Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQCS00017_Regional Office Historical File Pre 2018 (5)
RECEIVED/NC©ENRIf)WR SE° 11 2018 WQRQS NC MOORESVILLE REGIONAL OFFICE Great Place. Great People. Great Promise. Engineering Department P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com September 4, -2018 Ms. Dee Browder NCDENR Division of Water Quality 610 E. Center Avenue; Suite 301 Mooresville, NC 28115 Subject: City of Gastonia Local Sewer Permit Program —Flow Tracking Report Dear Ms. Browder: In reference to above, please find attached the following documents: • Form FTSE-10/07: Long Creek Wastewater Treatment Plant • Form FTSE-10/07: Crowder's Creek Wastewater Treatment Plant • Form FTSE-10/07: Eagle Road Wastewater Treatment Plant • Sewer Usage Spreadsheet as of July 1, 2018 If you have any questions or need additional information, please contact me at (704)866-6789. Sincerely, Jamie Johnson Land Development Cc: Rusty Bost, City Engineer Tucker Johnson, Assistant City Engineer 5097-S Evergreen Landing Apartments 5097 11/7/2008 728 LF of 8" Long Creek Domestic 4 4890 19560 4 4890 19560 5241-S Fresenius Medical Care 5241 12/22/2008 165 LF of 8" Crowders Creek Domestic 1 2000 2000 1 2000 2000 5743-S Ridge Mill Community / Nina Dawn Sewer 5743 1/30/2009 8557 LF of 8" Crowders Creek Domestic 74 300 22200 57 300 17100 5780-S Queens Road Sewer Rehab Phase 3 (COG) 5780 2/23/2009 6470 LF of 8" Crowders Creek Domestic 92 350 32200 92 350 32200 5786-S NCDOT 274 Widening Utility Relocation Project 5786 2/25/2009 492 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5926-S West Davidson Bridge Replacement 5726 7/24/2009 320 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5739-S NCDOT Gaston County Maintenance Yard 5739 11/5/2009 1231 LF of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 6467-S O'Reilly Auto Parts 6467 1/28/2010 218 If of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 6468-S Summit Crossing Phase III 6468 4/1/2010 657 If of 8" Long Creek Domestic 3 6520 19560 3 6520 19560 6957-S Rolling Meadows Drive SS Extension 6957 8/23/2010 731 If of 8" Long Creek Domestic 3 350 1050 0 350 0 6953-S Tech Park Sewer Improvements 6953 11/18/2010 6397 If of 12" Long Creek Domestic 2 65000 130000 2 65000 130000 7054-S Robinson Heights Subdivision 7054 12/15/2010 1766 If of 8" Long Creek Domestic 19 300 5700 15 300 4500 6982-S DRJ Holdings Property 6982 1/20/2011 338 If of 8" Long Creek Domestic 1 1600 1600 1 1600 . 1600 7056-S Pearson Properties-- Hoffman Road 7056 3/4/2011 585 If of 8" Long Creek Domestic 1 1500 1500 1 1500 1500 7024-S Bordeaux Apartments 7024 3/8/2011 58 If of 8" Long Creek Domestic 33 350 11550 33 350 11550 7177-S Roberts Family Ventures , 7177 6/15/2011 112 If of 8" Long Creek Domestic 1 500 500 1 500 500 5922-5 Ballantyne Apartments 5922 6/21/2011 1795 If of 8" Long Creek Domestic 241 237 57120 241 237 57120 6725-5 Gaston Mall Redevelopment (Target) 6725 8/16/2011 681 If of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 7384-5 CTL Packaging USA 7384 5/7/2012 489 If of 8" 1107 If of 10" Long Creek Domestic 1 1200 1200 1 1200 1200 7488-S Dollar General Outfall 7488 7/3/2012 681 If of 8" Long Creek Domestic 1 910 910 1 910 910 7605-S South Fork Catawba Regional Imp. (Fair St.) 7605 11/20/2012 2682 If of 8" Long Creek Domestic 1 52470 52470 0 52470 0 7606-S South Fork Catawba Regional Imp.(Kings Grant) 7606 11/20/2012 266 If of 8" Eagle Domestic 1 64440 64440 0 64440 0 7543-S Rosegate Phase 3 A/B 7543 11/29/2012 995 If of 8" Long Creek Domestic 19 360 6840 19 360 6840 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2018 Page 3 of 6 ° SSLIEMNTE.olyAax4Pkv4,- .' ' - -'54', 1 i ' ' - ' ' - ' lt , ':'-`,::,•nittO -3, - 7, i Okietaag.419MAFLOINAMMMIONA. 'w ' A kliitEATIKATEPIEVNISONAM201182kA - 4.4i tr - f„. ethIniiErt - , , '' JP*44. - - — h't " - (04— 7582-5 Daimler 7582 12/21/2012 316 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4698-S Kinmere Village 4698 2/28/2013 7139 If of 8" Long Creek Domestic 111 360 39960 111 360 39960 7616-S West Congregation of Johovah's Witness 7616 4/9/2013 3841? of 8" Crowders Creek Domestic 1 8000 8000 1 8000 8000 7457-S South Fork Village Apartments 7457. 4/17/2013 2490 If of 8", 870 If 6" FM Eagle Domestic 352 274 96448 352 274 96448 7710-S Long Creek Apartments 7710 5/6/2013 1474 If of 8" Long Creek Domestic 103 300 30900 103 300 30900 7615-5 Rosegate Phase 3 C/D/E 7615 5/30/2013 3032 If of 8" Long Creek Domestic 55 449 24695 55 449 24695 7467-S Kinmere Commons 7467 6/4/2013 1977 If of 8" Long Creek Domestic 106 360 38160 106 360 38160 7720-S Robinson Oaks 2013 7720 9/6/2013 8392of 8" Long Creek Domestic 204 120 73440 38 120 4560 7746-S Tractor Supply 7746 9/18/2013 180 If of 8" Crowders Creek Domestic 1 2280 2280 1 2280 2280 7785-5 Summit Crossing Phase IV 7785 10/14/2013 427 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4948-S Villas At Robinson Oaks 4948 1/22/2014 1160 If of 8" Long Creek Domestic 62 374 22480 44 374 16456 7848-S Owens Corning 7848 1/31/2014 667 If of 8" Long Creek Domestic 1 124000 124000 1 124000 124000 8090-S Oakhill Lane Sewer Extension 8090 7/31/2014 372 If of 8" Long Creek Domestic 4 360 1440 0 360 0 8091-S Winterlake Drive Sewer Extension 8091 . 7/31/2014 380 If of 8" Long Creek Domestic 3 360 1080 3 360 1080 8092-S American & Efird Sewer Line Upgrade 8092 8/13/2014 227 If of 8" private sewer Crowders Creek Industrial 1 23000 23000 ' 0 23000 0 7640-S Villages At Cramerton Mills - Ph 1 7640 10/27/2014 4515' of 8" Eagle Domestic 75 416 31200 6 416 2496 7721-5 Bethesda Oaks Ph 3 - 2013 7721 1/6/2015 4408' of 8" Long Creek Domestic 84 480 40320 56 480 26880 8189-S Woodbriar Trail Sewer Extension 8189 1/26/2015 420' of 8" Long Creek Domestic 4 360 1440 2 360 720 8205-5 Villages At Cramerton Mills Ph 1E 8205 4/9/2015 1012' of 8" Eagle Domestic 8 1228 9828 0 1228 0 8174-S Harris Teeter 8174 5/26/2015 718' of 8" Long Creek Domestic 1 7317 7317 1 7317 7317 8359-S MR Office Building 8359 10/12/2015 179' of 8" Long Creek ' Domestic 1 275 275. 1 275 275 8338-S Catawba Hills Ph 4 8338 1/6/2016 1,835' of 8" Long Creek Domestic 38 360 13680 38 360 13680 8469-S - Catawba Hills Village D Townhomes 8469 1/21/2016 905' of 8" Long Creek Domestic 39 360 14040 39 360 14040 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2018 Page 4 of 6 PW1154,; 'ow , ' 7 - t, ,R#9Ag-,, ,k - 4 . 1.-!,-4.-, . 4 4,4,44.44,7,,,,, MI4g.M1444 N. „.. ..,.. ... 7 -A,„mapv ,iw,,, wa.,,,,,, ,N, ,„.. - -„v •-?,,:: psteogSIGMEAOWACAlierilgATIONSSESITIVATEMELIONOWNEOPMA8msf ?":„4,0 ,,,. , ek,F,„E-TtP4 ( 176 syMrtlopitii, ApP.49NFAMICIaim,' Ai t • ,,egterter4'' 8283-S Gaston College - Center For Advanced Manufacturing 8283 5/10/2016 11 If of 8" Long Creek Domestic 1 9000 9000 1 9000 9000 8341-S The Enclave At Cramer Woods Ph 1 8341 8/1/2016 4,772 If of 8" Long Creek Domestic 59 360 21240 7 360 2520 8513-5 Villas At Union Trace 8513 8/19/2016 78 If of 8" Long Creek Domestic 60 240 14400 60 240 14400 8533-5 Caromont Professional Office 8533 8/31/2016 245 If of 8" Long Creek Domestic 1 5575 5575 1 5575 5575 8657-S S New Hope Road Sewer Improvements 8657 10/21/2016 462 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 8555-5 Apple Creek Village Ph 1 8555 11/8/2016 3,554 If of 8" Long Creek Domestic 64 360 23040 37 360 13320 8532-S Sundance Village Ph3 8532 11/22/2016 2,570 If of 8" Long Creek Domestic 77 360 27720 17 360 6120 8624-S Village At Parkside Ph 3 8624 4/7/2017 773 If of 8" Crowders Creek Domestic 21 360 7560 0 360 0 8543-S Waffle House 8543 6/22/2017 281 If of 8" Long Creek Domestic 1 1520 1520 1 1520 1520 8760-5 Dollar General 8760 8/2/2017 226 If of 8" Long Creek Domestic 1 200 200 1 200 200 8779-S Apple Creek Village Ph 2 & 3 8779 10/24/2017 6,072 If of 8" Long Creek Domestic 21 1 360 75960 0 360 0 8866-S Duke Energy Gastonia Operations Center 8866 11/16/2017 1342 If of 8" Long Creek Domestic 1 1250 1250 0 1250 0 8857-S Maycroft 8857 1/18/2018 2,159 If of 8", 15 MH Long Creek Domestic 59 262 15450 0 262 0 8778-S Villages At Southfork Ph 1 8778 1/26/2018 1250 If 6", 7987 If 8", 1 lift Eagle Domestic 174 • 225 39150 0 225 0 8651-S Bethesda Oaks Ph 4 8651 2/1/2018 6,948 If of 8" ' Long Creek Domestic 126 360 45360 0 360 0 8802-S Courtyards At Cramerton 8802 4/5/2018 3,414 If 8", 27 MH Eagle Domestic 72 150 10800 0 150 0 8952-5 Gaston Community Church 8952 4/18/2018 256 If of 8" Long Creek Domestic 1 1250 1250 0 1250 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2018 Page 5 of 6 x,... .�... �. ,,.l� s ..,�,.,, rs-^'+s,.�:.:f2 s..IR. .:� ,..r�1 . r a ,, �.-.r.:?• . ER :a ..K .. .. r _. s, � , .-± ym.N,... d.,...r >,.n �, �.� e.kr: .n,. ,a . „ 1. s""^3s ..15ar-�lti4n § t. c:N., t ._ ,P.,12<J,ECT ;. N.: n ,. � .� .t` . •F+. ,�..x .. -, x $c 4`.. ., _>�„us:� ... -ua., ,,,.. .,. %. , : ,,. r� �.. �r ,. ix .re �r .u� � . 1^N., x,, rF �; SY` �t , .. s 1SS;UE,DATE, • 3e :� :15• w -, -., fig_ >. , etyn:,. . hir „�,.. ,r,:.: a;.„.wb{� i.4te.�NN� ,,, .�;s ,,, , Div a . h.i -, ....; .4 ;DESCRP 10Nn I. F.. g� �,f{��.,t��`��� ;�., <� r,ir p -• ;. :,,., .�`., K`. < . 1DESIGN F. W CU O S a .__ gip. aCA s. ., }}__� �1. ,. ,�_..�.. m_ ,►,.... �s►_ _ ". :,�,.��aIM, ?y �1lv.. �y �. T Dti L J 0 P A F QiM U .� ., _�:(....�lR._Rs�.1. ,.,- .., .S�k,Y: ,.,n �.`s.;�:�•• w :�i,. ?s, Y ,. .,. ': W1AfF : W. &. ,. ,� a ^x.., � 7 , . .. .. •x _ a VIlASTET F?.E a '..F L•. ,.. a r ("F - "�.. I��+.:��r{'� '�'-_ ;! a n. .... .. .., ., ` "a'-' y I.� k' > 'l+i 5;... VN p $ ,' ,SI pLQW 1s, dlu t #„- 44 9B .,1111 ^t; _ < V}].,.�.,. , , ..� /�..I ,. .'S'M't ! �e.4.Y . .. _.. ¢f30', r5, ,�i#.. s ��' 4:S'. e .7b • v ' J^ �1.H'L't;`,� (gP ty� d tv (9P) ,,_ Y�.`:,Aicv1..'.s`e"1.4'I: m r.w5.�:va..,�Y .�?.,'S: w'+`�Jv Yedm..�.%.� tY C . .a:.�Rlf]fi.+�.h':rb„s��\yNi1�'�.*� a{'z..�i�9.�.£�`.,.w�i'kr.t �'8wx3'',w'yftYkr..,�....�`�..s"�a?i'3,o-...+J... MUNICIPAL SEWER CONTRACT SUMMARY * P 7J q>s 4 e C r l rt� Sys fl cl TYI ptift „ `� d , r1n C r,Xk yu` !. � W`° p� 44 �ys„s ryt 3.3 N,1'Ra1C�� -.. -� b tw i ;i . �a, i! as,c�l_k1111r3►�I� 2d"1$ a ADF' gu City of Bessemer City : Oates Road Crowders Creek 1,000,000 400,558 City of Bessemer City : Abernethy Creek Crowders `Creek 608,333 373,178 Town of Clover Crowders Creek 866,666 793,233 City of High Shoals Long Creek 100,000 35,301 City of Kings Mountain Crowders Creek 1,000,000 6,339 Town of Ranlo Long Creek 400,000 273,493 City of Lowell Long Creek N/A 34,487 City of Belmont Eagle Road 280,000 73,994 Dallas Spencer Mountain Village Long Creek N/A 22,746 Dallas Long Creek Apartments Long Creek N/A 13,882 Town of Stanley Long Creek 1,000,000 316,555 Town of McAdenville Long Creek 180,000 No Usage Pharr Yarns Long Creek 500,000 No Usage Long Creek WWTP: Crowders Creek WWTP: Eagle Road WWTP: "CONTRACT" FLOW (MGD) "DESIGN" FLOW (MGD) "CONNECTED" FLOW (MGD) FLOW "NOT YET TRIBUTARY" (MGD) 2.180 1.855 1.940 2.095 3.475 0.217 1.710 1.981 0.280 0.252 0.173 0.359 Long Creek WWTP Crowders Creek WWTP Eagle Road WWTP Permit # NC0020184 Permit # NC0074268 Permit # NC0006033 Permitted Flow: 16.0 MGD Permitted Flow: 6.0 MGD Permitted Flow: 4.0 MGD JAN-JUN 2018 ADF: 8.5 MGD JAN-JUN 2018 ADF: 2.9 MGD JAN-JUN 2018 ADF: 0.7 MGD mifted Flow«,Used. 66% Y „"f j.>;..,, ..,, Permitted`FlowtUsed..,81%,fi. ,N i ,r ,r „,;„ uPermitted FlbWUsed, ;26,5%0;. 1,r " , *Permitted Flow Used = (ADF + "Flow Not Yet Tributary') / WWTP Permitted Flow City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2018 Page 6 of 6 RECEIVEDINCDENRIDWR SEP -1 2017 WQROS MOORESVILLE REGIONAL OFFICE Great Place. Great People. Great Promise. Engineering Department P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com August 28, 2017 Ms. Dee Browder NCDENR Division of Water Quality 610 E. Center Avenue; Suite 301 Mooresville, NC 28115 Subject: City of Gastonia Local Sewer Permit Program —Flow Tracking Report Dear Ms. Browder: In reference to above, please find attached the following documents: • Form FTSE-10/07: Long Creek Wastewater Treatment Plant • Form FTSE-10/07: Crowder's Creek Wastewater Treatment Plant • Form FTSE-10/07: Eagle Road Wastewater Treatment Plant Sewer Usage Spreadsheet as of July 1, 2017 If you have any questions or need additional information, please contact me at (704)866-6789. Sincerely, Jamie Johnson Land Development Cc: Rusty Bost, City Engineer Tucker Johnson, Assistant City Engineer Matt Bernhardt, Director of Public Works and Utilities OF NAr - State of North Carolina Department of Environment and Natural Resources 7 Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Long Creek WWTP b. WWTP Facility Permit #: NC0020184 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 16.0 MGD 1.7 MGD 6.7 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD III. Certification Statement: I, 1Amfe c An GO eN , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates accepta of this wasp- at flow. ,41.7yvt.ts' Signing fficial Sign/ture 25)—/% Date r Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) State of North Carolina Department of Environment and Natural Resources Division of Water Quality Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Crowder's Creek WWTP b. WWTP Facility Permit #: NC0074268 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 6.0 MGD 1.8 MGD 2.7 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD (Firm/Design) Approx. Current Avg. Daily Flow, MGD III. Certification Statement: I, ,3.41, re. -o f r, so 0-- , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptan of this was ateriow. .Aires.-..e Signing f cial Signature Date SANITARY SEWER USAGE REPORT CITY OF GASTONIA, NORTH CAROLINA July 1, 2017 ,- PERri.1., PROJECT,,k7.7,#, '',Issu°t7 .,.,°ERiff',°,":',.:, -',7,-,:,:„ i!"As.,737 ,,,-&$Co'isi'v «ird' ludo : :1),P1(TIL.°0 vido.§E3 Al(aii)e..:'%Fi:iik(g-4)",. 0106343-S Rosegate Phs. 2 4505 1/10/2006 1898 LF-8" Long Creek Domestic 36 360 12960 36 360 12960 0106344-S Catawba Hills 3 4422 1/11/2006 1602 LF-8" Long Creek Domestic 48 360 17280 48 360 17280 0206345-S Town of Clover Monitoring Facility 4635 2/14/2006 230 LF-15" Crowders Creek Domestic 0 0 0 0 0 0 0206346-5 Bethesda Oaks Phase I 4562 2/20/2006 5603 LF-8" Long Creek Domestic 26 480 12480 26 480 12480 0206347-S Glyncastle 4442 2/24/2006 1600 LF-8" Long Creek Domestic 33 360 11880 33 360 11880 0306348-S 3001 Titman Road 4640 3/21/2006 65 LF-8" Long Creek Domestic 1 360 360 1 360 360 0306349-5 The Village at The Mountain 4475 6/7/2006 2418 LF of 8" Long Creek Domestic 78 360 28080 11 360 3960 0606351-S The Village at Parkside 4198 6/30/2006 8053 Lf - 8" Crowders Creek Domestic 228 360 82280 110 360 39600 0706352-S Village at 5th Avenue 4583 7/7/2006 5349 LF of 8" Long Creek Domestic 142 400 56800 130 400 52000 0606350-S Ferguson Subdivision Sewer Extension 4498 7/13/2006 366 LF - 8" Crowders Creek Domestic 5 360 1800 1 360 360 0706353-S Wren Turnpike Wholesales 4558 7/18/2006 305 LF of 8" Long Creek Domestic 4 119 475 2 119 238 0706354-S Carmax 4594 7/26/2006 695 If of 12" 798 If of 8" Long Creek Domestic 0 0 0 0 0 0 0706356-S Cramer Woods Phs 3 4588 8/3/2006 10,457 LF of 8" Long Creek Domestic 139 360 50040 133 360 47880 0706355-S Spencer Mountain Village Phs 1 4351 8/7/2006 12,868 LF of 8" Long Creek Domestic 254 360 91440 101 360 36360 0806357-S Shops at Franklin Square 4665 8/15/2006 1590 LF of 8" Long Creek Domestic 10 1614 16140 6 1614 9684 0806358-S Susan Farms Sewer Petition Phs 1&2 (COG) 5611 8/15/2006 3051 If of 8" Long Creek Domestic 32 290 9300 17 290 4930 1006361-S Woodleigh Subdivision 4637 10/11/2006 234 LF of 8" Long Creek Domestic 2 375 750 1 375 375 1106362-S Catawba Hills Subdivision Village D — Townhomes 4352 11/9/2006 2221 LF of 8" Long Creek Domestic 32 360 11520 32 360 11520 1106363-S Club Ridge Subdivision 4712 11/17/2006 1738 LF of 8" Long Creek Domestic 18 360 6480 4 360 1440 1106364-S Bethesda Oaks Phs. 2 4641 11/21/2006 6409 LF of 8" Long Creek Domestic 148 480 71040 148 480 71040 1106365-S New Hope Elementary SS Extension 4764 11/28/2006 160 LF of 8" Long Creek Domestic 1 6816 6816 1 6816 6816 0906360-5 Windsong Drive, Denise Dr. & Sugar Ln (COG) 5614 12/15/2006 1665 LF of 8" Long Creek Domestic 18 370 6660 18 370 6660 0107366-S Willow Creek Subdivision Phs 2 4536 1/5/2007 6572 LF of 8" Long Creek Domestic 192 360 69120 192 360 69120 0307367-S New Hope Crossing 4740 3/6/2007 1613 LF of 8" Long Creek Domestic 6 1035 6210 6 1035 6210 0307369-5 Value Place 4739 3/16/2007 115 LF of 8" Long Creek Domestic 1 7338 7338 1 7338 7338 0307368-S Kinmere Farms 4652 3/20/2007 4781 LF of 8" Long Creek Domestic 80 360 28800 80 360 28800 0407370-S Apple Creek Village — Off Site 4677 4/26/2007 1553 LF of 16" Long Creek Domestic 0 0 0 0 0 0 0507371-S Woodbriar Trail (COG) 5616 5/22/2007 1133 LF of 8" Crowders Creek Domestic 14 300 4200 14 300 4200 0507372-S The Summit at Court Drive • Phs 3 4765 5/24/2007 174 LF of 2" 200 LF of 8" Long Creek Domestic 5000 5000 1 5000 5000 0707373-S Apple Creek Village 4543 7/26/2007 9632 LF of 8" 227 LF of 16 Long Creek Domestic 291 360 104760 9 360 3240 City of Gastonia Semi -Annual Sanitary Sewer Usage Report July 2017 Page 1 of 4 ;PERMIT # °'S?* PROJECj.T '' igx"'a' �z �: nip # t3 ti 9" ISSUE DATE , cl` r ,,, DESCRIPTION .."Y WV' a , WWI P . lA y.,q WASTE TYPE 5 "DESIGN" FLOW CALCULATIONS ESTIMATED FLOW (JUNE 30, 2017). : #LOTS ,(. )9 ,,,F`4 (gP�lunit)" DESIGN FLOW a) pd)t , '' °' (#CD8)fi r• 'f iBPdiunit) a;k *^ Ft FLOW,(g Pud) 0707374-S Crowders View Phase II 4854 7/27/2007 2281 LF of 8" Crowders Creek Domestic 58 360 20880 58 360 20880 0807375-5 Howe Sewer Extension 4849 8/2/2007 48 LF of 8" Crowders Creek Domestic 1 600 600 1 600 600 1007376-S Villas at Applecreek 4802 10/30/2007 3488 LF of 8" Long Creek Domestic 89 360 32040 0 360 0 1107377-S Gaston Crossing 4947 11/16/2007 519 LF of 8" Long Creek Domestic 5 4802 24008 3 4802 14406 1107378-S Queens Road Sewer Rehab Phase 1 (COG) 5617 11/29/2007 2391 LF of 8" Crowders Creek Domestic 32 300 9600 32 300 9600 1207379-5 Robinson Oaks Villas (outfall) 5012 12/6/2007 1810 LF of 8" Long Creek Domestic 0 0 0 0 0 0 0208380-5 Bethlehem Baptist Church 4934 2/5/2008 1612 LF OF 8" Long Creek Domestic 2 6250 12500 2 6250 12500 0208381-5 Reserve at Catawba Creek 4675 2/6/2008 2996 LF OF 8" 1382 LF OF 6" Long Creek Domestic 127 405 51435 127 405 51435 0308384-5 Winterlake Drive SS Extension 4984 3/27/2008 1286 LF OF 8" Long Creek Domestic 8 360 2880 8 360 2880 0308383-S City of Gastonia Clouse Street SS 5623 3/27/2008 75 LF OF 8" Long Creek Domestic 1 300 300 1 300 300 0608385-S Gastonia Technology Park 4668 6/6/2008 593 LF OF 8" Long Creek Domestic 4 1581 6324 2 1581 3162 0608386-5 Spencer Mountain Village PH 2&3 4726 6/9/2008 9344 LF OF 8" Long Creek Domestic 227 360 81720 86 360 30960 0608387-S Gaston Mall 5032 6/17/2008 682 LF OF 8" 140 LF OF 18" Long Creek Domestic 4 400 1600 4 400 1600 0708388-5 Bayview Pump Station Abandonment 5628 7/14/2008 78 LF OF 8" Long Creek Domestic 0 0 0 0 0 0 0708389-5 Mill Creek Apartments Phase 3 5107 7/16/2008 755 LF OF 8" Long Creek Domestic 4 3120 12480 4 3120 12480 5097-5 Evergreen Landing Apartments 5097 11/7/2008 728 LF of 8" Long Creek Domestic 4 4890 19560 4 4890 19560 5241-S Fresenius Medical Care 5241 12/22/2008 165 LF of 8" Crowders Creek Domestic 1 2000 2000 1 2000 2000 5743-5 Ridge Mill Community / Nina Dawn Sewer 5743 1/30/2009 8557 LF of 8" Crowders Creek Domestic 74 300 22200 57 300 17100 5780-5 Queens Road Sewer Rehab Phase 3 (COG) 5780 2/23/2009 6470 LF of 8" Crowders Creek Domestic 92 350 32200 92 350 32200 5786-5 NCDOT 274 Widening Utility Relocation Project 5786 2/25/2009 492 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5926-5 West Davidson Bridge Replacement 5726 7/24/2009 320 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5739-5 NCDOT Gaston County Maintenance Yard 5739 11/5/2009 1231 LF of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 6467-5 O'Reilly Auto Parts 6467 1/28/2010 218 If of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 6468-S Summit Crossing Phase III 6468 4/1/2010 657 If of 8" Long Creek Domestic 3 6520 19560 3 6520 19560 6957-S Rolling Meadows Drive SS Extension 6957 8/23/2010 731 If of 8" Long Creek Domestic 3 350 1050 0 350 0 6953-5 Tech Park Sewer Improvements 6953 11/18/2010 63971f of 12" Long Creek Domestic 2 65000 130000 2 65000 130000 7054-S Robinson Heights Subdivision 7054 12/15/2010 1766 If of B" Long Creek Domestic 19 300 5700 15 300 4500 6982-5 DRJ Holdings Property 6982 1/20/2011 338 If of 8" Long Creek Domestic 1 1600 1600 1 1600 1600 7056-5 Pearson Properties-- Hoffman Road 7056 3/4/2011 585 If of 8" Long Creek Domestic 1 1500 1500 1 1500 1500 7024-5 Bordeaux Apartments 7024 3/8/2011 58 If of 8" Long Creek Domestic 33 350 11550 33 350 11550 7177-5 Roberts Family Ventures 7177 6/15/2011 112 If of 8" Long Creek Domestic 1 500 500 1 500 500 5922-5 Ballantyne Apartments 5922 6/21/2011 1795 If of 8" Long Creek Domestic 241 237 57120 241 237 57120 City of Gastonia Semi -Annual Sanitary Sewer Usage Report July 2017 Page 2 014 '¢PERMIT#'"" ,, , , ,. t ,, a ' 'PROJECT e , # " , ,, m.. .. „» 'AM '#`"`" .. `i". ..,A ISSUE DATE 5 a^z:..xl ..,w, c DESCRIPTION` .•asi;. "� ,.y:.... WWI'P" t+ �A . ., WASTE u , . ... ''DESIGN'' FLOW CALCULATIONS , .. ESTIMATED FLOW (JUNE 30 2017} ., ( ) .c Of LOTS) ,. �.� (0pd/unit .., s n . DESIGN FLOW .L d ) (9P ) °T ,iV1# COS' w:.*`J( Pdlun,t). FLOW d, (9P )z 6725-5 Gaston Mall Redevelopment (Target) 6725 8/16/2011 681 If of 8" Long Creek Domestic 1 21300 2000 1 2000 2000 7384-S CTL Packaging USA 7384 5/7/2012 489 If of 8" 1107 If of 10" Long Creek Domestic 1 1200 1200 1 1200 1200 7488-5 Dollar General Outfall 7488 7/3/2012 681 If of 8" Long Creek Domestic 1 910 91D 1 910 910 7605-S South Fork Catawba Regional Imp. (Fair St.) 7605 11/20/2012 2682 If of 8" Long Creek Domestic 1 52470 52470 0 52470 0 7606-5 South Fork Catawba Regional Imp.(Kings Grant) 7606 11/20/2012 266 If of 8" Eagle Domestic 1 64440 64440 0 6444D 0 7543-5 Rosegate Phase 3 A/B 7543 11/29/2012 995 If of 8" Long Creek Domestic 19 360 6840 19 360 6840 7582-S Daimler 7582 12/21/2012 316 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4698-S Kinmere Village 4698 2/28/2013 7139 If of 8" Long Creek Domestic 111 360 39960 104 360 37440 7616-S West Congregation of Johovah's Witness 7616 4/9/2013 3841f of 8" Crowders Creek Domestic 1 8000 8000 1 8000 8000 7457-S South Fork Village Apartments 7457 4/17/2013 2490 1f of 8", 870 If 6" FM Eagle Domestic 352 274 96448 352 274 96448 7710-S Long Creek Apartments 7710 5/6/2013 1474 If of 8" Long Creek Domestic 103 300 30900 103 300 30900 7615-5 Rosegate Phase 3 C/D/E 7615 5/30/2013 30321f of 8" Long Creek Domestic 55 449 24720 41 449 18409 7467-5 Kinmere Commons 7467 6/4/2013 1977 If of 8" Long Creek Domestic 104 360 37440 100 360 36000 7720-S Robinson Oaks 2013 7720 9/6/2013 8392' of 8" Long Creek Domestic 204 120 73440 28 120 3360 7746-S Tractor Supply 7746 9/18/2013 180 If of 8" Crowders Creek Domestic 1 2260 2280 1 2280 2280 7785-S Summit Crossing Phase IV 7785 10/14/2013 427 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4948-S Villas At Robinson Oaks 4948 1/22/2014 1160 If of B" Long Creek Domestic 62 374 22480 26 374 9724 7848-S Owens Corning 7848 1/31/2014 667 If of 8" Long Creek Domestic 1 124000 124000 1 124000 124000 8090-S Oakhill Lane Sewer Extension 8090 7/31/2014 372 If of 8" Long Creek Domestic 4 360 1440 0 360 0 8091-5 Winterlake Drive Sewer Extension 8091 7/31/2014 380 If of 8" Long Creek Domestic 3 360 1080 0 360 0 8092-S American & Efird Sewer Line Upgrade 8092 8/13/2014 227 !fa 8" private sewer Crowders Creek Industrial 1 23000 2300D 0 23000 0 7640-S Villages At Cramerton Mills - Ph 1 7640 10/27/2014 4515' of 8" Eagle Domestic 75 416 31200 5 416 2080 7721-S Bethesda Oaks Ph 3 - 2013 7721 1/6/2015 4408' of 8" Long Creek Domestic 84 480 40320 12 480 5760 8189-5 Woodbriar Trail Sewer Extension 8189 1/26/2015 420' of 8" Long Creek Domestic 4 360 1440 0 360 0 8205-S Villages At Cramerton Mills Ph 1E 8205 4/9/2015 1012' of 8" Eagle Domestic 8 1228 9828 0 1228 0 8174-S Harris Teeter 8174 5/26/2015 718' of 8" Long Creek Domestic 1 7317 7317 1 7317 • 7317 8359-5 MR Office Building 8359 10/12/2015 179' of 8" Long Creek Domestic 1 275 275 1 275 275 8338-S Catawba Hills Ph 4 8338 1/6/2016 1,835' of 8" Long Creek Domestic 38 360 13660 25 360 9000 8469-S Catawba Hills Village D Townhomes 8469 1/21/2016 905' of 8" Long Creek Domestic 39 360 14040 30 360 10800 8283-5 Gaston College - Center For Advanced Manufacturing 8283 5/10/2016 11 If of 8" Long Creek Domestic 1 9000 9000 0 9000 0 8341-5 The Enclave At Cramer Woods Ph 1 8341 8/1/2016 4,772 If of 8" Long Creek Domestic 59 360 21240 0 360 0 8513-5 Villas At Union Trace 8513 8/19/2016 78 If of 8" Long Creek Domestic 60 240 14400 0 240 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report July 2017 Page 3 of PERMIT # PROJECT AIP # ISSUE DATE , , DESCRIPTION V WTPi . W..E'TYPE AST "DESIGN"FLOW CALCULATIONS i - ESTIMATED FLOW::: (JUNE 30, 2017) .:. (it LOTS) (gpd/untt) DESIGN FLOW (god) (8 CO'S) (gpdamIt) FLOW (gpd) 8533-S Caromont Professional Office 8533 8/31/2016 245 If of 8" Long Creek Domestic 1 5575 5575 0 5575 0 8657-S S New Hope Road Sewer Improvements 8657 10/21/2016 462 If of 8" Long Creek Domestic 1 2500 2500 0 2500 0 8555-S Apple Creek Village Ph 1 8555 11/8/2016 3,554 If of 8" Long Creek Domestic 64 360 23040 0 360 0 8532-5 Sundance Village Phi 8532 11/22/2016 2,570 If of 8" Long Creek Domestic 77 360 27720 0 360 0 8624-S Village At Parkside Ph 3 8624 4/7/2017 773 If of 8" Crowders Creek Domestic 21 360 7560 0 360 0 8543-S Waffle House 8543 6/22/2017 281 If of 8" Long Creek Domestic 1 1520 1520 0 1520 0 MUNICIPAL SEWER CONTRACT SUMMARY ' .. CITY/TOWN . WNTP CONTRACT MAX ,.... (g Pd) ' JAN-JUNE 2017 r.. ADF ' (9Pd).... City of Bessemer City : Oates Road Crowders Creek 1,000,000 411,527 City of Bessemer City : Abernethy Creek Crowders Creek 606,333 375,298 Town of Clover Crowders Creek 620,000 704,354 City of High Shoals Long Creek 100,000 29,330 City of Kings Mountain Crowders Creek 1,000,000 6,823 Town of Ranlo Long Creek 400,000 196,551 City of Lowell Long Creek N/A 25,638 City of Belmont Eagle Road 280,000 82,486 Dallas - Spencer Mountain Village Long Creek N/A 35,622 Town of Stanley Long Creek 1,000,000 155,477 Long Creek WWTP: Crowders Creek WWTP: Eagle Road WWTP: "CONTRACT" FLOW (MGD) Janufiaf2006r"June 30 )201AL*.o�y "DESIGN" FLOW (MGD) "CONNECTED" FLOW (MGD) FLOW "NOT YET TRIBUTARY" (MGD) 1.500 1.715 1.559 1.656 3.228 0.217 1.635 1.810 0.280 0.202 0.181 0.301 Long Creek WWTP Crowders Creek WWTP Eagle Road WWTP Permit # NC0020184 Permit # NC0074268 Permit # NC0006033 Permitted Flow: 16.0 MGD Permitted Flow. 6.0 MGD Permitted Flow 4.0 MGD JAN-JUNE 2017 ADF: 6.7 MGD JAN-JUNE 2017 ADF: 2.7 MGD JANJUNE 2017 ADF: 0.7 MGD Permitted Flow Used: 52% - Permitted Flow Used: 75% Permitted Flow Used: 25% `Permitted Flow Used = (ADF + "Flow Not Yet Tributary') / W WTP Permitted Flow City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2017 Page 4 of 4 't ECEIVEt/NCJENR/DWR ASTONI NC Great Place. Great People. Great Promise. Engineering Department S E P --1 2017 WQROS MOORESVILLE REGIONAL OFFICE P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com August 28, 2017 Ms. Dee Browder NCDENR Division of Water Quality 610 E. Center Avenue; Suite 301 Mooresville, NC 28115 Subject: City of Gastonia Local Sewer Permit Program —Flow Tracking Report Dear Ms. Browder: In reference to above, please find attached the following documents: • Form FTSE-10/07: Long Creek Wastewater Treatment Plant • Form FTSE-10/07: Crowder's Creek Wastewater Treatment Plant • Form FTSE-10/07: Eagle Road Wastewater Treatment Plant • Sewer Usage Spreadsheet as of January 1, 2017 If you have any questions or need additional information, please contact me at (704)866-6789. Sincerely, Jamie Johnson Land Development Cc: Rusty Bost, City Engineer Tucker Johnson, Assistant City Engineer Matt Bernhardt, Director of Public Works and. Utilities OV\1A T State of North Carolina PG Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Long Creek WWTP b. WWTP Facility Peiiiiit #: NC0020184 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 16.0 MGD 1.6 MGD 6.5 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD (Firm/Design) Approx. Current Avg. Daily Flow, MGD III. Certification Statement: I, aml a Sa An,5o,-.. , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptan( e of this w tewa er flow. \gig fr2 —/7 Signing fficial Si attire Date State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Crowder's Creek WWTP b. WWTP Facility Permit #: NC0074268 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 6.O MGD 1.8 MGD 2.4 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD (FiiuilDesign) Approx. Current Avg. Daily Flow, MGD III. Certification Statement: I, -No-,,, le- �a An a- , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates accept e of this w stev,ater flow. Signing' Official Stginature Date State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Eagle Road WWTP b. WWTP Facility Permit #: NC0006033 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 4.0 MGD 0.3 MGD 0.7 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Film/Design) Daily Flow, MGD III. Certification Statement: I, m f e- dins'o�. , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates accepta e of this astewater flow. g- 29-/r7 Signin Official ,S�gnature Date PERMIT # - , -,, ,^, , PROJECT 1r, ;•,, ,;,, „,_, 4 —,: , :^,,, AM # ,e,,,., ',,, , 4, ISSUE DATE ,,,,,,Ieletbfig° DESCRIPTION ',,,,,, ,;41,,,'„-,0,,', WIMP 0 ' - , ,. C, WASTE TYPE ,,,, ' , '' . ,„ LOTS) ' ,,", ' , , ',(F,PIfun'(tiptiFS,:a DESIGN FLOW ,„„,,,,, ‘".Q.'77,1. „,„„„„ ,„ . ''7,.,..7!k,'ml.. , „s FLOW ‘9?.',, 6725-S Gaston Mall Redevelopment (Target) 6725 8/16/2011 681 If of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 7384-5 CTL Packaging USA 7384 5/7/2012 489 If of 8" 1107 If of 10" Long Creek Domestic 1 1200 1200 1 1200 1200 7488-S Dollar General Outfall 7488 7/3/2012 681 If of 8" Long Creek Domestic 1 910 910 1 910 910 7605-S South Fork Catawba Regional Imp. (Fair St.) 7605 11/20/2012 2682 If of 8" Long Creek Domestic 1 52470 52470 0 52470 0 7606-S South Fork Catawba Regional Imp.(Kings Grant) 7606 11/20/2012 266 If of 8" Eagle Domestic 1 64440 64440 0 64440 0 7543-S Rosegate Phase 3 A/B 7543 11/29/2012 995 If of 8" Long Creek Domestic 19 360 6840 17 360 6120 7582-S Daimler 7582 12/21/2012 316 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4698-S Kinmere Village 4698 2/28/2013 7139 If of 8" Long Creek Domestic 111 360 39960 104 360 37440 7616-S West Congregation of lohovah's Witness 7616 4/9/2013 3841f of 8" Crowders Creek Domestic 1 8000 8000 1 8000 8000 7457-S South Fork Village Apartments 7457 4/17/2013 2490 If of 8", 870 If 6" FM, 1 Eagle Domestic 352 274 96448 352 274 96448 7710-S Long Creek Apartments 7710 5/6/2013 1474 if of 8" Long Creek Domestic 103 300 30900 103 300 30900 7615-5 Rosegate Phase 3 C/D/E 7615 5/30/2013 3032 If of 8" Long Creek Domestic 55 449 24720 36 449 16164 7467-S Kinmere Commons 7467 6/4/2013 1977 if of 8" Long Creek Domestic 104 360 37440 92 360 33120 7720-S Robinson Oaks 2013 7720 9/6/2013 8392' of 8", 44 MH Long Creek Domestic 204 120 73440 18 120 2160 7746-S Tractor Supply 7746 9/18/2013 180 If of 8" Crowders Creek Domestic 1 2280 2280 1 2280 2280 7785-S Summit Crossing Phase IV 7785 10/14/2013 427 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4948-S Villas At Robinson Oaks 4948 1/22/2014 1160 If of 8" Long Creek Domestic 62 374 22480 22 374 8228 7848-S Owens Corning 7848 1/31/2014 667 If of 8" Long Creek Domestic 1 124000 124000 1 124000 124000 8090-S OakhIll Lane Sewer Extension 8090 7/31/2014 372 If of 8" Long Creek Domestic 4 360 1440 0 360 0 8091-S Winterlake Drive Sewer Extenslon 8091 7/31/2014 380 If of 8" Long Creek Domestic 3 360 1080 0 360 0 8092-5 American & Efird Sewer Line Upgrade 8092 8/13/2014 227 If of 8" private sewer Crowders Creek Industrial 1 23000 23000 0 23000 0 7640-5 Villages At Cramerton Mills - Ph 1 7640 10/27/2014 4515' of 8" Eagle Domestic 75 416 31200 5 416 2080 7721-5 Bethesda Oaks Ph 3 - 2013 7721 1/6/2015 4408of 8" Long Creek Domestic 84 480 40320 10 480 4800 8189-S Woodbriar Trail Sewer Extension 8189 1/26/2015 420' of 8" Long Creek Domestic 4 360 1440 0 360 0 8205-S Villages At Cramerton Mills Ph lE 8205 4/9/2015 1012' of 8" Eagle Domestic 8 1228 9828 0 1228 0 8174-S Harris Teeter 8174 5/26/2015 718' of 8" Long Creek Domestic 1 7317 7317 1 7317 7317 8359-S MR Office Building 8359 10/12/2015 179' of 8" Long Creek Domestic 1 275 275 1 275 275 8338-S Catawba Hills Ph 4 8338 1/6/2016 1,835' of 8" Long Creek Domestic 38 360 13680 19 360 6840 8469-S Catawba Hills Village D Townhomes 8469 1/21/2016 905' of 8" Long Creek Domestic 39 360 14040 19 360 6840 8283-S Gaston College - Center For Advanced Manufacturing 8283 5/10/2016 11 If of 8" Long Creek Domestic 1 9000 9000 0 9000 0 8341-5 The Enclave At Cramer Woods Ph 1 8341 8/1/2016 4,772 If of 8", 31 MH Long Creek Domestic 59 360 21240 0 360 0 8513-S Villas At Union Trace 8513 8/19/2016 78 If of 8" Long Creek Domestic 60 240 1440D 0 240 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report January 2017 Page 3014 PERMIT -.. PROJECT AIP# ISSUE DATE DESCRIPTION , WWTP WASTE TYPE "DESIGN",: FLOW CALCULATIONS •.;: ESTIMATED FLOW (DEC 31,: 2818) (# LOTS)` '. (OPd/unitl DESIGN FLOW (god) ..... (#CO's)'' "(gpd/unit), FLOW (gpd) 8533-5 Caromont Professional Office 8533 8/31/2016 245 If of 8" Long Creek Domestic 1 5575 5575 0 5575 0 8527-S Snider Tire Facility 8527 10/5/2016 285 If of 8" Long Creek Domestic 1 5300 5300 0 5300 0 8657-5 S New Hope Road Sewer Improvements 8657 10/21/2016 462 If of 8" Long Creek Domestic 1 2500 2500 0 2500 0 8555-S Apple Creek Village Ph 1 8555 11/8/2016 3,554 If of 8" Long Creek Domestic 64 360 230413 0 360 0 8532-S Sundance Village Phi 8532 11/22/2016 2,570 If of 8" & 13 MH Long Creek Domestic 77 360 27720 0 360 0 MUNICIPAL SEWER CONTRACT SUMMARY CITY/TOWN WWTP CONTRACT MAX (gpd) JAN-DEC 2016 ADF (god) City of Bessemer City : Oates Road Crowders Creek 1,000,000 466,737 City of Bessemer City : Abernethy Creek Crowders Creek 606,333 404,766 Town of Clover Crowders Creek 620,000 624,989 City of High Shoals Long Creek 100,000 29,884 City of Kings Mountain Crowders Creek 1,000,000 13,060 Town of Ranlo Long Creek 400,000 274,197 City of Lowell Long Creek N/A 38,016 City of Belmont Eagle Road 280,000 84,052 Dallas -Spencer Mountain Village Long Creek N/A 34,494 Town of Stanley Long Creek 1,000,000 133,552 Long Creek WWTP: Crowders Creek WWTP: Eagle Road WWTP: "CONTRACT" FLOW (MGD) Jdhuerykl;1¢006,o December "CONNECTED" FLOW (MGD) 31h2616 FLOW "NOT YET TRIBUTARY" (MGD) "DESIGN" FLOW (MGD) 1.500 1.719 1.600 a 1.619 3.228 0.209 1.666 1.771 0.280 0.202 0.183 0.299 Long Creek WWTP Crowders Creek WWTP Eagle Road WWTP Permit # NC0020184 Permit # NC0074268 Permit # NC0006033 Permitted Flow. 16.0 MGD Permitted Flow: 6.0 MGD Permitted Flow: 4.0 MGD JAN-DEC 2016 ADF: 6.5 MGD JAN-DEC 2016 ADF: 2.4 MGD JAN-DEC 2016 ADF: 0.7 MGD Permitted Flow Used: 50.7% .Permitted. Flow Used: 70% Permitted Flow Used:. 25% 'Permitted Flow Used = (ADF + °Flow Not Yet Tributary') / WWTP Permitted Flow City of Gastonia Semi -Annual Sanitary Sewer Usage Report: January 2017 Page 4 of ASTONIf1 Great Place. Great People. Great Promise. Engineering Department i GeIv5Dti\ict)eNlilowll MAR 31 2.017 WQROS S IOORESVILLE REGIONAL OFFICE P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com March 31, 2017 Deborah Gore NCDENR Division of Water Quality Pretreatment, Emergency Response & Collection Systems Unit 1617 Mail Service Center Raleigh, NC 27699-1617 SUBJECT: CITY OF GASTONIA LOCAL SEWER PERMIT PROGRAM Dear Ms. Gore: In reference to above, there were no sewer permits issued during the period January 2017 through March 2017 for the city's treatment plants. If you have any questions or need additional information, please call me at (704) 866-6789. Sincerely, Jamie Johnson Land Development Project Manager RECEIVEb/NCIDENR/DWR OCT 202016 ...ram ASTONI Great Place. Great People. Great Promise. Engineering Department Ph0ne:704.866.6022 • Fax: 704.854.6654 P.O. Box 1748 • Gastonia, NCB ci 7of astonia.Com October 14, 2016 Ms. Dee Browder NCDENR Division of Water Quality 610 E. Center Avenue; Suite 301 Mooresville, NC Subject: City of Gastonia Local Sewer Permit Program WQROS MOORESVILLE REGIONAL OFFICE Flow Tracking Report Dear Ms. Browder: documents: In reference to above, please find attached the following • For m FTSE-10/07: Long Creek Wastewater Treatment Plant • Form FT SE-10/07: Crowder's Creek Wastewater Treatment Plant • For m FTSE-10/07: Eagle Road Wastewater Treatment Plant • Sewer Usage Spreadsheet as of July 1, 2016 If you have any questions or need additional information, please contact me at (704)866-6789. Sincerely, 941/111 Jamie Johnson Land Development Cc: Rusty Bost, City Engineer Engineer Tucker Johnson, Assistant City Matt Bernhardt, Director of Public Works and Utilities SILVLI V LUIIVv✓.-��� ..v... ET 20 Z016 VVA7 7 Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) �C�ROS State of North Carolina MOOD rLLmte�I;WID}Migtnment and Natural Resources Division of Water Quality Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Crowder's Creek WWTP b. WWTP Facility Peiniit #: NC0074268 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 6.0 MGD 1.6 MGD 2.6 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Filin/Design) Daily Flow, MGD III. Certification Statement: 1, ellle 30In sid , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptan of this wa ewat r flow. Signingfficial Sig ature Date F NAT State of North Carolina QG Department of Environment and Natural Resources r Division of Water Quality '- Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Eagle Road WWTP b. WWTP Facility Peiinit #: NC0006033 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 4.0 MGD 0.4 MGD 0.741 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Film/Design) Daily Flow, MGD III. Certification Statement: I, J In to , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptan of this was -wat; flow. �rA /C—/r%A Signing fficial Sig ® tore Date PERMIT # ,. � -- -' PROJECT -.,• ., A/P # r .: "' ISSUE DATE DESCRIPTIONS , "WWTP - WASTE TYPE .,_( - ,."DESIGN"! FLOW CALCULATIONS, ..r m,;:+„ESTIMATED .FLOW_(JUNE-30g2016)';c--- . ..#' LOTS), " «' , 6'1Unit) DESiGN(FLOW ,(#COS),a�s,q-.(gPd/unit)� - FLOW.(gpd). 0507372-S The Summit at Court Drive - Phs 3 4765 5/24/2007 174 LF of 2" 200 LF of 8" Long Creek Domestic 1 5000 5000 1 5000 5000 0707373-S Apple Creek Village 4543 7/26/2007 . 