HomeMy WebLinkAbout20110855 Ver 2_DCM Permit_20120801..s -..L »P> - :- .:..r -x ,:-M- :�.t•�.. -•.� -r �- ���...:4 -rte .!�-. �.rr*, rc.�.�r�.,;.. -.w�,ro a•�ra^r.rr.; ..;.,�....,.; ;.,,, .^.� r� :- :. rp;,.. -r• -r :- , r .•rrra,.�.s..+ : rrr^rrm,.;.:.:.n+...rr: �:.; ._:..- r.•.•r.- :c•o-rso-..,..w.,..
;._-mir L Ls U��U�- �l�S f 1Q S Permit Nt.r bc'
IFiCA ON/Nil OR
2) -A
SATE 0T ,N0 T 14 CAROLINA
y •'C'i, I" .iii; ".. f ;Ji r di:(� . ?t ,.a� Re301]i-%S
ik- WgSSV2.
X_ Major De,-elcpmcnt i"1 do !area of E iror.-nertal Concern
pLus'aa_it to NCGS 113 A-i l v
Excavation andlor filling pursuant to NCGS 113 -229
issued to Piedmort Natural Gas, 4720 Piedmont Row Drive, Charlotte, NC 28210
Authorizing development in New Hanover/Brunswick County at Anson County east to Navassa. Brunswick County. crossing
eOder the Cane Fear River. in Wilmi igton , as requested in the permittee's application dated 5/22/12
This permit, issued on August 1, 2012 , is subject to compliance with the application (where consistent
with the pen-nit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) Unless specifically altered herein, this minor modification authorizes the additional temporary impacts for
the temporary work space in connection with Sutton Pipeline Project, all as expressly and specifically set
forth in the workplan drawings.
2) This minor modification shall be attached to the original Permit No. 23 -12, which was issued on 3/28/12,
and copies of both documents shall be readily available on site when Division personnel inspect the project
for compliance.
3) All conditions and stipulations of the active permit remain in force under this minor modification unless
specifically altered herein.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2015
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
Z// J�
Braxton C. Davis, ssistant Director
' Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee