Loading...
HomeMy WebLinkAbout090025_30 day POA_20210302PLAN OF AC I1I N (PM) FOR G=iIIGH FREE0 Cam'' F/� C' c� c0i)�0 ty I'\�ll9GIn i'OC?U,° ! F6(I(�C, F." ( L D AT ANil ✓1�c1 MAL FACfJLIITO 1'Vi'Y1�' j0\0i 'i. Current liquid level(s) in it`1Ghes as J3"lecj5'f;l�('�� from the current liquid lowest p0ipoint onthe top of thedam for lagoons without spillways;r level in the lagoon 'to the in the lagoon to the bottom of the spillway for lagoons with spillways. � �!� , f orn the current liquid level • Structure 1 • .Structure 2 Structure 3 Structure 4 Structure 5 Structure ,tc Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check eii►II applicable items \F f Liquid level is within the designed .structural freeboard elevations•of one or more structures. Five'. 30 day Plans of Action are siiachEd, Hydraulic �nc agronomic balance are within accepcable ranges, Liquid level is within the 25 year 24 hour storm elevations for one or more structur Plan of Action is attached. Agronomic balance is within acceptable range, es. A 30 day \Neste is to be pumped and hauled to off site locations. Volume and PAN content of pumped and hauled is reflected in section 111 tables. Included within this lan is e list ote to proposed sites with related facility.- � � ih�, number(S), number acres and receiving cro' t ��[,����,� �[���1 ���,rr'� �[�y�[�'�•��f �[r°��� , ;�i��=� � ���LTp�T�;�G"G �P �,�1,°at� '., �, � Inf01"t "I�Llon. t��, a Ate not co1.re'e�� Lr'� %C�7,���.�rr�.-� �,y�=">` �� �, `G' _7U1�?� � [�Gi�®G l�� t;��IIP��GQr1w�1 tac.= rIt s csTrili: iec chi' [uLc1V ;e ' e �i[� G.�'�� �?[�i ��l��ifi�� �l� �9G1E�i _ Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation if animals are to be moved to another permitted facility,p Provide facility number; lagoon freeboard levels and herd population for the receiving facility Earliest possible date to begin land application of waste: uerfeby cevtigy that have vvG riyedi the eniferG i i iion ''`-t s[�,,ove and i .i ii;j d ;,n> t r L , and GJ c r u v. ..1 G 1' Hated �S `.= 1! O. ��1 r C � l�.� � L^'� i �v lf'•..� il a � I� li 4 [I� '�attached '�' '7 n ���,`'aci�:?�[�i� �G�� to �%� (=����ti � r„- f. �,�, -� .r� -.'� ,> [L�� �,(4� L`LC_Gl �� �:LLv ClL� LLLC � �1 �L'eUl!'i�LLrL+aI;!io- is ac'a Late and correct. k krAn Faciiity Q'wnett'%_ciic?[ra,c,�er ([ rr! it) vSc[�'ILr' (oI(o) B72 - 20r)I "L Po. .Cov-Gu° Pao.; 2/2'/©r!% b II. TOTAL POUNDS OF PAN STORED V ITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Storms 5 Storms 6 line m = 230.4 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN n.lines 1+2+3+4+5+6= 230.4IbPAN III. TTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (I b/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column rxs u. application window' 1043 J P1 wheat wheat 2.60 4.90 60.00 60.00 156.0 294.0 Sept - April 30 Sept - April 30 ** guestimate on PAN left 1State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w -x) = NARRATIVE: 450.0 Ib. PAN 230.4 Ib. PAN 450.0 Ib. PAN -220 Ib. PAN will begin pumping as soon as field conditions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Storms 5 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 8568 certified herd # 16.0 19.0 inches inches 3.0 inches 127596 ft2 238605 gallons 180 161410 8568 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/7/20 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 161410 ft3 0 j ft3 77000 ft3 297218 gallons 0.43 lbs/1000 gal. 230.4 Ibs. PAN PoA (30 Day) 2/21/00