9632 LF of 8" 227 LF of 16 Long Creek Domestic 291 360 104760 0 360 0 0707374-S Crowders View Phase 1I 4854 7/27/2007 2281 LF of 8" Crowders Creek Domestic 58 360 20880 19 360 6840 0807375-5 Howe Sewer Extension 4849 8/2/2007 48 LF of 8" Crowders Creek Domestic 1 600 600 1 600 600 1007376-5 Villas at Applecreek 4802 10/30/2007 3488 LF of 8" Long Creek Domestic 89 360 32040 0 360 0 1107377-S Gaston Crossing 4947 11/16/2007 519 LF of 8" Long Creek Domestic 5 4802 24008 3 4802 14406 1107378-S Queens Road Sewer Rehab Phase 1 (COG) 5617 11/29/2007 2391 LF of 8" Crowders Creek Domestic 32 300 9600 32 300 9600 1207379-S Robinson Oaks Villas (outfall) 5012 12/6/2007 1810 LF of 8" Long Creek Domestic 0 0 0 0 0 0 0208380-S Bethlehem Baptist Church 4934 2/5/2008 1612 LF OF 8" Long Creek Domestic 2 6250 12500 2 6250 12500 0208381-S Reserve at Catawba Creek 4675 2/6/2008 2996 LF OF 8" 1382 LF OF 6" Long Creek Domestic 127 405 51435 127 405 51435 0208382-S Rosegate Phase 3 4676 2/8/2008 3885 LF OF 8" Long Creek Domestic 81 360 29160 0 360 0 0308384-S Winterlake Drive SS Extension 4984 3/27/2008 1286 LF OF 8" Long Creek Domestic 8 360 2880 8 360 2880 0308383-S City of Gastonia Clouse Street SS 5623 3/27/2008 75 LF OF 6" Long Creek Domestic 1 300 300 1 300 300 0608385-S Gastonia Technology Park 4668 6/6/2008 593 LF OF 8" Long Creek Domestic 4 1581 6324 1 1581 1581 0608386-S Spencer Mountain Village PH 2&3 4726 6/9/2008 9344 LF OF 8" Long Creek Domestic 227 360 81720 36 360 12960 0608387-5 Gaston Mall 5032 6/17/2008 682 LF OF 8" 140 LF OF 18" Long Creek Domestic 4 400 1600 4 400 1600 0708388-5 Bayview Pump Station Abandonment 5628 7/14/2008 78 LF OF 8" Long Creek Domestic 0 0 0 0 0 0 0708389-S Mill Creek Apartments Phase 3 5107 7/16/2008 755 LF OF 8" Long Creek Domestic 4 3120 12480 4 3120 12480 5097-S Evergreen Landing Apartments 5097 11/7/2008 728 LF of 8" Long Creek Domestic 4 4890 19560 4 4890 19560 5241-5 Fresenlus Medical Care 5241 12/22/2008 165 LF of 8" Crowders Creek Domestic 1 2000 2000 1 2000 2000 5743-5 Ridge Mill Community / Nina Dawn Sewer 5743 1/30/2009 8557 LF of 8" Crowders Creek Domestic 74 300 22200 57 300 17100 5780-5 Queens Road Sewer Rehab Phase 3 (COG) 5780 2/23/2009 6470 LF of 8" Crowders Creek Domestic 92 350 32200 92 350 32200 5786-5 NCDOT 274 Widening Utility Relocation Project 5786 2/25/2009 492 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5926-S West Davidson Bridge Replacement 5726 7/24/2009 320 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5739-5 NCDOT Gaston County Maintenance Yard 5739 11/5/2009 1231 LF of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 6467-5 O'Reilly Auto Parts 6467 1/28/2010 218 If of 8" pvc Long Creek Domestic 2 2000 4000 1 2000 2000 6468-S Summit Crossing Phase III 6468 4/1/2010 657 If of 8" Long Creek Domestic 3 6520 19560 3 6520 19560 6957-5 Rolling Meadows Drive SS Extension 6957 8/23/2010 731 If of 8" Long Creek Domestic 3 350 1050 0 350 0 6953-5 Tech Park Sewer Improvements 6953 11/18/2010 6397 If of 12" dip Long Creek Domestic 2 65000 130000 2 65000 130000 7054-S Robinson Heights Subdivision 7054 12/15/2010 1766 If of 8" Long Creek I Domestic 19 300 5700 15 300 4500 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2016 Page 2 of 4 PERMIT 0 PROJECT AJP 6 ISSUE DATE DBSCRIPTION WWTP WASTE TYPE "OESIGN" FLOW CALCULATIONS ESTIMATEO FLOW (JUNE 30, 2016) (8 LOTS) .,-'ccipgimip,,,,,. DBSGN ,,,4,4 (rip,,i) i st.,,Fa§xt„- i,,,A9pgiul!9z, ,,,9,/y(gp,q , 6982-S DRJ Holdings Property 6982 1/20/2011 338 If of 8" Long Creek Domestic 1 1600 1600 1 1600 1600 7056-5 Pearson Properties-- Hoffman Road 7056 3/4/2011 585 If of 8" Long Creek Domestic 1 1500 1500 1 1500 1500 7024-S Bordeaux Apartments 7024 3/8/2011 58 If of 8" Long Creek Domestic 33 350 11550 33 350 11550 7177-S Roberts Family Ventures 7177 6/15/2011 112 If of 8" Long Creek Domestic 1 500 500 1 500 500 5922-5 Ballantyne Apartments 5922 6/21/2011 1795 If of 8" Long Creek Domestic 241 237 57120 241 237 57120 6725-S Gaston Mall Redevelopment (Target) 6725 8/16/2011 681 If of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 7384-S CTL Packaging USA 7384 5/7/2012 489 If of 8" 1107 If of 10" Long Creek Domestic 1 1200 1200 1 1200 1200 7488-5 Dollar General Outfall 7488 7/3/2012 681 If of 8" Long Creek Domestic 1 910 910 1 910 910 7605-8 South Fork Catawba Regional Imp. (Fair St.) 7605 11/20/2012 2682 If of 8" Long Creek Domestic 1 52470 52470 0 52470 0 7606-8 South Fork Catawba Regional Imp.(Kings Grant) 7606 11/20/2012 266 If of 8" Eagle Domestic 1 64440 64440 0 64440 0 7543-5 Rosegate Phase 3 A/B 7543 11/29/2012 995 If of 8" Long Creek Domestic 19 360 360 16 360 5760 7582-S Daimler 7582 12/21/2012 316 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4698-S Kinmere Village 4698 2/28/2013 7139 If of 8" Long Creek Domestic 111 360 39960 64 360 23040 7616-S West Congregation of Johovah's Witness 7616 4/9/2013 3841f of 8" Crowders Creek Domestic 1 8000 8000 1 8000 8000 7457-5 South Fork Village Apartments 7457 4/17/2013 2490 If of 8", 870 If 6" FM, 1 Eagle Domestic 352 274 96360 0 274 0 7710-S Long Creek Apartments 7710 5/6/2013 1474 If of 8" Long Creek Domestic 103 300 30890 0 300 0 7615-S Rosegate Phase 3 C/D/E 7615 5/30/2013 3032 If of 8" Long Creek Domestic 55 449 24720 28 449 12572 7467-5 Kinmere Commons 7467 6/4/2013 1977 If of 8" Long Creek Domestic 104 360 37440 46 360 16560 7720-S Robinson Oaks 2013 7720 9/6/2013 8392' of 8", 44 MH Long Creek Domestic 204 120 73440 2 120 240 7746-5 Tractor Supply 7746 9/18/2013 180 If of 8" Crowders Creek Domestic 1 2280 2280 1 2280 2280 7785-S Summit Crossing Phase IV 7785 10/14/2013 427 if of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4948-S Villas At Robinson Oaks 4948 1/22/2014 1160 If of 8" Long Creek Domestic 62 374 22480 12 374 4488 7848-5 Owens Corning 7848 1/31/2014 667 If of 8" Long Creek Domestic 1 124000 124000 1 124000 124000 8090-5 Oakhill Lane Sewer Extension 8090 7/31/2014 372 If of 8" Long Creek Domestic 4 360 1440 0 360 0 8091-S Winterlake Drive Sewer Extension 8091 7/31/2014 380 If of 8" Long Creek Domestic 3 360 1080 0 360 0 8092-S American & Efird Sewer Line Upgrade 8092 8/13/2014 227 If of 8" private sewer Crowders Creek Industrial 1 23000 23000 0 23000 0 7640-S Villages At Cramerton Mills - Ph 1 7640 10/27/2014 4515' of 8" Eagle Domestic 75 416 31200 0 416 0 7721-S Bethesda Oaks Ph 3 - 2013 7721 1/6/2015 4408' of 8" Long Creek Domestic 84 480 40320 0 480 0 8189-S Woodbriar Trail Sewer Extension 8189 1/26/2015 420' of 8" Long Creek Domestic 4 360 1440 0 360 0 8205-S Villages At Cramerton Mills Ph 1E 8205 4/9/2015 1012' of 8" Eagle Domestic 8 1228 9828 0 1228 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2016 Page 3014 PERMIT # PROJECT ANP # ISSUE DATE DESCRIPTION WWTP WASTE TYPE "DESIGN" FLOW; CALCULATIONS ESTIMATED FLOW (JUNE 30, 2016) ,,(# LOTS) _ (gpd/unit) DESIGN FLOW `(GPd) " (# COS) - (gpd/unit) FLOW (gpd) 8174-5 Harris Teeter 8174 5/26/2015 718' of 8" Long Creek Domestic 1 7317 7317 0 7317 0 8359-S MR Office Building 8359 10/12/2015 179' of 8" Long Creek Domestic 1 275 275 0 275 0 8338-S Catawba Hills Ph 4 8338 1/6/2016 1,835' of 8" Long Creek Domestic 38 360 13680 0 360 0 8469-S Catawba Hills Village D Townhomes 8469 1/21/2016 905' of 8" Long Creek Domestic 41 360 14760 27 360 9720 8283-5 Gaston College - Center For Advanced Manufacturing 8283 5/10/2016 11 If of 8" Long Creek Domestic 1 9000 9000 0 9000 0 MUNICIPAL SEWER CONTRACT SUMMARY ,. CITY/TOWN - WWTP. CONTRACT MAX'-` (gpd)-. JAN-JUNE 2016 ADF -`(gpd) City of Bessemer City : Oates Road Crowders Creek 1,000,000 501,932 City of Bessemer City : Abernethy Creek Crowders Creek 608,333 474,828 Town of Clover Crowders Creek 620,000 709,656 City of High Shoals Long Creek 100,000 32,813 City of Kings Mountain Crowders Creek 1,000,000 22,844 Town of Ranlo Long Creek 400,000 326,082 City of Lowell Long Creek N/A 52,445 City of Belmont Eagle Road 280,000 73,606 Dallas -Spencer Mountain Village Long Creek N/A 30,227 Town of Stanley Long Creek 1,000,000 134,358 Long Creek WWTP: Crowders Creek WWTP: Eagle Road WWTP: "CONTRACT" FLOW (MGD) JiyitAy 1P2006"Jdne130 "CONNECTED" FLOW (MGD) 4119 FLOW "NOT YET TRIBUTARY" (MGD) "DESIGN" FLOW (MGD) 1.5 1.7 1.5 1.7 3.2 0.2 1.8 1.6 0.3 0.2 0.1 0.4 Long Creek WWTP Crowders Creek WWTP Eagle Road WWTP Permit # NC0020184 Permit # NC0074268 Permit # NC0006033 Permitted Flow: 16.0 MGD Permitted Flow: 6.0 MGD Permitted Flow: 4.0 MGD JAN-JUNE 2016 ADF: 6.9 MGD JAN-JUNE 2016 ADF: 2.6 MGD JAN-JUNE 2016 ADF: 0.741 MGD ,lc --- -. - e" 'io'» i. 6%.37.011 rjerinlilfted In . ep iA *Permitted Flow Used = (ADF +"Flow Not Yet Tributary') / WWTP Permitted Flow City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July2016 Page 4 of 4 NC Great Place. Great People. Great Promise. Engineering Department P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • www.cityofgastonia.com March 17, 2016 Ms. Dee Browder NCDENR Division of Water Quality 610 E. Center Avenue; Suite 301 Mooresville, NC 28115 RECEIVED/NCDENP,/DWR MAR 2 1 2016 WOROS MOORESVILLE REGIONAL OFFICE Fax: 704.854.6654 Subject: City of Gastonia Local Sewer Permit Program —Flow Tracking Report Dear Ms. Browder: In reference to above, please find attached the following documents: • Form FTSE-10/07: Long Creek Wastewater Treatment Plant • Form FTSE-10/07: Crowder's Creek Wastewater Treatment Plant • Form FTSE-10/07: Eagle Road Wastewater Treatment Plant • Sewer Usage Spreadsheet as of January 1, 2016 If you have any questions or need additional information, please contact me at (704)866-6789. Sincerely, Jamie Johnson Land Development Cc: Rusty Bost, City Engineer Tucker Johnson, Assistant City Engineer Matt Bernhardt, Director of Public Works and Utilities W ATF9 State of North Carolina OQG Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Long Creek WWTP b. WWTP Facility Penult #: NC0020184 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 16.0 MGD 1.1 MGD 6.6 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD (Filln/Design) Approx. Current Avg. Daily Flow, MGD III. Certification Statement: 1, 3 .m i e `J a An so n , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates accepta of this watew ter flow. U �.,_ 3 -/2 /G Signing fficial Suture Date O State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Crowder's Creek WWTP b. WWTP Facility Peiiuit #: NC0074268 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 6.O MGD 1.8 MGD 2.6 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD (Firm/Design) Approx. Current Avg. Daily Flow, MGD III. Certification Statement: I, 'T To.. m 1 e. --Si; 4n 5O , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates accep nce of this wastewater flow. 3 Signi Official Si nature Date OFF T State of North Carolina 406 Department of Environment and Natural Resources r Division of Water Quality . - Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Eagle Road WWTP b. WWTP Facility Permit #: NC0006033 c. WWTP facility's peituitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 4.0 MGD 0.4 MGD 0.725 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD III. Certification Statement: I, tea.,,, r c —1-0 A n so . , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptanc f this waste yaterAflow. Signing l Sign ure Date SANITARY SEWER USAGE REPORT CITY OF GASTONIA, NORTH CAROLINA January 1, 2016 .J PEWS ',�t,r T PROJECT"'"'AIP # . �•t` ISSUDATE .'DESIGN" DESCRIPTION - WASTE TYPE F„kOW CALCULATIONSA„„„ = tESTIMATED FLOW (DECEMBER 31,'.2015). (# LOTS),, (9Ptl/unit) DESIGN,FLOW - .°,s" ' "- rc "'�" #COS ( ) :"+r'*• - tl/unit° (9p ) FLOW (9pd)w " 0106343-S Rosegate Phs. 2 4505 1/10/2006 1898 LF-8" -Long Creek Domestic 36 36D 12960 35 360 12600 0106344-S Catawba Hills 3 4422 1/11/2006 1602 LF-8" Long Creek Domestic 48 360 17280 48 360 17280 0206345-S Town of Clover Monitoring Facility . 4635 2/14/2006 230 LF-15" Crowders Creek Domestic 0 0 D 0 0 0 0206346-S Bethesda Oaks Phase I 4562 2/20/2006 5603 LF-8" Long Creek Domestic 26 480 12480 26 480 12480 0206347-S Glyncastle 4442 2/24/2006 1600 LF-8" Long Creek Domestic 33 - 360 11880 33 360 11880 0306348-S 3001 Titman Road 4640 3/21/2006 65 LF-8" Long Creek Domestic 1 360 360 1 360 360 0306349-S The Village at The Mountain 4475 6/7/2006 2418 LF of 8" 16 MH's Long Creek Domestic 78 360 28080 10 360 3600 0606351-S The Village at Parkside 4198 6/30/2006 8053 Lf - 8" Crowders Creek Domestic 228 360 82280 79 360 28440 0706352-S Village at 5th Avenue 4583 7/7/2006 5349 LF of 8" Long Creek Domestic 142 400 56800 76 400 30400 0606350-S Ferguson Subdivision Sewer Extension 4498 7/13/2006 366 LF - 8", 1 MH Crowders Creek Domestic 5 360 1800 1 360 360 0706353-S Wren Turnpike Wholesales 4558 7/18/2006 305 LF of 8" Long Creek Domestic 4 119 475 2 119 238 0706354-S Carmax 4594 7/26/2006 695 If of 12". 798 If of 8" and 9 manholes Long Creek Domestic D 0 0 0 0 0 0706356-S Cramer Woods Phs 3 4588 8/3/2006 10,457 LF of 8" Long Creek Domestic 139 360 50040 117 360 42120 0706355-S Spencer Mountain Village Phs 1 4351 8/7/2006 12,868 LF of 8" Long Creek Domestic 254 360 91440 SOS 360 36360 0806357-S Shops at Franklin Square 4665 8/15/2006 1590 LF of 8" Long Creek Domestic 10 1614 16140 6 1614 9684 0806358-S Susan Farms Sewer Petition Phs 1&2 (COG) 5611 8/15/2006 3051 If of 8" Long Creek ' Domestic 32 290 9300 16 290 4640 1006361-S Woodleigh Subdivision 4637 10/11/2006 234 LF of 8" Long Creek Domestic 2 375 750 1 375 375 1106362-S Catawba Hills Subdivision Village D — Townhomes 4352 11/9/2006 2221 LF of 8" Long Creek Domestic 72 360 25920 26 360 9360 1106363-S Club Ridge Subdivision 4712 11/17/2006 1738 LF of 8" Long Creek Domestic 18 360 6480 4 360 1440 1106364-5 Bethesda Oaks Phs. 2 4641 11/21/2006 6409 LF of 8" Long Creek Domestic 148 480 71040 131 480 62880 1106365-S New Hope Elementary SS Extension 4764 11/28/2006 160 LF of.8" Long Creek Domestic 1 6816 6816 1 6816 6816 0906360-S Windsong Drive, Denise Dr. & Sugar Ln (COG) 5614 12/15/2006 1665 LF of 8" Long Creek Domestic 18 370 6660 18 370 6660 0107366-S Willow Creek Subdivision Phs 2 4536 1/5/2007 6572 LF of 8" Long Creek Domestic 192 360 69120 192 360 69120 0307367-S New Hope Crossing 4740 3/6/2007 1613 LF of 8" Long Creek Domestic 6 1035 6210 6 1035 6210 0307369-S Value Place 4739 3/16/2007 115 LF of 8" Long Creek Domestic 1 7338 7338 1 7338 7338 0307368-S Kinmere Farms 4652 3/20/2007 4781 LF of 8" Long Creek Domestic 80 360 28800 78 360 28080 0407370-S Apple Creek Village — Off Site 4677 4/26/2007 1553 LF of 16" Long Creek Domestic 0 0 0 0 0 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: January 2016 Page 1 of 4 Love, Barry F From: Johnson, Jamie <jamiej@cityofgastonia.com> Sent: Wednesday, April 06, 2016 3:52 PM To: Gore, Deborah Cc: Leggett, Michael; Parker, Michael; Love, Barry F Subject: City of Gastonia Quarterly Report Attachments: Quarterly Reports Jan -Mar 2016.doc; Jan -Mar 16_SS report.pdf Good afternoon, Please find attached the January 2016 — March 2016 quarterly reports for. the City of Gastonia's local sewer permit program. If you have any questions or need additional information, please do not hesitate to contact me. Thank you. Jamie Johnson Engineering Department City of Gastonia PO Box 1748 Gastonia, NC 28o53 704-866-6789 Fax: 704-854-6654 jamiej@cityofgastonia.com i Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com April 6, 2016 Deborah Gore NCDENR Division of Water Quality Pretreatment, Emergency Response & Collection Systems Unit 1617 Mail Service Center Raleigh, NC 27699-1617 SUBJECT: CITY OF GASTONIA LOCAL SEWER PERMIT PROGRAM Dear Ms. Gore: In reference to above, attached are the Quarterly Permit Reports for the permits received during the period January 2016 through March 2016 for the city's treatment plants. If you have any questions or need additional information, please call me at (704) 866-6789. Sincerely, Jamie Johnson Land Development Project Manager Love, Barry F From: Johnson, Jamie <jamiej@cityofgastonia.com> Sent: Thursday, February 25, 2016 11:47 AM To: Gore, Deborah Cc: Leggett, Michael; Parker, Michael; Love, Barry F Subject: City of Gastonia Quarterly Report Attachments: Quarterly Reports_Oct-Dec 2015.doc; Oct -Dec 15_SS report.pdf Good morning, Please fmd attached the October 2015 — December 2015 quarterly reports for the City of Gastonia's local sewer permit program. If you have any questions or need additional information, please do not hesitate to contact me. Thank you. Jamie Johnson Engineering Department City of Gastonia PO Box 1748 Gastonia, NC 28o53 704-866-6789 Fax:704-854-6654 jamiej@cityofgastonia.com 1 ASTONI NC Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com February 25, 2016 Deborah Gore NCDENR Division of Water Quality Pretreatment, Emergency Response & Collection Systems Unit 1617 Mail Service Center Raleigh, NC 27699-1617 SUBJECT: CITY OF GASTONIA LOCAL SEWER PERMIT PROGRAM Dear Ms. Gore: In reference to above, attached are the Quarterly Permit Reports for the permits received during the period October 2015 through December 2015 for the city's treatment plants. If you have any questions or need additional information, please call me at (704) 866-6789. Sincerely, Jamie Johnson Land Development Project Manager North Carolina Division of Water Quality PERCS Unit Quarterly Permit Report Delegated Municipality: City of Gastonia Year: 2015 Quarter: October - December Permit Date Design Flow Type of Treatment Plant Current Number Issued Permittee Project Description (gpd) Waste NPDES No. Status 8359-S 10/12/2015 MR Office Building 179 If of 8" 275 Domestic LONG CREEK: NC0020184 Design Complete Total GPD this Qtr.: 275 r Submit to NCDENR, Division of Water Quality, PERCS Unit,1617 Mail Service Center, Raleigh, NC 27699-1617 and your regional Division of Water Quality office. No copies of permits or plans are necessary. 2/25/2016 ASTONIIA Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com October 6, 2015 Deborah Gore NCDENR Division of Water Quality Pretreatment, Emergency Response & Collection Systems Unit 1617 Mail Service Center Raleigh, NC 27699-1617 SUBJECT: CITY OF GASTONIA LOCAL SEWER PERMIT PROGRAM Dear Ms. Gore: In reference to above, attached are the Quarterly Permit Reports for the permits received during the period April 2015 through June 2015 for the city's treatment plants. If you have any questions or need additional information, please call me at (704) 866-6789. Sincerely, Jamie Johnson Land Development Project Manager ASTONIA Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com October 6, 2015 Deborah Gore NCDENR Division of Water Quality Pretreatment, Emergency Response & Collection Systems Unit 1617 Mail Service Center Raleigh, NC 27699-1617 SUBJECT: CITY OF GASTONIA LOCAL SEWER PERMIT PROGRAM Dear Ms. Gore: In reference to above, there were no sewer permits issued during the period July 2015 through September 2015 for the city's treatment plants. If you have any questions or need additional information, please call me at (704) 866-6789. Sincerely, Jamie Johnson Land Development Project Manager North Carolina Division of Water Quality PERCS Unit Quarterly Permit Report Delegated Municipality: City of Gastonia Year: 2015 Quarter: April - June Permit Date Design Flow Type of Treatment Plant Current Number Issued Permittee Project Description (gpd) Waste NPDES No. Status 8205-S 4/9/2015 . Villages At Cramerton Mills Ph 1 E 1,012 If of 8" 9,828 Domestic EAGLE ROAD: NC 0006033 Design Complete 8174-S 5/26/2015 Harris Teeter 718 If of 8" 7,317 Domestic LONG CREEK: NC0020184 Design Complete Total GPD this Qtr.: 17,145 Submit to NCDENR, Division of Water Quality, PERCS Unit,1617 Mail Service Center, Raleigh, NC 27699-1617 and your regional Division of Water Quality office. No copies of permits or plans are necessary. 10/6/2015 Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com May 1, 2015 Deborah Gore NCDENR Division of Water Quality Pretreatment, Emergency Response & Collection Systems Unit 1617 Mail Service Center Raleigh, NC 27699-1617 SUBJECT: CITY OF GASTONIA LOCAL SEWER PERMIT PROGRAM Dear Ms. Gore: In reference to above, attached are the Quarterly Permit Reports for the permits received during the period January 2015 through March 2015 for the city's treatment plants. If you have any questions or need additional information, please call me at (704) 866-6789. Sincerely, Jamie Johnson Civil Engineer I North Carolina Division of Water Quality PERCS Unit Quarterly Permit Report Delegated Municipality: City of Gastonia Year: 2015 Quarter: January - March Permit Date Design Flow Type of Treatment Plant Current Number Issued Permittee Project Description (gpd) Waste NPDES No. Status 7721-S 1/6/2015 Bethesda Oaks Phase 3 4,408 If of 8" 40,320 Domestic LONG CREEK: NC0020184 Design Complete 8189-S 1/26/2015 Woodbriar Trail 263 If of 8" 1,440 Domestic LONG CREEK: NC0020184 Design Complete Total GPD this Qtr.: 41,760 Submit to NCDENR, Division of Water Quality, PERCS Unit,1617 Mail Service Center, Raleigh, NC 27699-1617 and your regional Division of Water Quality office. No copies of permits or plans are necessary. 5/1/2015 I+ ASTONIA Great Place. Great People. Great Promise. Engineering Standards RECEIVED/NCDENR/DWR MAR I92015 WQROS MOORESVILLE REGIONAL OFFICE P.O. Box 1748 ° Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com March 13, 2015 Ms. Dee Browder NCDENR Division of Water Quality 610 E. Center Avenue; Suite 301 Mooresville, NC 28115 Subject: City of Gastonia Local Sewer Permit Program —Flow Tracking Report Dear Ms. Browder: In reference to above, please find attached the following documents: • Form FTSE-10/07: Long Creek Wastewater Treatment Plant • Form FTSE-10/07: Crowder's Creek Wastewater Treatment Plant • Form FTSE-10/07: Eagle Road Wastewater Treatment Plant • Sewer Usage Spreadsheet as of January 1, 2015 If you have any questions or need additional information, please contact me at (704)866-6789. Sincerely, Jamie Johnson Land Development Cc: Rusty Bost, City Engineer Thorne A. Martin, Assistant City Engineer Matt Bernhardt, Director of Public Works and Utilities State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. RECEIVED/NCDENR/DWR I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Long Creek WWTP b. WWTP Facility Permit #: NC0020184 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used MAR 1 9 2015 WQROS MOORESVILLE REGIONAL OFFICE All flows are in MGD 16.0 MGD 1.2 MGD 7.0 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD (Firm/Design) Approx. Current Avg. Daily Flow, MGD III. Certification Statement: I, ' JGan i ,e, J 4 n sail , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptange\of this wast ater j ow. 91 3.- /3-/S Signing Ificial Sign re Date State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. RECEIVE D/N CD E N R/DWR a. WWTP Facility Name: Crowder's Creek WWTP b. WWTP Facility Permit #: NC0074268 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of peitiiitted flow used MAR 1 9 2015 p�s All flay F2EGIONAL OFFICE 6.0 MGD 1.8 MGD 2.5 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD (Film/Design) Approx. Current Avg. Daily Flow, MGD III. Certification Statement: I, Jrr, i o%, o sort , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptan of this wastewer fl.w. Signing, ficial Signat v_/3-/S Date pump stations along the route of the proposed wastewater flow. ��F9 State of North Carolina QG Department of Environment and Natural Resources 7r Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all RECEIVED/NCDEN R/DW R I. Complete this section only if you are the owner of the wastewater treatment plant. MAR i 9 2015 a. WWTP Facility Name: Eagle Road WWTP b. WWTP Facility Permit #: NC0006033 c. WWTP facility's peiiuitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used WQROS MOORESVILLE REGIONAL OFFICE All flows are in MGD 4.0 MGD 0.4 MGD 0.5 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD (Finn/Design) Approx. Current Avg. Daily Flow, MGD III. Certification Statement: I, J e, /r, i e j o An 5-0 , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptant of this wastatet` ow. � Jl.(,iyvt c;e 3 -- / 3 — /5 Signing,Official Signore Date SANITARY SEWER USAGE REPORT CITY OF GASTONIA, NORTH CAROLINA December 31, 2014 PERMIT # '' , '', PROJECT ,', -, ' MP # ISSUE DATE ri,'",DESORIpTION'" ' "r _WW,TP "." WASTE TYPE "DESIGN" FLOW CALCULATIONS i'L. = -or ESTIMATED FLOW DEC 31;2014) , '(,„ LOTS) , . (gpiiiii;,,,t) - 'OEfiN(qpdF),L,OW , i".8(A)' it ..':' (6Pdlun'it)', S' ci FLOW (thi" 0106343-S Rosegate Phs. 2 4505 1/10/2006 1898 LF-8" Long Creek Domestic 36 360 12960 33 360 11880 0106344-S Catawba Hills 3 4422 1/11/2006 1602 LF-8" Long Creek Domestic 48 360 17280 47 360 16920 0206345-S Town of Clover Monitoring Facility 4635 2/14/2006 230 LF-15" Crowders Creek Domestic 0 0 0 0 0 0 0206346-S Bethesda Oaks Phase I 4562 2/20/2006 5603 LF-8" Long Creek Domestic 26 480 12480 26 480 12480 0206347-S Glyncastle 4442 2/24/2006 1600 LF-8" Long Creek Domestic 33 360 11880 33 360 11880 0306348-S 3001 Titman Road 4640 3/21/2006 65 LF-8" Long Creek Domestic 1 360 360 1 360 360 0306349-S The Village at The Mountain 4475 6/7/2006 2418 LF of 8" 16 MH's Long Creek Domestic 78 360 28080 10 360 3600 0606351-S The Village at Parkside 4198 6/30/2006 8053 Lf - 8" Crowders Creek Domestic 228 360 82280 57 360 20520 0706352-S Village at 5th Avenue 4583 7/7/2006 5349 LF of 8" Long Creek Domestic 142 400 56800 59 400 23600 0606350-S Ferguson Subdivision Sewer Extension 4498 7/13/2006 366 LF - 8", 1 MH Crowders Creek Domestic 5 360 1800 1 360 360 0706353-S Wren Turnpike Wholesales 4558 7/18/2006 305 LF of 8" Long Creek Domestic 4 119 475 2 119 238 0706354-S Carmax 4594 7/26/2006 695 If of 12". 798 If of 8" and 9 manholes Long Creek Domestic 0 0 0 0 0 0 0706356-S Cramer Woods Phs 3 4588 8/3/2006 10,457 LF of 8" Long Creek Domestic 139 360 50040 108 360 38880 0706355-S Spencer Mountain Village Phs 1 4351 8/7/2006 12,868 LF of 8" Long Creek Domestic 254 360 91440 100 360 36000 0806357-S Shops at Franklin Square 4665 8/15/2006 1590 LF of 8" Long Creek Domestic 10 1614 16140 6 1614 9684 0806358-S Susan Farms Sewer Petition Phs 1&2 (COG) 5611 8/15/2006 3051 If of 8" Long Creek Domestic 32 290 9300 16 290 4640 1006361-S Woodleigh Subdivision 4637 10/11/2006 234 LF of 8" Long Creek Domestic 2 375 750 1 375 375 1106362-S Catawba Hills Subdivision Village D - Townhomes 4352 11/9/2006 2221 LF of 8" Long Creek Domestic 72 360 25920 13 360 4680 1106363-S Club Ridge Subdivision 4712 11/17/2006 1738 LF of 8" Long Creek Domestic 18 360 6480 1 360 360 1106364-S Bethesda Oaks Phs. 2 4641 11/21/2006 6409 LF of 8" Long Creek Domestic 148 480 71040 131 480 62880 1106365-S New Hope Elementary SS Extension 4764 11/28/2006 160 LF of 8" Long Creek Domestic 1 6816 6816 1 6816 6816 0906360-S Windsong Drive, Denise Dr. & Sugar Ln (COG) 5614 12/15/2006 1665 LF of 8" Long Creek Domestic 18 370 6650 18 370 6650 0107366-S Willow Creek Subdivision Phs 2 4536 1/5/2007 6572 LF of 8" Long Creek Domestic 192 360 69120 192 360 69120 0307367-S New Hope Crossing 4740 3/6/2007 1613 LF of 8" Long Creek Domestic 6 1035 6207 6 1035 6210 0307369-S Value Place 4739 3/16/2007 115 LF of 8" Long Creek Domestic 1 7338 7338 1 7338 7338 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: December 2014 Page 1014 - PERMIT # PROJECT AIP # ISSUE DATE - DESCRIPTION WWTP WASTE TYPE "DESIGN" FLOW CALCULATIONS -. ESTIMATED FLOW DEC 31, 2014) <; (it LOTS) (gpolunit) DESIGN FLOW ; (#CO'S)...: ,, (gpd/unit) FLOW(gpd), 0307368-S Kinmere Farms 4652 3/20/2007 4781 LF of 8" Long Creek Domestic 80 360 28800 78 360 28080 0407370-S Apple Creek Village - Off Site 4677 4/26/2007 1553 LF of 16" Long Creek Domestic 0 0 0 0 0 0 0507371-S Woodbriar Trail (COG) 5616 5/22/2007 1133 LF of 8" Crowders Creek Domestic 14 300 4200 14 300 4200 0507372-S The Summit at Court Drive Phs 3 4765 5/24/2007 174 LF of 2" 200 LF of 8" Long Creek Domestic 1 5000 5000 1 5000 5000 0707373-S Apple Creek Village 4543 7/26/2007 9632 LF of 8" 227 LF of 16 Long Creek Domestic 291 360 104760 0 360 0 0707374-S Crowders View Phase II 4854 7/27/2007 2281 LF of 8" Crowders Creek Domestic 58 360 20880 10 360 3600 0807375-S Howe Sewer Extension 4849 8/2/2007 48 LF of 8" Crowders Creek Domestic 1 600 600 1 600 600 1007376-S Villas at Applecreek 4802 10/30/2007 3488 LF of 8" Long Creek Domestic 89 360 32040 0 360 0 1107377-S Gaston Crossing 4947 11/16/2007 519 LF of 8" Long Creek Domestic 5 4802 24008 2 4802 9604 1107378-S Queens Road Sewer Rehab Phase 1 (COG) 5617 11/29/2007 2391 LF of 8" Crowders Creek Domestic 32 300 9600 32 300 9600 1207379-S Robinson Oaks Villas (outfall) 5012 12/6/2007 1810 LF of 8" Long Creek Domestic 0 0 0 0 0 0 0208380-S Bethlehem Baptist Church 4934 2/5/2008 1612 LF OF 8" Long Creek Domestic 2 6250 12500 2 6250 12500 0208381-S Reserve at Catawba Creek 4675 2/6/2008 2996 LF OF 8" 1382 LF OF 6" Long Creek Domestic 127 405 51435 55 405 22275 0208382-S Rosegate Phase 3 4676 2/8/2008 3885 LF OF 8" Long Creek Domestic 81 360 29160 0 360 0 0308384-S Winterlake Drive SS Extension 4984 3/27/2008 1286 LF OF 8" Long Creek Domestic 8 360 2880 8 360 2880 0308383-S City of Gastonia Clouse Street SS 5623 3/27/2008 75 LF OF 8" Long Creek Domestic 1 300 300 1 300 300 0608385-S Gastonia Technology Park 4668 6/6/2008 593 LF OF 8" Long Creek Domestic 4 1581 6324 1 1581 1581 0608386-S Spencer Mountain Village PH 2&3 4726 6/9/2008 9344 LF OF 8" Long Creek Domestic 227 360 81720 11 360 3960 0608387-S Gaston Mall 5032 6/17/2008 682 LF OF 8" 140 LF OF 18" Long Creek Domestic 4 400 1600 4 400 1600 0708388-S Bayview Pump Station Abandonment 5628 7/14/2008 78 LF OF 8" Long Creek Domestic 0 0 0 0 0 0 0708389-S Mill Creek Apartments Phase 3 5107 7/16/2008 755 LF OF 8" Long Creek Domestic 4 3120 12480 4 3120 12480 5097-S Evergreen Landing Apartments 5097 11/7/2008 728 LF of 8" Long Creek Domestic 4 4890 19560 4 4890 19560 5241-S Fresenius Medical Care 5241 12/22/2008 165 LF of 8" Crowders Creek Domestic 1 2000 2000 1 2000 2000 5743-S Ridge MIS Community / Nina Dawn Sewer 5743 1/30/2009 8557 LF of 8" Crowders Creek Domestic 74 300 22200 57 300 17100 5780-S Queens Road Sewer Rehab Phase 3 (COG) 5780 2/23/2009 6470 LF of 8" Crowders Creek Domestic 92 350 32200 92 350 32200 5786-S NCDOT 274 Widening Utility Relocation Project 5786 2/25/2009 492 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5926-S West Davidson Bridge Replacement 5726 7/24/2009 320 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5739-S NCDOT Gaston County Maintenance Yard 5739 11/5/2009 1231 LF of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: December 2014 Page 2 of4 PERMIT # PROJECT ', " AIP # , ISSUE DATE , .. DESCRIPTION .. , . WWTP' WASTE TYPE , ... "DESIGN" FLOW .CALCULATIONS . ESTIMATED FLOW ,DEC 31,-2014)' 4 (# LOTS) • - (gpd/unit)ond) DESIGN FLOW (# CO'S) (gpdiunit) FLOW (gpd) 6467-S O'Reilly Auto Parts 6467 1/28/2010 218 If of 8" pvc Long Creek Domestic 2 2000 4000 1 2000 2000 6468-S Summit Crossing Phase III 6468 4/1/2010 657 If of 8" Long Creek Domestic 3 6520 19560 1 6520 6520 6957-S Rolling Meadows Drive SS Extension 6957 8/23/2010 731 If of 8" Long Creek Domestic 3 350 1050 0 350 0 6953-S Tech Park Sewer Improvements 6953 11/18/2010 6397 If of 12" dip Long Creek Domestic 2 65000 130000 1 65000 65000 7054-S Robinson Heights Subdivision 7054 12/15/2010 1766 If of 8" Crowders Creek Domestic 19 300 5700 15 300 4500 6982-S DRJ Holdings Property 6982 1/20/2011 338 If of 8" Long Creek Domestic 1 1600 1600 1 1600 1600 7056-S Pearson Properties-- Hoffman Road 7056 3/4/2011 585 If of 8" Long Creek Domestic 1 1500 1500 1 1500 1500 7024-S Bordeaux Apartments 7024 3/8/2011 58 If of 8" Long Creek Domestic 33 350 11550 33 350 11550 7177-S Roberts Family Ventures 7177 6/15/2011 112 If of 8" Long Creek Domestic 1 500 500 1 500 500 5922-S Ballantyne Apartments 5922 6/21/2011 1795 If of 8" Crowders Creek Domestic 241 237 57120 241 237 57120 6725-S Gaston Mall Redevelopment (Target) 6725 8/16/2011 681 If of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 7384-S CTL Packaging USA 7384 5/7/2012 489 If of 8" 1107 If of 10" Long Creek Domestic 1 1200 1200 1 1200 1200 7488-S Dollar General Outfall 7488 7/3/2012 681 If of 8" Long Creek Domestic 1 910 910 1 910 910 7605-S South Fork Catawba Regional Imp. (Fair St.) 7605 11/20/2012 2682 If of 8" Long Creek Domestic 1 52470 52470 0 52470 0 7606-S South Fork Catawba Regional Imp.(Kings Grant) 7606 11/20/2012 266 If of 8" Eagle Domestic 1 64440 64440 0 64440 0 7543-S Rosegate Phase 3 A/B 7543 11/29/2012 995 If of 8" Long Creek Domestic 19 360 360 12 360 4320 7582-S Daimler 7582 12/21/2012 316 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4698-S Kinmere Village 4698 2/28/2013 7139 If of 8" Long Creek Domestic 111 360 39960 22 360 7920 7616-S West Congregation of Johovah's Witness 7616 4/9/2013 3841f of 8" Crowders Creek Domestic 1 8000 8000 1 8000 8000 7457-S South Fork Village Apartments 7457 4/17/2013 2490 If of 8", 870 If 6" FM, 1 Pmmn SI-at-inn Eagle Domestic 352 274 96360 0 274 0 7710-S Long Creek Apartments 7710 5/6/2013 1474 If of 8" Long Creek Domestic 103 300 30890 0 300 0 7615-S Rosegate Phase 3 C/D/E 7615 5/30/2013 3032 If of 8" Long Creek Domestic 55 449 24720 6 449 2694 7467-S Kinmere Commons 7467 6/4/2013 1977 If of 8" Long Creek Domestic 104 360 37440 17 360 6120 7720-S Robinson Oaks 2013 7720 9/6/2013 8392' of 8", 44 MH Long Creek Domestic 204 120 73440 0 120 0 7746-S Tractor Supply 7746 9/18/2013 180 If of 8" Crowders Creek Domestic 1 2280 2280 1 2280 0 7785-S Summit Crossing Phase IV 7785 10/14/2013 427 If of 8" Long Creek Domestic 1 2500 2500 1 2500 0 4948-S Villas At Robinson Oaks 4948 1/22/2014 1160 If of 8" Long Creek Domestic 62 374 22480 0 374 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: December 2014 Page 3 of 4 PERMIT # PROJECT Alp # ISSUE DATE DESCRIPTION WWTP WASTE TYPE "DESIGN" FLOW CALCULATIONS ESTIMATED: FLOW DEC 31, 2014) (# LOTS) (gpd/unit) DESIGN FLOW (grid) (# CO'S) (gpd/unit) FLOW d) (9P 7848-S Owens Corning 7848 1/31/2014 667 If of 8" Long Creek Domestic 1 124000 124000 0 124000 0 8090-S Oakhill Lane Sewer Extension 8090 7/31/2014 372 If of 8" Long Creek Domestic 4 360 1440 0 360 0 8091-S Winterlake Drive Sewer Extension 8091 7/31/2014 380 If of 8" Long Creek Domestic 3 360 1080 0 360 0 8092-S American & Efird Sewer Line Upgrade 8092 8/13/2014 227 If of 8" private sewer Crowders Creek Industrial 1 23000 23000 0 23000 0 7640-S Villages At Cramerton Mills Ph 1 7640 10/27/2014 4515' of 8" Eagle Domestic 75 416 31200 0 416 0 MUNICIPAL SEWER CONTRACT SUMMARY CITY/TOWN WWTP CONTRACT MAX -; (gpd) `. JAN-DEC 2014 ADF - (gpd)`. City of Bessemer City : Oates Road Crowders Creek 1,000,000 467,522 City of Bessemer City : Abernethy Creek Crowders Creek 608,333 427,956 Town of Clover Crowders Creek 620,000 608,321 City of High Shoals Long Creek 100,000 29,300 City of Kings Mountain Crowders Creek 1,000,000 33,499 Town of Ranlo Long Creek 400,000 217,149 City of Lowell Long Creek N/A 50,688 City of Belmont Eagle Road 280,000 58,756 Dallas - Spencer Mountain Village Long Creek N/A 17,090 Long Creek WWTP: Crowders Creek WWTP: Eagle Road WWTP: "CONTRACT' FLOW (MGD) ,rJanuary1 006,iDe:cember3lf2014 "DESIGN" FLOW (MGD) 'CONNECTED" FLOW (MGD) FLOW "NOT YET TRIBUTARY" (MGD) 0.5 1.5 0.8 1.2 3.2 0.3 1.7 1.8 0.3 0.2 0.1 0.4 Long Creek WWTP Crowders Creek WWTP Eagle Road WWTP Permit# NC0020184 Permit# NC0074268 Permit# NC0006033 Permitted Flow: 16.0 MGD Permitted Flow: 6.0 MGD Permitted Flow: 4.0 MGD JAN-DEC 2014 ADF: 7.0 MGD JAN-DEC 2014 ADF: 2.5 MGD JAN-DEC 2014 ADF: 0.5 MGD e aeu#9 ec 0a 'Permitted Flow Used = (ADF + "Flow Not Yet Tributary") / W WTP Permitted Flow City of Gastonia Semi -Annual Sanitary Sewer Usage Report: December 2014 Page 4 of 4 --. ASTONIA Great Place. Great People. Great Promise. Engineering Standards SEP222014 P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com September 17, 2014 Ms. Dee Browder NCDENR Division of Water Quality 610 E. Center Avenue; Suite 301 Mooresville, NC 28115 Subject: City of Gastonia Local Sewer Permit Program —Flow Tracking Report Dear Ms. Browder: In reference to above, please find attached the following documents: • Form FTSE-10/07: Long Creek Wastewater Treatment Plant • Form FTSE-10/07: Crowder's Creek Wastewater Treatment Plant • Form FTSE-10/07: Eagle Road Wastewater Treatment Plant • Sewer Usage Spreadsheet as of July 1, 2014 If you have any questions or need additional information, please contact me at (704)866-6789. Sincerely, Jamie Johnson Land Development Cc: Rusty Bost, City Engineer Thorne A. Martin, Assistant City Engineer Matt Bernhardt, Director of Public Works and Utilities OF��F9 State of North Carolina 0G Department of Environment and Natural Resources r Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Long Creek WWTP b. WWTP Facility Permit #: NC0020184 c. WWTP facility's peiuiitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 16.0 MGD 1.2 MGD 7.5 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD (Finn/Design) Approx. Current Avg. Daily Flow, MGD SEP 2 2 2014 III. Certification Statement: I, ,,, 2 J,J h.1 so.. , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptan e of this was wat r flow. Signin fcial Si ature Date 1 State of North Carolina F., Department of Environment and Natural Resources G r Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Crowder's Creek WWTP b. WWTP Facility Permit #: NC0074268 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Approx. Capacity, MGD Approx. Current Avg. Pump Station Name (Firm/Design) Daily Flow, MGD All flows are in MGD 6.0 MGD 1.6 MGD 2.8 MGD SEP 2 2 2014 Mn III. Certification Statement: I, ,�� J f � on , certify that, to the best of my knowledge, the addition oft e �rt ns volume of wastewater to be permitted in this project has been project as not antited cipated to cause ng the route to any capacity e receiving wastewater treatment facility and that the flow from p J the receiving related sanitary sewer overflows or overburden any downstreamroute with local treatment plant under normal circumstances. This analysis has been performed ines to those established policies and procedures using the best available wparty.s certification Signature of thplform indicatesms listed above in Sections I and II for which I am the responsible accepta .. e of this w• tewa er flow. /jq /j Date Signin •/9ff cial Si ( ature R„ CE..VED fRfStCN, OF'_ _.+:?