to be_6/5/06. This office should be notified at Tony.Evans@ncmail.net once all final inspection items have been turned over to the owner for Contract 1. E. During the inspection, the contractor (contract #2-Seaside Utilities, Inc.) was - primarily working on curb and gutter. Page 16of16 V. PROGRESS MEETING PARTICIPANTS 1:30 p.m. Meeting Name Chuck Baxley Tracy Dowd Vance McGougan Larry Roberts Dickie Vinent Mick Nolan Mike Prillaman Phil Meador Joe Bustamante Ed Stempier Perry Locklear Mark Messere Dave Dismukes Antonio Evans Representing PWC PWC PWC PWC PWC PWC Seaside Utilities Seaside Utilities Seaside Utilities Seaside Utilities Via Electric Hazen Sawyer Hazen Sawyer DWQ-CGL 09119/06 Antonio V. Evans, P.E. Date