Loading...
HomeMy WebLinkAboutGW1-2021-01068_Well Construction - GW1_20210322 Print Form WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Nathan Seagle 14.WATER ZONES FROM '10 11"CRIY'110R Well Contractor Name n. .r n. 4499-A LfL n. n. NC\C ell Contractor Ccnitication\umber 15,OUTER CASING for multbeased wells OR LINER(if so litable Aqua Drill, Inc. FROM ft. 1'0 ft. DIAM81'I:R THICKNUSS MATERIAL Cmnpnny Name FROM INNER CASING OR TIIBDIG tolhermal clERKNtoo 2.Well Construction Permit S: N(1" 0�'`Q �� 3��� FROM TO DIMIETER TIIICKNFSS MATERIAL Lisrell upp6rahlr turd!oonvvumm�pnmirs ri.e. LIC.C'ounp.Shire. E'urimar.rrrl ft. D, in. 3.Well Use(check well use): ❑. n. is 17.SCREEN Water Supply lYdl: FROM TO DIAMETER SLOTFIZE 1'mCKNM1 MATERIAL Agricuhurel Municipal Public II, fE In Geothermal(Heating('oohng Supply) �esidenlial Water Supply(singlet IndustriaUConunercial Residential Water Supply(shared) ULGROUT Irrigation FROM 10 NIATERLU, EMPLACEMENT METH OD&AMOUNT N'on-Water Supply Well: C) " Zt, rt. Monitoring Recovery ft. D. Injection Well: ft. R. Aquifer Recharge QGrounde'ater Remedialiun 19.SAND/GRAVEL PACK(ifankahl0 Aquifer Storage and R2co\'cry E3Salinll3 Barrier FROM I To MATERIAL EMPLACEMENT METHOD Aquifer Test aStornvater Drainage ft. ft. Experimental'Technology Subsidence Control Geothermal(Closed Lrxip) ®Tracer 20.DRILLING LOG aR¢h additional sheets if necessary) Geothermal Ilealin Cooling Return) nOther(explain under ft2l Remakes) FROM To IDTsemIflON cobr,bardmx.,rolur«st nmslxe,ac. o H. n' C/ 4.Dale Well(s)Completed: Well IDq ft. Hp ft. ft. It. 5a.Well Location: C. 1� �.��-1 11 rL 125, n. - el I a,,lit,(Inner m Nae I'acilav lD=oI applicable) ft. R. ft. n. 2tzo c r t n C tit la D. Pbysical Address,City,and Zip '� LI I 2LREh1ARKS Country Parcel Identiit.niun No (PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: - (Twell Held one[.I I.u,Is sudieienO 22.Certification: N W �� , 6.1s(are)the well(s)OPPrmanent or ❑Temporary Signature o Ccrt�ifii t�r}It n'ir-a �f( ^T Date 0 I--I�— B'sigldrg rids loon. 7/rer v renh'dmr the ncrll(o nos pvere/'meow"M m vaordmae 7.Is this a repair to an existing well: Yes or Earn wah I5d NCAC 02C'.0100 or/5A NCAC 02C 0200 Well Constoi,ucn Standards and that u It th"k u repair,fill our A ur//rnuvnv,mot Inlr.....i...and ecp)aia the nuru t,of rhr rn/n• if IN,rerard h.heea provided to the null mwrar. repair under 421 remurke sr.5loo ur at the bacA qj this Jonn. 23.Site diagram or additional well details: 8.For Geoprobe/DFT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages ifnecessary. drilled: SUBMITTAL LNSTRUCTIONS 9.Total weil depth below land surface: I ZS eft•) 24a, For All Wells: Submit this form within 30 days of completion of well R.r construction to the following: 10.Static water level below top of casing: (ft.) Division of Water Resources,Information Processing Unit, lltmrrr level is above rnring.use'- 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: (in.) 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit one copy of this form within 30 days of completion of"ell 12.Well construction method: I v- I)n I-t construction to the following: It v auger,rotury,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 2 769 9-1 636 13a.Yield(gpm) 3C Method of lest: `J t 5 Lr t 24c. For Water Suuuly& Infection Wells: In addition to sending the form to the addTCSS(eS) above, also submit one copy of this form within 30 days of 13b.Disinfection type:&4 4j AmounC I C C 1 completion of well construction to the county health department of the county where constructed. Fomm G W-I North Carolina Deportment of Environmental Quality-Division of!Pater Resources Re,feed 2-22-2010