Loading...
HomeMy WebLinkAbout20120770 Ver 1_Application_201208150 O STATE OF NORTH CAROLINA ZNR sZQ� DEPARTMENT OF TRANSPORTATIC4,,*o��,ry Z BEVERLY EAVES PERDUE q�R GOVERNOR EUGE CONTI JR SECRETARY August 3 2012 U S Army Corps of Engineers Regulatory Field Office Post Office Box 1000 Washington N C 27889 1000 120"7'i 0 Attention Bill Biddlecome Subject Request for a NW 14 permit and DWQ 401 Certification for a secondary road widening project on SR 1340 (Clayton House Rd) in Martin County The North Carolina Department of Transportation is requesting a NW 14 permit for impacts resulting from road improvements on SR 1340 (Clayton House Rd) in Martin County NCDOT proposes to widen the existing gravel road from 18 to a 20 paved surface width with the ditchline being set back and shoulders being adjusted to accommodate a wider paved surface After avoidance and mimmization the remaining unavoidable impacts are 14 lmear feet of open water impacts (ditch through hydnc soil) Included with this letter are the PCN form vicinity map pernut drawings and aerial photos If you need any additional information or have any questions concerning this project please contact Ryan Shook at 252 482 7977 Sincerely Jerry Jennings P E Division One Engineer Clay Willis Division One Envi nmental Officer Cc Garcy Ward DWQ Sonia Greeory DWQ 113 Airport Drive Suite 100 Edenton NC 27932 Phone (252) 482 7977 Fax (252) 482 8722 O J W m :i a. UV N J L 0 L CO ~ _j O �O zz n • ICI / X 8 I � j I � 1 r o �$ I 1 c.4 I 2 i U) �I I °I I I ;! �I �Y r --lip 10 N Os 0 W J J W CL if zLL 0 mZ oW F_ _ aU �a W a �a CL co T_ LL O et M F- W W O 2 W Q_ yj11`o � sip _r � p F- W w w == O � � U W J 0 o 1 W <° � Z O c i--zXCN LLI o LU N Q o r i > a.� ❑ a F- S Z % U I- LLI ❑ U zz --)w =3cnOt- a- o Z UOm F_ � W O O a- <° � z Li ~ � LLI o 0 Q ® a' S Z Z ' Z Li U O O U~ LL z 2 O � O O Z 0 CD z G F- Li C. 0 W J J w CL (n a Z LL W m Z OW f- _ av �Q W aP- �Q r Q J w Q LL O w O 0 w z a F- Z Liz Q W F- H LL O w O 0 w 0 W J J w (a A Z LL w0 am o Oz F- w a= QU �Q W CL F- �a a0 � .0 MVU Z N P LL J CO 0 L X °°� v 0 LLI _j OQO RZZ C O C O O O O U) m N O (/) (n O` O Ja.0 E— U) X O WUwc- O If II J � m Q _ R — Q U U) +' C U_ N fn F— Z Ix CN d O a'Qwr I O> i ) CQpar' C IZ r0 d4 F�LU yr 1 C0 V W Z J W 16- z w U 0 W J J W Q (� a ZLL LU M 0 W Z OW F- _ av �Q w a �a C O a0 IY w CL W C L � cLa CD F- Q O O 0 W CL ZY C = F— Z Ix CN d O a'Qwr E J) i ) CQpar' C IZ ~ O o U z w M�no� Z L ma U a 0 O (D z_ Q D E- w Iz a0 IY w � I T � I F- 2VN MO Z y0 ILL � d w J W 0H O ui W N �X Z z uj O (D z_ Q D E- w Iz O� OG r >_ y I ° ®' ' ° El Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Pre - Construction Notification (PCN) Form A Applicant Information 1 Processing 1 a Type(s) of approval sought from the Corps Section 404 Permit ® ❑ Section 10 Permit 1 b Specify Nationwide Permit (NWP) number NW 14 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? as ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑Yes No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project SR 1340 Clayton House Rd 2b County Martin 2c Nearest municipality / town Hamilton 2d Subdivision name 2e NCDOT only T I P or state project no State Project no 1 C 058035 3 Owner Information 3a Name(s) on Recorded Deed NCDOT 3b Deed Book and Page No n/a 3c Responsible Party (for LLC if applicable) NCDOT Division One 3d Street address 113 Airport Drive Suite 100 3e City state zip Edenton NC 27932 3f Telephone no 252 482 7977 3g Fax no 252 -482 8722 3h Email address tcwillis @ncdot gov Page 1 of 11 PCN Form — Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 11 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History I Property Identification 1a Property identification no (tax PIN or parcel ID) lb Site coordinates (in decimal degrees) Latitude 35 94118 Longitude 7723442 (DD DDDDDD) (DD DDDDDD) 1 c Property size 2 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to proposed project Conoho Creek 2b Water Quality Classification of nearest receiving water C 2c River basin Roanoke 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The existing gravel road is 18 wide with 3 4 variable grass shoulders Land use within the project area is agricultural and rural residential 3b List the total estimated acreage of all existing wetlands on the property <1 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project To build the existing road to a 20 paved surface with relocation of ditches and widening of shoulders 3e Describe the overall project in detail including the type of equipment to be used To upgrade an existing gravel secondary road from 18 to 20 wide paved surface with 4 5 shoulders pipe replacement Ditches will have to be set back in order to accommadate the widening of shoulders Heavy equipment to be used will be an excavator backhoe motor grader and dumptrucks 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown Comments 4b If the Corps made the jurisdictional determination what type of determination was made' ❑ Preliminary ❑ Final 4c If yes who delineated the jurisdictional areas Agency /Consultant Company NCDOT Name (if known) Ryan Shook Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the pasY� TO Yes ® No ❑ Unknown 5b If yes explain in detail according to help file instructions Page 3 of 11 PCN Form — Version 1 3 December 10 2008 Version 6 Future Project Plans 6a Is this a phased project? ❑ Yes ®No 6b If yes explain Page 4 of 11 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a Wetland impact 2b 2c 2d 2e Type of jurisdiction 2f number — Permanent (P) or Type of impact Type of wetland Forested (Corps 404 10 Area of impact Temporary T (if known) DWQ — non -404 other) (acres) W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ w3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T El Yes El Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 0 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number Permanent (P) or (PER) or (Corps 404 10 stream length Temporary (T) intermittent (INT)? DWQ — ror, 404 other) width (feet) (linear feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ IAIT ❑ DVvQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT E] DWQ 3h Total stream and tributary impacts 31 Comments Page 5 of 11 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a Open water impact number — Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ®P ❑ T UT to Conoho Creek fill (pipe) wetland equalizer (ditch cut through hydric soil) 00006 02 P ❑T ❑ 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 00006 4g Comments 28 sq ft (14 linear ft) of impact resulting from installation of longer pipe 5 Pond or Lake Construction If and or lake construction proposed then complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction Page 6 of 11 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a Project is in which protected basin? 6b 6c [6d Buffer impact number — Reason Permanent (P) or for Tem ora T im act B1 ❑P ❑T B2 ❑P ❑T B3 ❑P ❑T 61 Comments LD Impact Justification and Mitigation ❑ Neuse ❑ Tar Pamlico ❑ Other ❑ Catawba ❑ Randleman 6e 6f 6g Buffer Stream name mitigation required? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes E01 No 6h Total buffer impacts Zone 1 impact Zone 2 impact (square feet) (square feet) 1 Avoidance and Minimization la Specifically descrbe measures taken to avoid or minimize the proposed impacts in designing project Impacts were minimized by reducing pipe lengths from 60 to 48 in order to obtain the minimum shoulder width needed at stream crossing locations 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Methods of construction will be concurrent with NCDOT Best Management Practices for replacement of pipes and for sod and erosion control Staged construction will be utilized and the road will be closed or reduced to one lane of traffice during pipe replacements rather than using an on site detour in order to minimze the proposed impacts 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? 2b If yes mitigation is required by (check all that apply) 2c If yes which mitigation option will be used for this project 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) ❑ Yes ® No ❑ DWQ ❑ Corps ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation Type I Quantity Page 7 of 11 PCN Form — Version 1 3 December 10 2008 Version 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes buffer mitigation? No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) F6hComments Page 8 of 11 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ® No lb If yes then is a diffuse flow plan included? If no explain why Comments ❑ Yes ❑ No 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? n/a % 2b Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan NCDOT state stormwater permit for highway system is applicable NCDOT will follow guidelines for Erosion and Sediment Control 2e Who will be responsible for the review of the Stormwater Management Plan? 3 Certified Local Government Stormwater Review 3a In which local governments jurisdiction is this project? 3b Which of the following locally implemented stormwater management programs apply (check all that apply) 3c Has the approved Stormwater Management Plan with proof of approval been attached? 4 DWQ Stormwater Program Review 4a Which of the following state implemented stormwater management programs apply (check all that apply) 4b Has the approved Stormwater Management Plan with proof of approval been attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? 5b Have all of the 401 Unit submittal requirements been met? ❑ Certified Local Government ❑ DWQ Stormwater Program ❑ DWQ 401 Unit n/a ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other ❑ Yes ❑ No ❑ Coastal counties ❑ HQW ❑ ORW ❑ Session Law 2006 246 ® Other NCDOT stormwater permit No NCGO10000 ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10 2008 Version F Supplementary information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the use of public (federal /state) land? ® Yes ❑ No 1 b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter ) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in additional development which could impact nearby downstream water quality? [01 Yes No 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility No wastewater will be created from this project Page 10 of 11 PCN Form —Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ® No 5b Have you checked with the USFWS concerning Endangered Species Act impacts? I ❑ Yes ® No 5c If yes indicate the USFWS Field Office you have contacted ❑ Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Natural Heritage database 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes 0 N 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? Marine Fisheries Essential Fish Habitat List 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation status (e g National Historic Trust designation or properties significant in E] Yes No North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? A request was submitted to NCDOT s Cultural Resource office on 7/26/12 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes ® No 8b If yes explain how project meets FEMA requirements n/a 8c What source(s) did you use to make the floodplain determination? NC Flood Mapping Information System Clay Willis Applicant/Agent s Printed Name plicant/Agent s Signature Date (Agent s signature is valid only if an authorization letter from the applicant Page 11 of 11 PCN Form — Version 1 3 December 10 2008 Version Martin County SR 1 340 Clayton House Rd End project 35.9402i7 - 77.234152 _ a JSGS Quad - Hamilton Roanoke River Basin J 4y y 0 0.02750.055 0.11 Miles I I I I I I I I I N W E c tea' Begin prole, may' i 35.94345' � - 77.234858'. rr� IL F a rP End project 35.9402i7 - 77.234152 _ a JSGS Quad - Hamilton Roanoke River Basin J 4y y 0 0.02750.055 0.11 Miles I I I I I I I I I N W E c Martin County SR 1340 Clayton House Rd grade, drain, base, and pave _ IAF I I r ry Bagip P. dct Pipe .' 35.94118 - 7723442 nd project - r ? Y S "1 t —'' ' ., � ] I ._•• -!-rA r f 3 , _ ' t • • 1 � j � X =1 , fi r I " A,.b- _;.a A? '': 35.940217 / - 77.234152 J If nl X . . M , , t USGS Quad - Hamilton N Roanoke River Basin 0 0.1250.25 0.5 Miles w E I l l i l l l l l S