HomeMy WebLinkAbout20210589 Ver 1_Pre-Filing Acknowledgement Email_20210322Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, March 22, 2021 12:26 PM
To: Parker, Jerry A
Cc: Wanucha, Dave
Subject: Pre -Filing Meeting Request Acknowledgement - Scientific Street Bridge Replacement
- 20210589 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for Scientific Street Bridge Replacement that you submitted on (date). The ID number for that project
is 20210589, Version 1.
Reviewer Contact Information:
Reviewer: David Wanucha
Reviewer Email: dave.wanucha@ncdenr.gov
Reviewing Office: Winston-Salem Regional Office - (336) 776-9800
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
1
ID#* 20210589
Version* 1
Regional Office* Winston-Salem Regional Office - (336) 776-9800
Reviewer List* Dave Wanucha
Pre -Filing Meeting Request submitted 3/19/2021
Contact Name * Jerry Parker
Contact Email Address* japarker3@ncdot.gov
Project Name* Scientific Street Bridge Replacement
Project Owner* NCDOT
Project County* Guilford
Owner Address: Street Address
1584 Yanceyville Street
Address Line 2
P.O. Box 14996
aty
State / Frovince / Region
Greensboro
NC
Rbstal/Zip Code
Country
27415-4996
USA
Is this a transportation project? * r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit F Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
17BP.7.R.114
Do you know the name of the staff member you would like to request a meeting with?
Dave Wanucha
Please give a brief project description below.*
Project will involve replacing a structurally deficient bridge with a new
bridge in the same alignment. An offsite detour will be utilized during
construction. The project has been designed to have as little
environmental impacts as practically possible. Best Management
Practices will be used throughout all phases of construction.
Please give a couple of dates you are available for a meeting.
3/25/2021
3/30/2021
3/31 /2021
Please attach the documentation you would like to have the meeting about.
Scientific Street Permit Drawings.pdf 5.39MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
9k,v ?-k-
Submittal Date 3/19/2021