Loading...
HomeMy WebLinkAbout20210272 Ver 1_Pre-Filing Meeting Request_20210208ID#* 20210272 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 2/8/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Dean Fisher LKNDOCK@GMAIL.COM Foster shoreline Randy Foster Catawba Street Address 3789 Landmark Dr Address Line 2 aty Sherrills Ford Rbstal / Zip Code 28673 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F- 401 Water Quality Certification Regular Express r- Individual Permit r- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Frovince / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below. Installation of approx 2001nft of footer with compacted gravel, RipRap and 140 block to create base level along shoreline. Installation of approx 700 Rockwood 8' segmented block wall along base course to obtain a 4-5ft total wall height. Please give a couple of dates you are available for a meeting. 2/16/2021 2/17/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/8/2021