_ER QUALITY SEP 222014 III. Certification Statement: I, fib..in t e__ -S-04„ Sa" , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates accepta r e of this wa r flow. 9/iih f Date OFFICE Signin Official Si, ature et -„ SANITARY SEWER USAGE REPORT CITY OF GASTONIA, NORTH CAROLINA January 1, 2016 PERMIT # PROJECT AJP # : ISSUE DATE „„ .: - DESCRIPTION ,. WWTP °' ,, _.:. WASTE TYPE "<< "D8SIGN" FLOW CALCULATIONS ,° ESTIMATED FLOW (DECEMBER31'2015). „ (# LOTS) . (gpd/unit) DESIGN FLOW (qPd) ,(#CO'S) (gPdfunit) FLOW (gpd) 0106343-S Rosegate Phs. 2 4505 1/10/2006 1898 LF-8" Long Creek Domestic 36 360 1296D 35 360 12600 0106344-S Catawba Hills 3 4422 1/11/2006 1602 LF-8" Long Creek Domestic 48 360 17280 48 360 17280 0206345-S Town of Clover Monitoring Facility 4635 2/14/2006 230 LF-15" Crowders Creek Domestic 0 0 0 0 0 0 0206346-S Bethesda Oaks Phase I 4562 2/20/2006 5603 LF-8" Long Creek Domestic 26 480 12480 26 480 12480 0206347-S Glyncastle 4442 2/24/2006 1600 LF-8" Long Creek Domestic 33 360 11880 33 360 11880 0306348-S 3001 Titman Road 4640 3/21/2006 65 LF-8" Long Creek Domestic 1 360 360 1 360 360 0306349-S The Village at The Mountain 4475 6/7/2006 2418 LF of 8" 16 MH's Long Creek Domestic 78 360 28080 10 360 3600 0606351-S The Village at Parkside 4198 6/30/2006 8053 Lf - 8" Crowders Creek Domestic 228 360 82280 79 360 28440 0706352-S Village at 5th Avenue 4583 7/7/2006 5349 LF of 8" Long Creek Domestic 142 400 56800 76 400 30400 0606350-S Ferguson Subdivision Sewer Extension 4498 7/13/2006 366 LF - 8", 1 MH Crowders Creek Domestic 5 360 1800 1 360 360 0706353-S Wren Turnpike Wholesales 4558 7/18/2006 305 LF of 8" Long Creek Domestic 4 119 475 2 119 238 0706354-S Carmax 4594 7/26/2006 695 If of 12". 798 If of 8" and 9 manholes Long Creek Domestic 0 0 0 0 0 0 0706356-S Cramer Woods Phs 3 4588 8/3/2006 10,457 LF of 8" Long Creek Domestic 139 360 50040 117 360 42120 0706355-S Spencer Mountain Village Phs 1 4351 8/7/2006 12,868 LF of 8" Long Creek Domestic 254 360 91440 SOS 360 36360 0806357-S Shops at Franklin Square 4665 8/15/2006 1590 LF of 8" Long Creek Domestic 10 1614 16140 6 1614 9684 0806358-S Susan Farms Sewer Petition Phs 1&2 (COG) 5611 8/15/2006 3051 If of 8" Long Creek ' Domestic 32 290 9300 16 290 4640 1006361-S Woodleigh Subdivision 4637 10/11/2006 234 LF of 8" Long Creek Domestic 2 375 750 1 375 375 1106362-S Catawba Hills Subdivision Village D - Townhomes 4352 11/9/2006 2221 LF of 8" Long Creek Domestic 72 360 25920 26 360 9360 1106363-S Club Ridge Subdivision 4712 11/17/2006 1738 LF of 8" Long Creek Domestic 18 360 6480 4 360 1440 1106364-S Bethesda Oaks Phs. 2 4641 11/21/2006 6409 LF of 8" Long Creek Domestic 148 480 71040 131 480 62880 1106365-S New Hope Elementary SS Extension 4764 11/28/2006 160 LF of.8" Long Creek Domestic 1 6816 6816 1 6816 6816 0906360-S Windsong Drive, Denise Dr. & Sugar Ln (COG) 5614 12/15/2006 1665 LF of 8" Long Creek Domestic 18 370 6660 18 370 6660 0107366-S Willow Creek Subdivision Phs 2 4536 1/5/2007 6572 LF of 8" Long Creek Domestic 192 360 69120 192 360 69120 0307367-S New Hope Crossing 4740 3/6/2007 1613 LF of 8" Long Creek Domestic 6 1035 6210 6 1035 6210 0307369-S Value Place 4739 3/16/2007 115 LF of 8" Long Creek Domestic 1 7338 7338 1 7338 7338 0307368-S Kinmere Farms 4652 3/20/2007 4781 LF of 8" Long Creek Domestic 80 360 28800 78 360 28080 0407370-S Apple Creek Village - Off Site 4677 4/26/2007 1553 LF of 16" Long Creek Domestic 0 0 0 0 0 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: January 2016 Page 1 of 4 PERMIT # ' PROJECT A/p $0" ISSUE DATE . DESCRIPTION " INWTP, IWASTE TYPE "DESIGN" FLOW CALCULATIONS ESTIMATED FLOW (DECEMBER ,, .t) . 31, 2015) ,, , ,,FLOW (gpcl) = DESIGN FLOW 0507371-S Woodbriar Trail (COG) 5616 5/22/2007 1133 LF of 8" Crowders Creek Domestic 14 300 4200 14 300 4200 0507372-S The Summit at Court Drive - Phs 3 4765 5/24/2007 174 LF of 2" 200 LF of 8" Long Creek Domestic 1 5000 5000 1 5000 5000 0707373-S Apple Creek Village 4543 7/26/2007 9632 LF of 8" 227 LF of 16 Long Creek Domestic 291 360 104760 0 360 0 0707374-S Crowders View Phase II 4854 7/27/2007 2281 LF of 8" Crowders Creek Domestic 58 360 20880 10 360 3600 0807375-S Howe Sewer Extension 4849 8/2/2007 48 LF of 8" Crowders Creek Domestic 1 600 600 1 600 600 1007376-S Villas at Applecreek 4802 10/30/2007 3488 LF of 8" Long Creek Domestic 89 360 32040 0 360 0 1107377-S Gaston Crossing 4947 11/16/2007 519 LF of 8" Long Creek Domestic 5 4802 24008 3 4802 14406 1107378-S Queens Road Sewer Rehab Phase 1 (COG) 5617 11/29/2007 2391 LF of 8" Crowders Creek Domestic 32 300 9600 32 300 9600 1207379-S Robinson Oaks Villas (outfall) 5012 12/6/2007 1810 LF of 8" Long Creek Domestic 0 0 0 0 0 0 0208380-S Bethlehem Baptist Church 4934 2/5/2008 1612 LF OF 8" Long Creek Domestic 2 6250 12500 2 6250 12500 0208381-S Reserve at Catawba Creek 4675 2/6/2008 2996 LF OF 8" 1382 LF OF 6" Long Creek Domestic 127 405 51435 124 405 50220 0208382-S Rosegate Phase 3 4676 2/8/2008 3885 LF OF 8" Long Creek Domestic 81 360 29160 0 360 0 0308384-S Winterlake Drive SS Extension 4984 3/27/2008 1286 LF OF 8" Long Creek Domestic 8 360 2880 8 360 2880 0308383-S City of Gastonia Clouse Street SS 5623 3/27/2008 75 LF OF 8" Long Creek Domestic 1 300 300 1 300 300 0608385-S Gastonia Technology Park 4668 6/6/2008 593 LF OF 8" Long Creek Domestic 4 1581 6324 1 1581 1581 0608386-S Spencer Mountain Village PH 2&3 4726 6/9/2008 9344 LF OF 8" Long Creek Domestic 227 360 81720 21 360 7560 0608387-5 Gaston Mall 5032 6/17/2008 682 LF OF 8" 140 LF OF 18" Long Creek Domestic 4 400 1600 4 400 1600 0708388-S Bayview Pump Station Abandonment 5628 7/14/2008 78 LF OF 8" Long Creek Domestic 0 0 0 0 0 0 0708389-S Mill Creek Apartments Phase 3 5107 7/16/2008 755 LF OF 8" Long Creek Domestic 4 3120 12480 4 3120 12480 5097-S Evergreen Landing Apartments 5097 11/7/2008 728 LF of 8" Long Creek Domestic 4 4890 19560 4 4890 19560 5241-S Fresenius Medical Care 5241 12/22/2008 165 LF of 8" Crowders Creek Domestic 1 2000 2000 1 2000 2000 5743-S Ridge Mill Community / Nina Dawn Sewer 5743 1/30/2009 8557 LF of 8" Crowders Creek Domestic 74 300 22200 57 300 17100 5780-5 Queens Road Sewer Rehab Phase 3 (COG) 5780 2/23/2009 6470 LF of 8" Crowders Creek Domestic 92 350 32200 92 350 32200 5786-S NCDOT 274 Widening Utility Relocation Project 5786 2/25/2009 492 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5926-S West Davidson Bridge Replacement 5726 7/24/2009 320 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5739-S NCDOT Gaston County Maintenance Yard 5739 11/5/2009 1231 LF of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 6467-S O'Reilly Auto Parts 6467 1/28/2010 218 If of 8" pvc Long Creek Domestic 2 2000 4000 1 2000 2000 6468-S Summit Crossing Phase III 6468 4/1/2010 657 If of 8" Long Creek Domestic 3 6520 19560 2 6520 13040 6957-S Rolling Meadows Drive SS Extension 6957 8/23/2010 731 If of 8" Long Creek Domestic 3 350 1050 0 350 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: January 2018 Page 2014 PERMIT # .• a„• :. ," ^ r �. ,#z w. .:ti,, s , )" PROJECT� .. s xYw,ta:.,"z c$w W. y " >''wAi P # " ,• f"= z ,$c,2' (€ ISSUE DATE < % z, ,. c *oYrs-?nw:1';w;-*w n ' ^sw'"'.. ' . w - DESCRIPTION '. n. . .^ ^ '1 ^' �.: WWTP , +,„( e„". ,„.„ g , ;WASTE TYPE .w*,41,DESIGN AFLOWx.CALCULATIONS kw,:,= JESTIMATED?FLOW.t(DECEMBER'31, 2015)"+. " 'mv.. `z (# LOTS)w ,".'`, :' (9pdtunit) ..x..k .. rw� DESIGN.F,LOWfu#"^f ,,,p r 19,N.) ,:t. g # Co 5 " .. (a°w v. ),+u: dlunrt ._ (9P") "x`�z*'w"7i r, FL OW.(9Pd)' WASP. 6953-S Tech Park Sewer Improvements 6953 11/18/2010 6397 If of 12" dip Long Creek Domestic 2 65000 130000 2 65000 130000 7054-S Robinson Heights Subdivision 7054 12/15/2010 1766 If of 8" Crowders Creek Domestic 19 300 5700 15 300 4500 6982-5 DR] Holdings Property 6982 1/20/2011 338 If of 8" Long Creek Domestic 1 1600 1600 1 1600 1600 7056-5 Pearson Properties-- Hoffman Road 7056 3/4/2011 585 If of 8" Long Creek Domestic 1 1500 1500 1 1500 1500 7024-S Bordeaux Apartments 7024 3/8/2011 58 If of 8" Long Creek Domestic 33 350 11550 33 350 11550 7177-S Roberts Family Ventures 7177 6/15/2011 112 If of 8" Long Creek Domestic 1 500 500 1 500 500 5922-5 Ballantyne Apartments 5922 6/21/2011 1795 If of 8" Crowders Creek Domestic 241 237 57120 241 237 57120 6725-S Gaston Mall Redevelopment (Target) 6725 8/16/2011 681 If of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 7384-5 CTL Packaging USA 7384 5/7/2012 489 If of 8" 1107 If of 10" Long Creek Domestic 1 1200 1200 1 1200 1200 7488-5 Dollar General Outfall 7488 7/3/2012 681 If of 8" Long Creek Domestic 1 910 910 1 910 910 7605-S South Fork Catawba Regional Imp. (Fair St.) 7605 11/20/2012 2682 If of 8" Long Creek Domestic 1 52470 52470 0 52470 0 7606-5 South Fork Catawba Regional Imp.(Kings Grant) 7606 11/20/2012 266 If of 8" Eagle Domestic 1 64440 64440 0 64440 0 7543-5 Rosegate Phase 3 A/B 7543 11/29/2012 995 If of 8" Long Creek Domestic 19 360 360 15 360 5400 7582-5 Daimler 7582 12/21/2012 316 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4698-S Kinmere Village 4698 2/28/2013 7139 If of 8" Long Creek Domestic 111 360 39960 44 360 15840 7616-S West Congregation of Johovah's Witness 7616 4/9/2013 384If of 8" Crowders Creek Domestic 1 8000 8000 1 8000 8000 7457-S South Fork Village Apartments 7457 4/17/2013 2490 If of 8", 870 If 6" FM, 1 Pi urn Statinn Eagle Domestic 352 274 96360 0 274 0 7710-S Long Creek Apartments 7710 5/6/2013 1474 If of 8" Long Creek Domestic 103 300 30890 0 300 0 7615-S Rosegate Phase 3 C/D/E 7615 5/30/2013 3032 If of 8" Long Creek Domestic SS 449 24720 12 449 5388 7467-S Kinmere Commons 7467 6/4/2013 1977 If of 8" Long Creek Domestic 104 360 37440 40 360 14400 7720-S Robinson Oaks 2013 7720 9/6/2013 8392' of 8", 44 MH Long Creek Domestic 204 120 73440 0 120 0 7746-5 Tractor Supply 7746 9/18/2013 180 If of 8" Crowders Creek Domestic 1 2280 2280 1 2280 0 7785-5 Summit Crossing Phase IV 7785 10/14/2013 427 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4948-5 Villas At Robinson Oaks 4948 1/22/2014 1160 If of 8" Long Creek Domestic 62 374 22480 0 374 0 7848-5 Owens Corning 7848 1/31/2014 667 If of 8" Long Creek Domestic 1 124000 124000 0 124000 0 8090-5 Oakhill Lane Sewer Extension 8090 7/31/2014 372 If of 8" Long Creek Domestic 4 360 1440 0 360 0 8091-5 Winterlake Drive Sewer Extension 8091 7/31/2014 380 If of 8" Long Creek Domestic 3 360 1080 0 360 - 0 8092-5 American & Efird Sewer Line Upgrade 8092 8/13/2014 227 If of 8" private sewer Crowders Creek Industrial 1 23000 23000 0 23000 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: January 2016 Page 3 of 4 SANITARY SEWER USAGE REPORT CITY OF GASTONIA, NORTH CAROLINA July 1, 2013 PERAIT# £ $ ' PROJECT L *' "A/P'# ' #ISSUE € DATE k DESCRIPTION ,,_ WWTP WASTE TYPE- "DESIGN" FLOW CALCULATIONS ti ESTIMATED FLOW.,(JUNE 30, 2013) "- (#LOTS} ` t) ,(gpd/unit){xGOS) DESIGN; FLOW - (9Qdldnit) FLOW (gpd) 0106343-S Rosegate Phs. 2 4505 1/10/2006 1898 LF-8" Long Creek Domestic 36 360 12960 30 360 10800 0106344-S Catawba Hills 3 4422 1/11/2006 1602 LF-8" Long Creek Domestic 48 360 17280 41 360 14760 0206345-S Town of Clover Monitoring Facility 4635 2/14/2006 230 LF-15" Crowders Creek Domestic 0 0 0 0 0 0 0206346-S Bethesda Oaks Phase I 4562 2/20/2006 5603 LF-8" Long Creek Domestic 26 480 12480 26 480 12480 0206347-S Glyncastle 4442 2/24/2006 1600 LF-8" Long Creek Domestic 33 360 11880 33 360 11880 0306348-S 3001 Titman Road 4640 3/21/2006 65 LF-8" Long Creek Domestic 1 360 360 1 360 360 0306349-S The Village at The Mountain 4475 6/7/2006 2418 LF of 8" 16 MH's Long Creek Domestic 78 360 28080 10 360 3600 0606351-S The Village at Parkside 4198 6/30/2006 8053 Lf - 8" Crowders Creek Domestic 228 360 82280 35 360 12600 0706352-S Village at 5th Avenue 4583 7/7/2006 5349 LF of 8" Long Creek Domestic 142 400 56800 45 400 18000 0606350-S Ferguson Subdivision Sewer Extension 4498 7/13/2006 366 LF - 8", 1 MH Crowders Creek Domestic 5 360 1800 1 360 360 0706353-5 Wren Turnpike Wholesales 4558 7/18/2006 305 LF of 8" Long Creek Domestic 4 119 475 2 119 238 0706354-S Carmax 4594 7/26/2006 695 If of 12". 798 If of 8" and 9 manholes Long Creek Domestic 0 0 0 2 0 0 0706356-S Cramer Woods Phs 3 4588 8/3/2006 10,457 LF of 8" Long Creek Domestic 139 360 50040 88 360 31680 0706355-S Spencer Mountain Village Phs 1 4351 8/7/2006 12,868 LF of 8" Long Creek Domestic 254 360 91440 95 360 34200 0806357-S Shops at Franklin Square 4665 8/15/2006 1590 LF of 8" Long Creek Domestic 10 1614 16140 6 1614 9684 0806358-S Susan Farms Sewer Petition Phs 1&2 (COG) 5611 8/15/2006 3051 If of 8" Long Creek Domestic 32 290 9300 15 290 4350 1006361-S Woodleigh Subdivision 4637 10/11/2006 234 LF of 8" Long Creek Domestic 2 375 750 1 375 375 1106362-S Catawba Hills Subdivision Village D — Townhomes 4352 11/9/2006 2221 LF of 8" Long Creek Domestic 72 360 25920 13 360 4680 1106363-S Club Ridge Subdivision 4712 11/17/2006 1738 LF of 8" Long Creek Domestic 18 360 6480 0 360 0 1106364-S Bethesda Oaks Phs. 2 4641 11/21/2006 6409 LF of 8" Long Creek Domestic 148 480 71040 131 480 62880 1106365-S New Hope Elementary SS Extension 4764 11/28/2006 160 LF of 8" Long Creek Domestic 1 6816 6816 1 6816 6816 0906360-S Windsong Drive, Denise Dr. & Sugar Ln (COG) 5614 12/15/2006 1665 LF of 8" Long Creek Domestic 18 370 6650 18 370 6650 0107366-S Willow Creek Subdivision Phs 2 4536 1/5/2007 6572 LF of 8" Long Creek Domestic 192 360 69120 180 360 - 64800 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2013 Page 1 of 4 1 ASTONI NC Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • www.cityofgastonia.com February 7, 2014 Ms. Dee Browder NCDENR Division of Water Quality 610 E. Center Avenue; Suite 301 Mooresville, NC 28115 R7C:. JED. tE UAL!T`f MAY 12 2014 MOORESV;LL if'`,.ECAONAL OFFICE Fax: 704.854.6654 Subject: City of Gastonia Local Sewer Permit Program —Flow Tracking Report Dear Ms. Browder: In reference to above, please find attached the following documents: • Form FTSE-10/07: Long Creek Wastewater Treatment Plant • Form FTSE-10/07: Crowder's Creek Wastewater Treatment Plant • Form FTSE-10/07: Eagle Road Wastewater Treatment Plant • Sewer Usage Spreadsheet as of. January 1., 2014 If you have any questions or need additional information, please contact me at (704)866-6789. Sincerely, Jamie Johnson Civil .Engineer I Cc: Rusty Bost, City Engineer Thorne A. Martin, Assistant City Engineer Matt Bernhardt, Director of Public Works and Utilities SANITARY SEWER USAGE REPORT CITY OF GASTONIA, NORTH CAROLINA July 1, 2013 PERMIT# PROJECT A/P # ISSUE DATE DESCRIPTION WWTP WASTE TYPE "DESIGN" FLOW CALCULATIONS ESTIMATED FLOW (JUNE 30, 2013) (# LOTS) (gpd/unit) DESIGN FLOW (4pd) (# CO'S) (gpd/unit) FLOW (gpd). 0106343-S Rosegate Phs. 2 4505 1/10/2006 1898 LF-8" Long Creek Domestic 36 360 12960 30 360 10800 0106344-S Catawba Hills 3 4422 1/11/2006 1602 LF-8" Long Creek Domestic 48 360 17280 41 360 14760 0206345-S Town of Clover Monitoring Facility 4635 2/14/2006 230 LF-15" Crowders Creek Domestic 0 0 0 0 0 0 0206346-S Bethesda Oaks Phase I 4562 2/20/2006 5603 LF-8" Long Creek Domestic 26 480 12480 26 480 12480 0206347-S Glyncastle 4442 2/24/2006 1600 LF-8" Long Creek Domestic 33 360 11880 33 360 11880 0306348-S 3001 Titman Road 4640 3/21/2006 65 LF-8" Long Creek Domestic 1 360 360 1 360 360 0306349-S The Village at The Mountain 4475 6/7/2006 2418 LF of 8" 16 MH's Long Creek Domestic 78 360 28080 10 360 3600 0606351-S The Village at Parkside 4198 6/30/2006 8053 Lf - 8" Crowders Creek Domestic 228 360 82280 35 360 12600 0706352-S Village at 5th Avenue 4583 7/7/2006 5349 LF of 8" Long Creek Domestic 142 400 56800 45 400 18000 0606350-S Ferguson Subdivision Sewer Extension 4498 7/13/2006 366 LF - 8", 1 MH Crowders Creek Domestic 5 360 1800 1 360 360 0706353-S Wren Turnpike Wholesales 4558 7/18/2006 305 LF of 8" Long Creek Domestic 4 119 475 2 119 238 0706354-S Carmax 4594 7/26/2006 695 If of 12". 798 If of 8" and 9 manholes Long Creek Domestic 0 0 0 2 0 0 0706356-S Cramer Woods Phs 3 4588 8/3/2006 10,457 LF of 8" Long Creek Domestic 139 360 50040 88 360 31680 0706355-S Spencer Mountain Village Phs 1 4351 8/7/2006 12,868 LF of 8" Long Creek Domestic 254 360 91440 95 360 34200 0806357-S Shops at Franklin Square 4665 8/15/2006 1590 LF of 8" Long Creek Domestic 10 1614 16140 6 1614 9684 0806358-S Susan Farms Sewer Petition Phs 1&2 (COG) 5611 8/15/2006 3051 If of 8" Long Creek Domestic 32 290 9300 15 290 4350 1006361-S Woodleigh Subdivision 4637 10/11/2006 234 LF of 8" Long Creek Domestic 2 375 750 1 375 375 1106362-5 Catawba Hills Subdivision Village D — Townhomes 4352 11/9/2006 2221 LF of 8" Long Creek Domestic 72 360 25920 13 360 4680 1106363-S Club Ridge Subdivision 4712 11/17/2006 1738 LF of 8" Long Creek Domestic 18 360 6480 0 360 0 1106364-S Bethesda Oaks Phs. 2 4641 11/21/2006 6409 LF of 8" Long Creek Domestic 148 480 71040 131 480 62880 1106365-S New Hope Elementary SS Extension 4764 11/28/2006 160 LF of 8" Long Creek Domestic 1 6816 6816 1 6816 6816 0906360-S Windsong Drive, Denise Dr. & Sugar Ln (COG) 5614 12/15/2006 1665 LF of 8" Long Creek Domestic 18 370 6650 18 370 6650 0107366-S Willow Creek Subdivision Phs 2 4536 1/5/2007 6572 LF of 8" Long Creek Domestic 192 360 69120 180 360 64800 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2013 Page 1 of 4 PERMIT# PROJECT A/P# ISSUE DATE DESCRIPTION WWTP WASTE TYPE "DESIGN" FLOW CALCULATIONS ESTIMATED FLOW (JUNE 30, 2013) (# LOTS) (gpd/unit) , - DESIGN FLOW (and) (#CO'S) (gpd/unit) FLOW (gpd) 0307367-S New Hope Crossing 4740 3/6/2007 1613 LF of 8" Long Creek Domestic 6 1035 6207 6 1035 6210 0307369-S Value Place 4739 3/16/2007 115 LF of 8" Long Creek Domestic 1 7338 7338 1 7338 7338 0307368-S Kinmere Farms 4652 3/20/2007 4781 LF of 8" Long Creek Domestic 80 360 28800 73 360 26280 0407370-S Apple Creek Village — Off Site 4677 4/26/2007 1553 LF of 16" Long Creek Domestic 0 0 0 0 0 0 0507371-S Woodbriar Trail (COG) 5616 5/22/2007 1133 LF of 8" Crowders Creek Domestic 14 300 4200 14 300 4200 0507372-S The Summit at Court Drive - Phs 3 4765 5/24/2007 174 LF of 2" 200 LF of 8" Long Creek Domestic 1 5000 5000 1 5000 5000 0707373-S Apple Creek Village 4543 7/26/2007 9632 LF of 8" 227 LF of 16 Long Creek Domestic 291 360 104760 0 360 0 0707374-S Crowders View Phase II 4854 7/27/2007 2281 LF of 8" Crowders Creek Domestic 58 360 20880 10 360 3600 0807375-S Howe Sewer Extension 4849 8/2/2007 48 LF of 8" Crowders Creek Domestic 1 600 600 1 600 600 1007376-S Villas at Applecreek 4802 10/30/2007 3488 LF of 8" Long Creek Domestic 89 360 32040 0 360 0 1107377-S Gaston Crossing 4947 11/16/2007 519 LF of 8" Long Creek Domestic 5 4802 24008 2 4802 9604 1107378-S Queens Road Sewer Rehab Phase 1 (COG) 5617 11/29/2007 2391 LF of 8" Crowders Creek Domestic 32 300 9600 32 300 9600 1207379-S Robinson Oaks Villas (outfall) 5012 12/6/2007 1810 LF of 8" Long Creek Domestic 0 0 0 0 0 0 0208380-S Bethlehem Baptist Church 4934 2/5/2008 1612 LF OF 8" Long Creek Domestic 2 6250 12500 2 6250 12500 0208381-S Reserve at Catawba Creek 4675 2/6/2008 2996 LF OF 8" 1382 LF OF 6" Long Creek Domestic 127 405 51435 1 405 405 0208382-S Rosegate Phase 3 4676 2/8/2008 3885 LF OF 8" Long Creek Domestic 81 360 29160 0 360 0 0308384-S Winterlake Drive SS Extension 4984 3/27/2008 1286 LF OF 8" Long Creek Domestic 8 360 2880 7 360 2520 0308383-5 City of Gastonia Clouse Street SS 5623 3/27/2008 75 LF OF 8" Long Creek Domestic 1 300 300 1 300 300 0608385-S Gastonia Technology Park 4668 6/6/2008 593 LF OF 8" Long Creek Domestic 4 1581 6324 1 1581 1581 0608386-S Spencer Mountain Village PH 2&3 4726 6/9/2008 9344 LF OF 8" Long Creek Domestic 227 360 81720 0 360 0 0608387-S Gaston Mall 5032 6/17/2008 682 LF OF 8" 140 LF OF 18" Long Creek Domestic 4 400 1600 4 400 1600 0708388-S Bayview Pump Station Abandonment 5628 7/14/2008 78 LF OF 8" Long Creek Domestic 0 0 0 0 0 0 0708389-S Mill Creek Apartments Phase 3 5107 7/16/2008 755 LF OF 8" Long Creek Domestic 4 3120 12480 4 3120 12480 5097-S Evergreen Landing Apartments 5097 11/7/2008 728 LF of 8" Long Creek Domestic 4 4890 19560 4 4890 19560 5241-S Fresenius Medical Care 5241 12/22/2008 165 LF of 8" Crowders Creek Domestic 1 2000 2000 1 2000 2000 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2013 Page 2 of 4 PERMIT # PROJECT AiP # ISSUE DATE DESCRIPTION WWTP WASTE TYPE "DESIGN" FLOW CALCULATIONS ESTIMATED FLOW (JUNE 30, 2013) (# LOTS) (gpd/unit) DESIGN FLOW (9pd) (# CO'S) (gpd/unit) FLOW (gpd). 5743-S Ridge Mill Community / Nina Dawn Sewer 5743 1/30/2009 8557 LF of 8" Crowders Creek Domestic 74 300 22200 57 300 17100 5780-S Queens Road Sewer Rehab Phase 3 (COG) 5780 2/23/2009 6470 LF of 8" Crowders Creek Domestic 92 350 32200 92 350 32200 5786-S NCDOT 274 Widening Utility Relocation Project 5786 2/25/2009 492 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5926-S West Davidson Bridge Replacement 5726 7/24/2009 320 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5739-S NCDOT Gaston County Maintenance Yard 5739 11/5/2009 1231 LF of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 6467-S O'Reilly Auto Parts 6467 1/28/2010 218 If of 8" pvc Long Creek Domestic 2 2000 4000 1 2000 2000 6468-5 Summit Crossing Phase III 6468 4/1/2010 657 If of 8" Long Creek Domestic 3 6520 19560 1 6520 6520 6957-S Rolling Meadows Drive SS Extension 6957 8/23/2010 731 If of 8" Long Creek Domestic 3 350 1050 0 350 0 6953-S Tech Park Sewer Improvements 6953 11/18/2010 6397 If of 12" dip Long Creek Domestic 2 65000 130000 1 65000 65000 7054-S Robinson Heights Subdivision 7054 12/15/2010 1766 If of 8" Crowders Creek Domestic 19 300 5700 14 300 4200 6982-S DR] Holdings Property 6982 1/20/2011 338 If of 8" Long Creek Domestic 1 1600 1600 0 1600 0 7056-S Pearson Properties-- Hoffman Road 7056 3/4/2011 585 If of 8" Long Creek Domestic 1 1500 1500 0 1500 0 7024-S Bordeaux Apartments 7024 3/8/2011 58 If of 8" Long Creek Domestic 33 350 11550 33 350 11550 7177-S Roberts Family Ventures 7177 6/15/2011 112 If of 8" Long Creek Domestic 1 500 500 1 500 500 5922-S Ballantyne Apartments 5922 6/21/2011 1795 If of 8" Crowders Creek Domestic 241 237 57120 241 237 57117 6725-S Gaston Mall Redevelopment (Target) 6725 8/16/2011 681 If of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 7384-S CTL Packaging USA 7384 5/7/2012 489 If of 8" 1107 If of 10" Long Creek Domestic 1 1200 1200 1 1200 1200 7488-S Dollar General Outfall 7488 7/3/2012 681 If of 8" Long Creek Domestic 1 910 910 0 910 0 7605-5 South Fork Catawba Regional Imp. (Fair St.) 7605 11/20/2012 2682 If of 8" Long Creek Domestic 1 54247 54247 0 52407 0 7606-5 South Fork Catawba Regional Imp.(Kings Grant) 7606 11/20/2012 266 If of 8" Eagle Domestic 1 64440 64440 0 64440 0 7543-S Rosegate Phase 3 A/B 7543 11/29/2012 995 If of 8" Long Creek Domestic 19 360 360 0 360 0 7582-S Daimler 7582 12/21/2012 316 If of 8" Long Creek Domestic 1 2500 2500 0 2500 0 4698-S Kinmere Village 4698 2/28/2013 7139 If of 8" Long Creek Domestic ill 360 39960 0 360 0 7616-S West Congregation of Johovah's Witness 7616 4/9/2013 384If of 8" Crowders Creek Domestic 1 8000 8000 0 8000 0 7457-5 South Fork Village Apartments 7457 4/17/2013 2490 If of 8", 870 If 6" FM, 1 Pump Eagle Domestic 352 274 96360 0 274 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2013 Page 3 of 4 PERMIT* PROJECT A/P # ISSUE DATE DESCRIPTION WWTP WASTE TYPE, "DESIGN" FLOW CALCULATIONS ESTIMATED FLOW (JUNE 30, 2013) (#LOTS) (gpd/unit) DESIGN FLOW (mod) (#CO'S) (gpd/unit) FLOW (gpd) 7710-S Long Creek Apartments 7710 5/6/2013 1474 If of 8" Long Creek Domestic 103 300 30890 0 300 0 7615-S Rosegate Phase 3 C/D/E 7615 5/30/2013 3032 If of 8" Long Creek Domestic 55 449 24720 0 449 0 7467-S KInmere Commons 7467 6/4/2013 1977 If of 8" Long Creek Domestic 104 360 37440 0 360 0 MUNICIPAL SEWER CONTRACT SUMMARY CITY/TOWN WWTP CONTRACT MAX (gpd) JAN-JUNE 2013 ADF (9pd) City of Bessemer City : Oates Road Crowders Creek 1,000,000 459,887 City of Bessemer City : Abernethy Creek Crowders Creek 608,333 408,442 Town of Clover Crowders Creek 620,000 603,508 City of High Shoals Long Creek 100,000 24,444 City of Kings Mountain Crowders Creek 1,000,000 25,028 Town of Ranlo Long Creek 400,000 207,006 City of Lowell Long Creek N/A 3,267 City of Belmont Eagle Road 280,000 39,575 Dallas - Spencer Mountain Village Long Creek N/A 14,413 Long Creek WWTP: Crowders Creek WWTP: Eagle Road WWTP: "CONTRACT" FLOW (MGD) January 1, 2006 - June 30, 2013 "DESIGN" FLOW (MGD) CONNECTED" (MGp FLOW "NOT YET TRIBUTARY" (MGD) 0.500 1.286 0.703 1.083 3.228 0.247 1.640 1.834 0.280 0.161 0.040 0.401 Long Creek WWTP Crowders Creek WWTP Eagle Road WWTP Permit # NC0020184 Permit # NC0074268 Permit # NC0006033 Permitted Flow: 16.0 MGD Permitted Flow: 6.0 MGD Permitted Flow: 4.0 MGD JAN-JUNE 2013 ADF: 6.2 MGD JAN-JUNE 2013 ADF: 2.6 MGD JAN-JUNE 2013 ADF: 0.4 MGD Permitted F101 .sed 9/ Ben:bFl ow low Use"" 7,45, s P'.ermr6ted F.Io Used. 292A 'Permitted Flow Used = (ADF + "Flow Not Yet Tributary") / WWTP Permitted Flow City of Gastonia Semi -Annual Sanitary Sewer Usage Report: July 2013 Page 4 of 4 State of North Carolina Department of Environment and Natural Resources Division of Water Quality < - Flow T racking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Long Creek WWTP b. WWTP Facility Permit #: NC0020184 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 16.0 MGD 1.1 MGD 6.2MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD (Firm/Design) Approx. Current Avg. Daily Flow, MGD III. Certification Statement: —co / n so h , 'certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptance of this as water flow. l A/v Sig g ff g n O icia i nature Date State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Crowder's Creek WWTP b. WWTP Facility Permit #: NC0074268 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 6.O MGD 1.9 MGD 2.6 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD III. Certification Statement: I, , , s t n SOA , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates accep nce of this ast water flow. /,7hy Signi g Official gnature Date State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Eagle Road WWTP b. WWTP Facility Permit #: NC0006033 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 4.O MGD 0.4 MGD 0.4 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD III. Certification Statement: I, c mi Q j oAn e o , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates accep nee of thi was ewater flow. .' Signg Officia` ignature I2,J/ y Date SANITARY SEWER USAGE REPORT CITY OF GASTONIA, NORTH CAROLINA December 31, 2013 PERMIT # PROJECT AIP # ISSUE DATE DESCRIPTION WWTP WASTE TYPE "DESIGN" FLOW CALCULATIONS x ` ESTIMATED FLOW (DEC 31, 2013) (# LOTS) (gpd/unit) DESIGN FLOW (and) (# CO'S) ; (gpd/unit)' FLOW (gpd) 0106343-S Rosegate Phs. 2 4505 1/10/2006 1898 LF-8" Long Creek Domestic 36 360 12960 32 360 11520 0106344-S Catawba Hills 3 4422 1/11/2006 1602 LF-8" Long Creek Domestic 48 360 17280 41 360 14760 0206345-S Town of Clover Monitoring Facility 4635 2/14/2006 230 LF-15" Crowders Creek Domestic 0 0 0 0 0 0 0206346-S Bethesda Oaks Phase I 4562 2/20/2006 5603 LF-8" Long Creek Domestic 26 480 12480 26 480 12480 0206347-S Glyncastle 4442 2/24/2006 1600 LF-8" Long Creek Domestic 33 360 11880 33 360 11880 0306348-S 3001 Titman Road 4640 3/21/2006 65 LF-8" Long Creek Domestic 1 360 360 1 360 360 0306349-S The Village at The Mountain 4475 6/7/2006 2418 LF of 8" 16 M H's Long Creek Domestic 78 360 28080 10 360 3600 0606351-5 The Village at Parkside 4198 6/30/2006 8053 Lf - 8" Crowders Creek Domestic 228 360 82280 37 360 13320 0706352-S Village at 5th Avenue 4583 7/7/2006 5349 LF of 8" Long Creek Domestic 142 400 56800 47 400 18800 0606350-S Ferguson Subdivision Sewer Extension 4498 7/13/2006 366 LF - 8", 1 MH Crowders Creek Domestic 5 360 1800 1 360 360 0706353-S Wren Turnpike Wholesales 4558 7/18/2006 305 LF of 8" Long Creek Domestic 4 119 475 2 119 238 0706354-S Carmax 4594 7/26/2006 695 If of 12". 798 If of 8" and 9 manholes Long Creek Domestic 0 0 0 2 0 0 0706356-5 Cramer Woods Phs 3 4588 8/3/2006 10,457 LF of 8" Long Creek Domestic 139 360 50040 95 360 34200 0706355-5 Spencer Mountain Village Phs 1 4351 8/7/2006 12,868 LF of 8" Long Creek Domestic 254 360 91440 100 360 36000 0806357-S Shops at Franklin Square 4665 8/15/2006 1590 LF of 8" Long Creek Domestic 10 1614 16140 6 1614 9684 0806358-S Susan Farms Sewer Petition Phs 1&2 (COG) 5611 8/15/2006 3051 If of 8" Long Creek Domestic 32 290 9300 16 290 4640 1006361-S Woodleigh Subdivision 4637 10/11/2006 234 LF of 8" Long Creek Domestic 2 375 750 1 375 375 1106362-S Catawba Hills Subdivision Village D — Townhomes 4352 11/9/2006 2221 LF of 8" Long Creek Domestic 72 360 25920 13 360 4680 1106363-S Club Ridge Subdivision 4712 11/17/2006 1738 LF of 8" Long Creek Domestic 18 360 6480 0 360 0 1106364-S Bethesda Oaks Phs. 2 4641 11/21/2006 6409 LF of 8" Long Creek Domestic 148 480 71040 131 480 62880 1106365-5 New Hope Elementary SS Extension 4764 11/28/2006 160 LF of 8" Long Creek Domestic 1 6816 6816 1 6816 6816 0906360-S Windsong Drive, Denise Dr. & Sugar Ln (COG) 5614 12/15/2006 1665 LF of 8" Long Creek Domestic 18 370 6650 18 370 6650 0107366-S Willow Creek Subdivision Phs 2 4536 1/5/2007 6572 LF of 8" Long Creek Domestic 192 360 69120 190 360 68400 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: January 2014 Page 1 of 4 PERMIT# PROJECT AIP# ISSUE DATE DESCRIPTION WWTP ' ''= WASTE TYPE "DESIGN" FLOW CALCULATIONS ». ESTIMATED FLOW (DEC 31, 2013) (#LOTS) (gpd/unit) • DESIGN FLOW food) (# CO'S) (gpi►tunit) ' FLOW(gpd) 0307367-5 New Hope Crossing 4740 3/6/2007 1613 LF of 8" Long Creek Domestic 6 1035 6207 6 1035 6210 0307369-S Value Place 4739 3/16/2007 115 LF of 8" Long Creek Domestic 1 7338 7338 1 7338 7338 0307368-S Kinmere Farms 4652 3/20/2007 4781 LF of 8" Long Creek Domestic 80 360 28800 78 360 28080 0407370-S Apple Creek Village - Off Site 4677 4/26/2007 1553 LF of 16" Long Creek Domestic 0 0 0 0 0 0 0507371-S Woodbriar Trail (COG) 5616 5/22/2007 1133 LF of 8" Crowders Creek Domestic 14 300 4200 14 300 4200 0507372-5 The Summit at Court Drive - Phs 3 4765 5/24/2007 174 LF of 2" 200 LF of 8" Long Creek Domestic 1 5000 5000 1 5000 5000 0707373-S Apple Creek Village 4543 7/26/2007 9632 LF of 8" 227 LF of 16 Long Creek Domestic 291 360 104760 0 360 0 0707374-S Crowders View Phase II 4854 7/27/2007 2281 LF of 8" Crowders Creek Domestic 58 360 20880 10 360 3600 0807375-S Howe Sewer Extension 4849 8/2/2007 48 LF of 8" Crowders Creek Domestic 1 600 600 1 600 600 1007376-5 Villas at Applecreek 4802 10/30/2007 3488 LF of 8" Long Creek Domestic 89 360 32040 0 360 0 1107377-S Gaston Crossing 4947 11/16/2007 519 LF of 8" Long Creek Domestic 5 4802 24008 2 4802 9604 1107378-5 Queens Road Sewer Rehab Phase 1 (COG) 5617 11/29/2007 2391 LF of 8" Crowders Creek Domestic 32 300 9600 32 300 9600 1207379-S Robinson Oaks Villas (outfall) 5012 12/6/2007 1810 LF of 8" Long Creek Domestic 0 0 0 0 0 0 0208380-5 Bethlehem Baptist Church 4934 2/5/2008 1612 LF OF 8" Long Creek Domestic 2 6250 12500 2 6250 12500 0208381-S Reserve at Catawba Creek 4675 2/6/2008 2996 LF OF 8" 1382 LF OF 6" Long Creek Domestic 127 405 51435 2 405 810 0208382-5 Rosegate Phase 3 4676 2/8/2008 3885 LF OF 8" Long Creek Domestic 81 360 29160 0 360 0 0308384-S Winterlake Drive SS Extension 4984 3/27/2008 1286 LF OF 8" Long Creek Domestic 8 360 2880 8 360 2880 0308383-5 City of Gastonia Clouse Street SS 5623 3/27/2008 75 LF OF 8" Long Creek Domestic 1 300 300 1 300 300 0608385-S Gastonia Technology Park 4668 6/6/2008 593 LF OF 8" Long Creek Domestic 4 1581 6324 1 1581 1581 0608386-5 Spencer Mountain Village PH 2&3 4726 6/9/2008 9344 LF OF 8" Long Creek Domestic 227 360 81720 0 360 0 0608387-S Gaston Mall 5032 6/17/2008 682 LF OF 8" 140 LF OF 18" Long Creek Domestic 4 400 1600 4 400 1600 0708388-5 Bayview Pump Station Abandonment 5628 7/14/2008 78 LF OF 8" Long Creek Domestic 0 0 0 0 0 0 0708389-S Mill Creek Apartments Phase 3 5107 7/16/2008 755 LF OF 8" Long Creek Domestic 4 3120 12480 4 3120 12480 5097-S Evergreen Landing Apartments 5097 11/7/2008 728 LF of 8" Long Creek Domestic 4 4890 19560 4 4890 19560 5241-S Fresenius Medical Care 5241 12/22/2008 165 LF of 8" Crowders Creek Domestic 1 2000 2000 1 2000 2000 5743-5 Ridge Mill Community / Nina Dawn Sewer 5743 1/30/2009 8557 LF of 8" Crowders Creek Domestic 74 300 22200 57 300 17100 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: January 2014 Page 2 of 4 PERMIT # PROJECT A/P # ISSUE DATE DESCRIPTION WWTP WASTE TYPE "DESIGN" FLOW CALCULATIONS ESTIMATED FLOW (DEC 31, 2013) (# LOTS) (gpd/unit) DESIGN FLOW (aodl (# CO'S) (gpd/unit) FLOW (gpd) 5780-S Queens Road Sewer Rehab Phase 3 (COG) 5780 2/23/2009 6470 LF of 8" Crowders Creek Domestic 92 350 32200 92 350 32200 5786-S NCDOT 274 Widening Utility Relocation Project 5786 2/25/2009 492 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5926-S West Davidson Bridge Replacement 5726 7/24/2009 320 LF of 8" Long Creek Domestic 0 0 0 0 0 0 5739-S NCDOT Gaston County Maintenance Yard 5739 11/5/2009 1231 LF of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 6467-S O'Reilly Auto Parts 6467 1/28/2010 218 If of 8" pvc Long Creek Domestic 2 2000 4000 1 2000 2000 6468-S Summit Crossing Phase III 6468 4/1/2010 657 If of 8" Long Creek Domestic 3 6520 19560 1 6520 6520 6957-5 Rolling Meadows Drive SS Extension 6957 8/23/2010 731 If of 8" Long Creek Domestic 3 350 1050 0 350 0 6953-S Tech Park Sewer Improvements 6953 11/18/2010 6397 If of 12" dip Long Creek Domestic 2 65000 130000 1 65000 65000 7054-S Robinson Heights Subdivision 7054 12/15/2010 1766 If of 8" Crowders Creek Domestic 19 300 5700 14 300 4200 6982-S DRJ Holdings Property 6982 1/20/2011 338 If of 8" Long Creek Domestic 1 1600 1600 1 1600 1600 7056-S Pearson Properties-- Hoffman Road 7056 3/4/2011 585 If of 8" Long Creek Domestic 1 1500 1500 1 1500 1500 7024-S Bordeaux Apartments 7024 3/8/2011 58 If of 8" Long Creek Domestic 33 350 11550 33 350 11550 7177-S Roberts Family Ventures 7177 6/15/2011 112 If of 8" Long Creek Domestic 1 500 500 1 500 500 5922-S Ballantyne Apartments 5922 6/21/2011 1795 If of 8" Crowders Creek Domestic 241 237 57120 241 237 57117 6725-5 Gaston Mall Redevelopment (Target) 6725 8/16/2011 681 If of 8" Long Creek Domestic 1 2000 2000 1 2000 2000 7384-S CTL Packaging USA 7384 5/7/2012 489 If of 8" 1107 If of 10" Long Creek Domestic 1 1200 1200 1 1200 1200 7488-S Dollar General Outfall 7488 7/3/2012 681 If of 8" Long Creek Domestic 1 910 910 1 910 910 7605-S South Fork Catawba Regional Imp. (Fair St.) 7605 11/20/2012 2682 If of 8" Long Creek Domestic 1 54247 54247 0 52407 0 7606-S South Fork Catawba Regional Imp.(Kings Grant) 7606 11/20/2012 266 If of 8" Eagle Domestic 1 64440 64440 0 64440 0 7543-S Rosegate Phase 3 A/B 7543 11/29/2012 995 If of 8" Long Creek Domestic 19 360 360 3 360 1080 7582-S Daimler 7582 12/21/2012 316 If of 8" Long Creek Domestic 1 2500 2500 1 2500 2500 4698-S Kinmere Village 4698 2/28/2013 7139 If of 8" Long Creek Domestic 111 360 39960 0 360 0 7616-S West Congregation of Johovah's Witness 7616 4/9/2013 3841f of 8" Crowders Creek Domestic 1 8000 8000 1 8000 8000 7457-S South Fork Village Apartments 7457 4/17/2013 2490 If of 8", 870 If 6" FM, 1 Pump Statinn Eagle Domestic 352 274 96360 0 274 0 7710-S Long Creek Apartments 7710 5/6/2013 1474 If of 8" Long Creek Domestic 103 300 30890 0 300 0 City of Gastonia Semi -Annual Sanitary Sewer Usage Report: January 2014 Page 3 of 4 PERMIT# PROJECT A/P # ISSUE DATE DESCRIPTION WWTP WASTE TYPE "DESIGN" FLOW CALCULATIONS ESTIMATED FLOW (DEC 31,2013) (# LOTS) (gpolunit) DESIGN FLOW fond) (# CO'S) (gpolunit). FLOW (gpd) 7615-S Rosegate Phase 3 C/D/E 7615 5/30/2013 3032 If of 8" Long Creek Domestic 55 449 24720 0 449 0 7467-S Kinmere Commons 7467 6/4/2013 1977 If of 8" Long Creek Domestic 104 360 37440 0 360 0 7720-S Robinson Oaks 2013 7720 9/6/2013 8392' of 8", 44 MH Long Creek Domestic 204 120 73440 0 120 0 7746-S Tractor Supply 7746 9/18/2013 180 If of 8" Crowders Creek Domestic 1 2280 2280 0 2280 0 7785-S Summit Crossing Phase IV 7785 10/14/2013 427 If of 8" Long Creek Domestic 1 2500 2500 0 2500 0 MUNICIPAL SEWER CONTRACT SUMMARY CITY/TOWN WWTP CONTRACT MAX (gPd) JAN-DEC 2013, ADF (9pd) City of Bessemer City : Oates Road Crowders Creek 1,000,000 440,840 City of Bessemer City : Abernethy Creek Crowders Creek 608,333 412,030 Town of Clover Crowders Creek 620,000 556,551 City of High Shoals Long Creek 100,000 26,273 City of Kings Mountain Crowders Creek 1,000,000 34,170 Town of Ranlo Long Creek 400,000 196,042 City of Lowell Long Creek N/A 13,931 City of Belmont Eagle Road 280,000 49,567 Dallas -Spencer Mountain Village Long Creek N/A 14,830 Long Creek WWTP: Crowders Creek WWTP: Eagle Road WWTP: "CONTRACT" FLOW (MGD) January.1,'2006 - December 31 2013 "DESIGN" FLOW (MGD) "CONNECTED" FLOW (MGD) FLOW "NOT YET TRIBUTARY" (MGD) 0.5 1.4 0.7 1.1 3.2 0.2 1.6 1.9 0.3 0.2 0.0 0.4 Long Creek WWTP Crowders Creek WWTP Eagle Road WWTP Permit # NC0020184 Permit # NC0074268 Permit # NC0006033 Permitted Flow: 16.0 MGD Permitted Flow: 6.0 MGD Permitted Flow: 4.0 MGD JAN-DEC 2013 ADF: 6.2 MGD JAN-DEC 2013 ADF: 2.6 MGD JAN-DEC 2013 ADF: 0.4 MGD ,ert" fitted -Furs Used: G9/,, Pe,- tt a Mo l'sed: 2C°lo "Permitted Flow Used = (ADF + "Flow Not Yet Tributary") / WWTP Permitted Flow City of Gastonia Semi -Annual Sanitary Sewer Usage Report: January 2014 Page 4 of 4 TASTONI. NC Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com August 21, 2013 Ms. Dee Browder NCDENR Division of Water Quality 610 E. Center Avenue; Suite 301 Mooresville, NC 28115 Subject: City of Gastonia Local Sewer Permit Program -Flow Tracking Report. Dear Ms. Browder: In reference to above, please find attached the following documents: • Form FTSE-10/07: Long Creek Wastewater Treatment Plant • Form FTSE-10/07: Crowder's Creek Wastewater Treatment Plant • Form FTSE-10/07: Eagle Road Wastewater Treatment Plant • Sewer Usage Spreadsheet as of July 1, 2013 If you have any questions or need additional information, please contact me at (704)866-6019. Sincerely, „Eta, Brian J. Potocki, PE Construction Engineer / ROW Administrator Cc: Rusty Bost, City Engineer Thorne A. Martin, Assistant City Engineer Matt Bernhardt, Director of Public Works and Utilities AUG 29 an3 OF®JA7 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE -10/07) LJ74f o,,.,i'.i.,,i q-P;., Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is nonesponsible for,all pump stations along the route of the proposed wastewater flow. AUG 2 I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Long Creek WWTP b. WWTP Facility Permit #: NC0020184 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 16.0 MGD 1.1 MGD 6.2 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Final/Design) Daily Flow, MGD III. Certification Statement: I, gkldfJ T PhCC1 , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates accep „o ris wastewater flow. 08.Zl•l3 Signing Official Signature Date OFFR State of North Carolina Department of Environment and Natural Resources rDivision of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE-1'0707) -D LIME Project Applicant Name: Project Name for which flow is being requested: AUG S MOO RVL. More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Crowder's Creek WWTP b. WWTP Facility Permit #: NC0074268 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligatedflows to the facility h. Percent of permitted flow used All flows are in MGD 6.0 MGD 1.8 MGD 2.6 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Fiiiii/Design) Daily Flow, MGD III. Certification Statement: I, SZir/ T% P•To ci(I , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acc "pis wastewater flow. Signing Official Signature d$Zlhl3 Date OFF QG Flow Tracking/Acceptance for Sewer Extension Permit Applications State of North Carolina Department of Environment and Natural Resources Division of Water Quality (FTSE—10/07)Y. „e � Project Applicant Name: Project Name for which flow is being requested: More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not r`esp"ansible for; all =' F pump stations along the route of the proposed wastewater flow. CI AuL I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Eagle Road WWTP b. WWTP Facility Permit #: NC0006033 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 4.0 MGD 0.4 MGD 0.4 MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD III. Certification Statement: I, 14i o9 ?: Pr .cal , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acce o. t ' astewater flow. Signi g Official Signature Date Pat McCrory Governor A7A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Charles Wakild, P. E. Director MEMORANDUM April 10, 2013 TO: Lk . rkera- M. ores ill -Regional Officge Surface FROM: Michael Leggett, P.E. PERCS Unit SUBJECT: City of Gastonia Delegation Audit Package — Delegated Local Permit Program for Sewer Extensions Audit — John Skvarla, III Secretary UN:iiFRf rsA`.Lt v APR 152013 LEE. REGIOMAL OFFICE. ICE. IN\Gt, 11° Co nakat The Central Office recently requested documents related to the City of Gastonia's local permit program for sewer extensions. The requested information was received by this office and a copy is attached your records and comments. Upon completion of the review of these items, an onsite visit with officials with the City of Gastonia will be held. The Mooresville regional office will be invited to participate in this meeting. Please relay any comments or additional information requests that you have to this office about the materials received or comments related to the authority's local permit program within 45 days of _receipt. If you have any questions please contact me at (919) 807-6312 or via email at michael.leggett@ncdenr.gov. enclosures: requested documentation package 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-6492 Internet: www.ncwaterouality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturally «Owner_Affiliation», «Owner_Affiliation_Title» April 10, 2013 Page 2 of 2 cc: PERCS Unit (electronic copy) Philip Bombardier, P.E. — Assistant City Manager City of Gastonia PO Box 1748 Gastonia, NC 28053 North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John E. Skvarla, Ill Governor Director Secretary February 21s`, 2013 pF, 1 CI'13 ii..