Loading...
HomeMy WebLinkAbout20210589 Ver 1_Pre-Filing Acknowledgement Email_20210322Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, March 22, 2021 12:26 PM To: Parker, Jerry A Cc: Wanucha, Dave Subject: Pre -Filing Meeting Request Acknowledgement - Scientific Street Bridge Replacement - 20210589 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Scientific Street Bridge Replacement that you submitted on (date). The ID number for that project is 20210589, Version 1. Reviewer Contact Information: Reviewer: David Wanucha Reviewer Email: dave.wanucha@ncdenr.gov Reviewing Office: Winston-Salem Regional Office - (336) 776-9800 When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. 1 ID#* 20210589 Version* 1 Regional Office* Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Dave Wanucha Pre -Filing Meeting Request submitted 3/19/2021 Contact Name * Jerry Parker Contact Email Address* japarker3@ncdot.gov Project Name* Scientific Street Bridge Replacement Project Owner* NCDOT Project County* Guilford Owner Address: Street Address 1584 Yanceyville Street Address Line 2 P.O. Box 14996 aty State / Frovince / Region Greensboro NC Rbstal/Zip Code Country 27415-4996 USA Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit F Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 17BP.7.R.114 Do you know the name of the staff member you would like to request a meeting with? Dave Wanucha Please give a brief project description below.* Project will involve replacing a structurally deficient bridge with a new bridge in the same alignment. An offsite detour will be utilized during construction. The project has been designed to have as little environmental impacts as practically possible. Best Management Practices will be used throughout all phases of construction. Please give a couple of dates you are available for a meeting. 3/25/2021 3/30/2021 3/31 /2021 Please attach the documentation you would like to have the meeting about. Scientific Street Permit Drawings.pdf 5.39MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 9k,v ?-k- Submittal Date 3/19/2021