Loading...
HomeMy WebLinkAboutGW1-2021-00329_Well Construction - GW1_20210312 WELL CONSTRUCTION RECORD For Internal Use ONLY This form can be used for single or multiple wells 1.Well Contractor Information: COREY FUTRAL lW4VWAUWZbNk9 FROM TO DESCRIPTION Well Contractor Name 4330-B NC Well Contractor Certification Number f1S(iNNERC.>AS7NG'ORT[7BTGr eo her'�'°,nall'eted loo FROM I TO DIAMETER TMCKNESS I MATERIAL CATLIN Engineers and Scientists oft.oft.1 Oft. 2 id Sch.40 1 PVC Company Name IRT6 TfER formnt""`""Tr cam"'de .wills ORhT11�ER if:a it e FROM TO DIAMETER THICFTESS MATERIAL 2.Well Construction Permit#: N/A a a in. List all applicable well permits(i.e.County,State, Variance,Injection,etc.) ft. (t. 3.Well Use(check well use): 6�:fsciiEFa Water Supply Well: FROM TO DIAMETER I SLOTSIZE THICKNESS I MATERIAL ❑Agricultural ❑Municipal/Public 0 ft. 15 rt. 2 in. SIOt.010 I Sch.40 1 PVC ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ft. Ic. in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 68CGR0+�r FROM TO MATERIAL ENIPLACEMENTMETHOD&AIv10UNT ❑Irrigation ft. a. Non-Water Supply Well: ®Monitoring ❑Recovery ft. ft. injection Well: rt. rt. ❑Aquifer Recharge ❑GroundmvaterRemediation 1f19�SAN1l'GitASET�FP CK3ifa amble FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control 0 n. 15 rt. Natural Baekfill IF201DRI11LI1VGIAG'alle addTional she""ets'tf nee ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color,hardness,soilhock tvpe,grain size etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under 021 Remarks) a. ft. 4.Date Well(s)Completed: 03/04/21 Well ID#: TMW-01 rt. ft. e - 5a.Well Location: rt. rt. S �O «� Paula Nethercutt NCDOT R-2303 D Paula Nethercutt �.,do Facility/Owner Name Facility iD#(if applicable) fc. 5951 ROSEBORO HWY,CLINTON,NC 28328 Physical Address,City,and Zip ft. ft #211rRE1NAltiCS SAMPSON County Parcel identification No.(PIN) = - 51b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (if well field,one Iat/long is sufficient) 34.973711499 N -78.42659006 W 3/8/2021 Signature of Certified Well Contractor Date 6.Is(are)the well(s): ❑Permanent or M Temporary Hv signing this form.I hereby certify that the well(s)was(were)constructed in accordance with IAA MAC 02C.0100 or 15.4 NCAC 02(".0200 Well Construction Standards and that a cow of 7.Is this a repair to an existing well: ❑Yes or ®No this record has been provided to the well owner. lfihis is a repair,ill out known well construction information and explain the nature of the repair under+21 remarks section or on the back ofthis form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. For multiple injection ur non-water supply wells ONLY with the same construction,you can submit one form. SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 15 (g,) 24a.For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths in different(example-3@200'and 2@100J construction to the following: 10.Static water level below top of casing: 6.0 (ft.) Division of Water Resources,Information Processing Unit, If water keel is above casing,use" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 2 (in.) 24b.For Infection Wells ONLY: In addition to sending the fonn to the address in 24a above,also submit a copy of this form within 30 days of 12.Well construction method: DPT completion of well construction to the following: (i.e.auger,rotaty,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test: 24c.For Water Sv'auly&Infection Wells: Also submit one copy of this form within 30 days of completion of well 13b.Disinfection type: Amount: construction to the county health department of the county where constructed. Adapted from Form GW-I North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised 2-22-2016 WELL LOG CATLIN Engineers and Scientists 220211 SHEET 1 OF 1 PROJECT NO.: 220211 STATE: NC COUNTY: SAMPSON LOCATION: CLINTON PROJECT: NCDOT R-2303D PAULA LOGGED BY: COREY FUTRAL WELL ID: NETHERCU17 DRILLER: PATRICK MCCAIN TMW-01 NORTHING: 445920 1 EASTING: 2171853 CREW: TREVOR MIZELLE SYSTEM: NCSP NAD 83 USft BORING LOCATION: —13'OFF ROSEBORO HWY T.O.C.ELEV.: DRILL MACHINE: Power Probe METHOD: DPT 10 HOUR DTW: 6.0 TOTAL DEPTH: 15.0 START DATE: 3/4/21 END DATE: 3/4/21 124 HOUR DTW: N/A WELL DEPTH: 15.0 DEPTH BLOW COUNT OVA LA8 o a SOIL AND ROCK WELL 0.5tt 0.5ft 0.5ft 0.5tt (PPM) s G DEPTH DESCRIPTION DETAIL 0.0 LAND SURFACE 0.0 0.0 0.5 (SM)-Brown,Silty TOPSOIL 0.0 a 1.0 (CH)-Tan with orange and red mottling,Sandy highly plastic CLAY (n Direct N M D (SC)-Brown with gray grading to tan,Clayey F.SAND N Push - 4.0 4.5 (CH)-Gray with orange,red,and purple mottling, - highly plastic CLAY Direct NM D Push o> 0- 6 in= 8.0 Direct N M M - Push 12.0 - Direct N M M Push - 15.0 15.0 15.0 _ 15.0 BORING TERMINATED AT DEPTH 15.0 ft Native Backfill