— Subject: Delegated Local Permit Program for Sewer Extensions Audit City of Gastonia Dear Mr. Bombardier: MOORES'J' �'.l.saap3tU The City of Gastonia received approval for delegation of its local permit program for sewer extensions on April 19th, 2006. Per 15A NCAC 02T.306 (f) the Division may audit a delegated program for compliance with 15A NCAC 02T.306 and G.S. 143-215.1(f) at any time with a scheduled appointment with the delegated authority. Please note that this audit is being conducted in an effort to evaluate the Delegated Authority's program and to confirm that the delegated program is in compliance with the requirements of 15A NCAC 02T.306 (f) and G.S. 143-215.1(f). This audit is not a result of any complaints or perceived deficiency with the delegated authority's program. As a result, the Pretreatment, Emergency Response & Collection System (PERCS) Unit would like to schedule a date and time to audit the Delegated Authority's sewer extension permit program. The audit will focus on the overview of the program and a file review. Due to time constraints and volume of data, the following information is requested prior to the audit: • Permit Application • Permit Shell • Shell Certification Forms • Ordinance Pertaining to Permitting • Permitting Procedure • Current Staff for Permit Program • Review Checklists (if applicable) • Standard Specifications •and Minimum Design Criteria (hardcopy or link) • Operational Agreement(s) (if applicable) 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-64921 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.orq An Equal Opportunity 1 Affirmative Action Employer No thCarolina Naturally City of Gastonia February 21 st, 2013 Page 2 of 2 • Inspection and Certification Documents • Appeal Process Procedure • Permitting Action Reports for the last two quarters • Copy of approved permits during this period (no more than 3 permits) • Copy of approved plans and certifications during this period (no more than 3 sets) Upon receipt of this letter, please submit the requested information and one copy, along with any applicable information to this office within thirty (30) days. If more time is required, please contact this office. This information should be sent to the following address: North Carolina Division of Water Quality Pretreatment, Emergency Response & Collection System Unit Attention: Michael W. Leggett, P.E. 1617 Mail Service Center Raleigh, NC 27699-1617 Once this information is submitted and reviewed, a meeting with representatives of the program is suggested in order to discuss the City of Gastonia's delegated program and to answer questions that may arise during the review. If you have any questions regarding this matter please contact Michael Leggett at (919) 807-6312 or via email at michael.leggett@ncdenr.gov. Sincerely, for Deborah Gore PERCS Unit Supervisor cc: Michael Parker, Surface Water Protection Supervisor, Mooresville Regional Office Delegated Program File (electronic copy) City File # City of Gastonia Garland Business Center Great Place. Great People. GrcatPromnise. Engineering Standards 150 5. York 5t., Gastonia, NC 28053 704-866-6022(P) 704-854-6654(F) Land Development Application Project/Development Type: ❑ Residential Subdivision ❑ Commercial/Industrial (Non -single family) AKPAR# and/or Address (Required): Primary Contact: _ Yes No Date: / / Name Company: Address: City: State: Zip: Developer: _ Property Owner: _ PE/PLS: _ Other: Day Phone: ( ) . Mobile: ( ) Fax: ( ) Pager: ( ) Email: Project Name: Project Size: Acres LF of Public Water LF of Public Sewer Comments: Attach six (6) copies of the plans with the application Applicant Signature: CITY OF GASTONIA INSTRUCTIONS FOR APPLICATION FORM (PUMP STATIONS, FORCE MAINS, AND GRAVITY SEWERS) The City of Gastonia will not accept this application unless all the instructions are followed. Plans and specifications must be prepared in accordance with City of Gastonia Standard Details and Specifications and with 1SA NCAC 2H.0200 practices. Failure to submit all of the required items will lead to additional processing and review time for the permit application. A. Application Form (All Application Packages): • Submit one original and one copy of the completed and appropriately executed application form. The instructions (Pages 1 and 2 of 7) do not need to be submitted. Any changes made to this form will result in the application being returned. The City of Gastonia will only accept application packages that have been fully completed with all applicable items addressed. • The project name should be consistent with the project name on the plans. • If this project involves a modification of an existing permit, submit one copy of the existing permit. B. Application Fee (All Application Packages): • Submit a check in the amount of $400 made payable to: The City of Gastonia. C. Cover Letter (All Application Packages): • Submit a cover letter, which lists all items and attachments included in the application package as well as a brief project description. • If necessary for clarity, include attachments to the application form. Such attachments will be considered part ofthe application package and should be numbered to correspond to the section to which they refer. D. Detailed Plans and Specifications (All Application Packages): • Submit six (6) sets of detailed plans and specifications signed, sealed, and dated by a North Carolina Professional Engineer. • Plans must include the following minimum items: a general location map, plan and profile views of the sewer extension as well as the proximity of the sewer extension to other utilities and natural features, and detail drawings of all items pertinent to the sewer extension and pump station. Depict minimum separations required in 71B-18 on the plans, and note the use of ferrous pipe material with joints equivalent to water main standards if minimum separations are not met. Minimum cover over sewer extensions in accordance with 13.01 must also be shown clearly on the plans. • Plans and specifications must not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate that they are anything other than final plans and specifications. However, the plans and specifications may be labeled with the phrase: FINAL DESIGN — NOT RELEASED FOR CONSTRUCTION. E. Engineering Calculations (All Application Packages): • Submit three copies of all design calculations that have been signed, sealed, and dated by a NC Professional Engineer. • Calculations must include the following minimum items: friction/total dynamic head calculations and system curve analysis (with one pump running, two pumps running, etc.); pump selection information including pump curves, manufacturer's information, and recommended installation guidelines; pump Page 1 of 7 station cycle times and pump run times; minimum velocities in the sewer extension in accordance with 15A NCAC 2H .0219(i)(2)(B); and flotation calculations for the pump station. F. Downstream Sewer Evaluations (All Application Packages): o For connection to a gravity sewer, submit an evaluation of the gravity sewer based on peak flows from the proposed project. Provide calculations and detail how existing peak flows were determined. • For connection to a pump station, submit an evaluation of the existing pump station to pump peak flow from proposed project and peak flows already tributary to the existing pump station. Provide calculations and detail how existing peak flows were determined. m For connection to a force main, provide an evaluation of the existing force main based on peak flows from proposed project and peak flows already tributary to the existing force main. In addition, evaluate the ability of each pump station tributary to the existing force main to pump against additional head created by greater flows through the force main. Evaluation may include alternate designs such as telemetry to coordinate pumping between pump stations (provided sufficient storage is available). Also, include an evaluation of the discharge point of the existing force main as described above. G. Reliability (All Application Packages): • If the pump station is to be supplied by a dual electrical source/feed, submit the following minimum information: a letter from the power supplier acknowledging that the pump station site will be supplied by two electrical sources. • If an on -site (stand-by) generator is proposed for installation at the pump station, ensure that the plans and .specifications detail the generator, the automatic transfer switch, and how these items interact with the pump station instrumentation/controls. • If a portable (stand-by) generator is proposed to fulfill power reliability requirements at the pump station, ensure that the plans and specifications detail the generator quick -connect receptacle, the manual transfer switch, and the telemetry provided as well as how this telemetry interacts with the pump station instrumentation and controls. In addition, submit a contingency plan which details the number of portable generators that the applicant has available for use at the proposed pump station, the number of other items these portable generators are expected to serve, and verification that the portable generators may be moved between items in a way that prevents any sanitary sewer overflows. The plan must also detail procedures for contacting personnel, the number of personnel available to respond to a power outage, and the predicted response time. • If 15A NCAC 2H .0219(h)(3)(D) is intended to fulfill the power reliability requirement, ensure that the plans and specifications detail the storage time available above the high-water alarm as well as how a telemetry device will interact with the pump station instrumentation and control, and submit at least three years of power outage data from the power supplier for the electrical source from which the pump station will be supplied. The completed application package, including all supporting information and materials, should be sent to the following address: By U.S. Postal Service: The City of Gastonia Development Services Department Engineering Standards Post Office Box 1748 Gastonia, North Carolina 28053-1748 By Courier: The City of Gastonia Development Services Department Engineering Standards 150 South York Street Gastonia, North Carolina 28052 Page 2 of 7 • PUMP STATIONS, FORCE MAINS, AND GRAVITY SEWERS APPLICATION FORM (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) Application Number: ( to be completed by City of Gastonia) I. GENERAL INFORMATION: 1. Applicant's name (name of the corporation, individual, etc): 2. Owner's or signing official's name and title: 3. Name and complete address of applicant: City: State: Zip: Telephone number: ( ) Facsimile number ( ) 4. Project name (name of subdivision, facility or establishment, etc.) 5. Fee Submitted: $ 6. Name and compete address of engineering firm: City: State Zip: Telephone number: ( ) Facsimile number ( 7. Name and affiliation of contact person who can answer questions about application: II. PERMIT INFORMATION: 1. Project is: ❑ new; ❑ modification 2. If this application is being submitted as a result of a modification to an existing permit, provide: existing permit number and the issuance date 3. If project disturbs more than one acre, provide date when an erosion and sedimentation control plan was submitted to the Division of Land Resources for approval: 4. If project included any stream or wetland crossings, provide date when Nationwide 12 or 404 permit was submitted for approval: Page 3 of 7 III. INFORMATION ON WASTEWATER: 1. Please provide a one- or two -word description specifying the origin of the wastewater (school, subdivision, hospital, commercial facility, industry, apartments, condominiums, etc.): 2. Volume of wastewater generated by this project: gallons per day. 3. Explanation of how wastewater flow was determined: 4. Nature of wastewater : Domestic/Commercial; To Percent Industrial To Other waste — specify: 5. If wastewater is industrial in nature: a. Level of pretreatment that has been provided to ensure protection of the receiving collection system and wastewater treatment facility: b. If a pretreatment permit is required, has one been issued? . Yes fl No O. If yes, please attach a copy of the pretreatment permit. If no, provide date application was submitted: IV. DESIGN INFORMATION: 1. Brief project description: 2. Name of wastewater treatment facility (WWTF) receiving wastewater 3. Pipe diameter of sewers immediately downstream: 4. Engineering evaluation of downstream sewers' ability to accept the wastewater from this project (See Instruction F.) is provided on page of the calculations. 5. Summary of GRAVITY SEWER to be permitted: Diameter (inches) Length (linear feet) 6. Does the subject gravity sewer collection system comply with the City of Gastonia Standard Specifications and Details ❑ Yes; ❑ No. If no, please identify criteria and explain: Page 4. of 7 V. PUMP STATION INFORMATION (Complete Page 5 of 6 for each pump station included in this project.) 1. Pump station number or street address: 2. Describe the measures that are being implemented to prevent impacts on down -slope surface waters should a power failure occur at this pump station (See Instruction G.):' 3. Design flow of pump station: million gallons per day. 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH). 5. Number of pumps provided: 6. Number of pumping cycles at average daily flow. cycles per hour. 7. For extended travel times (greater than 24 hours) or if appropriate pumping cycles are not met, describe odor and corrosion control measures taken: 8. Provide the location of each design element in the specifications and/or engineering plans: Design Element Sheet Number of the Plans Page Number in the Specifications Alternate Power Sources: Portable Generator (telemetry and receptacle required) On -site Generator (automatic transfer switch required) Wet Well Vented with Screen Fillets in Wet Well Check Valves and Gate Valves Security Fencing Lockable Wet Well Cover and Dead Front Control Panel Area Light 110-Volt Electrical Convenience Outlet High Water Alarms: Audible Alarm Visual Alarm Auto-Dialer/Telemetry Non -Corrosive Guide Rails/Lift Chains All -Weather Access Road 9. List any equipment (note sheet number of the plans or page number in the specifications) not specifically mentioned above (hoist, odor control equipment, etc.): Page 5 of 7 10. a. 100-year flood elevation: b. Finish grade elevation of the pump station: • feet. c. Measures taken to protect the pump station against flooding 11. Summary of FORCE MAIN to be permitted, by diameter and length: Diameter (inches) Length (linear feet) High Elevation (feet) Discharge Elevation (feet) Pump -Off Elevation (feet) 12. Station location of air -release valves: Note: Air -release valves must be provided at all high points along the force main where the elevation difference exceed 10 feet. Page 6 of 7 Professional Engineer's Certification: I, , attest that this application for has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, and the most recent versions of the City of Gastonia Standard Specifications, NCDENR Gravity Sewer Minimum Design Criteria, NCDENR Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains, and the watershed classification in accordance with NCDENR guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. I further attest that all offsite easements required for the sewer extension installation as shown on the plans have been acquired and legal proof for the acquisition is available upon request. North Carolina Professional Engineer's seal, signature, and date: Applicant's Certification: attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Furthermore, I certify that upon complete installation of the sewer extensions permitted through this application form, the subject sewer extensions shall be dedicated to the City of Gastonia. Signature: Date: Approval: The permit cited in the foregoing application is hereby approved insofar as the protection of public health is concerned as provided in the regulations, standards and criteria adopted under the authority of Chapter 14, Article II. Division 2. Water & Sewer Extensions, Section 14-141 of the Code of Ordinance for the City of Gastonia, with the following provisions: This permit is issued with the understanding that upon installation of such sewer extensions, the project shall be dedicated to the City of Gastonia, who will operate the installation to the best accepted practice and in accordance with the recommendations of the State of North. Carolina Department of Environment and Natural Resources. The official copies of plans accompanying this application have been sealed and stamped with the serial number of this application . Only such plans are included in this permit approval and any erasures, additions or alterations of the proposed sewer extensions will make such approval null and void. Date: Approved By: Updated_07-09-2010 Page 7 of 7 Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 ° Gastonia, NC 28053-1748 ° Phone: 704.866.6022 ° Fax: 704.854.6654 www.cityofgastonia.com (Date) (Name) (Company, if applicable) (Address) (City, State, Zip) Subject: Permit # -S Dear (Name): In accordance with your completed application dated , we are forwarding herewith permit number .. -S, dated , to you for the construction of a sanitary sewer extension to serve This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. If any conditions or limitations contained in this permit are unacceptable to you, you have the right to appeal any such conditions to the office of the City Engineer within thirty days of issuance of said permit. Construction shall not commence prior to the issuance of a Notice to Proceed at the Pre -Construction Conference. Upon completion of the permitted extension, a certification must be received by the City of Gastonia, Engineering Division, from your Engineer certifying that the sanitary sewersystem extension has been installed in accordance with the approved plans and specifications. The certification statement is on page two of this permit. Please return a copy of the permit with your Engineer's certification statement completed. The construction will not be accepted by the City until the certification statement is received. One (1) set of approved plans and specifications is being forwarded to you. If you need additional information concerning this matter, please contact at Sincerely, THORNE A. MARTIN, PE Assistant City Engineer 3. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 4. The facilities shall be properly maintained and operated at all times. 5. This permit is not transferable. 6. Completion of construction and prior to acceptance and operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. This approval is given with the understanding that upon installation of such works, the project shall be dedicated to the City of Gastonia who will operate the installation of the best accepted practice and in accordance with the recommendations of the Division of Health Services. The official copies of plans and specifications accompanying this application have been sealed and stamped with the serial number of this application -S. Only such plans and specifications are included in this approval and any erasures, additions or alterations of the proposed improvements will make up such approval null and void. PERMIT NO. DATE ISSUED: THORNE A. MARTIN, PE Assistant City Engineer I, . as a duly registered Professional Engineer in the State of North Carolina hereby certify that construction of these permitted facilities has been completed within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date 4. The facilities shall be properly maintained and operated at all times. 5. This permit is not transferable. 6. Completion of construction and prior to acceptance and operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. This approval is given with the understanding that upon installation of such works, the project shall be dedicated to the City of Gastonia who will operate the installation of the best accepted practice and in accordance with the recommendations of the Division of Health Services. The official copies of plans and specifications accompanying this application have been sealed and stamped with the serial number of this application -S. Only such plans and specifications are included in this approval and any erasures, additions or alterations of the proposed improvements will make up such approval null and void. PERMIT NO. DATE ISSUED: THORNE A. MARTIN, PE Assistant City Engineer I, . as a duly registered Professional Engineer in the State of North Carolina hereby certify that construction of these permitted facilities has been completed within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date 6y UTILITIES § 14-141 Sec. 14-109. Electric service lines, conduits, etc. All conduits, inside works, switches, fuses, circuit breakers and meter loops shall be installed and maintained by and at the expense of the consumer, provided that when service lines are placed underground, the city may elect to participate by contributing an amount not to exceed the cost of comparable overhead installation. Where service wires are to be led to any placeor to any apparatus within a building, such additional connection expense will be borne by the consumer. When a service connection has once been made, and there is a request from the consumer that it be changed, such change shall be optional with the city, and at the expense of the consumer. (Code 1982, § 14-48) Sec. 14-110. City inspection. By making application for service the consumer agrees that the city possesses the right to inspect the private water distribution systems, water connections, sewage collection system and sewer connections before they are connected to the city water and sewer systems. The city shall be given notice to inspect before the pipes are covered and the systems are connected. (Code 1982, § 14-49) Sec. 14-111. Irrigation services. (a) Irrigation meter requirement. In accordance with G.S. 143-355.4, all new in -ground irrigation systems installed after adoption of this section that will be supplied water from the water system shall be a separate service connection to the water system and the water consumption shall be measured through a separate irrigation meter. (b) Methods of connection. An irrigation service line may be installed as a standard water tap to the main parallel to the existing water service or as an irrigation service addition to the existing domestic water service. Either method of connection shall be performed by the public works andutilities department or a licensed contractor and shall be installed in accordance with the city standard specifications and standard details. A licensed contractor must obtain approval from the public works and utilities department prior to installing any irrigation service line. The irrigation service shall be inspected and approved by the city prior to being placed into service. (Ord. No. 09-574, § 1, 12-1-09) Secs. 14-112-14-140. Reserved. DIVISION 2. WATER AND SEWER EXTENSIONS ' Sec. 14-141. General principles of water and sewer line extension. (a) No sewer line or water main may be connected to the city's water or sewer system unless such line or main (i) is properly designed and constructed to service the properties intended to be served directly by such line or main and (ii) is of a size and design sufficient to accommodate any necessary expansion of the water and sewer system to serve other properties, including fire hydrant protection. Supp. No. 53 CD14:23 § 14-143 GASTONIA CITY CODE sufficient funds budgeted for such, and each request will be reviewed by the engineering standards division for recommendation to the council. The developer shall make application to the city by each April 1, for any reimbursements to become due in August of each budget year. (c) Water and sewer extensions from the basic water and sewer facilities described in subsection (a) to individual customer services may be made by or through the city for the following reasons: (1) The need to protect health, public safety and welfare. (2) Upon request of property owners of existing development. (3) Upon application of developers of new development, including business activities, industrial development, residential development and similar ventures. (d) All applicants for connection to the city's water or sewer service line shall pay all applicable charges and fees as set forth in the schedule referenced in section 14-19. (Code 1982, § 14-58; Ord. of 1-21-86; Ord. of 7-21-87; Ord. of 10-18-94, § 16; Ord. No. 04-472, § 3, 11-2-04; Ord. No. 10-581, § 2, 5-4-10; Ord. No. 10-583, § 3, 8-3-10) Sec. 14-144. Extensions for need and existing development. (a) All water and sewer extension from the basic facilities described in subsection 14-143(a) to individual customer services for need or existing developments will be made by the city's utility department, or approved licensed contractors. (b) Extensions of water and/or sanitary sewer service within the service area of the city shall be made upon petition as described in subsection (b)(1) except in those cases described in subsection (b)(2) in which cases the city shall order the service constructed without petition. The costs of such extension shall be specially assessed as hereinafter provided. (1) Apetition for extension of water and/or sewer service shall be on a form provided by the city and shall designate by a general description the improvements proposed and shall request that the same be made in conformance with the provisions of this division and that such proportion of the cost of each of such improvements as may be specified in the petition be specially assessed against the property abutting on the street or streets or part thereof in which or on which such extensions are proposed to be made. The petition shall be signed by at least a majority in number of the owners, which majority must own at least a majority of all lineal feet of frontage of the lands abutting the street or streets or part of the street proposed to be served by the extension. For purposes of the petition all owners of undivided interests shall be deemed and treated as one person and such land shall be sufficiently signed for when the petition is signed by the owner or owners of a majority in amount of such undivided interests; provided that for purposes of this section the word "owner" shall be considered to mean the owners of any life estate or of estate of inheritance but shall not include mortgagees, trustees of a naked trust, trustees under deeds of trust to secure payment of money, or Supp. No. 55 CD14:26 UTILITIES § 14-145 lienholders. Upon the filing of such petition with the city, the clerk or other person designated by the council shall investigate the sufficiency of the petition, and if found to be sufficient, shall certify the same to the governing body. (2) Whenever it is determined by the council based on evidence presented that an area within the corporate limits is without water or sewer and that the protection of the public health requires that water and sewer extensions be made into such area and if in the opinion of the council the abutting property will be benefited by said improve- ment to the extent of the portion of the cost to be assessed against such abutting property, the council may without petition of a majority of the property owners order the extension of such lines. (3) Upon receipt of a petition certified as sufficient or upon a determination pursuant to subsection (b)(2), the council shall follow the procedure set out in chapter 160A, article 10, of the North Carolina General Statutes as amended concerning special assess- ments. (4) The council may adopt such rules and regulations as are necessary to carry out the requirements of this division. (Code 1982, § 14-59; Ord. of 1-21-86; Ord. of 6-2-87; Ord. of 7-21-87; Ord. of 10-18-94, § 17; Ord. of 8-1-95, § 3; Ord. No. 10-581, § 3, 5-4-10) Sec. 14-145. Extensions for new development. (a) All water and sewer extensions for new development will be made by the city's utilities department or approved licensed contractors. These extensions will be financed by the developer or owner, and water and sewer user charges including, but not limited to, system expansion fees, and the procedures set forth in this section will be followed for such extensions. All applicable charges and fees as set forth in the schedule reference in section 14-19 shall be paid with respect to such extensions. (b) Any person desiring to install any water or sewer line to new developments within the city's service area. to be connected to and served by the water and sewer system of the city shall make application therefore to the engineering standards division on forms designated and provided by the city and shall furnish such information or exhibits as are required by such application forms.. With such application, the applicant shall: (1) Pay to the city the nonrefundable application fee set forth in the city's schedule of fees. (2) Submit 12 copies of engineering plans, profiles and specifications of such water main or sewer line, including those for any required fire hydrants, valves, manholes, sewer lift stations, force mains or collector sewer lines necessary in connection therewith, to the city engineer for approval. The engineering standards division will prepare the amount of reimbursements to be made under this division and such amount(s) shall be included in the contract. If the application is approved, the city attorney shall prepare a written contract between the city and the applicant in accordance with the provisions of subsection (c) and other provisions of this division. Supp. No. 55 CD14:27 J § 14-145 GASTONIA CITY CODE (c) Any person desiring to install any water or sewer line to new developments within the city's service area to be connected and served by the water and sewer system of the city shall make application, and obtain a permit pursuant to the city's local water and sewer approval program as described in subsection 14-141(f). A nonrefundable application fee in the amount established in the city's schedule shall accompany the application. (d) No water main or sewer line may be installed and connected to the city water or sewer system except after the permit required by subsection (c) has been obtained and a written contract approved by the city and executed by the city and the applicant. The city manager shall be authorized to execute any contract provided for herein according to the limits established in the city's standard bidding procedures. All contracts shall incorporate the substance of the following provisions: (1) Installation of any water main or sewer line, including any required fire hydrants, valves, manholes, sewer lift stations, force mains or collector sewer lines necessary in connection therewith, shall be done by the applicant, if the applicant under the laws of North Carolina is permitted to make such installations, or by a contractor of the applicant licensed by the State of North 'Carolina to make such installations. Such installations shall be done in accordance with engineering plans, profiles and specifi- cations approved by the engineering standards division, and a copy of the same shall be endorsed as to such approval for the applicant's use. The applicant shall be responsible, at his own expense, for the preparation of any such required plans, profiles and specifications, for obtaining approval for sewer line and water line extensions either under the local program described in subsection (c) hereof or from the North Carolina Department of Environment and Natural Resources, Division of Environmental Health and from the Division of Water Quality respectively, and/or any other review agencies so designated, and for any other engineering fees in connection with the installation of such utilities. (2) The installation of the utilities shall be subject to the inspection and supervision of the city during construction, and the connection thereof to the city water or sewer system shall not be made or maintained until the same shall have been tested under supervision of and the written approval and acceptance of such installation given by the engineering standards division. After such approval and acceptance, the city shall thereafter repair and maintain the same, except the applicant shall be responsible for defects in workmanship or materials or any noncompliance with the plans and specifications that appear within one year after such acceptance. (3) Installation of such utilities shall be done and completed at the sole expense and responsibility of the applicant, free and clear of all claims or encumbrances. Permitted utilities shall be under construction within 12 months of the contract date. If for any reason substantial progress is not attained within a 12-month period the contract shall become null and void. (4) The applicant shall, at his expense (including attorney's fees and recording expenses) obtain for or provide. to the city such perpetual rights -of -way or deeds as shall be Supp. No. 55 CD14:28 UTILITIES § 14-145 specified by the city for the construction, maintenance and operation of such utilities, including any encroachment agreements that may be required from the North Carolina Department of Transportation, railroad, or any other public utility. (5) Upon completion of the utilities and the connection thereof to the city's water and sewer system, the water main or sewer line and any fire hydrants, valves, manholes, sewer lift stations, force mains or collector sewer lines required in connection therewith shall thereupon and thereafter be the entire and sole property of the city and under the sole and exclusive control of the city. (6) . Neither the applicants nor any other person shall be entitled to any service. laterals from any water main or sewer line installed by the applicant except upon permission of the city and the payment of any water meter or any other water or sewer service connection charges therefore as required by the ordinances or regulations of the city, including, but not limited to, the system expansion fee. (7) If a water main, sewer line, sewer force main or collector line shall be required by the city in excess of eight inches in size to provide for the expansion of water or sewer service to other properties, then the city will agree to reimburse the applicant the difference in the cost of the pipe material for any such water main, sewer line, sewer force main or collector line in excess of eight inches in size and the cost of eight -inch pipe for any such water main or sewer line, such difference in cost to be determined by the engineering standards division and stated in the contract. However, the city will not agree to refund any such difference if any such water main or sewer line in excess of eight inches is necessary to serve the property intended to be then served thereby. In addition, if in order to provide for the expansion of sewer service to other properties a sewer pump station larger in size or capacity than necessary to serve the properties intended to be then serviced by the sewer installations shall be required by the city, then the city will agree to reimburse the applicant the difference in the cost of a sewer pump station that otherwise would be adequate to serve such properties intended to be then serviced and of the sewer pump stations required by the city to be installed, such difference in cost to be determined by the engineering standards division and stated in the contract. Any such cost differences which the city agrees to refund shall be due and payable without interest to the applicant in August following the first April 1 after the date on which the utilities to be installed under the contract have been completed, and accepted and approved by the