HomeMy WebLinkAbout430032_POA_20200121PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 43-32 County: Harnett
Facility Name: P-62
Certified Operator Name: David W. Hull Operator Number: 1004386
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: P-62
Spillway(Y or N): N
Level(inches): 16
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section 111 tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 1/21/20 Weather permitting.
hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Prestage Farms Inc. Phone: 910-592-5771
Facility Owner/Manager Sprint)
47
Facility Owner/Manag (signature)
Date: 1 /21 /2020
30 DAY DRAIN DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
P-62
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a, current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
top of dike surface area according to design
d. (area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
2400
certified herd #
16.0
19.0
inches
inches
3.0 inches
168,200
ft2
314534 gallons
180
253,779
2400
actual waste produced = current herd # x line g =
certified herd #
volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m_ ((lines e + k)/1000) x line I =
1 /6/2 020
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
253779 fti
0
98,116
ft3
f3
438696 gallons
1.76
1326 Ibs. PAN
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
2. Structure ID:
3. Structure ID:
4. Structure ID,
5. Structure ID:
6. Structure ID:
P-62
n.lines 1+2+3+4+5+6=
line m = 1325.7 Ib PAN
line m = lb PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
Tine m = lb PAN
1325.7 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining fRR-t.
2 PAN balance
(Ib/acre)
TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column rx s
u. application window'
4630
10A
SG -OS
4.31
50.00
215.5
OCT-MAR
4630
16A
SG -OS
3.24
50.00
162.0
OCT-MAR
4630
17A
SG -OS
3.37
36.00
121.3
OCT-MAR
4630
2A
SG -OS
5.29
50.00
264.5
OCT-MAR
4630
3A
SG -OS
5.37
50.00
268.5
OCT-MAR
4630
4A
SG -OS
5.37
37.00
198.7
OCT-MAR
4630
5A
SG -OS
4.46
50.00
223.0
OCT-MAR
v. Total PAN available for all fields (sum of column t) =
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) =
1453.5 lb. PAN
1325.7 lb. PAN
1453.5 Ib. PAN
-128 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE;
Called in to DWR on 1/21/20.