HomeMy WebLinkAbout20120296 Ver 1_Meeting Minutes_20120906BEVERLY EAVES PERDUE GOVERNOR Contract ID: T.I.P. No.: W13S No.. F. A. Project No. Counties: Description: sv- STATE W . OF NORTH CAROLINA DEPARTNTNT OF TRANSPORTATION September 6, 2012 C202616 R -2507A 35488.3.1 NIA Hertford & Gates EUGENE A. CONTI, JR, SECRETARY US 131 US 158 Widening from NC 45 near Winton to the US 158 Bypass in Tarheel Mr. Chris Martin, Project Manager E. V. Williams, Inc. P.O. Box 65128 Virginia Beach, VA 23467 -5128 SUBJECT: Preconstruction Conference Minutes A preconstruction conference was held at the Division Engineer's Office, Edenton, NC, on Thursday, August 30, 2012. Attendees and Proiect Personnel: Mr. Mark Osenbaugh/E. V. Williams Mr. Chris Martin/E. V. Williams Mr. Brian Evans /E. V. Williams Mr. Joe Budt / E. V. Williams Mr. Dave LePage / E. V. Williams Mr. James Rountree / E. V. Williams Mr. Gary Meads / Mclean Mr. Ashley Ray Christiansen 1 Mclean Mr. Bryan Badey / RK &K Mr. John Stewart / RK &K Mr. Kevin Bisby / RK &K Mr. David Peterson / RK &K Mr. Matthew Cook / RK &K Mr. Michael Merritt / RK &K Mr. Thomas Roberts / Telics & Time Warner Cable Mr. Michael Wood / CATENA Mr. Ivy Kimbrough / CATENA Mr. Russell Ribblett 1 Fiber Technologies & MCNC Mr, Jeffrey Williamson / CenturyLink Mr. Hubert Williamson / CenturyLink Mr. Mike Kotarba 1 Right of Way Consultants, LLC Mr. Gary Taylor / AMEC Mr. Garcy Ward /NCDENR Mr. David Wainwright / NCDENR Mr. Bill Biddlecome/ US ACOE Mr. Paul Williams / NCDENR Mrs. Michelle Pittman / NCDOT Mr. Wiley Jones / NCDOT Mr. Bob Capehart / NCDOT Mr. S. L. Emory / NCDOT Mr. Clay Willis / NCDOT Ms. Carla Pugh I NCDOT Mr. M. E. Joyner / NCDOT Mr. Bill Copeland / NCDOT Mr. Eddie Bunn / NCDOT Mr. R. J. Kaylor/NCDOT Mr. M. R. Hill/NCDOT 230 NC 42 West, Ahoskie, NC 27910, Phone (252)332 -4514; Fax(252)332-3040 Mr. Chris Martin Preconstruction Conference Minutes 9/6/2012 Page 2 of 3 Scott Emory opened the meeting and introductions were made. Permit and Environmental Issues: Bill Biddlecome reviewed the Department of the Army Permit (Permit SAW 2006- 101391). E. V. Williams only has one pit at this time but they are looking for another one. Bill said to make sure the permit plans match the construction plans. Also, make sure that permit is onsite at all times. Bill said that it is possible to vary the in water work moratorium for work at the beginning or end of the moratorium if it will facilitate an earlier completion of the project. Section 10 is included in the permit for utility work and not for new bridge construction. Bill said to make sure that SHPO conditions are followed. The Utility Coordinator is going to review the permit with every utility subcontractor. Clay said that he would be glad to meet with them. David Wainwright reviewed the 401 Water Quality Certification (Certification No. 003918). Paul Williams reviewed DENR Permit Number 92 -12. Bill and Garcy Ward said that it was okay to install high visibility silt fence 3' to 5' off of the toe of the slope if the slopes are marked with stakes. Bill said to not allow silt to stay in the area between the toe of slope and the silt fence for a long period of time. Scott Emory said that we want ground cover as soon as possible. This project is under the 21 day soil stabilization rule. Scott said that the NCDOT plans to have a dedicated erosion control inspector on the project. Scott welcomed the environmental agency personnel to the monthly construction conference that is held on the third Wednesday of every month at 11 AM at the Contractor's office trailer. Utilities AT &T is getting their contractor now. They will begin work in around 6 weeks. It will take them 4 to 5 months to complete their work. Time Warner plans to complete work by the end of the year. Century Link will be ready to start soon. MCNC has a deadline to be completed by December, 2012. There is 25,000 feet of 12" gas main that has to be relocated. 230 NC 42 West, Ahoskie, NC 27910 Phone: (252) 332 -4514 Fax: (252) 332 -3040 Mr. Chris Martin Preconstruction Conference Minutes 9/6/2012 Page 3 of 4 Right of Way Mike Kotarba reviewed the right of way issues and passed out a sheet with the status of the properties. The plan is to have all right of way available for construction by November 1, 2012. Other Issues: EV Williams plans to have a safety officer onsite at all times once we are in full swing. EV Williams has finished clearing the borrow pit and they will begin installing the silt fence tomorrow. Joe Bordt said that it will take them 3 months to clear the project. M. E. Joyner said that he recommends installing the safety fence prior to clearing. If you try to install a highly visible silt fence before clearing starts, the silt fence will be damaged and there will be difficulty toeing it in. The plan is to start the north bound bridge at Buckhorn Creek in October, 2012. Wiley Jones wanted to make sure that we get all of documentation including material certifications that is needed. This completes the minutes of the Preconstruction Conference for Contract C202616 held on Thursday, August 30, 2012 at the Division Engineer's Office, Edenton, NC. Any discrepancies with the content of these minutes should be submitted in writing to this office. Failure to do so will be an indication of agreement. Sincerely, Scott Emory, P.E. Resident Engineer BY: Michael R. Hill, P.E. Acting Senior Assistant Resident Engineer SLE/MRIVmrh CC: Jerry Jennings, P. E. Meeting Attendees Mr. Robert Barrett -PCNG 230 NC 42 West, Ahoskie, NC 27910 Phone: (252) 332 -4514 Fax: (252) 332 -3040 REVISIONS R/W REVISION NO7AUGUST 30 2012 REVISED PROPOSED DRIVE AND ADDED SECOND PROPOSED DRIVE ON PARCEL 38 ADJUSTED R/W AND ADDED PERMANENT EASEMENT /2012 Hyd 1 \PERMITS E m t 1 \D g\ 2507A Hyd p t p h18 dg O 0 0 ti m � I M m T j MATCHLINE —L— STA 189 +00 SEE SHEET 17 Frl aoO� s � �I r ( / I I N1C�`m tj C b < om 10 Ln r 2 oZm D D CZ �1 i lr I �-_- - � y R > I� 4i A � rrl 2 r 2 r� + p 1 ° a , I Ill llil �OD � Ln ROAD / R 1 NETS ti 'R v O } -c Lq n I1 O _ L Qn o` m W � I ti F m0 N uZ0 m �y \O � J mil z n O Z o�'-' a oo op mau Q7 - 00 61 VAS I I r 1 195 f-zaJ Z z4� °n cv o n A �D oU D Ol oom � r s � o � n - -5 m o - °n n $ x = 3 f xx Rg 3 S -g T O N S on O oc i m0 D � _ < fl W I o� - ° z ro 200 oN �ti o 5 _ / n o 1° o ff r0 �O , D o a3 -- aT 0 n y pZO z I � S _�_ 3N11H� V l p ° ~o z$ Z �x 00 p� a o ,