city. (8) The applicant shall agree to indemnify and save harmless the city from any and all loss, cost, damages, expense and liability (including attorney's fees) caused by accident or occurrence causing bodily injury or property damage arising from the installation of such utilities by the applicant or the contractor of the applicant. The applicant or the contractor of the applicant shall maintain workers' compensation coverage as well as general liability insurance with a contractual coverage endorsement and automobile liability insurance with policy limits of not less than $1,000,000.00 per occurrence for bodily injury and $1,000,000.00 for property damage. The applicant will furnish Supp. No. 55 CD14:29 § 14-145 GASTONIA CITY CODE certificates of such insurance to the city with the provision that the city will be given 30 days' written notice of any intent to terminate such insurance by either the applicant or the insuring company. (9) The contract shall be conditioned on the applicant complying with all zoning and subdivision ordinances and regulations of the city that are applicable to any properties to be serviced by the utilities, and also any ordinances or regulations of the city for the operation, control, maintenance and protection of the water and sewer systems of the city. (10) In the event the applicant violates any of the terms of the contract, the city shall have the right to declare all or any of the rights of the applicant under the contract forfeited, and to remove and disconnect any connections that might have been made to the city's water or sewer system. (e) Without limiting the right of the city to disapprove for any reason whatsoever the execution of any written contract between an applicant and the city prepared in accordance with this division, the city will not approve any contract for the installation of any water main or sewer line to be connected to and served by its water or sewer system if in the judgment of the council (i) the projected volume of water that would be used by any properties to be serviced thereby would unduly tax the available water supply and/or sewage treatment capacity of the city, or (ii) it would not be financially feasible for the city to commit itself to such cost. Before submitting a formal application under subsection (b) an applicant may request from the council an informal advisory opinion on its willingness to allow such service line extension. Such request shall be filed with the engineering standards division, together with such documentation as the engineering standards division deems necessary, and the engineering standards division shall thereafter bring such request before the council pursuant to normal agenda procedures. An advisory opinion given by the council shall not bind the council to approve an application submitted thereafter or to execute any contract prepared under subsection (d). (f) Whenever offsite water and sewer line extensions are made at the developer's expense, the city will refund to the developer of the property served by such extension an amount equal to $11.06 per foot for six-inch or larger water lines, with an additional $513.00 for each fire hydrant, and $16.86 per foot for eight -inch or larger sanitary sewer lines. The maximum. reimbursement amounts will be included in the contract. Reimbursements are to be made by the city to the developer from budgeted funds in annual payments in August of each calendar year based on certificates of compliance issued by April 1 of the preceding, fiscal year and the percentage of development completed in accordance with site plans/subdivision plans ap- proved by the city. (g) Reimbursements under this section shall be limited as follows: (1) Notwithstanding the provisions of subsection (f), no reimbursements shall be made unless the development in question is served with both city water and city sewer. Supp. No. 55 CD14:30 UTILITIES § 14-171 (2) Notwithstanding the provisions of subsection (f), the developer will be eligible for reimbursements only during the first five years after the contract has been approved. (3) An applicant shall submit a request for reimbursement to the city manager by April 1 preceding the fiscal year in which he wishes to be paid those reimbursements he is eligible for under the terms of the contract. No reimbursements shall be paid unless the applicant has complied with the above procedure. (4) No reimbursements shall be made until the engineering standards division receives and approves the engineer's certification, as -built drawings and dedications or conveyances of necessary easements and rights -of -way. If such drawings, easements and rights -of -way are not received by the engineering standards division within 90 days of the tentative approval for acceptance of the water and sewer line extensions by the city, 20 percent of the eligible refund will be retained by the city for the preparation of as -built drawings, easements and rights -of -way. (Code 1982, § 14-60; Ord. of 1-21-86; Ord. of 7-21-87; Ord. of 12-15-87; Ord. of 5-16-89; Ord. of 4-3-90; Ord. of 12-18-90; Ord. of 10-18-94, § 18; Ord. No. 04-472, § 4, 11-2-04; Ord. No. 10-581, § 4, 5-4-10; Ord. No. 10-583, § 4, 8-3-10) Secs. 14-146-14-170. Reserved. Editor's note —Ord. No. 10-581, § 5, adopted May 4, 2010, repealed § 14-146 in its entirety. The former § 14-146 pertained to extensions approved prior to October 1, 1982 and derived from the Code of 1982; § 14-61; an ordinance adopted Jan. 1, 1986; and an ordinance adopted July 21, 1987. DIVISION 3. FIRE PROTECTION SERVICE* Sec. 14-171. Fire hydrants. (a) The developers of subdivisions and unsubdivided developments, whether inside or outside the city, may be required as a condition of connecting to the city's water system to install fire hydrants in accordance with city requirements and specifications. Among other matters, such requirements and specifications may govern the number, locations, and type of hydrants required. (b) The city may contract with a developer to install fire hydrants required pursuant to subsection (a), but, subject to the reimbursement provisions of article II, division 2, the full cost of providing for such hydrants shall be borne by the developer. (c) Connection to the city's water system of any hydrant constructed pursuant to subsection (a) shall constitute dedication to the city of such hydrant. *Cross references —Fire protection and fire prevention, ch. 12; minimum housing stan- dards, ch. 16; subdivisions, ch. 18. Supp. No. 55 CD14:31 § 14-171 GASTONIA CITY CODE (d) In the event any fire hydrants situated outside the corporate limits of the city that are unmetered and supplied from the city water system are used in fighting or extinguishing a fire, then the owner of the building or premises on which such fire occurred shall pay the city the sum set forth in the schedule referenced in section 14-19 for the water used from each such hydrant. (e) No person, unless authorized by the city, may draw water or otherwise tamper with any hydrant. (Code 1982, § 14-70) Sec. 14-172. Fire protection service lines. (a) Subject to the provisions of this division, the city may allow fire protection service connections to be made to the city's water lines. (b) Backflow prevention conforming to city specifications shall be installed at such points in the fire protection system as necessary to assure protection of the water supply. (Code 1982, § 14-71) Supp. No. 55 CD14:32 Sewer Permitting Procedure 1. Susan Bell will stamp in new plans when they are submitted. (6 sets required.) 2. Susan Bell will enter the plan information into Hansen and create a project which will generate a project number. This number will be used as the sewer permit number as well. 3. The plan will be reviewed by staff to verify that it has been drawn to City of Gastonia standards and meet minimum design criteria. 4. Jamie Johnson or Susan Bell will type the sewer permit and Thorne Martin will sign the permit and the plans. 5. Susan Bell or Jamie Johnson will create a file folder with a copy of the sewer permit and other pertinent information. 6. City staff will hold a preconstruction meeting with the contractor, engineer, and owner. Permitted plans will be distributed at the meeting. 7. The permitted plans and sewer permit will be scanned and linked to GIS by Thomas Smith. 8. A copy of the scanned permitted plans will be placed in the following City directory: engshare S:\Land Development\Peinuitted Plans, under the permit number. (Folders will be created as needed using the permit number.) Quarterly Reports Quarterly permit reports (action reports) are imported into Excel from Hansen. There should be a separate report for each WWTP. An e-mail containing the quarterly permit reports (action reports) should be sent to Deborah Gore (Deborah.Gor@ncdenr.gov) and Rob Krebs (Rob.Krebs@ncmail.net). Peninits, plans, and certifications are kept on file a minimum of 3 years and made available to NCDENR upon request. Current Staff For Permitting Susan Bell Jamie Johnson Thorne Martin Thomas Smith Jimmy Lineman City of Gastonia - Engineering Department Water and Sewer Review Check List Project: Owner: Engineer: Yes No N/A Yes No N/A Yes No N/A General Information 1. Name of Project (w/ Phase #, Section #, or Map #) 2. Name and address of Developer 3. Name and address of Engineer 4. Date of Drawing/Revisions. 5. Vicinity Sketch 6. Legend 7. North Arrow (all applicable sheets) 8. Signature and seal of Professional Engineer on every sheet 9. Street layout (w/names and R/W widths) 10. Lot layout (building layout if multi -family) with dimensions 11. Pavement width on plan view (back of curb to back of curb) 12. Lot numbers 14. Typical roadway section (on at least 1 profile) 15. Match lines (w/Stations on each sheet) 16. Plan/Profile scale (no less than 1"=40' HORIZ., 1"=4' VERT.) 17. Bench mark location and datum to be described with elevations 18. Sidewalk location on plan view 19. All dimensions must be legible Water Line Information 20. Water line location (north and east sides of the road) 19. Size & type of water line in both plan and profile views 20. Length of main between fittings 21. List all fittings or appurtenances (size and type) 22. Horizontal separation between water, sewer, and other utilities in plan view 23. Depth of water line (shown on profile) 24. Show tees and bends along main by stations 26. Other utility crossings shown with vertical separations in profile view 27. Proper fire hydrant spacing 'Sewer Line Information 28. Size & type of sewer line in both plan and profile views 29. Grade of sewer line in both plan and profile views 30. Invert elevations in profile view 31. Manholes shown by manhole and station numbers in plan and profile views 32. Length of main between manholes in both plan and profile views 33. Manhole rim elevations in plan and profile view 34. Minimum ground cover of 30" if Ductile Iron and in roadway 35. Minimum ground cover of 36" for all types of sewer line other than ductile iron 36. Horizontal separation between water, sewer, and other utilities in plan view 37. Other utility crossings shown with vertical separations in profile view 38. If piers are required, city standard detail cited 39. Location of piers by stations 1 Yes No N/A 'Force Main Information 41. Force main location 42. Force main size 43. Force main length 44. Force main type 45. Force main depth Yes l No N/A 'Sealed Manhole Information 46. Label all sealed manholes 47. Show vents on sealed manholes in profile view 48. Label vent elevation Yes No N/A Reviewed By: Flood Study Information 49. Completed FEMA application form MT1/2 50. Narrative on project and submittal explaining any adjustments, revisions, or omissions to any models 51. Hydrologic computations along with digital files of computer models 52. Hydraulic computations along with digital files of Duplicate Effective, Corrected Effective, and Proposed midels used. 53. Certified topographic map with floodplain, floodway, and cross-section delineations 54. Annotated FEMA FIRM and/or FBFM to reflect changes due to project 55. Engineers "no -rise" certification Date: GRAVITY SEWER DESIGN CHECKLIST REVIEW AUTHORITY: REVIEW NO. REVIEW BY: NCP.E. NO. PROJECT TITLE: DATE: PERMIT APPLICANT/PROJECT OWNER: (Check Far Left Blank If Minimum Requirements Not Met And Provide Comments) 1.) Total length of sewer pipe (by diameter size): Diameter Length inch lineal feet inch lineal feet inch lineal feet inch lineal feet inch lineal feet inch lineal feet inch lineal feet Total lineal feet 2.) Type of pipe material 3.) Wastewater strength (domestic, etc.) 4.) Total number of manholes: 5.) Invert elevations given: yes no 6.) Sewer reach - per Diameter: inch inch inch inch maximum slope: maximum flowrate: MGD MGD MGD MGD maximum velocity: fps fps fps fps minimum slope: 7.) Proposed average daily flowrate: GPD Proposed peak daily flowrate: GPD (2.5 times average) 8.) Adequate horizontal/vertical separation provide for: -storm sewers: yes no (12 inch vert. min) -water main: yes no (18 inch vert. min) -water main: yes no (10 feet horizontal min) (benched trench: yes no (18 inch vert. min) If no, explain: 9.) Pipe cover greater than or equal to three (3) feet: yes no If no, explain: 10.) Are there any wells within 100 feet of the proposed sewer: yes no 11.) Construction/Permanent Right -of -Ways indicated: yes no 100-year flood elevations of adjacent streams given: yes no manhole top elevations given: yes no 12.) Maximum sewer reach length between manholes: lineal feet Can owner/authority clean this length: yes no 13.) Manhole specifications given: yes no Adequate manhole foundation: yes no Shear support for pre-fab manholes: yes no Drop manholes required: yes no (invert separation greater than 2.5 feet) Number of drop manholes: 14.) Pipe bedding and backfill specifications adequate: yes no Installation methods specified adequate: yes no Water tight pipe connections and joints: yes no Adequate support for aerial sewers provided: yes no 15.) Infiltration/Exfiltration test rate specified: yes no 200 GPD/in./mi. Maximum rate specified GPD per inch diameter per mile length 16.) Does construction, relocation, or rehabilitation of proposed sewers require maintaining service of existing utilities: yes no 17.) All sheets of plans signed/sealed by NCP.E.: yes no Cover sheet of specifications signed/sealed by NCP.E.: yes no 18.) Other comments: I hereby certify that the subject project has been reviewed in accordance with Division of Environmental Management Guidelines for Gravity Sanitary Sewers. Reviewer's Signature pc/grayswrcklist SECTION 13.0 SANITARY SEWER. 13.01 Sanitary Sewer Pipe All sanitary sewer pipe shall be Extra Strength Vitrified Clay, Cement Lined Cast Iron, or Cement Lined Ductile Iron. These standard specifications for sanitary sewer pipe are intended for sizes up to and including 1.5" in diameter. Material and Construction Specifications for pipe sizes in excess of 15" in diameter shall require approval by the City Engineer. It is the intent of this specification to provide pipe of the highest standard known to the trade and to provide pipe that is free from defects in workmanship and materials. All pipe and other materials shall be first class and no used or second hand pipe or materials will be permitted. For depths of cover over pipe three feet or less, only cast iron or ductile iron sewer pipe may be used. For depths of cover over pipe greater than three feet, but less than twelve feet, Extra Strength Vitrified Clay, Cement Lined Cast Iron or Cement Lined Ductile Iron may be used. For depths of cover over pipe from twelve feet to twenty-two feet, Extra Strength Vitrified Clay, Cement Lined Cast Iron or Cement Lined Ductile Iron may be used. For depths of cover over pipe in excess of twenty-two feet, Cement Lined Cast Iron and Cement Lined Ductile Iron may be used. Thickness ofCIP/DIP shall be as specified by the City Engineer. PVC Sewer Pipe may be used as specified in. Section 13.20. Clearing The Contractor will be required to clear, remove,or dispose of all natural, artificial, or man made obstructions to the constructionas indicated on the Project Plans, or as may be evident at the time of the bidding of this Contract. The Contractor will be required to restore the construction area as close as is practical to the condition he found it. Items 83 5/1912006 ; 1:35 PM in which there are "unit price" requests in the Proposal shall be priced so indicated for removal and replacement of such bid items. There will also be some incidental items in which there is not a unit bid item for, the cost for these items shall be merged in with the cost per linear foot of pipe installation and other bid unit prices as requested on the Proposal. No additional payment will be approved for items considered by the City Engineer as incidental to the construction and evident at the time or bidding. Environmental Assessment, Corps of Engineer NW Permit 12, and 401 Certification Requirements No fertilizer shall be applied within 10 feet of streams. Construction corridors in. Jurisdictional Wetlands shall be limited to 40 feet and must be minimized to the maximum extent practical. Measures shall be taken to prevent live or fresh concrete :from corning into contact with waters of the State until the concrete has hardened. Restore the Wetland contours as close as practical to those existing prior to construction. All trees, stumps, roots and other debris shall be removed and disposed of off the site by the Contractor. Fences, mailboxes, street signs, small shrubs, driveways, roads, sidewalks, curb and gutter, walls, drainage systems, poles and cables, etc., shall be protected. If damaged they shall be restored by the Contractor to a condition equal to that existing at the date of award of the Contract. No additional payment will be allowed for this restoration. All restoration shall be subject to the approval of the City Engineer. Existing shrubbery reset at the Owner's request will be done so with utmost care, but the Contractor will not be required to guarantee the plants to live. Minor clearing of opened street rights -of -way is considered incidental to the installation of the sewer line. Therefore, all cost for minor clearing of open areas and open street rights -of -way shall be included in the Contractor's bid unit price per L.F. for "Sanitary Sewer Pipe" complete in place. Any large tree removal not to be considered above, will be identified on the Project Plans and also listed on the Proposal, as a separate pay item. 84 5/192006 ; 1:35 PM (G) All cost for clearing shall be included in the Contractor's bid unit price per. L.F. for "Sanitary Sewer Pipe" complete in place, unless said work is specifically included on the Proposal as a separate "item" in the bid. (G) Payment for all sanitary sewer pipe shall include all material, labor, equipment, fittings, clearing, grading, seeding, munching, tack, dewatering, shoring, trenching, bedding, trench stabilization, tamping, undercut, backlilling, required fill over and adjacent to pipe, all ditching and creek widening, testing, connecting to existing pipes, plugging, capping stubs, overhead, profit, insurance, etc., required to provide a complete project, unless such material or work is specifically included on the Proposal as a separate "item" in the bid. Payment for this item shall be based on the actual linear feet of pipe measured from center of manhole to center of manhole complete in place for the depth installed as determined by the City Engineer.. The length measured for payinent for sewer line pipe shall be as per the Standard Specifications including but not limited to Section 2.56. Any open cuts approved by the City shall be restored with asphalt/concrete the same day as the disturbance began. A.11 disturbed areas shall be seeded, mulched, and tacked no later than seven (7) days after the land disturbing activity started. No payment for pipe (complete in place) shall be made until the restoration by seed, mulch, and tack of all disturbed areas and restoration of all paved drives and streets has been completed by the contractor to the satisfaction of the engineer. For Special Conditions requiring ferrous material pipe see Section 2. 12. 13.02 Extra Strength Vitrified Clay Pipe All vitrified clay sanitary sewer pipe used shall be extra strength class pipe. Pipe shall conform to ASTM Standard Specification C 700-78A or latest subsequent revision. The pipe shall be joined using a compression sleeve manufactured to conform to ASTM C-425-82 or latest revision. All vitrified clay sewer pipe shall be extra strength "Uptig_ht" clay sewer pipe as manufactured by Logan Clay Products Company or an approved equal. 85 5/19n006 ; 1:35 PM 13.03 Cement Lined Cast Iron Sewer Pipe Cast Iron Pipe shall be manufactured and tested in the U.S.A. and shall conform to AWWA Specification C 106 and A.S.A. Standard ##A21.6 or latest revision or conform to AWWA Specification C 108 and A.S.A. Standard #A21.8 or latest revision. Cast iron pipe shall be mechanical joint or push -on joint type. Push -on type joints shall be "Bell-Tite," "Fastite" or approved equal. All joints for cast iron pipe shall conform to the applicable dimensions and weights shown in the tables in AWWA C-I06 and to ANSI A 21.11 (AWWA. C -I 11) or latest revision. Cement linings for cast iron pipe shall conform to AWWA. Specification C 104, ASA # A21.4, or latest revision. Thickness for all Cast Iron Pipe in this contract shall be as recommended for the proposed depth of cover in the "Handbook of Cast .Iron .Pipe (Ductile Iron Pipe)," third edition as published by the Cast Iron Research Association, or as shown on the Project Plans, with the minimum being Class 22 for 18/40 iron strength. All Cast Iron pipe shall be for minimum working pressure of 150 PSI. All pipe shall be clean and sound without defects that will impair their service. Repairing of defects by welding or other methods shall not be allowed. All pipe shall have an outside petroleum asphaltic coating of approximately 1 mil thick. The coating shall be applied to the outside of all pipe and the finished coating shall be continuous, smooth, neither brittle when cold, nor sticky when exposed to the sun, and shall be strongly adherent to the pipe. 13.04 Omitted 13.05 Cement Lined Ductile Iron Sewer Pipe Ductile Iron Pipe shall be manufactured and tested in the U.S.A.-and shall conform to .AWWA Specification C 151 and ANSI Standard #A2.1-51 or latest revision. Cement linings for ductile iron pipe shall conform to AWWA Specification C 104. 86 5/192006 ; 1:35 Phf Ductile iron pipe shall be mechanical joint or push -on joint type. Push -on joints shall be "Bell-Tite," "Fastite" or approved equal. All joints for ductile iron pipe shall conform to the applicable dimensions and weights shown in the tables in AWWA. C151 and to ANSI A 2.1.11 (A WWA C 111) or latest revision. All pipe shall be clean and sound without defects that will impair their service. Repairing of defects by welding or other methods shall not be allowed. All pipe shall have an outside petroleum asphaltic coating of approximately 1 mil thick. The coating shall be applied to the outside of all pipe and the finished coating shall be continuous, smooth, neither brittle when cold, nor sticky when exposed to the sun, and shall be strongly adherent to the pipe. Thickness for all Ductile Iron Pipe in this contract shall be as recommended for the proposed depth of cover in the "Handbook of Cast Iron Pipe (Ductile Iron Pipe)," third edition as published by the Cast Iron Pipe Research Association, or as shown on the Project Plans (with the minimum being Class 51). Flanged DIP, Polyethylene Encasement - See Section 14.06 Solid Sleeves - See Section 14.09 13.06 Manholes Manholes shall be built where shown on the plans and shall be in accordance with City Standard No. 71B-1 thru 71 B- 4B and these specifications. Distance between manholes shall vary as shown on the plans, but the maximum distance between manholes shall be three hundred fifty feet (350') for sewer mains and five hundred feet (500') for outfall lines. Inverts are to have a smooth finish and shall confortn to City Standard No. 71 B-4 in cross-section. There shall be a minimum drop of 0.2 feet within the manhole, but in no case shall it exceed two and one half feet (2-1/2') , unless an outside drop is constructed. Manhole walls shall be constructed to a minimum thickness of 6" when standard manhole blocks are used and to a minimum thickness of 8" when brickis used. This minimum thickness shall be increased by the width of one block or brick for manhole depths of depth over 14 feet. The bottom of the manhole shall extend a minimum of six inches (6") below the invert of the sewer. Only clay brick or standard concrete manhole block shall be used unless other 87 5/19/2006 ; 1:35 PM material is approved in writing by the Public Works/Utilities Director prior to construction, except that precast concrete manholes may be used provided they conform to Section 13.09 of these specifications. Manhole bottoms shall be constructed of 3000 PSI Class "A." concrete and shall be a minimum of six inches (6") in thickness. When required by the City Engineer, the foundation for the manhole bottoms shall be stabilized by placing No. 57 washed stone in the excavation. Manhole steps shall be provided and installed in accordance with City Standard Detail 71B-2. Manhole steps shall. be made with a No. 3 reinforcing rod encapsulated in a polypropylene plastic, and shall be No. PS-1 or PS-1-45, as manufactured by M.A. Industries, Inc., or approved equal. Cast iron manhole covers and frames shall be furnished and installed in accordance with. City Standard No. 71B-1. Manhole covers and frames shall be set in mortar with even bearing. As a normal policy, all manhole rim elevations in well maintained areas such as streets, parking lots, yards, ball fields, etc., shall be set flush with the existing grade. Manhole rims set in fields, pastures, woods, etc. , shall be set 6" above the natural existing grade and backfilled flush with the rim with a maximum slope of 4:1. Manhole rims in flood plain areas, shall be set two (2) feet above the 100 year flood elevation; or a sealed manhole shall be set flush with the natural existing ground and vented according to Standard Detail 71B-4A and as shown on the project plans. The City's inspector may vary from this policy if special field conditions warrant it. Plugs and sealed stubs shall be placed as required by the plans or as directed by the City Engineer. The outside of the manhole shall be plastered with a 1:2 mortar mixture. Cracks between manhole blocks or brick shall be plastered thoroughly. All iron work, in and about the manhole, shall be protected from rust. The masonry height for adjustment of grade above the cone shall be 12 inches maximum. Manholes shall be cleaned, and in good order, and so kept until final acceptance of the job. 88 5/192006 ; 1:35 PM Block and brick manhole specifications are included herein for use with the repair of existing structures only. All new (proposed) manholes shall be as specified in Section 13.09 herein. 13.07 Manhole Brick All manhole brick used shall be hard rough, sound clay brick of first class quantity, especially suitable for this class of work and shall conform to A.STM Standard No. C-62 or latest subsequent revision. Over -burned brittle brickor brick from benches of kilns shall not be accepted. The brick shall be set at the time of laying, except when liable for freezing. The brick shall be laid with full shove joints, filling up the joints with mortar and the thickness of the joints on the inside of the walls must not be more than three -eighths (3/8") of an inch in width. 13.08 Manhole Block All manhole block used in construction shall be a standard six. inch (6") thick concrete manhole block and shall conform to ASTM Standard No. C-139 or latest subsequent revision and shall be those manufactured by Metromont Materials of Charlotte, North Carolina, or an approved equal. The manhole shall be constructed of two (2) types of block, the barrel block and the battered entrance block. The barrel block shall form the main body of the manhole and shall form a cylindrical section. The Standard inside diameter of the cylinder shall be four feet (4') for manholes up to fourteen feet (14') in depth and five feet (5') for manhole sections greater than fourteen feet (14') in depth. The top battered section shall form a conical section which shall have a four foot (4') diameter base and shall be constructed of four (4) courses of eight inch (8") high battered blocks. These blocks shall be designed so as to reduce the inside diameter by six inches (6") per course. The top diameter of the manhole shall be twenty-four inches (24"), and shall be the standard opening needed for the cast iron manhole ring. The blocks shall be embedded in a mortar bed to form 1/2" horizontal mortar joints and shall be laid end to end without mortar on ends. As each course is completed, the end openings shall be filled with mortar and shall be rodded thoroughly to form a watertight seal between blocks. 13.09 Precast Manholes All precast manhole sections and components shall conform to ASTM C-478-72 or latest subsequent revision. Precast manholes shall be those as manufactured by Tindall Concrete in. Spartanburg, South. Carolina, Brooks/Oldcastle in Charlotte, North Carolina, Foltz Pipe Company in Winston-Salem, North. Carolina, Universal 89 5/19/2006 ; 1:35 PM Concrete Products in Harrisburg, North. Carolina, Materials Supply Co. in Charlotte(Lexington. Plant), N.C., M. etrornont :Meterials, Corp., in Greenville, S.C., and Tru-Contour in Harrisburg, N.C.; but in all cases shall meet all provisions contained herein.. Precast manhole sections shall consist of circular sections with nominal inside diameters of 48" and 60". Heights of the sections may be in multiples o:f 12" at the option of the Contractor. The nominal wall thickness for 48" and 60" diameter sections shall be minimum of 5", and shall be designed to support all dead load and HS-20 traffic loads. Reinforcement for precast manhole sections shall consist of a single cage of steel, placed at the approximate center of the wall section. The 48" diameter sections shall have :not less than 0.12 square inches of circumferential steel per linear foot of barrel and the 60" diameter section shall have not less than 0.17 square inches of circumferential steel per linear foot of barrel. The cage steel shall be welded at every circumferential wire, or lapped 40 wire diameters and tied. The welded splice shad develop a tensile strength of 50,000 PSI of the wire diameter. Joints between sections shall be tongue and groove, and shall provide 0.10' nominal annular space, height shall be 4". Joint surfaces and tolerances shall be as per ASTM C-361. All joints shall be sealed with either an "0" ring seal conforming to ASTM C 443, or with an approved Butyl Rubber Sealant conforming to Federal Specification SS-S- 2.1.0A, A.ASHTO M-198, for. Type B-Butyl :Rubber. Approved sealants are "K.ent Seal No. 2, "Conseal CS-102 or CS-202", RuVan R.V30, Press -Seal "Pro-Stik", "Bidet)" Sealants, ".Butyl-Nek", and "E-Z Stik", or approved equal. Care is to be taken with the Butyl Rubber Sealant to make sure manufacturer's recommendations and overlaps are properly followed. Butyl Rubber Sealant shall be kept in original containers, stored in a cool area and kept free from foreign materials. Manhole steps shall be cast, drilled, or firmly grouted in place so as to ensure completely watertightness, any step holes shall not extend through the manhole wall. Steps shall be spaced at 16" centers and installed so as not to interfere with the reinforcing steel. Steps shall be No. 3 reinforcing rod encapsulated in a polypropylene plastic, No. PS-1 with a depth ring, as manufactured by M.A. Industries or approved equal. No more than two lift holes shall be cast into each section. Holes shall be located so as not to damage reinforcing steel or expose it to corrosion. Steel loops may be provided for handling, in lieu of lift holes. Precast conical eccentric transition sections shall be provided for :reductions in diameters. The transition manhole sections shall conform to the cross-section as shown on City Standard No. 71 B-4. The height of the transition section 90 5/1912006 ; 1:35 PM. shall not be less than 24". Transition and barrel sections shall be free from fractures, cracks and surface roughness. All manhole components shall be capable of producing a watertight structure. Special Engineer's approval is required to use flat transition slabs or flat tops. Manholes shall have precast concrete bottoms with integral walls extending to a minimum of six inches (6") above the top of the highest pipe line, except as shown on the plans. Precast manhole sections shall be affixed to a monolithic poured bottom to provide a watertight seal, and constructed in accordance with City Standard Drawing No. 7I B-4. Pipe openings shall have a cast-inplace rubber sleeve or rubber boot complying with ASTM C 923 designed to provide a flexible watertight seal around the pipe and between the sleeve/rubber boot and the manhole. Approved boots are "PSX", "Kor-N-Seal", and "EPCO". The cone section shallbe the eccentric type, unless approved otherwise for a specific location for each use. Inverts of the manhole shall be constructed as specified in Section 13.06 of these specifications. Inverts shall be poured -in -place, using the base section as form, and shaped as required for the proper flow. Separate pour pre -cast inverts may be used, approval required. Holes or openings left in barrel sections for pipe connections shall be constructed so as to provide a minimum clearance between pipe and edge of opening as recommended by the manufacturer of the boot to be installed. This space may need to be mortared to produce a watertight seal and support the pipe, see the manufacturer's recommendations. Alkalinity of the concrete used for the manholes shall be adequate to provide a Life Factor, AZ equal to the calcium carbonate equivalent times the cover over the reinforcement of no less than 0.35, for bases, risers, cones, transition and adjustment pieces. Chemical Admixtures shall be as per ASTM C 494. Calcium chloride or admixtures containing calcium chloride shall not be used. Any interior patching of wall penetrations shall be by using a two -component epoxy gel, solvent free, moisture insensitive, high modulus, high -strength, structural epoxy paste adhesive meeting ASTM C-881, Type I and II, Grade 3, Class B and C, Epoxy Resin Adhesive. 91 5/19/2006 ; 1:35 PM The masonry height for adjustment of grade above the cone shall be 12 inches maximum. Butyl rubber sealant shall be provided between the frame, grade rings, and all manhole sections. Corrosion Protection for .Manholes 1. Where corrosive conditions due to septicity or other causes are anticipated, consideration shall be given to providing corrosion protection on the interior of the manholes. 2. Where high flow velocities are anticipated, the manholes shall be protected against displacement by erosion and impact. Tie-ins at existing manholes shall be constructed to the same standards as specified for new manholes herein. Any exceptions shall be as approved by the Engineer. Payment for all "Tie-in at Existing Manholes" shall include all labor, equipment, and materials necessary to tie the sewer line into the existing manhole. (G) Payment for manholes shall include all material, labor, and equipment necessary to install the manholes to comply with the Project Plans and bid documents. Payment for this item shall be based on the actual number of manholes complete in place, for depth installed as determined by the City Engineer. 13.10 Cement Cement used shall .be of a high grade Portland Cement of a brand approved by the City Engineer. It shall meet AASI TO :M-85-49 or latest subsequent revision. Cement shall be .newly manufactured, well housed and preserved dry for use. No cement which has been injured by age or exposure shall be used. 13.11 Sand (Fine Agaregate) All sand used shall be clean, sharp coarse grain sand and shall be free from clay, loam or organic matter and shall be subject to the approval of the City Engineer. 13.1.2 Water 92 5/19/2006 ; 1:35 PM Water used in Portland Cement mortar or concrete shall be free from oil, alkali, or other organic substances. No free use of City water will be permitted. If water is used from City's supply, the Contractor shall make arrangements with the City Utilities Department, and shall be required to pay for such water used. (G) On City let projects, the city will allow the use of City water for construction without any additional charge. This will be subject to availability and to all City Departmental Policies, Backflow prevention and metered use will be required, the contractor shall supply all necessary egniptment, materials, and labor. See section 2.03. 13.13 Mortar Mortar for brick work shall be composed of one (1) part Portland Cement to three (3) parts fine aggregate. Mortar for plastering shall be composed of one (1) part cement to two (2) parts fine aggregate. During cold weather, mortar and brick work may be placed when the air temperature in the shade is 40° Fahrenheit or above and rising. 1t may not be placed When the air temperature in the shade is 42° Fahrenheit and falling. 13.14 Concrete Concrete used shall consist of Portland Cement, fine aggregate, coarse aggregate, water and admixtures to a design mix approved by the City Engineer. It shall have a twenty-eight (28) day compressive strength of 3000 PSI. No water shall be added to the mix, except that called for in the mix design. Water added to th.e concrete enroute to the job site or on the job site shall be reason enough to reject the batch and have it removed from the job. 13.15 Manhole Frames and Covers All castings shall be of good quality cast iron manufactured on Number One grade scrap or equivalent. No other casting shall be considered. Castings must be free from blow holes, sand holes and any other defect, and shall conform strictly to the dimensions shown on the City's Standard Drawing No. 71B-1. Gray Iron castings may be supplied with "no paint". Weight of the manhole ring and cover shall be approximately 310 Pounds. Machining on certain parts of the manhole ring and cover shall be required. That portion of the manhole cover which is to be machined shall be the horizontal surface on the underside which comes in contact with the ring, This 93 5/19/2006 ; 1:35 PM machined surface shall be 1 3/8" in width along the full circumference of the cover. That portion of the manhole ring or frame which is to be machined shall be the inside horizontal surface upon which the cover sits. This machined surface shall be one inch (1") in width, along the full circutnference of the ring. The machining described above shall be so accomplished so as to leave the machined surfaces in a true even plane, so that when the cover is placed on the ring in any position, the machined surfaces will be in full contact and even bearing, with no tilting or rocking motion. The machining to be done is in no way intended to decrease the thickness of the parts machined, but will have the dimensions shown on the City's standard drawing. Locking Watertight Covers for Outfall Construction Locking watertight frames and covers shall be used on outfall construction. Frames and covers shall be produced from ASTM A 48-74, class 30 iron. The minimum weight of the frame and cover shall be 310 pounds, as per Detail 71B-1. The frame flange shall have four one -inch holes at 90 degrees for anchoring the flange to the concrete manhole with 4 each - 5/8" dia. bolts. The Contractor shall coordinate the bolt circle diameter with the manhole and frame suppliers. The cover shall have four holes for bolts at 90 degrees for locking the cover to the frame. The frame shall be tapped and the cover attached using four hexhead 1/2" X. 1-3/4" brass or stainless steel bolts. A. neoprene gasket shall be provided between the cover and the frame seat. Butyl rubber sealant shall be provided between the frame, grade rings, and all manhole sections. Vulcan's (E.J.1.W.) watertight cover V-2384 and U. S. Foundaty's USF 669 & KL with BWT cover meets these requirements. Only frames and covers manufactured and tested in the U.S.A. will be allowed. Manhole covers are to be provided withtwo one -inch diameter holes for ventilation, unless the Project Plans indicate that the manhole is to be vented to a specified elevation or a sealed manhole indicated. Vented manholes shall be as indicated on the project details and Std. Detail 71 B-4a as revised 1/05/95 or later revision. (G) Payment for all manholes shall include all material, labor, and equipment necessary to install the manholes to comply with the Project Plans and bid documents. Payment for this item shall be based on the actual number of manholes complete in place, for depth installed as determined by the City Engineer. 13.16 Concrete Encasing for Pipe 94 5/19/2006 ; 1:35 PM Encasing for pipes shall consist of plain 3000 PSI Class "A" concrete as a protective cover and reinforcement poured and formed to the cross-section as shown in City Standard Detail 71B-15. This protective cover shall be required when shown or indicated on the plans, or when directed by the City Engineer. 13.17 Laying Pipe and Making Joints The pipe shall be laid beginning at the lower or down -stream end of the line and shall progress continuously upstream. Under no circumstances shall the Contractor leave out any section of the line to work on another portion further upgrade, without first securing written approval from the Engineer. Each joint of pipe shall be laid according to manufactures recommendations and, in accordance with latest revision of A.STM Standard No. C-12 for Clay Pipe, and according to A.WWA H1-67, AWWA C-150, .AWWA C-600 and ASTM A-746 for Cast and Ductile Iron Pipe. Care shall be taken in placing pipe so that prior made joints are not disturbed. Competent pipe layers shall be required for pipe installation. Lines that do not exhibit true line and grade or have structural defects shall be corrected at the Contractor's total expense. Refer to Section 15.00 also. At the end of each days work, the Contractor shall plug all pipe ends. Trench Preparation The Contractor shall prepare the pipe trench according to the "Project Details, and to the Standard Specifications" including but not limited to Sections 10.03, 10.04, 13.0, 14.0, and 15.0 thereof and pipe manufacturer's recommendations. Class B Bedding Class B bedding shall consist of bedding the pipe in compacted granular material placed on a flat trench bottom, after jointing of the pipe, extending the compacted granular material along the sides of the pipe to the level 1/2 the diameter of the pipe, and the placement of compacted select backfill material to a depth of 6" above the top of the pipe, all as specified herein and detailed on the Drawings. 95 5/19n006 ; 1:35 PM :Depth of compacted granular material under the pipe shall be :not less than 4". The granular material shall have a width equal to the width of the pipe trench and the length as indicated on the Drawings or as directed by the Engineer. Granular material used for Class B bedding shall be washed stone conforming to the gradation requirements of the N.C. Department of Transportation standard specifications for No. 57 standard size aggregate. Granular material shall be placed in layers not more than 6" in thickness and each layer thoroughly tamped with approved mechanical tampers being extremely careful to completely fill all spaces under and adjacent to the pipe. The granular material shall be placed under and adjacent to the pipe by hand if necessary to completely fill all spaces under and adjacent to the pipe. (G) All costs for providing Class B bedding as specified above shall be included in the unit price for pipeline installation. Class C Bedding Class C bedding shall consist of granular material complying with the requirements specified for Class B bedding, except that granular material shall extend up the pipe barrel at least I /6 the outside diameter of the pipe. All other aspects of granular material gradation, backfilling, compaction, etc., shall be as specified for Class B bedding. (G) All costs for providing Class C bedding as specified above shall be included in the unit price for pipeline installation. Class D Bedding Class D bedding shall consist of square cut trench bottom with bell holes. Wherever rock is encountered for Class D bedding conditions the rock shall be removed for at least 6" below pipe and replaced with compacted backfill to the required pipe bedding grade. (G) All cost for providing Class D bedding as specified on the Project Details shall be included in the bid unit price for pipeline installation. Concrete Encasement Concrete encasement shall be made of 3000 psi class concrete and shall be constructed in accordance with details shown on the Drawings. The Contractor shall submit for approval of the Engineer his proposed method of supporting the sewer to maintain line and grade while the concrete encasement is being constructed. All concrete encasement shown on the Drawings shall be included in the base bid and any additions to or deductions from this amount ordered 96 5/19/2006 ; 1:35 PM by the Engineer shall be adjusted on the basis of the unit price stated in the Contractor's bid for non -reinforced concrete encasement, per cubic yard, complete in place. All concrete encasement placed without the prior order of the Engineer shall be at the Contractor's expense. Also, see section 13.16. Trench Stabilization (#57 washed stone) will be required when a wet or poor subgrade condition is encountered by the Contractor and when in the City Engineer's opinion other proper foundations cannot be provided. Refer to Standard Specifications Section 15.04 for additional requirements. (G) All cost for trenching, backfilling, backfill material, trench stabilization (#57 washed stone), etc. shall be included in the Contractor's bid unit price for pipe complete in place. Rock Excavation Excavation of hard rock, ledge rock, or boulders larger than two cubic yards which can not be ripped, clawed, etc., and or removed by conventional construction :methods will be considered as Rock Excavation. All blasting operations (use of explosives) shall be conducted in strict accordance with existing laws, rules, and regulations relative to the storage and use of explosives. Blasting shall be performed only by experienced personnel working according to accepted practice. The Contractor shall be responsible for securing all necessary permits including, but not limited to the City Fire Department. The Contractor shall comply with the City's Standard Specifications including, but not limited to Section 2.08. Extreme care shall be exercised by the Contractor to prevent injury to any existing pipes, water, sewer, gas, poles, wires, cables, drains, buildings or other structures or utilities either below or above the surface of the ground. The Contractor shall be solely responsible for any and all damage resulting from the use of explosives. Where there is any possibility of damage being caused by blasting it may be necessary to resort to drilling, wedging, and splitting to remove the rock. Any rock encountered shall be excavated six inches (6") below the subgrade of the pipe bed. See Pipe Material for payment of unsuitable material and/or backfill material. (G) Payment for rock excavation. shall include all labor, materials, and equipment necessary to :remove the previously described rock. and deposit it off site in a Contractor supplied spoils area or, if an area is approved by the Engineer, with the Project Limits. (G) Payment for rock excavation shall be as per the Contract unit price as established in the Proposal. The quantity shown is estimated and is approximate. Payment shall be based on the actual quantity approved as Rock Excavation. 97 5/19/2006 ; 1:35 PM 13.18 Testing The Contractor shall make the construction site and pipe installation available to the City Engineer or his representative at all times for performing tests on the materials and construction. These tests shall include, but not be limited to, the following: (a) Compaction of Ditch Backfill material shall be thoroughly tamped as specified in Section 6.06 of these specifications and shall be tested in accordance with AASHTO T99-57 test procedures for field density. (b) Alinment and Grade The alignment and grade of the line shall be checked during installation by the use of blue top grade stakes. The lines shall be laid straight, within one fourth (1/Q") inch variation per joint, but in all cases so that a full moon is visible from manhole to manhole. Lines which do not exhibit a true line and grade or have structural defects shall be corrected to meet these specifications. (c) Infiltration/Exfiltration (1) The Contractor shall provide the equipment, materials and labor necessary to check the lines for infiltration or exfiltration before they are put in service. Infiltration or exfiltration in excess of one hundred (100) gallons per day per inch -mile of sewer will result in having the Contractor go over the lines, ascertain where the leakage exists, and repair the lines to the extent necessary to bring the infiltration or exfiltration down within acceptable limits. The Contractor shall test only pipe of the same diameter and for such lengths as approved by the Engineer. (2) Exfiltration tests shall be conducted on all gravity sewer lines, unless authorized otherwise by the City Engineer. The line under test shall be plugged and filled with water in such a manner that 98 5/19/2006 ; 1:35 PM (3) the maximum hydrostatic head at any point in the line would not exceed ten feet of water. All manholes shall be tested. The exfiltration from the line under test shall not exceed 100 gallons per inchof nominal pipe diameter per mile of pipe per twenty-four hours. The amount of ex filtration shall be measured by the inspector using methods specified by the City Engineer for the particular situation. Where ground water is encountered during construction, the Contractor shall furnish labor, equipment, and materials including pumps, and shall assist the Engineer in making infiltration. tests of the completed sewer section before it can be placed in service or connected to any other lines. The Contractor will furnish and install the measuring weirs or other measuring devices. The length of line to be tested at any time shall be subject to the approval of the Engineer. The total infiltration shall in no case exceed 100 gallons per inch of diameter, per mile of pipe per day. The test period shall be twenty-four hours, and if the quantity of infiltration is in excess of the maximum allowable, the leaking joints shall be relaid if necessary or other remedial construction shall be performed by and at the expense of the contractor. The section of sewer shall then be retested after repairs are completed to determine compliance with the specifications. (4) The infiltration in the line shall be checked thru a low pressure exfiltration air test. The sanitary sewer pipe and lines shall be capable of reaching a constant pressure of 4 psig within the time specified in Table 1 and shall be capable of maintaining the pressure for the time limit specified in Table 2. The City may at its option perform a visual inspection of the pipe complete in place by passing a video recording camera thru the pipe. Any visible defects, as specified in ASTM C- 700-78a or latest addendum, will be justification for rejection and the contractor shall repair the rejected section of pipe at his own expense. The City will supply the equipment necessary for making the air pressure test and the video recording of the sewer line. The Contractor may be required to supply one laborer to assist the engineer. ( CITY OPTION) The City may, upon. notification, require that the contractor perform the subject video testing under the scrutiny of the inspector, tapes shall be supplied to the Engineering Division along with any required comment sheets. (5) All tests shall be made in the presence of the contractor or his representative and the Engineer. The costs for these tests shall be included in the unit price bid for installing the pipe. 99 5/19/2006 ; 1:35 PM (6) Any and all work necessary to bring the line into conformance with the infiltration/exfiltration specifications shall be performed by the contractor at no extra cost to the City. All apparent sources of infiltration shall be repaired. The City reserves the right to require that the lines be tested in sections such that the maximum allowable static head is imposed on as much of the line as is practicable. (7) (8) 5/19/2006 ; 1:35 1'M Where a stream is not readily available as a source of water to use for testing, water from the City system may be used, providing proper notification procedures for operating valve hydrants will be required. Materials and construction methods called for in these specifications are of such nature as to insure maximum protection for the sewer from infiltration. The contractor shall be responsible for the sewer conforming to the above limits for a period of one year from date of final acceptance. 100 TABLE 1 TIME REQUIRED TO PRESSURIZE To 4 PS1G* TIME (IN MINUTES) PIPE REACH OF LINE TESTED SIZE 20' 100' 200' 300' 400' 500' 600' 4" 6 sec. 0.5 1.0 1.5 1.9 2.4 3.0 6" 12 sec. 1.0 2.2 3.2 4.4 5.8 6.4 8" 23 sec. 1.9 3.8 6.0 7.6 9.6 11.6 10" 35 sec. 2.9 5.8 8.8 11.6 14.6 17.6 12" 50 sec. 4.2 8.4 12.6 16.8 21.2 25.6 15" 1.3 min. 6.6 13.2 19.8 26.4 35.0 39.6 18" 1.9 9.4 18.8 28.2 37.6 47.0 56.4 21" 2.5 12.6 25.2 37.8 50.4 63.0 75.6 24" 3.4 17.0 34.0 51.0 68.0 102.0 136.0 * This table is based on the compressor unit mounted on a Cherne Air-Loc Testing unit assuming 5 cfm capacity. 101 5/19/2006 ; 1:35 PM TABLE 2 MINIMUM TEST TIME FOR. VARIOUS PIPES:1=S NOMINAL T (TIME) NOMINAL T (TIME) PIPE SIZE IN.MIN/100 FT. PIPE SIZE IN.MIN/100 FT. 3 0.2 21 3.0 4 0.3 24 3.6 6 0.7 27 4.2 8 1./ 30 4.8 10 1.5 33 5.4 12 1.8 36 6.0 15 2.1 39 6.6 18 2.4 42 7.3 The low pressure air test shall be performed as specified in latest revision of ASTM C 828 for VCP and ASTM C924 for. RCP. If the line pressure drops more than 1 PSI during the required test time, then the section of pipe has failed the test. Furtherrnore, in testing any sanitary sewer line, the infiltration/exfiltration rate shall be less than 100 gallons per inch diameter of pipe per day per mile of sanitary sewer. See Section 13.18(c) (1), (2), and (3). 102 5/19/2006 ; 1:35 MI 13.19 Taps/Service Connections (Sewer) Only authorized personnel of the City of Gastonia Utilities Department shall be permitted to make sanitary sewer taps unless the developer has received permission, in writing, from the City's Public Works and Public Utilities Director or designated representative, for an approved Utilities Contractor to make these taps. All taps shall be made in strict conformance to City requirements. No tap shall be made before the tests are complete and approved. Sanitary sewer service connections may be installed by the developer of property upon request. The Application (form supplied by the City) should be completed and sent to the Public Works and Public Utilities Director. Material for these services will be obtained by the contractor. Materials used in making the sanitary sewer service connection shall be as follows: 4" Pipe - CI soil pipe or PVC-DWV Sch 40 (Type 1 Grade 1) ASTM D-2665-68 (Solvent Cemented Joints) PVC sewer service pipe shall be NSF approved, and shall be made of PVC plastic having a cell classification of .12454-B as per ASTM D-1784 (1.2454-B is old type 1 grade 1 ) 8" x 4" Saddle - ROM.AC STYLE "CB" - O.D. Range (6.275 - 25.80) (Tie ins at manholes, and tees are to be used where at all possible, Wyes maybe used with an additional 1/8 horizontal bend to keep the tap perpendicular to the street ) 4" Plug - 4" PVC Cap Plug (remove when tap attached from building) 4" Combination long turn Wye and 1/8 bend ( for clean out ) 4" PVC Plug (recessed cap) 4" 1/8 Bend 18" x 18" x 5-3/4" Concrete collar with 6x6 welded wire reinforcing and a 6" diameter hole for the clean -out, or 4" sewer clean out pad with #3 reinforcing bar as manfactured by Masonry Supply, Inc. in Selma, N.C. Fernco Donut required when tying into tees. (See Section 13.20 for adapters and further requirements for taps into PVC Sewer Pipe.) 103 5/19/2006 ; 1:35 PM All material will be inspected for compliance by Water and Sewer :Division inspector prior to installation. All services will be inspected prior to back fill operation for compliance. The backtlll and compaction operation shall be according to standard procedure, and the Standard Specifications including Section No. 6.06. All taps shall be made in a method approved by the Director of Public Works and Public Utilities, and according to Standard Details including 7113-19. All taps installed by cutting into the sewer main shall be made with the use of a tapping/coring machine if saddles are used. (The use of a hammer and chisel or other manual impact methods will not be allowed.) Any customer service connection required to be installed into any outfall sanitary sewer line will be tied into either a proposed manhole shown on the Project Plans or into an added manhole as required and approved by the City Engineer. See section 13.25 for smoke testing requirement on existing taps to be reconnected. Pavement cuts across public streets for services shall be avoided. The contractor shall install these lines using an air pressure driven, pneumatic "mole" or an auger type machine. If an open cut is unavoidable, the contractor shall secure approval from the City Engineer prior to making any street cut for a service line. No sanitary sewer tap shall be permitted until the curb and gutter has been installed. All tap locations shall be shown on the "as -built" plans and shall be marked on the top of the curb with "arrow" indicating the water and "X" indicating the sewer. . See Section 2.63 for additional as -built requirements. 13.20 PVC Sanitary Sewer Pipe and Pittines PVC sewer pipe may be permitted only in areas that generate domestic sewage, are zoned for residential use, and where all up stream drainage areas have residential zoning designations and uses. PVC sewer pipe may be installed in some commercial developinent; however, each project must be evaluated and approved by the City Engineer on a "case by case" basis. 104 5/19/2006 ; 1:35 PM When 8" thru. 15" diameter polyvinyl chloride (PVC) pipe is specified on the approved project plans, unless otherwise specified, the PVC pipe shall be as specified in ASTM D-3034 with a Standard Dimension Ratio (SDR) of 35, or PVC composite pipe (Truss) conforming to ASTM D-2680, Latest addendum as used with solid PVC tees for taps. PVC sewer pipe shall be furnished with an integral bell and elastomeric gasketed joint permanently installed at the factory in accordance with ASTM D-3212 and ASTM F-477. The pipe shall be furnished in nominal lengths of 13 feet or as approved 20 feet, shall be green in color, and shall be manufactured and tested in the U.S.A. 12" and 15" may also include pipe conforming to ASTM F-949 having exterior corrugated ribs. All PVC gravity sewer pipe shall be manufactured from material meeting the minimum requirements of cell, classification 1.2454-B, or 12364-B as per ASTM D1784. The pipe manufacturer shall certify that this requirement has been met, and the pipe shall be appropriately marked according to ASTM specifications. Sewer and Water crossings shall be as specified in Section 2.12 of the City of Gastonia Standard Specifications. Couplings for jointing PVC to ductile iron pipe (DIP) sewer pipe shall be accomplished by using the appropriate Femco "Donut", or approved equal. Flexible repair couplings will not be allowed. All fittings used on PVC sewer mains including tees for taps, shall meet the same specifications as those of the PVC sewer main. To couple the tapping tees to the sewer lateral bend, it will be necessary to use an SDR 35 to Schedule 40 PVC slip -by -hub adapter. See Section 13.19 of the City of Gastonia Standard Specifications for tap requirements. The Contractor shall provide adapters, seals, and transitional pieces as required for connecting to other pipe or structures shown on the Drawings or indicated in the bid documents. Flexible repair couplings will not be allowed. Any field cut ends shall be as per the pipe manufacturer's and AWWA's recommendations. In all instances PVC pipe shall be installed in an acceptable manner, true to line and grade, with the bell ends facing up -grade. The various pipes, referred to herein, shall be handled, belled up and installed in accordance with the manufacturer's recommendations and established engineering practices as described in the various publications referenced in this document. See section 13.17 also. All PVC pipe shall be shipped, stored, and placed at the project site in a manner so as to be protected from total accumulated exposure to sunlight and ultra violet radiation of no more than six .(6) months, no defects shall be visible. Any visible defects including but not limited to chalking, discoloration, blisters, or loss of sheen shall be 105 5/19/2006 ; 1:35 PM cause for the pipe to be rejected and replaced. Any testing suggested in lieu of the above shall be at the manufacturer's expense, all, such test shall be performed by an independent laboratory. Class B bedding as described on Standard Detail 71B-5A latest revision shall be used with all PVC sewer pipe. These installation requirements shall be as specified in ASTM D-2321, latest revision, Type IA Granular Embedment (## 57 washed stone) regardless of ground water or soil conditions; the bedding shall be installed to 95% Standard Proctor. Native materials of Classes II, and III may be used above the pipe springline and shall be placed and compacted as specified in the City of Gastonia Standard Specifications. The minimum depth of cover shall be 3 feet and the maximum depth of cover shall be 30 feet. No backfill may be placed over the PVC pipe until the City Engineer or his designated representative has visually inspected the gravel bed and PVC pipe installation. If for any reason backfill is placed prior to the inspection, the contractor will be required to remove the backfill to allow for this visual inspection. All cost for said removal and replacement of backfill, as well as any defects found, shall be at the contractor's and/or developer sole expense. In addition to other tests, including but not limited to Section 13.18 ofthe City of Gastonia Standard Specifications, a deflection test will be required to be performed not less than 30 days following completion of backfill operations. The contractor shall supply all labor, equipment, and materials necessary to pull a mandrel sized for a maximum of 5% deflection of the actual pipe inside diameter, as defined in ASTM D-3034. The mandrel shall be provided by the contractor unless the City of Gastonia deckles to supply it. The mandrel shall be pulled through each section of pipe from manhole to manhole. The mandrel must slide freely through the pipe with only a nominal hand force applied. No mechanical force shall be used in pulling the mandrel. Any pipe which refuses the mandrel shall be removed and replaced and the bedding shall be properly constructed as specified to prevent excessive deflection. Such sections shall be re -tested after completion of backfill. all cost for such testing, removal, and replacement shall: be at the contractors and /or developers sole expense. If a developer desires to use PVC sewer pipe, PVC sewer pipe must be used throughout the development unless DIP is required and is shown on the plans approved the by the City Engineer. The "Go -No -Go" mandrel test will not be required when 8" thru. 15" diameter PVC composite (Truss) pipe conforming to ASTM D-2680 is used. 13.21 Force Mains Pipe material for force mains shall be either Cement Lined Ductile Iron Pipe as specified in Section 14.06 herein or PVC AWWA C-900 as specified in Section 14.04 herein. 106 5/19t2006 ; 1:35 PM All force mains shall be tested in accordance to Section 14.15 herein with the minimum test pressure being 1.00 PSI. All blocking/restraining for the fittings shall be designed to withstand the test pressure. A properly sized and approved air release valve in a standard manhole shall be provided at all high points where a negative pressure of 10' may be produced. A. weep pit of No. 57 stone shall be provided similar to Standard Detail 71B-17. Crispin valves US20B(L) and S20B(L) have been approved to the date of this printing. 1.3.22 Piers/Piles/Concrete Supports This item shall include all labor, materials, and equipment necessary to construct piers according to the Standard Specifications, Standard Details, and Project .Plans. All concrete used shall be 3000 psi concrete as specified in Sections 846, 848, 1000, and 1024 of the NCDOT Standard Specifications for testing and curing requirements. All reinforcing used shall have standard defamations and a minimum yield strength of 40,000 psi. All splices shall be as required by the engineer, but in no case shall a lap splice be less than 24 bar diameters, or no less than 12 inches. Two layers of felt with Graphite Grease shall be installed between the pipe and the piers. (G) A.11 payment for piers complete in place, exclusive of any piles required, shall be paid at the Contractor's bid unit price per vertical foot (VF) as indicated in the Proposal. When piles are required by the Project Plans and the Engineer, the piles shall be 8" butt diameter wood piles, treated with creosote or pentachlorophenal in mineral spirits in accordance with AWPA C-14, C-8, C-9, and C-2 as applicable. The piles shall be driven as specified in Standard Details 71B-14 and 71B-15. When the plans call for piles and rock is encountered, the Engineer may delete the requirements for piles. In deleting the pile requirement, the rock shall be undercut as directed by the Engineer to give an adequate footing. (G) A.11 payrnent for piles complete in place shall be included in the Contractor's bid unit price per vertical foot (VF) as indicated in the Proposal. 107 5/19/2006 ; 1:35 PM 13.23 Dry Bore and Jack/Tunneling A. Dry Bore and Jack The Contractor shall supply all labor, material, and equipment necessary to install the sewer line without open cutting the pavement where indicated on the plans. The encasing pipe may be jacked through dry bores slightly larger than the pipe, bored progressively ahead of the leading edge of the pipe. Continuous checks shall be made as to the elevation, grade and alignment of each successive section of pipe as well as the tracks upon which the boring rig travels. The boring operation shall be continuous to its completion. In the event an obstruction is encountered during the boring and jacking, the auger is to be withdrawn and the excess pipe cut off, capped, and filled with 1:3 Portland Cement Grout at sufficient pressure to fill all voids. A new site will then be picked for a new bore. The Contractor shall be paid 50% of complete bore value for any bore aborted due to causes beyond the control of the Contractor. If open cut is allowed, then the aborted length shall be utilized and paid for at 100% of unit bid price for complete bores. The remaining length allowed to be installed by open cut shall be paid as per pipe installed by open cut as described in Sections including but not limited to 14.01 and Special Provisions. The carrier pipe shall be protected so as to prevent as much foreign material from entering as is possible. This installation will have to pass the tests in the Special Provisions before it can be placed into service. See Special Provisions and Plans for controlling agent notification requirements. The operation across the street right-of-way must conform to the requirements of the Permitter. The Contractor shall execute all necessary agreements and/or permits before entering upon or commencing any work on the street right-of- way. The Contractor shall comply also with the applicable requirements of the General Conditions and the Supplementary Conditions. The gravity sewer line shall be Class 51 cement lined ductile iron pipe. The minimum gauge or wall thickness shall correspond to the size of casing selected from the following chart; however, the Contractor shall be responsible for selecting the gauge consistent with his operation. 108 5/19/2006 ; 1:35 PM Gauge Table for Railroad Crossings Minimum Wall Thickness for Smooth Steel Casing Pipe for E80 Loading (ASTM A139 Grade R; AWWA C-200) Nominal Diameter. (inches) 12 3/4 and under 14 16 18 20 and 22 24 26 28 30 32 34 and 36 38 40 42 44and46 48 S0 52 54 56 and 58 60 62 64 66 and 68 5/192006 ; 1:35 PM When coated or cathodically protected Nominal Thickness (inches) 109 0.188 0.188 0.219 0.250 0.281 0.312 0.344 0.375 0.406 0.438. 0.469 0.500 0.531 0.562 0.594 0.625 0.656 0.688 0.719 0.750 0.781 0.8.1.2 0.844 0.875 When not coated or cathodically protected Nominal Thickness (inches) 0.188 0.250 0.281 0.312 0.344 0.375 0.406 0.438 0.469 0.500 0.531 0.562 0.594 0.625 0.656 0.688 0.719 0.750 0.781 0.812 0.844. 0.875 0.906 0.938 70 72 0.906 0.969 0.938 1.000 The exterior coal -tar enamel protective coating is to be supplied in accordance with AWWA C-203, the steel casing pipe minimum thickness may be reduced by 0.063 inches, as per the table for E80. Gauge Table for NCDOT (Street) Crossings (I1-20 Loadings) Smooth Steel Pipe Diameter Inches Minimum Thickness, Inches ASTM A139, Grade B; 15-24 0.25 AWWA C-200 The Contractor shall provide a strapped timber cradle under barrel of pipe, join pipe, and slide into casing. Pipe barrels shall bear continuously on cradles. SUPPORTS: Lumber shall be No. 2 or better Southern Yellow Pine. Lumber shall be pressure treated with creosote or pentachlorophenol in mineral spirits in accordance with A.WPA C14, C8, C9, and C2 as applicable. Minimum retention shall be as designated for Contract with ground. Method of treatment in accordance with the applicable portion of the AWPA manual standards. All timbers shall be cut to size before the material is given the preservative treatment. Spiders may be approved by the Engineer. STAINLESS STEEL BANDS: One-half inch wide by 0.020-inch thick, 304 stainless steel bands, or equal. Prior to the start of the work, submit satisfactory evidence to the Engineer that all bond and insurance coverage requirements called for by the Permitter have been complied with. All proposed construction methods and materials for the undercrossing shall be approved by the Engineer and Permitter prior to the crossing operation, and no construction shall be started until written approval to proceed from the Permitter has been submitted to the Engineer. PLACING SEALS AT ENDS OF CASING: After the carrier pipe has been tested and approved, place 3/16- inch blackneoprene rubber seals, or 8" masonry plug, as shown on the Drawings. Encroachment approval may require weep pits, contractor shall be responsibile to check with the Permit requirements and include them in his bid. 110 5/19)2006 ; 1:35 PM All cost for this installation (including all encasing and carrier pipes shown on the plans) shall be included in the Contractor's bid unit price per linear foot of the type of carrier pipe line installed complete in place by "dry bore and jack" method as listed on the Proposal and shown on the Project Plans, see Standard Detail 71B-25. No additional. payment will be allowed for trench excavation and backfill, for furnishing and placing casing pipe, or for any other items for the crossings as shown on the Drawings. Payments to the Contractor for any services provided by the Permitter shall also be included in this item. B. Tunneling The tunnels on this project shall be constructed wherever required by the Department of Transportation, Railroad Company (NCDOT/R..R.) or Plans, as applicable, and where other construction methods are not feasible due to field conditions encountered, and in accordance with these and AREA or AASHTO specifications, as applicable. The linear plates to be used shall be the 4 flange type. The liner plates shall be galvanized on both sides by the hot dipped process. The minimum thickness of the plates shall be as indicated on the Drawings. A coating of prime western spelter or equal shall be applied at the rate of two ounces per square foot, of double exposed surface. Spelter coating shall be of a first class commercial quality, free from defects, such as blisters, flux and uncoated spots. The steel liner plates shall be given a bituminous coating meeting North Carolina Department of Transportation specifications for bituminous protected corrugated metal pipe with a minimum thickness of 0.05". The space outside the liner plates shall be held to a minimum and grouted with a 1 to 3 portland cement grout of 50 psi through 2" openings on 4' - 6" centers provided in the top of the steel liner plates. This grouting operation shall be done with the installation of the liner plates so that at no time will the grouting operation be further than 25' from the front end or head of tunnel construction. A.t the end of each day's operation, the space outside the liner plates shall be grouted whether 25' or less. Grout shall be forced into each grout hole. If the grout from one hole should flow along the liner plate so as to plug the next grout hole, the plugged hole shall be opened by punching through the grout layer so that each hole may be used for grouting. The grouting operation shall be continued at each hole until all spaces outside the liner plates are filled and no grout will flow. 111 5/19/2006 ; 1:35 PM The tunneling operations shall proceed only a distance sufficient for placing one section of the tunnelliner, the tunnel liner placed before proceeding further, and at no time will jetting be allowed. Blasting will not be permitted. The Contractor and any of his subcontractors performing the work on the Railroad rights -of -way in connection with tunneling operations, shall furnish to and be approved by the Division Engineer/Manager of Insurance of the Railroad Company, a certificate of workmen's compensation and employer's liability insurance, and public liability insurance covering bodily injury: Limits as established in the General Conditions, Section 43. Such insurance is to include a Contractual liability endorsement covering the obligations assumed by the Contractor in agreeing to install the pipeline. The certificate is to show that explosion, collapse and underground insurance coverage is provided. The certificate shall include a statement that the insurance is not to be changed or canceled for a period of one year after completion and acceptance of the work by the Owner and the Railroad. The certificate is to be countersigned by an authorized North Carolina resident agent with name and address of the agent denoted thereon. The certificate is to make reference to the project and county. The Contractor shall furnish to and be approved by the Railroad Division Engineer/Manager of Insurance, an original policy of Railroad Protective Liability Insurance (RPLI) in the name of the Railroad Co. (Company). Said Policy shall have a combined single limit of $2,000,000.00 each occurrence and $6,000,000.00 aggregate. The insurance shall be written on ISO/RIMA Form No. CG 00 35 11 85 and include endorsement form No. CG 28 31 11 85. The original Railroad Protective Policy shall be submitted to and approved by Company prior to commencement of construction, maintenance of said Facility or entry on Company's property. Said RPLI coverage is available through the Railroad Company's Blanket Policy. After approval of insurance certificate, the Contractor shall notify NCDOT/R.R., and City 72 hours in advance of the start of the tunnel operation. The entire operation shall be subject to inspection by the NCDOT/R.R and the Engineer or Inspector on the project shall have full authority to stop work it; in his opinion, it shall cause any damage to the roadway section or endanger traffic. The Contractor shall reimburse the NCDOT/RR for repair costs, should any settlement or damage appear to the roadway within a period of one year after completion of the tunneling operations. 112 5119/2006 ; 1:35 PM After the tunneling operations have been completed, the vertical shoring for pits, surplus fill and material shall be removed from the site. The site shall be returned to its original condition, seeded and mulched where required, and the area shall be left in a neat and satisfactory condition. COSTS (G) Costs of all materials and construction methods, such as barricades, pipe casing, concrete casing, stone stabilizer, tunneling, tunnel liner, watchmen, or any other costs which are incurred as a result of the requirements herein or by the NCDOT/RR shall be included in the unit price per linear foot of tunnel liner installed as indicated on the Project Plans and the Proposal. No adjustments will be made to the unit price for the Highway and/or Railroad crossing as the result of the construction methods utilized. (G) Skewed, unbalanced, or unreasonable unit bids will be considered grounds for rejecting the bid in whole or in part as determined by the City. 13.24 Rip Rap Rip rap shall be Class 1 rip rap as specified by the NCDOT Standard Specifications for Roads and Structures. Place rip rap carefully to avoid disturbing the filter fabric. Average depth of rip rap shall be as shown on the Drawings with a plus or minus tolerance of not more than 2". Intermix the sizes of rip rap material to provide uniform gradation between small and large material. Prevent damage to pipe or other facilities. Filter fabric shall be nonwoven polypropylene, polyethylene, polyester, and/or nylon continuous filament fabric with an equivalent opening size of 80-100 openings per inch. Dry grab strength (ASTM D 1682) shall be at least 100 pounds and dry grab elongation (ASTM D 1682) shall be no more than 35 percent. Minimum weight shall be 4 ounces per square yard. Install filter fabric as recommended by the manufacturer and these specifications. Provide a minimum of 2 feet of overlap at joints. Loosely secure fabric in rip rap area during placement. 113 5/19/2006 ; 1:35 PM (G) Payment for rip rap will be based on the price per ton stated in the Contractor's Proposal, and the number of tons placed within the authorized limits. This payment shall constitute full compensation for the work as specified herein including excavation to the lines and grades indicated on the Drawings, filter fabric, and placement, complete. (G) Quantities for payment purposes shall be the actual number of tons used, based on truck measure and trip tickets signed by the Engineer. Trip tickets shall be presented to the Engineer for his signature at the time that the material is delivered. 13.25 Abandonment and Shutdown of Existing Operations of Utilities The Contractor shall supply all necessary labor, equipment, and :materials to plug and abandon in place the existing sanitary sewer outfall system as indicated on the Project Plans. Continuous operation of the City's existing sewer system is of critical importance. Connection to existing services or utilities, or other work that requires the temporary shutdown of any existing operations or utilities shall be planned in detail with appropriate scheduling of the work and coordinated with the Utility Customer and the Engineer. The approved schedule for shutdown or restart shall be indicated on the Contractor's Progress Schedule, and advance notice shall be given in order that the customer and the Engineer may witness the shutdown, tie-in, and start-up. The Contractor shall be responsible for notification of each property Owner prior to disruption of service, except in the event of an emergency situation. The Contractor shall coordinate his activities with any non -City owned utility. Only City personnel shall operate any valves and controls on the City's existing utility systems. The testing, acceptance, tap and mainline tie-overs shall be coordinated so as to eliminate any disruptions in service. A spill, leakage, or by-pass of wastewater shall not be allowed, the Contractor and his sureties shall hold harmless and defend the City from any penalties which may result thereof. All materials and equipment (including emergency equipment) necessary to expedite the tie-in shall be on hand prior to the shutdown of existing services or utilities. 114 5/19)2006 ; 1:35 PM All existing sewer taps shall be smoke tested (or other approved method) prior to reconnection, to make sure that no connection of storm water or other identified illegal inflow is present. It shall be the Contractor's responsibility to supply all labor, materials, and equipment to perform these tests and to notify the residents of such planned tests. It will be the City's responsibility to notify the Owner of any illegal inflows found, and to be sure all remedies are in place prior to allowing the Contractor to connect the tap to the new sewer line, and that the remedies are completed in a timely manner to allow the Contractor to complete his construction without any undue delay. (G) Payment for this item, except as specified elsewhere in these Special Provisions, shall be merged in with other pay items as indicated on the Proposal, no separate pay item shall be allowed. 13.26 Demolition of Existing Manholes Following completion of replacement of sewer lines and connection of house laterals, plug all sewer lines at each manhole on the abandoned system with non -shrink grout. Remove the abandoned manholes to depth o:f'4 feet below grade and fill the void with compacted sand to 18-inches below grade. Fill the remaining with top soil. Where the manhole is in a paved area the remaining shall be tilled with ABC to the bottom of the utility cut patch. Restore all affected areas. (G) Payment for demolition and filling of existing manholes shall include all material, labor, and equipment necessary and filling to demolish the manhole as called for in the Project Plans and bid documents. Payment for this item shall be based on the actual number of manholes demolished. Payment for any asphalt or concrete removal and replacement shall be as per Special Provisions. 13.27 Progress of Pipe Line Construction The work shall proceed in a systematic manner so that a minimum of inconvenience will result to the public in the course of construction. It is, therefore, necessary to confine operations to as small a length of work area per crew as is practical. Normally, the trenching equipment shall not be farther than 200 feet ahead of each pipe laying crew or such distance as necessary to provide maximum safety. Backfill the trench so no section of properly laid pipe is left uncovered longer than is absolutely necessary. The safety conditions of open excavations shall be the Contractor's responsibility. Completely backfill and clean up after each section of pipe has been inspected and approved. 115 5/192006 ; 1:35 PM 13.28 Inversion. Lining Inversion lining involves the insertion of a flexible lining material into an existing sanitary sewer pipe using an inversion process and then thermally hardening it in place. The flexible liner will be made of polyester fibers of at least 5 denier with sufficient needling and crosslapping to yield a burst strength of 1,000 pounds per square inch in transverse directions (hoop stress), free from tears, holes, cuts, foreign materials, and other defects. Polyurethane or polyvinyl chloride shall be bonded to the inside layer of the flexible liner at 400 grams/square meter forming a nominal (0.010 inch) pin -hole -free -coating layer. The flexible polyester fiber shall be impregnated with either polyester or epoxy, depending on application, with sufficient thixotrophic properties to obtain nondraining characteristics when impregnated into the flexible polyester fiber. A catalyst compatible with the resin and other materials shall be used in the manufacturing of the liner. The nonpromoted resin shall be catalyzed by the addition of sufficient catalyst to produce the required physical properties of the cured polyester liner. The finished lining shall consist of an inner polyurethane or polyvinyl chloride layer and an outer polyester felt layer (or layers) impregnated with a thermosetting resin to fit tightly and neatly against the existing inside pipe wall. The liner shall be fabricated from materials which, when cured, will be chemically resistant when exposed to quantities of hydrogen sulfide, carbon monoxide, methane, petroleum hydrocarbons, moisture saturation, and dilute sulfuric acid. The physical properties of the cured liner shall have minimum test values as follows: Tensile Strength at Yield Modulus of Elasticity Flexural Strength Flexural Modulus 5/19/2006 ; 1:351'M Minimum 3,000 psi per ASTM D 638 Minimum 300,000 psi per .ASTM D 638 Minimum 6,000 psi per ASTM D 790 250,000 psi per ASTM D 790 116 Impact Strength (Izod) Minimum 1.9 in. lbs. per ASTM :D 256 Shear Strength Minimum 5,550 psi per A.STM D 732 Samples of material identical to the raw material to be used in the project shall be provided. In addition, specimens shall be prepared utilizing identical materials, curing, and technique which will be accepted as representative of the actual installed liner. Unless otherwise specified, the licensed Contractor shall determine the size, length, and material composition of the liner, and warrant its suitability for the particular application and purpose specified and shown, Design calculations, assumptions, parameters, and equations shall be based on ASTM F-1216 and D-2412 and be signed and sealed by a professional engineer licensed in N.C. The minimum extended life expectancy shall be 50 years. The minimum thickness ofthe liner shall be 6.0 mm (0.235 inches). The fiber tube shall be fabricated to a diameter that, when installed, will tightly and neatly fit the internal circumference of the conduit to be rehabilitated. Allowance for circumferential stretching during insertion shall be made. The minimum length shall be that which continuously spans the distance from the center ofthe inlet manhole to the center of the outlet manhole. The Contractor shall verify the lengths in the field before impregnation. (a) Workmanship A polyester fiber felt tube coated on one side with a flexible impermeable material and impregnated with a liquid thermosetting resin is inserted into the existing sewer line through a manhole or other access point. Water or air forces the tubing through the pipe, inverting and pressing it firmly against the existing pipe wall. The water or air is then heated to cure the resin. After the resin is cured, service connections are remade. In pipes 8 inches diameter and larger, .holes are generally cut through the lining from inside the pipe at the connection points. In 6-inch diameter pipes, the connections are generally remade in excavations in the soil above the pipe. This Specification covers the method to insert and cure the liner using water as the medium. Prior approval of the Engineer will be required if air is proposed as the medium. The Engineer's decision to reject or allow the use of air 117 5/19/2006 ; 1:35 1'M will be based on the Contractor's demonstration that the method is applicable and his experience in using the method is proven. The Contractor shall submit shop Drawings in accordance with the provisions of the Instruction to Bidders. The submittals shall include details of all component materials and construction details including complete manufacturer's recommendation for storage procedures and temperatures control, handling and inserting the liner, curing details, service connection methods, and trimming and finishing. The submittals shall include insertion locations and proposed sewer flow controls. The Contractor's operations to furnish and install the inversion lining shall be in strict conformance with the manufacturer's recommendations and shall be licensed by the manufacturer. A representative of the manufacturer shall inspect and approve all methods employed by the Contractor. The representative shall be in attendance during the entire lining and opening of services procedure. The Contractor shall brace or otherwise protect the manholes if necessary to withstand forces generated by equipment used while installing the liner. The Contractor shall bypass the sewage as required to install the liner. Pumping shall be continuous and all sewage shall re-enter the sewer system. The Contractor shall clean and television inspect each reach of sewer main to be lined. If inspection reveals an obstruction that cannot be removed by conventional sewer cleaning equipment, a point repair excavation shall be made to uncover and remove or repair the obstruction. The location where resins and liner material will be stored shall be designated by the Contractor. The Engineer will inspect and reject any materials found defective or otherwise unsatisfactory. The "wet out" procedure shall utilize the resin and catalyst in sufficient quantities to ensure complete impregnation of the liner and provide the properties stated under physical properties above. The Contractor shall insert the liner into the pipe in accordance with the shop Drawings. Precautions shall be taken not to damage the liner during installation. 118 5/19/2006 ; 1:35 PM Insertion shall be through an existing manhole or other access approved by the .Engineer. Insertion shall .utilize an inversion tube, or the liner itself, depending on the method selected. A static head pressure shall be applied to cause the liner to invert down the full length of the reach to be lined. The pressure shall be sufficient to overcome external pressures exerted on the liner at service connections,. joints, and open sections, and to hold the tube tightly to the pipe wall, producing concave "dimples" at side connections. After inversion is completed, the Contractor shall cure the liner using an approved heat source and water recirculation equipment. The equipment shall be capable of delivering hot water throughout the liner by means of a perforated conduit, and shall uniformly raise and hold the water temperature as required to cure the resin. The heat source shall be fitted with suitable monitors to gauge the temperature of the incoming and outgoing water supply. Another such gauge shall be placed to monitor the temperature between the impregnated felt tube and the pipe invert at the remote manhole. The operation of the heat exchanger and the recirculation of the heated water shall be maintained continuously throughout the cure period. Cure shall be completed when the exposed portions of the liner are hard and sound and the remote temperature sensor indicates that an exotherm has occurred. Particular care shall be exercised during the curing operation to ensure that the liner is not overstressed. The hardened liner shall be cooled to the recommended temperature before relieving the static head pressure. Cool down may be accomplished by the introduction of cool water into the liner. Care shall be taken in the release of the static head so that surges will not develop and damage the newly installed liner. After the liner has been cured, the existing house connection sewers shall be reconnected. It is the Contractor's responsibility to determine and assure that all live house connection sewers are reconnected. The Contractor will notify the Engineer 4 days prior to the inversion lining ofa segment of sewer. The Engineer will notify the appropriate City personnel who will notify residents served by the segment of temporary service connection interruption. Liner shall be pressure tested for leakage. The Contractor shall submit a testing plan to the Engineer for approval. 119 5/192006 ; 1:35 PM The pipe shall be inspected by closed circuit television before and after lining and may be accomplished in conjunction with the reconnection of house connection sewers. Video tape and. written log records shall be made of these inspections and two copies of each shall be given to the Engineer for review prior to acceptance of the lining work. (b) Payment (G) Payment for inversion lining with resin impregnated polyester felt liner will be based on the unit price listed in the Proposal. Payment shall- include full compensation for all labor, material, tools, and incidentals for lining the existing sewer. The price per linear foot of resin impregnated polyester felt pipe lining shall include cleaning and television inspection of the existing sewer and reconnection of existing sewer connections complete. 1329 Sliplining Sliplining involves the bypass pumping, removal and replacement of asphalt and concrete surfaces, the excavating of an insertion pit, inserting a properly sized lining or carrier pipe on skids, grouting of the annular space, closure of the access pits, installation of service connections, and restoration of work site areas. Preparation by the Contractor Clean the existing host pipe as necessary TV inspection of host pipe Proof test, if necessary (pull piece of proposed liner through existing sewer) Determine laterals to be connected or reconnected Determine and complete any point repairs necessary Determine insertion pits Bypass pumping as necessaty, see Section 13.25; all waste water shall re-enter the system Installation Contractor shall adhere to ASTM F585, :PPI booklet - "renewing Sewers with Polyolefin Pipe", and the manufacturer's recommendations as are applicable. Caution is to be exercised not to stretch the liner pipe during installation. 120 5/19/2006 ; 1:35 PM Pipe Material Any pipe material specified elsewhere herein as a gravity sewer carrier pipe may be used in the sliplining.process. In addition, properly sized High Density Polyethylene (HDPE) pipe and fittings meeting the following minimum specifications may be used: High density polyethylene resin compound Type III Class C Category 5 Grade P34, per ASTM 1248 Meeting ASTM D3350 with cell classification PE345434C or higher Thickness to provide SDR17 minimum, to provide a minimum life expectancy of 50 years. The Contractor shall submit shopdrawings for all liner pipe and fittings for City approval prior to the pre -construction meeting. Any material rejected by the City shallbe resubmitted with a material meeting specifications. Joints (.I1DPE) The carrier pipe may be joined with bell and spigot end construction using rubber gaskets meeting specification requirements contained elsewhere herein, or by thermal (butt) welding the pipe in accordance with the manufacturer's recommendations. All joints shall be such to provide an air tight leak proof joint. Service Connections Fittings shall be provided and installed to the manufacturer's recommendations to provide an airtight customer service connection, see Section 13.19 also for service connection requirements. As a normal practice the service connections should be installed prior to the grouting operation. Testing 121 5/19,2006 ; 1:35 PM. The entire slipline carrier pipe and connection fittings shall be tested as per Section 13.18. In addition, deflection shall be tested in accordance with. Section 13.20. Care shall be exercised in determining and use of the mandrel in the proximity of the HDPE "butt" welded joints. The air test shall be performed after any go -no go device test where such "butt" welded joints are utilized. Other testing such as "full moon" visual and for sections failing that test flooding the pipe and TV final inspection may be required to guarantee that the grouting operation did not float the carrier/slipline out of position. Grouting The entire annular space between the host/casing pipe and the slipline/carrier pipe shall be filled under pressure. The Contractor and field Engineer shall calculate the volume of this space and keep records of the grout quantity used to certify to the completeness of the grouting process. Additional access holes may be necessary to achieve the complete grouting of the annular space, service connection access points may be used for the grouting purpose also. The maximum grouting pressure shall be 20 psi and shall be as recommended by the manufacturer of the slipline pipe material. Optional, a PVC header pipe with tees, or grout wand may be attached to the top of the slipline by the skid bands to aid in the grouting process. The Engineer may waive this grouting requirement when in his opinion the difference in the ID of the host pipe and the OD of the liner pipe is less than (1" ) one inch. In the event that the sliplining/grouting process requires that the inverts be raised, the Contractor shall include in his bid unit price for sanitary sewer pipe renewal, the cost for construction of new invert throughs and benches in all manholes, see payment. The Contractor shall cut in access points into the slipliner pipe at each manhole. Skids Wood skids or supports shall be as specified in Section 13.23 and similar to the Standard Detail 7113-25. Approved equal spider support devices :may be used as recommended by the pipe manufacturer, but in no event spaced further apart than 7.5 f%. centers for PVC or PE pipe, or one support at each joint far DIP. No creosote treated wood nor petroleum products (e.g., oil or grease) shall be used. Flax soap or drilling mud may be used as a lubricant for the skids to casing installation. End Seals 122 5/19/2006 ; 1:35 1'M End seals at each manhole shall be constructed with. any City Standard mixture of concrete, brick. and :mortar or grout as specified elsewhere in these provisions. Restoration The insertion pit areas and other areas of construction shall be restored as per Section 4.01. Payment (G) All cost for the renewal of an existing pipe line as indicated on the Project Plans by insertion of a slipline shall be included in the Contractor's bid unit price per linear foot for sanitary sewer pipe renewal. The casing and carrier pipes shall be as specified in these Special Provisions, on the Project Plans, and/or the Proposal. No other payment shall be made except as specified elsewhere in these Special Provisions and when bid unit prices are requested on the Proposal, any and all other cost shall be merged into the bid unit prices as requested on the Proposal. All pavement cuts and repairs (asphalt and concrete) necessary for the sliplining, tap tie-in, and grouting process shall be included in the Contractor's bid unit price per linear foot for sanitary sewer pipe renewal, even when there are proposals and specifications for asphalt and concrete removal and replacement for the remaining conventional pipe installation on this project elsewhere in these Provisions. 13.30 Protection of Existine Structures Existing structures adjacent to the project are susceptible to vibration and settlement damage. The Contractor is advised that he must take extreme care and in some cases must implement special construction procedures when proceeding with his work to assure that these structures are not damaged. Prior to beginning work. the Contractor shall photograph all structures located within 30 feet of the centerline of the new pipe. A minimum of 20 photographs shall be taken of each structure. The photographs shall be camera dated and two prints of each photograph shall be turned over to the City of Gastonia. .After the completion of the pipe installation, backfill, and all site restoration, a minimum of 20 photographs each, shall be taken at the same structures as at the beginning of the project. Two prints of these dated photographs shall be provided to the City of Gastonia. The photographs taken at the completion of the project shall show the same general part of the buildings as the photographs taken at the beginning of the project. The photographs shall be taken of the side of the structures adjacent to the work and particular emphasis shall be on foundations, doors and windows, and corners. 123 5/19/2006 ; 1:35 PM The following restrictions will be implemented by the Contractor when proceeding with this work. a) Construction equipment cannot be used within 10 feet of any existing structure. b) Hand excavation, power spades, and small hand tampers will be required to accomplish the pipe and manhole installation when standard motorized equipment cannot be used. The type, size, and general use of this equipment will be approved by the City of Gastonia :representative prior to the work preceding. c) OSHA and North Carolina trench supports and shoring standards shall be adhered to. Additional trench supports and shoring will be required whenever work is close to an existing structure. The Contractor shall exercise extreme care and take all precautions during excavation and construction operations to prevent damage to any existing structure. Any damage caused by the Contractor shall be reported immediately to the City of Gastonia and such work shall be repaired and/or replaced by the Contractor in a manner approved by the City of Gastonia. All costs to repair and/or replace any damage to existing structures shall be the sole responsibility of the Contractor and such repair or replacement shall be performed expeditiously without cost to the City of Gastonia. (G) All cost for this item shall be merged into other pay items. 13.31. FIBERGLASS METERING MANHOLE GENERAL Under this section of the specification the contractor shall furnish and install at the location(s) shown on the drawing(s), totally integrated fiberglass Packaged Metering Manhole(s) as manufactured by Plasti-Fab, Inc. P. O. Box 100, Tualatin, Oregon or approved equal. The same manufacturer• shall fabricate the barrel, flume, ladder and accessories as well as fully assemble the unit. This is to assure quality control and single source accountability. Manufacturers other than the above named company wishing to quote on equipment in this section shall submit detailed drawings of their proposed equipment, a list of at least five similar installations (with contact names) which have been installed for over two years, and test reports showing full compliance with ASTM .D 3753-81 for Fiber - Reinforced Polyester ( FRP ) Manholes to the engineer and obtain his written approval to quote at least 10 days prior to bid opening. 124 5/192006 ; 1:35 PM Each. Packaged Metering Manhole shall be a completely integral unit consisting of: a corrosion resistant fiberglass reinforced plastic (FRP) manhole with sealed fiberglass bottom, (22 1/2 inch diameter concentric manway opening/48 inch diameter hinged fiberglass cover with locking hasp), fiberglass access Iadder, metering flume and accessories as required. Two neoprene boots with stainless steel clamps sized to connect inlet and outlet pipe stubs shall be supplied by the manhole manufacturer and the manhole will be equipped with hold down brackets for anchoring the unit to a concrete slab. A l/2 inch thick expanded polystyrene bead board will be supplied for placement on the concrete slab under the manhole. COVER/HATCH (For above grade hinged cover) The Packaged Metering Manhole will be furnished with a fiberglass cover equipped with heavy duty stainless steel hinges having 1/2" diameter hinge pins and stainless steel hasp for locking. The cover shall be sufficient strength to withstand 1000 lbs. top load. The cover shall overlap the manhole and scat on a neoprene seal to prevent dirt, rain and debris from getting into the manhole. COVERS for STREET R/W INSTALLATIONS (For all H-20 Highway loadings and in -street covers) The Packaged Metering Manhole concentric manway opening shall be designed to withstand a 16,000 lb. vertical dynamic wheel load(H-20), plus lateral forces from earth loading, ground water and frozen soil. The manhole opening shall be a 22 1/2 inch manway for use with, a cast iron cover, suitable for H-20 highway loading. Height Requirements: The fiberglass manhole will be of the height as indicated on the project plans. MANHOLE GENERAL CONSTRUCTION The Packaged Metering Manhole shall have a minimum 1/2" wall thickness and be designed and manufactured in accordance with ANSI/ASTM D3753-8.1 Standard Specification for fiber reinforced manholes. Any portion of the flume or end adapters extending outside the manhole shall have a reinforced cover. The manhole sides, bottom and external flume sections shall be designed to withstand a static load of 150 lb./ft. per foot of depth with less than 1/4" deflection. There shall be no light duty angles of flanges protruding beyond the flume or manhole, that can be damaged by shear or load forces. The fiberglass manhole shall be fabricated with polyester resin, in one integral 125 5/19/2006 ; 1:35 PM piece that is structurally strong, lightweight, watertight and corrosion resistant to salt water, ground water, corrosive soil conditions and many commonly encountered industrial chemicals. Manhole Barrel: .Fiberglass barrel shall be 48 inch. in diameter. The barrel shall have a minimum 1/2 inch thickness. Interior of barrel shall have a 15-20 mil. thick white gelcoat.. Barrel manufacturer shall be the same as that of the flume and the accessories. OD. of collar shall be equal to O.D. of incoming and outgoing pipe. Pipe Stubs: The FRP manhole and flume shall be provided with pipe stubs to match the O.D. of incoming and outgoing type of pipe as shown on the project plans or accepted in the Proposal. Flume end adapters shall allow a smooth flow transition from pipe flow to flume flow. STANDARD FLUME SIZES Parshali 3" thru 36" ( sized and Approved for use with flow over 100,000 gpd ) Palmer-Bowlus 4" thru 36"( sized and Approved for use with flow under 100,000 gpd ) Flume: The flume shall be designed to handle a normal flow of (gpm/cfs) with expected peak flow (gpm/cfs) and minimum flow (gpm/cfs). The flume shall be a inch. (Parshali/Palmer- Bowlus with a trapezoidal throat) flow measurement flume. Flume inside surface shall be smooth, isophthalic gelcoat of 10 - 20 mil thickness. Flume shall be constructed of orthophthalic polyester resin reinforced with. fiberglass. The minimum glass content shall be 30% exclusive of gelcoat surfaces. Nominal wall thickness shall be a minimum of 1/4 inch for areas inside the barrel and 1/2 inch minimum for portions extending beyond the barrel. The flume shall be furnished with the following : attached 12" floatwell ( left side ) T-304 stainless steel adjustable support bracket for ultrasonic level sensor over the waterway 126 5/19/2006 ; 1:35 PM pH probe bracket temperature probe bracket molded -in head gage graduated in feet and inches, right scale shall be graduated in feet and half tenths with 3/4" high black numerals at each tenth, the left scale shall be graduated in half inch with 3/4" high black numerals at each inch. The above to accept the instrumentation of an Utrasonic Open Channel Flow Transmitter and pH Continuous Chart Recorder, as required in the "Policies for Flowmeter Devices" and "pH Monitoring" by the City's Wastewater Division. The flume shall be bonded into the manhole to form a totally integral flow measurement manhole package. The resultant structure will be watertight. Portions of the flume extending outside the manhole shallbe covered with fiberglass to assure a watertight system. The fiberglass cover shall be reinforced and of sufficient strength to withstand soil loads up to 150 lb./ft per foot of depth when buried. Internal Ladder: The Packaged Metering Manhole shall be furnished with an internal fiberglass ladder to provide easy access. The ladder rungs shall have a non -slip traction surface and internal stainless steel safety bar. The ladder shall meet or exceed OSHA. General Industry Standards, Part 1910.27 for "Fixed Ladders". Utility Tap The manhole barrel shall be fitted with (give 3 quantity and 3/4"_ size of access taps required), diameter FRP through -wall utility tap(s) having threaded connections to permit subgrade entrance of power, sample or recording lines without damaging the watertight integrity of the manhole. ( Temporarily Plugged ) Flume Cover : A internal fiberglass grate or cover shall be furnished to provide a walking surface and prevent debris from failing into flume channel. INSTALLATION General: The Packaged Metering manhole shall be installed in accordance with the engineers specifications and local codes and in a manner consistent with the installation instructions and recommendations of the manufacturer. The contractor shall see that good construction and installation procedures are followed throughout handling, storage and 127 5/19/2006 ; 1:35 PM placement to insure that the :manhole is not damaged in any manner, and that maximum serviceable results a:re achieved. Handling and Storage: During loading, unloading and storage care shall be exercised to insure that the manhole is not dropped or otherwise damaged through impacting with solid surfaces. The manhole shall be stored on a smooth surface, free of sharp objects, and if laid horizontally, shall be placed in such a way as to avoid structural damage to the inlet and outlet channels. Slinging will be accomplished using nylon or other fabric material. Under no circumstances shall cable or chain slings be used in direct contact with fiberglass surfaces. Site Preparation: The site shall be excavated wide enough to accommodate the manhole and to provide a safe working environment for workers. The contractor shall provide a level concrete slab as indicated on the project plans with smooth troweled surface. Pad elevation shall be as shown on the drawings, and positioned so that the invert of manhole piping matches that of the pipeline. Pad shall be fitted/drilled with 10 count, 1/2"- 13 NC , T-304 stainless steel (wedge) anchor bolts at the location indicated on the project plans, manufacture's shop drawings, and installation instructions. Unless specified otherwise by the manufacturer, the bolt circle diameter shall be 54". Placement and Final installation: Prior to manhole placement, the slab shall be cleaned of all sharp objects and debris, and the foam pad, supplied with unit, properly placed on slab. Neoprene boots supplied with unit, shall also be placed onto existing pipes before lowering manhole onto concrete slab. Packaged Metering Manhole shall be lowered onto slab and properly located on anchor bolts in accordance with the manufacturers' written instructions and recommendations. Slip neoprene boots with stainless steel clamps over pipe ends, and tighten clamps securely. Under no circumstances shall petroleum lubricants of any type be used to install boots. After placement on the foam pad, all anchor bolts shall be securely tightened to tie downs on packaged manhole, and the flume level shall be checked and adjusted as necessary. On larger units all open spaces under the flume shall be filled with grout to provide adequate structural support. 128 5/19120O6 ; 1:35 PM Rackfilling: Care shall be taken to avoid uneven backfill loads on the packaged manhole. Groundwater or surface water runoff shall not be allowed to accumulate in the open excavation around a manhole which has not been completely backfilled. Backill materials shall be placed evenly around the packaged manhole in maximum 12 inch. lifts. If materials other than pea gravel or sand are to be used as fill, there shall be no soil lumps or sharp objects such as rocks, concrete or other debris larger than 1 inch in size. All fill workwill he in compliance with local codes, and shall meet the inspection standards established herein for backfilled sewer trenches. Stable Soils: (Bearing capacity greater than 2000 lbs./sq. ft.) Native soil, 1/4" x 3/8" round aggregate gravel or sand shall be used as backfill material, and placed in accordance with the above specifications. See trench specifications for ASTM 232.1 requirements. Unstable Soils and High Water Tables: (Bearing capacity less than 2000/lbs./sq. ft.) Sand or 1/4" x 3/8" rounded aggregate, compacted, shall be used in unstable soils such as expansive clays, marsh and/or where the water table may be less than 5 ft. from finished grade. Selected backfill (same as established in trench/bedding detail for ASTM 2321, except for the round aggregate gravel or sand required in lieu of class IA and 1 B) shall be placed in maximum 12 inch lifts, a minimum of 24 inches surrounding the manhole, and compacted to 95% Standard Proctor. Density up to the flat brick ledge. Finish to Grade (for Street R/W .Installations): For concentric top ( eccentric preferred where available), contractor shall finish to grade using brick and mortar or precast concrete rings to construct chimney of required height. Mortar bed and first grade ring shall be firmly supported on flat, bearing shoulder of packaged manhole. Under no circumstances shall cast iron ring and cover be placed directly on the manhole. 129 5/19/2006 ; 1;3511M1 APPLICATION FORM CONTRACT FOR UTILITY SERVICE TO: THE CITY OF GASTONIA ENGINEERING DEPARTMENT We the undersigned applicant(s) do hereby request that the City of Gastonia enter into a contract for water distribution service, sanitary sewer service, water distribution and sanitary sewer service to the property owned by located on We fully understand that the formal contract for these utilities will require that: 1. All utility system construction will be done in accordance to City of Gastonia Standard Specifications and Details and the attached Development Requirements. 2. All utility system construction shall be done in accordance to the plans for such work as approved by the City of Gastonia Director of Engineering. 3. The applicant shall dedicate to the City of Gastonia, at no cost to the City, all public easements and rights -of -way deemed needed by the City for the maintenance of the public portion of the utility system. 4. Upon completion of the public utility system and the connection thereof to the appropriate City system, all water mains, sewer lines and any fire hydrants, valves, manholes, sewer lift stations, force mains, collector sewer lines, or any other appurtenances used in connection with said main or system shall thereupon and thereafter be the entire and sole property of City and under the sole and exclusive control of City. The City of Gastonia will accept for public maintenance only those public lines indicated in the approved plans. 5. The City of Gastonia shall have the right to enter upon the construction site at any time for the purpose of inspecting the construction or materials used in constructing the public portion of the utility systems. 6. Upon completion of the public utility system, the applicant shall provide to the City a video tape of any newly constructed sanitary sewer line(s) and perform tests on the public utility system. The applicant or his contractor under the supervision of the City of Gastonia Engineering Department personnel shall perform such tests. Tests performed shall include, but not be limited to, water pressure tests, water purity tests and sanitary sewer low-pressure air exfiltration tests. 7. The applicant shall maintain the current minimum insurance requirements during the construction of the public portion of the utility system(s) with the provision that the City will be given thirty (30) days written notice of any intent to terminate such insurance by either the applicant or the insuring company. A copy of the City's current insurance requirements is attached. Failure of the construction or utility systems to meet any or all of the above requirements will result in (1) the disconnection of the defective system from the City's utility system, or (2) correction of such defects. In either case the cost of such repairs or disconnection construction shall be the total expense of the applicant. 1 Y 7 **Please provide the following information.** 1. Name of Applicant(s) Proprietorship ❑ Partnership ❑ Corporation or Limited Liability ❑ Limited Liability Company Corporation 2. Address of Applicant(s) County: 3. Name and addresses of owners: (If different from above) 4. Name, address and phone number of person designated as applicant's agent for this contract: Name: Address: Phone Number: 5. Name of Project: 6. Location of Project: 7. Number and type of units to be served: WATER SEWER single family residential multi- family residential business commercial other specify 2 z 8. Name and address of contractor: Water Line Contractor: Name: Address: Sanitary Sewer Contractor: Name: Address: 9. Anticipated water consumption rate for project covered by this application: peak hourly rate gallons per minute total annual rate gallons per year 10. Anticipated sanitary sewer flow rate for project covered by this application: Average daily flows total annual rate gallons per day gallons per year 11. Estimated construction costs (attach detailed estimate: see note #1): $ offsite water system $ onsite water system $ offsite sewer system $ onsite sewer system $ pump station system 12. Estimated beginning and completion date of construction: water sewer beginning completion We, the applicants and owners, do hereby agree to be governed by all ordinances and regulations adopted or made by the City of Gastonia for the control, maintenance, and protection of its utility systems and services in force at the time said application is made or by such ordinance or regulation that might be adopted by the City of Gastonia subsequent to this application. Submitted this day of , 20 . Signature of Property Owner(s) or Applicant(s) BY: (Printed Name) (Title) Note: 1. If reimbursement of deposits or cost is anticipated, applicant must attach detailed construction cost estimates from one to three water and sewer contractors. (See item #11) 2. Attach reproducible 8Y2 x 14 drawings representing the plan view of utility systems covered by this application. 3. Attach full size copy of plans and specifications approved by the NC Department of Human Resources (water plans) and/or NC Department of Natural Resources and Community Development (sewer plans). FOR CITY OF GASTONIA STAFF REVIEW ONLY Construction Plans Approved Yes No NC Department of Human Resources Approval (water plans) Yes No N/A NC Department of Natural Resources and Community Development (sewer plans) Yes No N/A 8'/2 x 14 reproducible drawings submitted Yes No water Yes No N/A sewer Yes No N/A Application fee submitted Yes No Amount: $ Check No: Date: Reimbursement Basis 1. No reimbursement 2. Offsite construction 3. Other (specify) WATER SEWER 4 City of Gastonia Development Requirements 1. The proposed utilities, including any required fire hydrants, valves, manholes, sewer lift stations, force mains, collector sewer lines, or any other appurtenances necessary in connection therewith, shall be installed by Applicant if Applicant, under the laws of North Carolina, is permitted to make such installations, or by a contractor of Applicant licensed by the State of North Carolina to make such installations. All installations shall be made in accordance with the engineering plans, profiles and specifications for the proposed installation approved by the Director of Engineering / City Engineer of the City and subsequent approved revisions, a copy of which has been so endorsed as to such approval for the Applicant's use and is on file in the City Engineer's office. 2. The installation of the subject improvements shall be performed under the direction of the City Engineer's designated representative during construction. All work and materials must conform to the City's Standard Details and Specifications. The sub -grade / stone base must be inspected and approved by the City's inspector prior to placing stone / bituminous concrete pavement. 3. Upon completion of construction, Applicant shall provide to City for its review, a videotape of any newly constructed sanitary sewer line(s). Additionally, the connection of the subject utilities to the City systems shall not be permanently made or maintained until the same shall have been tested under supervision of and the written approval and acceptance of such installation given by the City's Director of Engineering / City Engineer. After such approval and acceptance, City shall thereafter repair and maintain the same, except for defects in workmanship or materials, or as a result of noncompliance with the plans and specifications therefor, appearing within one year after such acceptance which shall be the responsibility of and done at the sole expense of Applicant. 4. Applicant shall obtain, provide and furnish at Applicants expense, including attorney fees and recording fees, such perpetual rights -of -way or deeds to City as shall be specified by City for the construction, maintenance and operation of the subject utilities, including any encroachment agreements that might be required from the North Carolina Department of Transportation or any public utility. Applicant does hereby dedicate perpetual rights -of -way for public purposes as to those areas shown on Exhibit "A" hereto, for the construction, maintenance and operation of streets and utilities over, in, and on said rights -of -way and easements. 5. Upon completion of the subject utilities and the connection thereof to the appropriate City system, all water mains, sewer lines and any fire hydrants, valves, manholes, sewer lift stations, force mains, collector sewer lines, or any other appurtenances used in connection with said main or system shall thereupon and thereafter be the entire and sole property of City and under the sole and exclusive control of City. 6. Neither Applicant nor any other person shall be entitled to any service laterals from the main or line installed by Applicant except upon permission of City and the payment of any water meter and any other water and sewer tap fees required by any ordinances or regulations of City. Provided that the payment of water and sewer availability fees as defined in Chapter 14, Article II, Division 2, Section 14-145 (a) of the "City of Gastonia Code of Ordinances" for each service connection to the mains or lines installed by Applicant shall not be required for a period of fifteen years from the effective date of this Agreement, unless the service connection is to a main or line for which City reimbursed the applicant for an off -site reimbursement. 7. Applicant warrants that upon completion of the installation and construction of the subject utilities, the same, including any rights -of -way therefor, shall be free and clear of all claims or encumbrances of any person whatso ever. 5 8. Installation of the subject utilities shall be done and completed at the sole expense and responsibility of Applicant free and clear of all claims or encumbrances. Applicant shall be solely responsible that the subject utilities are installed in accordance with the plans, profiles, and specifications as approved by the City's Director of Engineering / City Engineer and subsequent approved revisions, and is on file in the City Engineer's office. 9. Applicant shall comply and be bound and governed by all zoning and subdivision ordinances and regulations of City now in existence or hereafter adopted that are applicable to the properties to be serviced by the utilities, and all ordinances and regulations of City now in existence or hereafter adopted, regarding the operation, control, maintenance and protection of the subject utilities of City, and it is expressly understood that the aforesaid compliance shall be a condition precedent to the acceptance and approval by City of the system. 10. In the event of the violation of any of the above agreements, City shall have the right to declare all or any of the rights of Applicant under this application forfeited and to refuse to connect or to remove and to disconnect any tap or connection made under this application, and shall thereafter, at its option, be relieved of any obligations to Applicant. 11. This application shall be binding upon the parties hereto and upon their respective successors and assigns; provided however, no assigmnent of this agreement shall be made without the prior written consent of the City of Gastonia and the payment of any applicable fees, charges or expenses in accordance with applicable City ordinances, policies and regulations. 6 City of Gastonia Insurance Requirements Applicant shall indemnify and hold harmless City from any and all loss, cost, damages, expense and liability (including attorney's fees) caused by accident or other occurrence resulting in bodily injury or property damage to any person or property arising from the installation of such improvements by applicant or the contractor of Applicant. Applicant or the contractor of applicant shall maintain the following insurance coverages during the construction of the utilities: (a) Worker's compensation coverage; (b) General Liability Insurance with a contractual coverage endorsement with a single limit of liability of $1,000,000.00 bodily injury and property damage; (c) Automobile Liability Insurance with limits of liability of not less than $1,000,000.00 per occurrence for bodily injury and $1,000,000.00 per occurrence for property damage. (d) Applicant shall name the City of Gastonia an additional insured on its general and automobile liability insurance policies, and a certificate of insurance to that effect shall be delivered to City. The applicant shall furnish certificates of such insurance to City with the provision that City will be given thirty day's written notice of any intent to terminate such insurance by either applicant or the insuring company. MasterApplicationForUtilityService File Folder: Forms 7 Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com MEMORANDUM Date: of final submittal To: project engineer Fr: construction inspector Re: Checklist for Project Title Pre -Construction: 1. Initial and date Pre -Construction Photos 2. Contractor has Change Order Form 3. Contractor has Pay Request Faun 4. Contractor has Survey Request Form 5. Survey will be performed by ❑ City, ❑ Consultant, ❑ Contractor General: 1. Flyers to adjacent property owner with Inspector and Project Engineer contact info. 2. Has contractor established staging area? 3. Approved materials list 4. Date construction started. 5. Date of Substantial Completion . 6. Punch list delivered to contractor 7. Punch list completed 8. As -Built plans Earthwork: 1. Erosion control installed as per plan (dates for phases). 2. Proof -roll date(s) Water: 1. Date WL construction started. 2. Has contractor potholed potential conflicts? 3. All restrained joint visually verified by inspector. Note dates on plans. 4. All blocking visually verified by inspector. Attach concrete ticket(s). 5. All bends tied to two fixed objects and noted on plans with date. 6. Pressure tests passed. Indicate testing dates 7. Attach water sample reports (signed & approved by TRU) 8. Email TRU that WL has been tested and meter installation may begin 9. Valve boxes and meters to grade 10. All valves checked open and 1/4 turn off stop. 11. FH paint, grease and grade 12. FH flow report to TRU (Mike Bynum) ewer; 1. Date San. Swr. Line construction started. 2. Has contractor potholed potential conflicts? 3. MH Frames to grade 4. Pressure tests passed. Indicate testing dates 5. All taps (wyes) and service lines approved. 6. Received television report and video from contractor. 7. San. Swr. Punch list to contractor 8. Punch list complete 9. As -Built plans verified 10. Email l'KU that San. Swr. has been tested and service connections may begin Has contractor potholed potential conflicts? All blocking visually verified by inspector. Attach concrete ticket . All restrained joint visually verified by inspector. Note dates on plans. Pressure tests passed. Indicate testing dates and station ranges on plans. Storm Drainage: 1. Date storm drain construction started 2. Steps Approved 3. Verify that Footings are correct thickness and size. 4. Has contractor potholed potential conflicts? 5. Check pipe for alignment (flash, lamp) 6. Check pipe for grade 7. Keyways installed per specification. Note dates on plans. 8. Verify dimensions of catch basins, head -walls and tail ditches 9. Filter fabric visually inspected before rip -rap placement 10. Verify that all RCP has been cleanly broken off in CBs ox JBs and masonry work completed with smooth face of pipe at wall. 11. Check CBs and RCP for debris. 12. Verify that all RCP has been broken off in CB and masonry work completed. 13. Check for required spillways, aprons, and rip -rap. Retain stone tickets with signatures. 14. Punch -list delivered to contractor 15. System complete. Asphalt: 1. Date roadway construction started. 2. All valveboxes and MH lids GPS'd and tied to two points out of road. 3. Approved JMFs posted for all types of asphalt on this job. ❑ base ❑ binder 0 surface 0 other 4. Soil base proof -rolled and stringline checked (50' max). Station range & date. 5. Stone base proof -rolled and stringline checked (50' max). Station range & date. Attach density reports if available. 6. Binder tickets audited and archived. Attach density reports 7. Binder Approved and stringline checked (50' max). 8. All valve boxes and MH lids raised with sound brick and mortar. 9. Surface tickets audited and archived. Attach density reports 10. Punch list to contractor 11. Asphalt complete Concrete: 1. Date concrete work startedApproved Concrete mixes posted for all types ❑ Sidewalk ❑ C&G hand ❑ C&G machine ❑ other 2. C&G Stringline approved (Approval of string line for forms is NOT a final approval) 3. All C&G drains properly to CB - 4. All C&G joints sawed properly, curing compound applied, all honeycomb repaired. 5. All driveway joints sawed properly (not greater than 8'x12'), curing compound applied, all honeycomb repaired 6. Punch list to contractor 7. Concrete work complete Slopes and Seeding: 1. All slopes and shoulders to design grades 2. Seed beds raked smooth and free of debris. 3. Seed tickets attached 4. Turf reinforcing mat per approved list. Installed per manufacturers recommendation. Staples or pegs. (circle one) 5. Tack applied per CoG/DOT specs. (if no hydro -tack) Closeout: 1. Notify Project Engineer of eminent walkthrough. (10 day internal claim request) 2. Flyers to adjacent property owners (10 day request for claims.) 3. Final walkthrough with Contractor, Design Engineer, Project Engineer, Chief Engineer (Dev. Svcs.), Chief Stakeholder (TRU, PW, Planning, etc.) 4. Punchlist delivered to contractor. Include property owner claims. 5. Punchlist complete 6. Final Pay request received. 7. Submit this package with final pay request. North Carolina Division of Water Quality PERCS Unit Quarterly Permit Report Delegated Municipality: City of Gastonia Year: 2012 Quarter:October - December Permit Date Design Flow Type of Treatment Plant Current Number Issued Permittee Project Description (gpd) Waste NPDES No. Status South Fork Catawba Regional Waste Water Improvements, Ph I - Fair St. 7605-S 11/20/2012 City of Gastonia 2682 If of 8" 52,470 Domestic Long Creek-NC0020184 Design Complete 7543-S 11/29/2012 Rosegate Subdivision Ph 3 A & B 995 If of 8" 8,520 Domestic Long Creek-NC0020184 Design Complete Daimler 7582-S 12/21/2012 Childress Klein Properties 316 If of 8" 2,500 Domestic Long Creek-NC0020184 Design Complete Total GPD this Qtr.: 63,490 Submit to NCDENR, Division of Water Quality, PERCS Unit,1617 Mail Service Center, Raleigh, NC 27699-1617 and your regional Division of Water Quality office. No copies of permits or plans are necessary. 1/15/2013 North Carolina Division of Water Quality PERCS Unit Quarterly Permit Report Delegated Municipality: City of Gastonia Year: 2012 Quarter:October - December Permit Date Design Flow Type of Treatment Plant Current Number Issued Permittee Project Description (gpd) Waste NPDES No. Status South Fork Catawba Regional Waste Water Improvements, Ph I - Kings Grant 7606-S 11/20/2012 City of Gastonia 266 If of 8" 64,440 Domestic Eagle Road: NC0006033 Design Complete Total GPD this Qtr.: 64,440 Submit to NCDENR, Division of Water Quality, PERCS Unit,1617 Mail Service Center, Raleigh, NC 27699-1617 and your regional Division of Water Quality office. No copies of permits or plans are necessary. 1/15/2013 North Carolina Division of Water Quality PERCS Unit Quarterly Permit Report Delegated Municipality: City of Gastonia Year: 2012 Quarter: July - September Permit Date Design Flow Type of Treatment Plant Current Number Issued Perinittee Project Description (gpd) Waste NPDES No. Status 7488-S 7/3/2012 Dollar General-MED Group, LLC 662 If of 8" 910 Domestic Long Creek-NC0020184 Design Complete Total GPD this Qtr.: 910 Submit to NCDENR, Division of Water Quality, PERCS Unit,1617 Mail Service Center, Raleigh, NC 27699-1617 and your regional Division of Water Quality office. No copies of permits or plans are necessary. 10/30/2012 Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com December 21, 2012 Jon Wilson Childress Klein Properties 2800 One Wells Fargo Center Charlotte, North Carolina 28202 Subject: Permit # 7582-S — 316 linear feet of 8" Sanitary Sewer to serve Daimler Dear Mr. Wilson: In accordance with your completed application dated December 20, 2012, we are forwarding herewith permit number 7582-S, dated December 21, 2012, to you for the construction of a sanitary sewer extension to serve Daimler. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. If any conditions or limitations contained in this permit are unacceptable to you, you have the right to appeal any such conditions to the office of the City Engineer within thirty days of issuance of said permit. Construction shall not commence prior to the issuance of a Notice to Proceed at the Pre -Construction Conference. Upon completion of the permitted extension,a certification must be received by the City of Gastonia, Engineering Division, from your Engineer certifying that the sanitary sewer system extension has been installed in accordance with the approved plans and specifications. The certification statement is on page two of this permit. Please return a copy of the permit with your Engineer's certification statement completed. The construction will not be accepted by the City until the certification statement is received. One (1) set of approved plans and specifications is being forwarded to you. If you need additional information concerning this matter, please contact Jamie Johnson at 704-866-6789. Sincerely, HORNE A. MARTIN, PE Assistant City Engineer CITY OF GASTONIA PERMIT For the discharge of Sewerage, Industrial Wastes, or other Wastes In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations for the Consolidated Water and Sanitary Sewerage System of the City of Gastonia. PERMISSION IS HEREBY GRANTED TO Childress Klein Properties FOR THE construction and operation of approximately 316 linear feet of 8" gravity sanitary sewer and 1 manhole to serve Daimler, pursuant to the completed application received December 20, 2012 and in conformity with the requirements of the Department of Natural Resources and Community Development. This permit shall be effective from the date of issuance until rescinded, and shallbe subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the facilities are constructed in accordance with the approved plans, specifications and other supporting data. 2. Construction of the sewers shall be so scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 3. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 4. The facilities shall be properly maintained and operated at all times. 5. This permit is not transferable. 6. Completion of construction and prior to acceptance and operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. This approval is given with the understanding that upon installation of such works, the project shall be dedicated to the City of Gastonia who will operate the installation of the best accepted practice and in accordance with the recommendations of the Division of Health Services. The official copies of plans and specifications accompanying this application have been sealed and stamped with the serial number of this application 7582-S. Only such plans and specifications are included in this approval and any erasures, additions or alterations of the proposed improvements will make up such approval null and void. PERMIT NO. 7582-S Assistant City Engineer DATE ISSUED: December 21, 2012 I, . as a duly registered Professional Engineer in the State of North Carolina hereby certify that construction of these permitted facilities has been completed within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date GRAVITY SEWER DESIGN CHECKLIST Review authority City of Gastonia Review #7582-S Review by: Thorne Martin NCP.E. NO. 16826 Project title Daimler Date: 12/21/2012 Check for left blank if minimum requirements not met and provide comments 1). Total length of sewer pipe (by Diameter size): Diameter (inch) Length (lineal feet) 8 316 Total 316 2). Type of pipe material: PVC 3). Wastewater strength (domestic, etc.): Domestic 4). Total number of manholes: 1 5). Invert elevations given: YES 6). Sewer reach - per Diameter: 8 inch max. slope: 8.10 % max. flow rate: 2.22 MGD max. velocity: 9.86 fps min. slope: 8.10 7). Proposed average daily flowrate: 2500 GPD Proposed peak daily flowrate: 6250 GPD 8). Adequate horizontal /vertical separation provide for: storm sewer YES (12 inch vert. min) water main YES (18 inch vert. min) water main YES (10 feet horizontal min) benched trench YES . (18 inch vert. min) other utilities If no, explain: 9). Pipe cover greater than or equal to three (3) feet: YES If no, explain: 10). Are there any wells within 100 feet of the proposed sewer? NO Daimler Designcklist 11). Construction /permanent Right-of-way indicated: YES 100-years flood elevations of adjacent stream given: N/A manholes top elevations given: YES 12). Maximum sewer reach length between manholes: 316 Can. owner/authority clean this length: YES 13). Manhole specifications given: YES Adequate manhole foundation: YES Shear support for pre-fab manholes: YES Drop manholes required: NO (invert separation greater than 2.5 feet) Number of drop manholes: Location of drop manholes: 14). Pipe bedding and backfill specifications adequate: YES Installation methods specified adequate: YES Water tight pipe connections and joints: YES Adequate support for aerial sewers provided: N/A 15). Infiltration/Exfiltration test rate specified YES 100 GPD/in Maximum rate specified: 100 GPD per inch diameter per mile length 16). Does construction, relocation, or rehabilitation of proposed sewers require maintaining service of existing utilities? YES Adequate bypass provisions: YES (no surface -water discharge) 17). All sheets of plans signed/sealed by NC P.E.: YES 18). Other comments: I hereby certify that the subject project has been reviewed in accordance with Division of Environmental Management Guidelines for Gravity Sanitary Sewer. CATI° •''e ®a_ ', •Reviewer's •signature • 16 (4&4' Z— Z 7— ASTONI1 NC Great Place. Great People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com July 3, 2012 David Hoyle, Jr. MED Group, LLC PO Box 2494 Gastonia, North Carolina 28053 Subject: Permit # 7488-S — 662 linear feet of 8" Sanitary Sewer to serve Dollar General Dear Mr. Hoyle: In accordance with your completed application dated June 28, 2012, we are forwarding herewith permit number 7488-S, dated July 3, 2012, to you for the construction of a sanitary sewer extension to serve Dollar General. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. If any conditions or limitations contained in this permit are unacceptable to you, you have the right to appeal any such conditions to the office of the City Engineer within thirty days of issuance of said permit. Construction shall not commence prior to the issuance of a Notice to Proceed at the Pre -Construction Conference. Upon completion of the permitted extension, a certification must be received by the City of Gastonia, Engineering Division, from your Engineer certifying that the sanitary sewer system extension has been installed in accordance with the approved plans and specifications. The certification statement is on page two of this permit. Please return a copy of the permit with your Engineer's certification statement completed. The construction will not be accepted by the City until the certification statement is received. One (1) set of approved plans and specifications is being forwarded to you. If you need additional information concerning this matter, please contact Jamie Johnson at 704-866-6789. Sincerel THORNE A. MARTIN, PE Assistant City Engineer CITY OF GASTONIA PERMIT For the discharge of Sewerage, Industrial Wastes, or other Wastes In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations for the Consolidated Water and Sanitary Sewerage System of the City of Gastonia. PERMISSION IS HEREBY GRANTED TO MED Group, LLC FOR THE construction and operation of approximately 662 linear feet of 8" gravity sanitary sewer and 4 manholes to serve Dollar General, pursuant to the completed application received June 28, 2012 and in conformity with the requirements of the Department of Natural Resources and Community Development. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the facilities are constructed in accordance with the approved plans, specifications and other supporting data. 2. Construction of the sewers shall be so scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 3. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 4. The facilities shall be properly maintained and operated at all times. 5. This permit is not transferable. 6. Completion of construction and prior to acceptance and operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. This approval is given with the understanding that upon installation of such works, the project shall be dedicated to the City of Gastonia who will operate the installation of the best accepted practice and in accordance with the recommendations of the Division of Health Services. The official copies of plans and specifications accompanying this application have been sealed and stamped with the serial number of this application 7488-S. Only such plans and specifications are included in this approval and any erasures, additions or alterations of the proposed improvements will make up such approval null and void. PERMIT NO. 7488-S DATE ISSUED: July 3, 2012 THORNE A. MARTIN, PE Assistant City Engineer I� . as a duly registered Professional Engineer in the State of North Carolina hereby . certify that construction of these permitted facilities has been completed within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date GRAVITY SEWER DESIGN CHECKLIST Review authority City of Gastonia Review #7488-S Review by: Thorne Martin NCP.E. NO. 16826 Project title: MED Group, LLC Date: 7/3/2012 Check for left blank if minimum requirements not met and provide comments 1). Total length of sewer pipe (by Diameter size): Diameter (inch) Length (lineal feet) 8 662 Total 662 2). Type of pipe material: PVC, DIP 3). Wastewater strength (domestic, etc.): Domestic 4). Total number of manholes: 4 5). Invert elevations given: YES 6). Sewer reach - per Diameter: 8 inch max. slope: 10.00 % max. flow rate: 2.47 MGD max. velocity: 10.95 fps min. slope: 1.01 % 7). Proposed average daily flowrate: 910 GPD Proposed peak daily flowrate: 2275 GPD 8). Adequate horizontal /vertical separation provide for: storm sewer water main water main benched trench other utilities If no, explain: 9). Pipe cover greater than or equal to three (3) feet: YES If no, explain: 10). Are there any wells within 100 feet of the proposed sewer? MED Group Designcklist.xls YES (12 inch vert. min) YES (18 inch vert. min) YES (10 feet horizontal min) YES (18 inch vert. min) NO 11). Construction /permanent Right-of-way indicated: 100-years flood elevations of adjacent stream given: YES YES manholes top elevations given: 12). Maximum sewer reach length between manholes: YES Can owner/authority clean this length: 3YES 13). Manhole specifications given: YES YES Adequate manhole foundation: Shear support for pre-fab manholes: YES Drop manholes required: YES (invert separation greater than 2.5 feet) YES Number of drop manholes: 2 Location of drop manholes: PMH 1, PMH 2 14). Pipe bedding and backfill specifications adequate: YES Installation methods specified adequate: YES Water tight pipe connections and joints: YES Adequate support for aerial sewers provided: N/A 15). Infiltration/Exfiltration test rate specified: YES 100 GPD/in Maximum rate specified: 100 GPD per inch diameter per mile length 16). Does construction, relocation, or rehabilitation of proposed sewers require maintaining service of existing utilities? YES Adequate bypass provisions: YES (no surface water discharge) 17). All sheets of plans signed/sealed by NC P.E.: YES 18). Other comments: I hereby certify that the subject project has been reviewed in accordance with Division of Environmental Management Guidelines for Gravity Sanitary Sewer. `,,,,,u u.yy Y 1 '• a SEAL 16826 • = A4,4.1GINEO.:(1/4*/ J� Reviewer's signature t-,( 0 6 Zo/ z Great Place. Great -People. Great Promise. Engineering Standards P.O. Box 1748 • Gastonia, NC 28053-1748 • Phone: 704.866.6022 • Fax: 704.854.6654 www.cityofgastonia.com November 29, 2012 Robert B. Bowman Bowman Development Group, Inc. 13815 Cinnabar Place Huntersville, North Carolina 28078 Subject: Permit # 7543-S - 995 linear feet of 8" Sanitary Sewer to serve Rosegate Subdivision Phase 3 A & B Dear Mr. Bowman: In accordance with your completed application dated November 21, 2012, we are forwarding herewith permit number 7543-S, dated November 29, 2012, to you for the construction of a sanitary sewer extension to serve Rosegate Subdivision Phase 3 A & B. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. If any conditions or limitations contained in this permit are unacceptable to you, you have the right to appeal any such conditions to the office of the City Engineer within thirty days of issuance of said permit. Construction shall not commence prior to the issuance of a Notice to Proceed at the Pre -Construction Conference. Upon completion of the permitted extension, a certification must be received by the City of Gastonia, Engineering Division, from your Engineer certifying that the sanitary sewer system extension has been installed in accordance with the approved plans and specifications. The certification statement is on page two of this permit. Please return a copy of the permit with your Engineer's certification statement completed. The construction will not be accepted by the City until the certification statement is received. One (1) set of approved plans and specifications is being forwarded to you. If you need additional information concerning this matter, please contact Jamie Johnson at 704-866-6789. Sincerely, THORNE A. MARTIN, Assistant City Engineer CITY OF GASTONIA PERMIT For the discharge of Sewerage, Industrial Wastes, or other Wastes In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations for the Consolidated Water and Sanitary Sewerage System of the City of Gastonia. PERMISSION IS HEREBY GRANTED TO Bowman Development Group, Inc. FOR THE construction and operation of approximately 995 linear feet of 8" gravity sanitary sewer and 9 manholes to serve Rosegate Subdivision Phase 3 A 86 B, pursuant to the completed application received November 21, 2012 and in conformity with the requirements of the Department of Natural Resources and Community Development. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the facilities are constructed in accordance with the approved plans, specifications and other supporting data. 2. Construction of the sewers shall be so scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 3. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 1 40.41, 4. The facilities shall be properly maintained and operated at all times. 5. This permit is not transferable. 6. Completion of construction and prior to acceptance and operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. This approval is given with the understanding that upon installation of such works, the project shall be dedicated to the City of Gastonia who will operate the installation of the best accepted practice and in accordance with the recommendations of the Division of Health Services. The official copies of plans and specifications accompanying this application have been sealed and stamped with the serial number of this application 7543-S. Only such plans and specifications are included in this approval and any erasures, additions or alterations of the proposed improvements will make up such approval null and void. PERMIT NO. 7543-S Assistant City Engineer DATE ISSUED: November 29, 2012 I, . as a duly registered Professional Engineer in the State of North Carolina hereby certify that construction of these permitted facilities has been completed within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date GRAVITY SEWER DESIGN CHECKLIST Review authority City of Gastonia Review #7543-S Review by: Thorne Martin NCP.E. NO. 16826 Project title Rosegate Ph 3a/b Check for left blank if minimum requirements not met and provide comments 1). Total length of sewer pipe (by Diameter size): Diameter (inch) Length (lineal feet) 8 995 Total 995 2). Type of pipe material: PVC, DIP 3). Wastewater strength (domestic, etc.): 4). Total number of manholes: 5). Invert elevations given: 6). Sewer reach - per Diameter: max. slope: max. flow rate: max. velocity: min. slope: 7). Proposed average daily flowrate: Proposed peak daily flowrate: 8). Adequate horizontal /vertical separation storm sewer YES water main YES water main YES benched trench . YES other utilities If no, explain: 9). Pipe cover greater than or equal to three (3) feet: YES If no, explain: 10). Are there any wells within 100 feet of the proposed sewer? NO Rosegate 3ab Designcklist Date: 11/29/2012 Domestic 9 YES 8 inch 6.75 % 2.03 MGD 9.00 fps 0.60 % 8520 GPD 21300 GPD provide for: (12 inch vert. min) (18 inch vert. min) (10 feet horizontal min) (18 inch vert. min) 11). Construction /permanent Right-of-way indicated: YES 100-years flood elevations of adjacent stream given: N/A manholes top elevations given: YES 12). Maximum sewer reach length between manholes: 215.38 Can owner/authority clean this length: YES 13). Manhole specifications given: YES Adequate manhole foundation: YES Shear support for pre-fab manholes: YES Drop manholes required: NO (invert separation greater than 2.5 feet) Number of drop manholes: Location of drop manholes: 14). Pipe bedding and backfill specifications adequate: YES Installation methods specified adequate: YES Water tight pipe connections and joints: YES Adequate support for aerial sewers provided: N/A 15). Infiltration/Exfiltration test rate specified YES 100 GPD/in Maximum rate specified: 100 GPD per inch diameter per mile length 16). Does construction, relocation, or rehabilitation of proposed sewers require maintaining service of existing utilities? YES Adequate bypass provisions: YES (no surface water discharge) 17). All sheets of plans signed/sealed by NC P.E.: YES 18). Other comments: I hereby certify that the subject project has been reviewed in accordance with Division of Environmental Management Guidelines for Gravity Sanitary Sewer. lilt CA/4 i �Q -�{.7 16826 /\Reviewer's signature 1 4. The facilities shall be properly maintained and operated at all times. 5. This permit is not transferable. 6. Completion of construction and prior to acceptance and operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. This approval is givenwith the understanding that upon installation of such works, the project shall be dedicated to the City of Gastonia who will operate the installation of the best accepted practice and in accordance with the recommendations of the Division of Health Services. The official copies of plans and specifications accompanying this application have been sealed and stamped with the serial number of this application 7384-S. Only such plans and specifications are includedin this approval and any erasures, additions or alterations of the proposed improvements will make up such approval null and void. PERMIT NO. 7384-S DATE ISSUED: May 7,2012 THORNE A. MARTIN; PE Assistant City Engineer I, AIIC. M- 6 I,' - , as a duly registered Professional Engineer in the State of North Carolina hereby certify that construction ofthese permitted facilities has been completed within substantial compliance and intent of the ap•roye• plans and specifications. Signature Registration No. O 3 0 351 Date of ' I ' Z6.13 CITY OF GASTONIA PERMIT For the discharge of Sewerage, Industrial Wastes, or other Wastes In accordance withthe provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations for the Consolidated Water and Sanitary Sewerage System of the City of Gastonia. PERMISSION IS HEREBY GRANTED TO MED Group, LLC FOR THE construction and operation of approximately 662 linear feet of 8" gravity sanitary sewer and 4 manholes to serve Dollar General, pursuant to the completed application received June 28, 2012 and in conformity with the requirements of the Department of Natural Resources and Community Development. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the facilities are constructed in accordance with the approved plans, specifications and other supporting data. 2. Construction of the sewers shall be so scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 3. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 4. The facilities shall be properly maintained and operated at all times. 5. This permit is not transferable. 6. Completion of construction and prior to acceptance and operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. This approval is given with the understanding that upon installation of such works, the project shall be dedicated to the City of Gastonia who will operate the installation of the best accepted practice and in accordance with the recommendations of the Division of Health Services. The official copies of plans and specifications accompanying this application have been sealed and stamped with the serial number of this application 7488-S. Only such plans and specifications are included in this approval and any erasures, additions or alterations of the proposed improvements will make up such approval null and void. PERMIT NO. 7488-S Assistant City Engineer DATE ISSUED: July 3, 2012 7". CAR I ��o, ''�ssio0 AL Jl97IFOvtf17 - . as a duly registered Professittleitfigineer in the State of North Carolina hereby . certify that construction of these permitted facilities has been completed within substantial compliance and intent of the approved plans and specifications. Registration No. l6 036' Date /d// Z/T_ / /